RC-000231-2016 TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building& Codes (518)761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: RC-000231-2016 Date Issued: Tuesday, June 13, 2017
This is to certify that work requested to be done as shown by Permit Number RC-000231-2016
has been completed.
Tax Map Number: 308.11-149.21
Location: 375 LUZERNE RD
Owner: Gregory Garafalo,Regina Garafalo
Applicant: Gregory Garafalo
This structure may be occupied as a: 1592 s.f SFD w/2 car att.garage
May 6,2016 Paid$50 to renew permit for one year until May 6,2017 By Order of Town Board
TOWN OF QUEENSa11RY
Issuance of this Certificate of Occupancy DOES NOT relieve the r
property owner of the responsibility for compliance with Site Plan,
Variance,or other issues and conditions as a result of approvals by the
Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building&Codes (518)761-8256
BUILDING PERMIT
Permit Number: RC-000231-2016
Tax Map No: 308.11-149.21 REVISED
Permission is hereby granted to: Regina Garafalo,Gregory Garafalo
For property located at: 375 LUZERNE RD
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance
Type of Construction
Owner Name: Gregory Garafalo Single Family-New $150,000.00
Owner Address: 375 Luzeme RD Total Value $150,000.00
Queensbury,NY 12804
Contractor or Builders Name/Address Electrical Inspection Agency
Plans&Specifications
1592 s.f SFD w/2 car att.garage
$0.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday,April 29,2016
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town of eens n /�'huA
015
SIGNED BY: f_jyj!('/ /aJfor the Town of Queensbury.
Directory oofffBuilding&Code Enforcement
PRINCIPAL STRUCTURE APPLICATION (� p�� Office Use Only
, --, 4.DATE NOVe ber I 2,0 ' LuiP L5 I Recei10
Tax Map ID 30s, l( 3. a1
TAX MAP ID C7 . i 1 -I — • ," I APR 2 3 201[Permit NO' 02O/3
Permit Fe 40`x^ Vd
ZONING OWN OF QUEE Rec Fee 'rj
BUILDIN(' ? r Site Plan'
HISTORIC SITE Yes /No Subdivision# '$ Ie-olUa
�� (0- 4P sb3
SUBDIVISION NAME �71R 6I J i CO Lot# `J�,1 �h c----- - � �` �
W 9- opo "St6 9-fid /d
TOWN BD.RESOLUTION 86-2013: $850 RECREATION FEE FOR NEW DWELLING UNITS,INCLUDING SINGLE FAMILY DWELLINGS,DUPLEXES
OR TWO FAMILY DWELLINGS, MULTIPLE FAMILY DWELLINGS, APARTMENTS, CONDOMINIUMS, TOWNHOUSES, AND/OR MANUFACTURED &
MODULAR HOMES, BUT NOT MOBILE HOMES. THIS IS IN ADDITION TO THE PERMIT FEE.
APPLICANT Gre a ra-(6110 OWNER CI re) Cara T ca /O
ADDRESS 5 l I I-U -z er n e RGI( ADDRESS 37I-�z.erne I RG1
Queer'tsbi ry f N• Y C (.lev, 5 1 it -y N. Y
PHONE/E-MAIL 56 361 4 - c Z 8 3 ce I) PHONE/E-MAIL 51 g q - 9 z S
•
CONTRACTOR G(Pctl G a r a f it t , COST OF CONSTRUCTION(ESTIMATED): $ /5-- Ca
ADDRESS: 311 LLer rt C1 BUILDING ADDRESS: S75
U Lu Ler ii Q_ Rd
QLIPPncbury , N • Y. 513F-d-c)101-
-
-11
16
PHONE/E-MAIL f 917 - c z d
CONTACT PERSON FOR BUILDING& CODES COMPLIANCE: Gr el L-a ri (c& to PHONE 79 dark L,
TYPE OF CONSTRUCTION
Check all that apply Please indicate measurements as required below
New Addition Alteration 1St floor sq. ft. 2nd floor sq. ft. Total sq.ft. Height
Single Family V/ LI 9.j , 651 150
Two-Family
Multi-Family
(# of units )
Townhouse
Business Office
Retail - Mercantile
Factory- Industrial
-
Attached Garage /
(# of ' ) X1 'v' 576 ±-_,- 7(, 1 E2.3
Other
1
Town of Queensbury Building&Codes Principal Structure Application July 2014
Town of Queensbury Thomas R. Van Ness
Highway Department Highway Superintendent
742 Bay Road, Queensbury, NY 12804 Home: (518) 745-0929
Phone: (518) 761-8211
Fax: (518)745-4466 David Duell
Deputy Highway Superintendent
Home: (518) 745-0938
DRIVEWAY PERMIT e)/5 //
Date:
Applicant Name: ( i2j /4-12-464u3
Telephone No.: c/c3 —gq'f -yt,93
Address to Be Inspected: 375 E-aZt iO Qitu'2,Yi I✓//Z?
Return Address: .57J Luz&2rnC ti / tJ / /2-&-)c(
Applicant must show exact location and width of driveway(s) to be connected to the highway by
placing stakes at the specified location.
The Superintendent of Highways of the Town of Queensbury has reviewed this application. The
following action has been taken:
STEP 1: ( ) Preliminary approval
NEED ( ) Slight Swale
( ) Deep Swale
( ) Level with the road
( ) Level with the top of the paved wing
Size culvert pipe to be used (if necessary)
( ) 12" ( ) 15" ( ) 18" ( ) 24" ( ) 36"
Preliminary inspection completed by: Date:
Approval by Highway Supt.: (or) Deputy Supt.:
Upon completion please resubmit this approval permit for a final approval.
STEP 2: ( ) Final Approval ( ) Rejected
Date:
Thomas R. Van Ness, Highway Superintendent David Duell, Deputy Highway Superintendent
7
Town of Queensbury Building&Codes Principal Structure Application July 2014
SEPTIC DISPOSAL PERMIT
AprilOffice Use Only
DATE Lf , 7-016"-- Received
Tax Map ID
TAX MAP ID Og. 11- 1 ---0, 2-I Permit No.
Permit Fee
LOCATION OF INSTALLATION 37 S Latzer n GRef- Approvals:
APPLICANTPHONE/E-MAIL F9 i+ - ']z g3
4204
ADDRESS Z Zi''Yl e, Koct G j
INSTALLER/BUILDER: PHONE/E-MAIL
ADDRESS:
OWNER PHONE/E-MAIL
Address
CONTACT PERSON FOR BUILDIpVG&CODES COMPLIANCE: PHONE
RESIDENCE INFORMATION
Year Built #of bedrooms X Gallons per bedroom =Total Daily Flow
1980 or older Garbage grinder installed YEN V
1981-1991 Spa or Hot Tub installed _Y N
1992-Present 3 10 330
PARCEL INFORMATION /
Topography V Flat rolling _Steep slope %slope
Soil Nature IC Sand Loam Clay Other
, Groundwater At what depth? nO tvAtER
Bedrock/Impervious Material At what depth? t.1/A
Domestic Water Supply /Municipal Well(if well,water supply from any septic system absorption is ft.)
Percolation Test Rate: 5 7 per minute per inch(test to be completed by licensed engineering/architect)
PROPOSED SYSTEM FOR NEW CONSTRUCTION
Tank Size ICVO gallons(minimum size 1,000 gallons,add 250 gallons to size for each garbage grinder or spa or hot tub)
System Type Absorption field with#2 stone Total length ) O ft.;Each trench 915 x i
Seepage Pit with#3 stone How many: •size
Alternative System Bed or other type?
Holding Tank System Total required capacity? Tank size #of tanks _T
Notes: 1)Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency;2)We will no longe
allow systems to be covered until such time as an As-Built plan Is received&approved. The installed system must match the septic systen
I .
•
Y,f N / NA Residential Plan Review: One & Two Family Dwellings
�/ Two (2) full sets of plans
Over 1,500 sq. ft. requires engineering stamp
Design loads on plans: 90 Wind Floor Loads 40 psf
(north of Rt. 149 60) 50 Ground Snow Load Sleeping Areas & Attics 30 psf
/ Calculations
Y Window schedule with glass size
Door schedule / Main entrance 36" door
Emergency Escape or Bedrooms and Habitable Space
/1 Above / Below grade: 5.7 sq. ft.
Y Grade: 5.0 sq. ft.
24" (h) x 20" (w) minimum
44" maximum height above door
Desidential: Check paperwork compliance and Inspection checklist -Okay
riveway length: 300' or more -12' width required / 500' or more -turnaround required
Foundation insulation to basement floor
frDamp proofing / Waterproofing materials on plans
Foundation drainage on plans, if required
6" drop in 10' Exterior grade
7 Framing cross section for each roof line, Vertical fire stopping every 10' where required
Ice & Snow Shield -24" inside exterior wall / 24" inside knee walls
.Z✓ Platforms at exterior doors
Stairway headroom 6'8"; all stairs 36" width
talr Run and Rise
finder Run and Rise
Spiral not allowed from 2nd story
17- Smoke Detectors -battery backup and proper location interconnected
Bathroom fixtures -proper clearance
d Hall width -36" width
Handrails more than four risers on open sides
✓ Railing & Guards + 30" / Basement stairs included / Closed risers more than 4" in height
Safety glazing notes for required areas
Garage fire separation
Garage floor sloped
Attic access
/Roof over 30" -22" x 30" / Crawl spaces 18" x 24" access
Carbon Monoxide detector outside lowest sleeping area, on every level & interconnected within 15'
/Sf sleeping area
oil Test results, if required
Septic to well or water line separation
All paperwork signed
7 Note on plans energy saving light bulbs
/glower door test agency paperwork
7 K Floodplain Permit Required -Check Map
Truss ID Signage
Residential Plan Review -1 & 2 Family Dwellings 1-5-2015
Town of Queensbury Building & Code Enforcement V\!i6t
Office No. (518) 761-8256 g—I
Framing I Firestopping Inspection Report
Inspection request�receiivedd: 11 1'\Z-► \ 2S I
Name: N?9IP Inspected on: x`22 1?-0-1'S
Location: '5 )/rQI Arrive: ' \ i110 a.m./p.m.
Permit No.: "" l Inspector's Initials: or
w�
TYPE OF STRUCTURE:
Y/ N NIA COMMENTS:
tq Framing
Attic Access 22"x 30"minimum Jack Studs/Headers a/ 9Cl— 6��0
l/(Fil
Truss Specification Provided 'VV
Bracing/Bridging
Joist hangers Vr
Jack Posts/Main Beams V
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft.8 in.
Stairwells 36 in.or more
Exterior Deck Bracing
Headroom 6 ft.8 in.
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
1 %(w)16 gauge(8) 16D nails each side
Draft stopping 1,000 sq.ft.floor trusses
Anchor Bolts 6 ft.or less on center
Ice and water shield 24 inches from wall
Fire separation 1,2,3 hour
Fire wall 2,3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side 1/2 inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in.(H)
20 in.(W)
5.7 sf above/below grade
5.0 sf grade
Design Professional Sign-off,if required
Framing / Firestopping Inspection Report
YV
iQ
Foundation Inspection Report
Office No. (518) 761-8256 Date Inspection request received: A\'2-112,0A5
Queensbury Building&Code Enforcement Arrive: am/pm Depa a pm
742 Bay Rd., Queensbury,NY 12804 Inspector's Initials:(/�
NAME: PERMIT#: 5 —1\6
LOCATION: 75+5 L - t Q INSPECT ON: 1''22` -2.0,15
TYPE OF STRUCTURE:
Comments
Y_ N N/A
Footings _. j r,,„
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Reinforcement in Place
Footing Dowels or Keyway in place
Foundation Dampproofing
Foundation Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:\Building &Codes Forms\Building &Codes\Inspection Forms\Foundation Inspection Report.doc
Last printed 12/9/2014
Town of Queensbury Building & Code Enforcement
Office No. (518) 761-8256
Framing I Firestopping Inspection Report
Inspection request received:
Name: Lv � Inspected on: ‘4<\'A--
Location:
4<\'ALocation: L.L 54.2Arrive: t a.m./p.m.
Permit No.: �, ¶ 15,7) Inspector's Initials:
TYPE OF STRUCTURE: J J
Y N NIA COMMENTS:
Framing
Attic Access 22"x 30"minimum
Jack Studs/Headers
Truss Specification Provided
Bracing/Bridging
Joist hangers
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft.8 in.
Stairwells 36 in.or more
Exterior Deck Bracing
Headroom 6 ft.8 in.
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
1 1/2(w)16 gauge(8)16D nails each side
Draft stopping 1,000 sq.ft.floor trusses
Anchor Bolts 6 ft.or less on center
Ice and water shield 24 inches from wall r .
Fire separation 1,2,3 hour
Fire wall 2,3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side 1/2 inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in.(H)
20 in.(W)
5.7 sf above/below grade
5.0 sf grade
Design Professional Sign-off,if required
Framing /Firestopping Inspection Report
Town of Queensbury Building & Code Enforcement
Office No. (518) 761-8256
Framing I Firestopping Inspection Report
Inspection request received:
Name: , �7� Inspected on: L I l� `4\
Location:
�Z� �> (21) Arrive: a.m.l p.m.
Permit No.: 1, 31 Inspector's Initials:
TYPE OF STRUCTURE:
Y N NIA COMMENTS:
Framing
Attic Access 22"x 30"minimum
Jack Studs/Headers
Truss Specification Provided
Bracing I Bridging
Joist hangers
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft.8 in.
Stairwells 36 in.or more
Exterior Deck Bracing
Headroom 6 ft.8 in.
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
1 1/2(w)16 gauge(8) 16D nails each side
Draft stopping 1,000 sq.ft.floor trusses �.
Anchor Bolts 6 ft.or less on center
Ice and water shield 24 inches from wall
Fire separation 1,2,3 hour
Fire wall 2,3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side%inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in.(H)
20 in.(W)
5.7 sf above/below grade
5.0 sf grade
Design Professional Sign-off,if required
Framing / Firestopping Inspection Report
Town of Queensbury Building & Code Enforcement
Office No. (518) 761-8256 ( '
Framing I Firestopping Inspection Report
Inspection request received: -4161-2-4:A5
Name: r Inspected on: 1-104 .2,
Location: Z .-14tCa ng__CL 1. Arrive: AlEZ a.m.1 p.m.
Permit No.: 190-11$ Inspector's Initials: Row
,LL'
TYPE OF STRUCTURE: S
Y N NIA COMMENTS:
Framing
Attic Access 22"x 30"minimum
Jack Studs/Headers 61Y g l l r � �
Truss Specification Provided
Bracing/Bridging
Joist hangers
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft.8 in.
Stairwells 36 in.or more
Exterior Deck Bracing
Headroom 6 ft.8 in.
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
1 1/2(w)16 gauge(8)16D nails each side
Draft stopping 1,000 sq.ft.floor trusses
Anchor Bolts 6 ft.or less on center
Ice and water shield 24 inches from wall
OV
Fire separation 1,2,3 hour
Fire wall 2,3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side 1/2 inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in.(H)
20 in. (W)
5.7 sf above/below grade
5.0 sf grade
Design Professional Sign-off,if required
Framing/ Firestopping Inspection Report
"'1O
Foundation Inspection Report (Sv&,v �es-
Office No. (518) 761-8256 Date Inspection request received: 5 2`11,\`�
Queensbury Building&Code Enforcement Arrive: am/pm Depart• m/pm
742 Bay Rd., Queensbury,NY 12804 Inspector's Initials:
NAME: E ,ro o PERMIT#: � � \16
LOCATION: 1 vu,Vet. INSPECT ON: '10l ` 2 CZA
TYPE OF STRUCTURE:
Comments
N N/A idle 3b\_ 2,rnto
Footings
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Reinforcement in Place
Footing Dowels or Keyway in place
Foundation Dampproofing
Foundation Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
( Plumbing Under Slab Of
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:\Building&Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc
Last printed 12/9/2014
Town of Queensbury Building & Code Enforcement li\- jN
Office No. (518) 761-8256 13
Framing I Firestopping Inspection Report
Inspection request received: 511 5,13
Name: C7IC..vc��al,p Inspected on: 5 V2'Q'i�
Location: 59- 1—la, . Arrive: /_-P a.m.I p.m.
Permit No.: r-D —11 b Inspector's Initials:
TYPE OF STRUCTURE: Sep
Y N N/A COMMENTS:
Framing
Attic Access 22"x 30"minimum \
Jack Studs/Headers • JJ 5(0A,-2`Te)
Truss Specification Provided
Bracing/Bridging
Joist hangers
Jack Posts/Main Beams
Exterior sheeting nailed properly -;-‘(%(.Z
roperly <z= . G�
12"O.C. �/ `�
Headroom 6 ft.8 in.
Stairwells 36 in.or more
Exterior Deck Bracing ��
ady
Headroom 6 ft.8 in.
Notches/Holes/Bearing Walls p4,4
Metal Strapping for Notches Top Plate
1 '/2(w) 16 gauge(8) 16D nails each side
Draft stopping 1,000 sq.ft.floor trusses
Anchor Bolts 6 ft.or less on center
Ice and water shield 24 inches from wall
Fire separation 1,2,3 hour
Fire wall 2,3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side 1/2 inch or 5/8 inch Type X
Garage side 5/8 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in.(H)
20 in.(W)
5.7 sf above/below grade
5.0 sf grade
Design Professional Sign-off,if required
Framing / Firestopping Inspection Report
COMMONWEALTH ELECTRICAL INSPECTION SERVICE,INC.
Main Office 176 Doe Run Road-Manheim,PA 17545
MUNICIPAL CERTIFICATE - ELECTRICAL APPROVAL
�" '1 ' �`'p�� 44923
Pemut No.................................... ..Cert. Q Cut-in Card No.....................................
Owner..........--77 c....5 t4!�.�...-/��. 2. ........c..................................................../...�......................�.....
Location.3..:(. .... ,�.`/4"'../.-N.... .... y.......7.......... ..............................6.Z2i!�4?. t, .......
Installation Consistingo .Y, ` ,[ S :...-� ..Li....-.....
�.. .....................
7.. 7.... '. ,r..?..11 .. .A..;Su 8....P .......................................
........................................�..j.j.�]. ................. ...............................................................
InstalledBy........ ../.Y.!.:.".��..........................................................Lic.No...................................................
The conditions following governed the issuance of this certificate,and any certificate previously issued is
cancelled:-
This certificate only covers the electrical equipment and installation conditions as of date. Upon the
introduction of additional equipment or alterations,application shall be pr made for inspection.
Inspectors of this Company shall have the privilF..
ng i --tion at any time, and if its
rules are violated,the Company shall have the right-toDate.... .. ..` /............... INSPECTOR................. .............................................. ..............
Member N.F.P.A.,I.A.E.1.
3'7 5 U Z er n e_ N�o,&
32' "
i
i
i'
i
3-7 ' '
30 ' 37'
JUN 0 ; 2017
So'
i
Se��� c as buiH-
L 37� �uzcvnc �Q
6 '
b " G
air : O�a,r lie
1000 9ALLU✓^ �mc✓rar Thv1K
? ') -. F. � �� Ion
1 2t c� F���� r
REScheck Software Version 4.6.0
Compliance Certificate
Project Luzerne Cape
Energy Code: 2010 New York Energy Conservation
Location: Albany County, New York
Construction Type: Single-family
Project Type: New Construction
Conditioned Floor Area: 1,592 ft2
Glazing Area 7%
Climate Zone: 5 (6894 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
375 Luzeme Rd Greg Garafalo Greg Garafalo
Queensbury,NY 12804 Anchor Construction Anchor Construction
371 Luzeme Rd 371 Luzeme Rd
Queensbury,NY 12804 Queensbury, NY 12804
518-798-8560 518-798-8560
garafalos@roadrunner.com garafalos@roadrunner.com
,Compliance:Passes using UA .- o
Compliance: 8.3%Better Than Code Maximum UA: 266 Your UA: 244
The%Better or Worse Than Code Index reflects how dose to compliance the house Is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area C..,ty Cont. Glazing
Assembly or R-Value R-Value or Door UA
Perimeter U-Factor
Ceiling 1: Flat Ceiling or Scissor Truss 864 38.0 0.0 0.030 26
Ceiling 2:Cathedral Ceiling 108 30.0 0.0 0.034 4
Wall 1:Wood Frame, 16"D.C. 1,816 19.0 0.0 0.060 99
Window 1:Vinyl Frame:Double Pane with Low-E 102 0.340 35
Door 1:Solid 40 0.260 10
Door 2:Glass 20 0.340 7
Basement Wall 1: Solid Concrete or Masonry 992 13.0 0.0 0.064 63
Wall height: 8.0'
Depth below grade:6.0'
Insulation depth: 8.0'
Compliance Statement The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2010 New York Energy
Conservation Construction Code requirements in REScheck Version 4.6.0 and to comply with the mandatory requirements listed in
the REScheck Inspection Checklist.
Name-Title Signature Date
Project Title: Luzerne Cape Report date: 04/03/15
Data filename: Untitled.rck Page 1 of 2
2010 New York
Energy Conservation
Construction Code
Energy Efficiency
Certificate
I Insulation Rating R-Value
Above-Grade Wall 19.00
Below-Grade Wall 13.00
Floor 0.00
Ceiling / Roof 38.00
Ductwork(unconditioned spaces): _
Glass &D.
Window 0.34
Door 0.26
Heating &Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
REScheck Software Version 4.6.0
Inspection Checklist
Energy Code: 2010 New York Energy Conservation Construction Code
Requirements: 0.0% were addressed directly in the REScheck software
Text in the"Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review value Value Complies? Comments/Assumptions
& R .ID
103.2 Construction drawings and ❑complies
[PR111 documentation sufficiently ❑Does Not
demonstrates energy code
[]Not Observable
compliance for the building ❑Not Applicable
envelope.
103.2, Construction drawings and ❑Complies
403.7 documentation sufficiently ❑Does Not
[PR3]1 demonstrates energy code []Not Observable
M11 compliance for lighting and
mechanical systems. Systems ❑Not Applicable
serving multiple dwelling units
must demonstrate compliance
with the commercial code.
403.6 Heating and cooling equipment is Heating: Heating: ❑Complies
[PR2]2 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not
on loads per ACOA Manual J or Cooling: Cooling: []Not Observable
other approved methods. Btu/hr— Btu/hr ❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Luzeme Cape Report date: 04/03/15
Data filename: HADocuments and Settings\Greg Garafalo\My Documents-2\REScheck\Luzern Lot 1 Page 3 of 7
Final.rck
2010 New
York Foundation Inspection Complies? Comments/Assumptions
Energy
303.2.1 Exposed foundation insulation ❑Complies
[FO1112 protection. []Does Not
.a []Not Observable
❑Not Applicable
403.8 Snow melt controls. ❑Complies
[F01212 ❑Does Not
[-]Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Luzeme Cape Report date: 04/03/15
Data filename: H:\Documents and Settings\Greg Garafalo\My Documents-2\REScheck\Luzern Lot 1 Page 4 of 7
Final.rck
Section Plans Verified Field Verified
#
Framing/Rough-in Inspection Value Value Complies? Comments/Assumptions
&Req.ID
402.4.4 Fenestration that is not site built ❑Complies
[FR2011 is listed and labeled as meeting ❑Does Not
AAMA/WDMA/CSA 101/I.S.2/A440 ❑Not Observable
or has infiltration rates per NFRC
400 that do not exceed code ❑Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing/interior finish []Does Not
and labeled to indicate&It;=2.0 ❑Not Observable
cfm leakage at 75 Pa.
❑Not Applicable �
403.2.2 All joints and seams of air ducts, ❑Complies
[FR13]1 air handlers,filter boxes,and ❑Does Not
building cavities used as return ❑Not Observable
ducts are sealed.
❑Not Applicable
403.2.3 Building cavities are not used as ❑Complies
[FR15]3 ducts or plenums. ❑Does Not
❑Not Observable
❑Not Applicable
403.3 HVAC piping conveying fluids R-_ R-_ ❑Complies
[FR17]2 above 105 OF or chilled fluids ❑Does Not
below 55 OF are Insulated to R-3.
❑Not Observable
❑Not Applicable
403.4 Circulating service hot water R- R-_ ❑Complies
[FR1B]2 pipes are insulated to R-2. -❑Does Not
IV, ❑Not Observable
_ ❑Not Applicable
403.5 Automatic or gravity dampers are []Complies
[FR1912 installed on all outdoor air ❑Does Not
intakes and exhausts. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact(Tier 1) 2 Medium Impact[Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Luzerne Cape Report date: 04/03/15
Data filename: H:\Documents and Settings\Greg Garafalo\My Documents-2\REScheck\Luzerne Lot 1 Page 5 of 7
Final.rck
;2010 EnergNew
York Insulation Inspection Complies? Comments/Assumptions
303.1 All installed insulation labeled or OComplies
(IN13]2 installed R-values provided. ODoes Not
ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Luzerne Cape Report date: 04/03/15
Data filename: H:\Documents and Settings\Greg Garafalo\My Documents-AREScheck\Luzeme Lot 1 Page 5 of 7
Final.rck
section Plans Verined Field Verified
# Final Inspection Provisions Value Value Complies3 Comments/Assume#Ions
& Req.1D
402.4.2, Building envelope tightness ACH 50=_ ACH 50=_ ❑Complies
402.4.2.1 verified by blower door test result ❑Does Not
[FI17]1 of<7 ACH at 50 Pa.This ❑Not Observable
requirement may Instead be met
via visual inspection,in which ❑Not Applicable
case verification may need to
occur during Insulation
Inspection.
403.2.2 Duct tightness via post- _cfm _cfm ❑Complies
[FI411 -construction with maximum []Does Not
leakage of 8 cfm to outdoors,or
12 cfm across systems.For []Not Observable
rough-in tests, verification may ❑Not Applicable
need to occur during Framing
Inspection, with maximum
leakage of 6 cfm across systems
and 4 cfm without air handler.
403.1.1 Programmable thermostats ❑Complies
[FI9]2 installed on forced air furnaces. ❑Does Not
d ❑Not Observable
[]Not Applicable
403.1.2 Heat pump thermostat installed ❑complies
[FI10]2 on heat pumps. ❑Does Not
y. []Not Observable
❑Not Applicable
403.4 Circulating service hot water ❑Complies
[FIll]2 systems have automatic or ❑Does Not
t, accessible manual controls. ❑Not Observable
❑Not Applicable
401.3 Compliance certificate posted. ❑Complies
[F17]2 []Does Not
kv []Not Observable
ONot Applicable
303.3 Manufacturer manuals for ❑Complies
[FI18]3 mechanical and water heating ❑Does Not
equipment have been provided. []Not Observable
❑Not Applicable
Additional Comments/Assumptions:
111 High Impact(Tler 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: Luzeme Cape Report date: 04/03/15
Data filename: HADocuments and Settings\Greg Garefalo\My Documents-2\REScheck\Luzeme Lot 1 Page 7 of 7
Final.rck
THeRM' *A'L- ftociAIES
Quality. Comfort, Satisfaction, 'r
Thermal Associates
21 Thomson Ave.Glens Falls,NY 128oi
518.798.550o Fax 798.5620
Greg Garafalo
375 Luzerne Road
Queensbury, NY 12804
518-894-9283
We, Thermal Associates, performed a blower door test at the project at 375.Luzeme Road,
Queensbury NY, to determine the air changes per hour, for Anchor Construction on June 12, 2017.
Testing procedure performed as per ASTM E779.
The result of the test is: ( 925 CFM50 x 60 Minutes)/ ( 55,500 cubic feet _
2.424 ACH50
Test conditions were as follows:
89F outside air temperature
74F inside air temperature
-0.6 PA baseline pressure
-50.8- -52.5 PA testing pressure
1102.4.3.1 Testing option.Building envelope tightness and insulation installation shall be considered acceptable when tested air leakage is less
an seven air changes per hour(ACH)when tested with a blower door at a
pressure of 33.5 psf(50 Pa)as verified using instruments and procedures specified in ASHRAE/ASTM E779.The test shall be conducted by a
qualified person,who shall demonstrate competence to the satisfaction of the code
enforcement official for the conduct of such tests.For the purpose of this section,ACH50 shall mean air changes per hour of infiltration into a
house as measured with a blower door at 50 pascals of pressure,in accordance with
HRAE/ASTM E779.Testing shall occur after rough in and after installation of penetrations of the building envelope,including penetrations
or utilities,plumbing,electrical,ventilation and combustion appliances.
During testing.
1.Exterior windows and doors,fireplace and stove doors shall be closed,
but not sealed;
2.Dampers shall be closed,but not sealed,including exhaust,intake,
makeup air,back draft and flue dampers;
3.Interior doors shall be open;
4.Exterior openings for continuous ventilation systems and heat recovery
ventilators shall be closed and sealed;
5.Heating and cooling system(s)shall be turned off
6.HVAC ducts shall not be sealed;and
7.Supply and return registers shall not be sealed.
Adam DeVit
Blower Door Tester
Thermal Associates
www.thermalassociates.com
1
WINDOW SCHEDULE CALCULATION SHEET Greg Garafalo BP 2015-118
Job Site Address: 376 La zts"A Lot 1 , 375 Luzerne Road
Date SFD with 2-car attached garage
Owner
Application No.
Window#or Special
hardware or
letter on plan Instructions
Window and Door Schedule
Room Unit Mo. Qty. C1r. Qpg, Light Vent U-Factor
Bedroom#1 3056-2 69-4"x 513-9" 1 6.8 27.8 14.5 .34
Bedroom#2 30410 39-2"x 5'- 1" 2 5.9 12.1 5.9 .34
Master Bed 30410 3'-2"x 5'- 1" 2 5.9 12.1 5.9 .34
Living Room 3056 31-2"x 59-9" 2 6.8 13.9 6.8 .34
Living Room 3/0-6/8 3'-2 V2"x 6'-10 Y2" 1 20 3 20 1 .26
Kitchen 30210 3'-2"x 3'- 1" 1 3.1 6.7 3.1 .34
Kitchen 3/0-6/8 half 3'-2 Y2"x 6'-10 V2" 1 20 6.2 20 .26
Kitchen 3/0-6/8 Fr.Dr. 3'-0"x 6"-0" 1 20 18 20 .26
Mud Room 30210 3'-2"x 3'- 1" 1 3.1 6.7 3.1 .34
Mud Room 3/0-6/8 3'-2 V2"x 6'-10 %2" 1 20 0 20 .26
Dining Room 30310 3'-2"x 49- 1" 1 4.5 9.4 4.5 .34
Bath Down 30210-T 3'-2"x 4'- 1" 1 3.1 6.7 3.1 .34
Bath Up 30210-T 35-2"x 4'- 1" 1 1 13.1 6.7 3.1 .34
8
Town of Queensbury Buildina&.Codes PfIncloal Structure Aoolication July 2014
Y
NATURAL LIGHT, VENTILATION AND EMERGENCY EGRESS REQUIREMENTS CALCULATION SHEET
Job Site Address: Greg Garafalo BP 2015-118
Date
owner Lot 1 , 375 Luzerne Road
Application No. SFD with 2-car attached garage
for Remarks
Light and Vent Schedule
Li ht Vent
Room S .Ft. Needed Actual Needed Actual Egress
Bedroom#1 122 9.8 27.8 4.9 14.5 6.8
Bedroom#2 198 15.8 24.2 7.9 11.8 5.9
Master Bedroom 235 18.8 24.2 9.4 11.8 5.9
Liv./Kit./Din. 519 41.5 57.2 120.75 134.4 20
9
Tnum of(I.iooncArmi FxrlirAinn x.-(3,nrlac P.rinninai•Ctrnntnra Annlrnatinn:hfiv MIA