Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
RC-000138-2016
TOWN OF QUEENSBURY 742 Bay Road, Queensbury,NY 12804-5904 (518)761-8201 -- Community Development- Building& Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000138-2016 Date Issued: Thursday, June 9, 2016 This is to certify that work requested to be done as shown by Permit Number RC-000138-2016 has been completed. Tax Map Number: 296.15-1-2 Location: 76 GENTRY LN Owner: Schermerhorn Properties Applicant: Schermerhorn Properties This structure may be occupied as a: Cottage Hill Project, bldg. #2 4-unit wlgarages & FPs By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building& Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 *� Community Development-Building& Codes (518)761-8256 BUILDING PERMIT Permit Number: RC-000138-2016 2)� 20 — -2— Tax Map No: 296.15-1-2 Permission is hereby granted to: Schermerhorn Properties E �,V/ I S E D For property located at: 76 GENTRY LN In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Schemerhorn Properties Multi-Family-New $100,000.00 Owner Address: 536 Bay RD,Suite 2 Total Value $100,000.00 Queensbury,NY 12804 Contractor or Buildcr's Name/Address Electrical Inspection Agency Schermerhom Properties 536 BAY RD RENEWEC Queensbury,NY 12804 Plans&Specifications Cottage Hill Project,bldg.#2 4-unit w/garages&FPs PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,June 30,2016 (If a longer period is rewired,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of ueens /vlon ,J 14 SIGNED BY: �{1TI for the Town of Queensbury. Director of Building&Code Enforcement ---------------------------------------------- a�a OF=iGE US_ONLY ; a , a 7:=.i:1k+1A?ISO. a �PLRIrII i i10. r FEES: PERMIT RECREATION ENIGliVi=ERING ; (If applicable) s ------- .-..-..------------- - _- _.,_v-._-_----_ ---------------------- PRINCIPAL ----_-__--_--___ --tPRINCIPAL STRUCTURE: APPLICATION FOR ZONING APPROVAL & BUILDING PERMIT A PERMIT MUST BE OBTAINED BEFORE 13EGINNING CONSTRUCTION. APPLICATION IS SUBJECT TO REVIEW BEFORE ISSUANCE OFAA VALID PERMIT FOR CONSTRUCTION. APPLICANTIBUILDER: -�^i C 1W-OWNER: ADDRESS: 66(o ADDRESS: PHONE NOS. ,Q � P�H�,O,NE NOS. CONTACT PERSON FOR BUILDING&CODES COMPLIANCE 031 r4*A 14'A� PHONE: LOCATION OF PROPERTY: 'lam 0 2W"66� ��" � _ ILL HAS THERE BEEN A SITE PLAN REVIEW;VARIANCE OR SUBDIVISION APPROVAL? 1!�YES 11 NO IF SO, INDICATE APPLICATION NO.AND DATE OF APPROVAL: PLEASE INDICATE MEASUREMENTS AS REQUIRED BELOW: CHECK ALL.THAT z APPLY TO YOUR 0 dd I- PROJECT O co ® W [j_ coO w O � OJT � _j O = � F i �- O c) z ¢ 4 r- a Nco pL Or= ix w CL I- IL 4 T c� SINGLE FAMILY TWO-FAMILY MULTI-FAMILY (NO.of UNITS} 11 sl onh_ TOWNHOUSE BUSINESS OFFICE RETAIL- MERCANTILE FACTORY OR INDUSTRIAL ATTACHED GARAGE(1,2,3) OTHER Town of Queensbury Community Development Office*742 Bay Road, Queensbury NY 12804 Revised 4/94/2010 IF COMMERCIAL OR INDUSTRIAL-NAME OF BUSINESS: ESTIMATED CONSTRUCTION COSTA 1ODj OW FUEL 1 1,PE: � HEAT TYPE. *HOW MANY FIREPLACE(S)_4 AND!OR WOODSTOVES(S): ZONING CATEGORY: ARE THERE WETLANDS ON THIS SITE? IS THIS A HISTORIC SITE? PROPOSED USE OF BUILDING OR ADDITION: ARE THERE STRUCTURES NOT SHOWN ON PLOT PLAN? ARE THERE EASEMENTS ON PROPERTY? _ f acknowledge no construction activities shall be commenced prior to issuance of a valid permit. I certify that the application, plans, and supporting materials are a true and complete statementldescdption of the work proposed, that all work will be performed in accordance with the NY State Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. t acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of Occupancy. I also undersnd ta that llwe are required to provide an as survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree t h above. Signed Director of Buildin & Ccdes: 769-8256 (for questions regarding Building Per or septic systems mits, construction codes Zorin Administrator: 769-8218 (for questions regarding required pen-nits, the permit process: application requirements or to schedule an appointment) Town of Queensbury* Community Development Office*742 Bay Road, Queensbury NY 12804 Revised 4114/2010 Y----------------_ ------------------------ ------.----------------------------- Permission _-----------.-_----_ _ _.---Permission is hereby granted to the above : This application / proposed action described Applicant to erect or alter the building herein is found to be in accordance with the described herein in accordance with said ; zoning Laws of the Town of Queensbury. Application: ' r r r r r ; BUILDING & CODES APPROVAL ZONING APPROVAL. DATE DATE .- ------------------_----___-.-_--- ------- .--------.----------------------------------- CQUESTIONS? CALL 761-8256 OR EMAIL codest�4ueensbury.net Office Use Oni UR WEBSITE FOR MORE INFORMATION # Operating Permit issued: Yes No www.queensbury.ne Occupancy Type: Construction Classification: Assembly Occupancy Limit: Special Conditions: Town of Queensbury" Community Development Office*742 Bay Roast, Queensbury NY 12804 Office Use Onhr Town of Queensbury Building & Codes Received: Tax Map ID: FUEL BURNING APPLIANCE &CHIMNEY APPLICATION Permit No.: Permit Fee: $ Application is hereby made to the Building & Codes Ottice for the issuance of a Building & Use Permit pursuant to the NYS Fire Prevention & Building Code. The applicant or owner agrees to comply with all applicable laws,ordinances,regulations, and all conditions that are part of these requirements and also will allow all inspectors to enter premises to perform required inspections. Im ortant Note To Ilcant: Rough.In and FinalInspections Are Required: Date _ Owner r InstallerBuilder AY AddressAddress Phone Phone Location of proposed construction and for installation: AI IL Contact Person for Building&Codes Compliance: ge— .¢} Subdivision Name: _(f Fuel Buming Appliance Information Wood Coal Pellet Gas 07 Stove Fireplace Insert Fire face,facto built' Fire lace,Masonry Furnace, Gars a Only) If Factory Built,Please Provide: Manufacturer Name: Model No. Listed By: Number: Chimney Information Masonry* ✓check ane _Block Brick Stone Flue (check one �Tle ,Steel ,Size in inches Material ✓check one Double Well �Tripie Wall `Insulated Direct Vent `Chimney Liner **If Non-Masonry,please provide: Manufacturer Name: Model No. Signatures: Print Name: .► Signature: Date: ADDITIONAL NOTE: CONSTRUCTIONANSTALLATION MUST CONFORM TO NYS FIRE PREVENTION&BUILDING CODE AND/OR MANUFACTURER REQUIREMENTS. CONSULT AVAILABLE TOWN OF QUEENSBURY HANDOUTS REGARDING REQUIRED INSPECTIONS. 0 p . ; • �: : ° ..0 o a� V w O � co co E o : h $MOO •b ; ... . Zad w aCA A 1. w o c U i ; ' W a) -� 4. . Z 04 .� �•, b Wcr) o a� � a wco > cr a . U r"' V Fit �.+ .... V y cc „°rA CL as SOV ' Nu °Q o a -EiU U 4-4 • •� +•+ cn ca 4-0 z m If* T (FM OQ3007.2016) Town of Queensbury-Building and Codes-Fire Marshal 742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal Case Number: RC-000138-2016 Case Module: Permit Inspection Date: 06/09/2016 Inspection Status: Passed Inspector: Gary Stillman Inspection Type: OCC-Inspections Job Address: 76 GENTRY LN Parcel Number: 296.15-1-2 Queensbury,NY 12804 Contact Type Company Name Name Applicant [Schermerhorn Properties] Granted Permission [Schermerhorn Properties] Primary Owner [Schermerhorn Properties] Contractor [Schermerhorn Properties] Checklist Item Passed Comments Sprinkler System Annual YES Received NFPA 13 letter from Firetek Electrical Wiring Enclosed/Labeled FC605.3.1 YES CO Detectors FC610 YES Verified and tested Fire Marshal YES Units A-D Clearance to Electrical FC 605.3 YES Knox Box:installed/checked FC506 YES Ok Smoke Detectors FC907 YES Verified and tested F.D.Signage-FC510 YES Truss ID Signage FC505.3 YES Ok Combustibles in Equipment Rooms FC 315.2.3 YES Clearance to Sprinkler/Ceiling FC315.2.1 18"/24" YES Interior Finishes FC803-804 YES Sprinkler FDC YES Occupancy Cycle YES R D Davis Stillman,Gary(Inspector) Jun 09,2016 Page(1) s HRET1' fr1 SPRINKLER SYSTEMS, LLC 58 Hudson River Rd. • Waterford, NY 12188 Phone: (518)244-3772 Fax: (518)238-2608 6/7/16 Mr. Mike Palmer Fire Marshall Town of Queensbury 742 Bay Rd. Queensbury,NY 12804 RE: Cottage Hill Apts. 76 Gentry Lane Queensbury,NY Mike, The installation of the fire sprinkler system, at the above address, has been completed. The system is on and operational. To the best of my knowledge the installation conforms to NFPA 13R. Should you require anything further,please give me a call. Sincerely, Richard E Boucher Vice President Town of Queensbury-Building and Codes-Fire Marshal 742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal Case Number: RC-000138-2016 Case Module: Permit Inspection Date: 06/09/2016 Inspection Status: Passed Inspector: Gary Stillman Inspection Type: Gas Fireplace/Stove Job Address: 76 GENTRY LN Parcel Number: 296.15-1-2 Queensbury,NY 12804 Contact Type Company Name Name Contractor [Schermerhorn Properties] Primary Owner [Schermerhorn Properties] Applicant [Schermerhorn Properties] Granted Permission [Schermerhorn Properties] Checklist Item Passed Comments Floor Protection YES Building Inspection notes YES Units A-D Vent Chimney Termination YES CSST Bonding YES Firestop(s)-Vertical Chase YES Firestop(s)-Wall Penetration YES Clearances to Combustibles(all sides) YES Combustion Air YES Mantel-height above fp opening YES CO Detection YES Gas Shut-off Valve YES Vent Clearance to Combustibles YES Witness Operation YES General Comments YES Superior Fireplace,model DRT2033TMN D Davis Stillman,Gary(Inspector) Jun 09,2016 Page(1) Innovative Hearth Products Installation SuperiorTM DRT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015 Table 7:Horizontal vent termination clearances for buildings with combustible and noncumbustible exteriors Inside corn¢, Outside corner Rececsed Location LT, See Table 6 .8 I /Nil' P---I , M //I I ,,,s, \ H F — F xetl B ❑M Balcony w No side wall ;Yjndlor side Wall lose• C Opereble Ltd CI sadwith F_ �O {penabie —II! !! 1 , , Q B— 4 M II. I K—% 1) VI 0 l:I TERMINATION CAP O AIR SUPPLY INLET ®GAS METER 0 RESTRICTED AREA (TERMINATION PROHIBITED) U.S.Installation** Canadian Installation* A Clearance above grade,veranda,porch,desk,or balcony 12"(300 mm)** 12"(300 mm)* B Clearance to window or door that may be opened 6"(150 mm) 6"(150 mm) for fireplaces<10,000 Btu/h(3 kW), for fireplaces<10,000 Btu/h(3 kW), 9"(230 mm) 12"(300 mm) for fireplaces>10,000 Btu/h(3 kW),and<50,000 Btu/h for fireplaces>10,000 Btu/h(3 kW) (15 kW), 12"(300 mm) for fireplaces>50,000 Btu/h(15 kW)** C Clearance to permanently closed window 9"(229 mm) 12"(305 mm) recommended to prevent window condensation recommended to prevent window condensation D Vertical clearance to ventilated soffit located above the 18"(458 mm) 18"(458 mm) termination within a horizontal distance of 18"(458 mm) E Clearance to unventilated soffit 12"(305 mm) 12"(305 mm) F Clearance to outside corner 5"(127 mm) 5"(127 mm) minimum minimum G Clearance to inside corner 6"(152 mm)minimum 6"(152 mm)minimum H Clearance to each inside of center line extended above 36"(910 mm) 36"(910 mm) meter/regulator assembly within a height of 15 ft above the meter/regulator assembly** within a height of 15 ft above the meter/ regulator assembly* I Clearance to service regulator vent outlet 36"(910 mm)** 36"(910 mm)* J Clearance to nonmechanical air supply inlet to building or 6"(150 mm) 6"(150 mm) the combustion air inlet to any other fireplace for fireplaces<10,000 Btu/h(3 kW), for fireplaces<10,000 Btu/h(3 kW), 9"(230 mm) 12"(300 mm) for fireplaces>10,000 Btu/h(3 kW)and<50,000 Btu/h(15 kW), for fireplaces>10,000 Btu/h(3 kW) 12"(300 mm) for fireplaces>50,000 Btu/h(15 kW)** K Clearance to a mechanical air supply inlet 36"(910 mm)above if within 10 ft(3 m)horizontally** 72"(1830 mm)* L Clearance above paved sidewalk or paved diveway located 84"(2130 mm)$ 84"(2130 mm)$ on public property M Clearance under veranda,porch,deck or balcony 12"(300 mm)*$ 12"(300 mm)*$ N Depth of alcove(maximum) 72"(1830 mm)** 72"(1830 mm)* 0 Clearance to termination(alcove) 6"(15.2 mm)** 6"(15.2 mm)* P Width of alcove(minimum) 36"(910 mm)** 36"(910 mm)* 0 Clearance to combustible above(alcove) 18"(457 mm)** 18"(457 mm)* * In accordance with the current CSA-6149.1 National Gas And Propane Installation Code ** In accordance with the curent ANSI Z223.1/NFPA 54 National Fuel Gas Codes f A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings *$ Only permitted if veranda,porch,deck,or balcony is fully-open on a minimum two sides beneath the floor 13 Innovative Hearth Products Installation SuperiorTM DRT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015 MINIMUM CLEARANCES TO COMBUSTIBLES Fireplace And Vent Clearances The fireplace is approved with zero clearance to combustible materials on all sides (Table 8),with the following exception:The unit may not be recessed (allowance made for mantel legs/side trim in Figure 6'). When the unit is installed with one side flush with a wall,the wall on the other side of the unit must not extend beyond the front edge of the unit(Figure 6). Table 8:Minimum Clearances * 1"(26mm)to wrapper for 45"model,all Back others 1/2"(13mm)to wrapper 0"(0 mm)to Spacers Sides 1/2"(13 mm)to wrapper 0"(0 mm)to Spacers** Top Standoffs 0"(0 mm)to top standoffs Floor 0"(0 mm) From Bottom of Unit to Ceiling 64"(1626 mm) 3"(76mm)—Top**** Vent 1"(25.4 mm)—Sides and Bottom Front Service Clearance— 36"(914 mm) clearance immediately in front of viewing area(s) *3"(76 mm)above any horizontal/inclined vent component, **See Page 19 for clearance requirements to the nailing flange located at each side of the unit and any screw heads adjacent to it. ***Top vent clearance can be reduced to 2"on horizontal runs when first elbow is located at least 6 ft above the fireplace. The fireplace must be mounted on a fully supported base extending the full width and depth of the unit.The fireplace may be located on or near conventional construction materials. However, if installed on combustible materials,such as carpeting, vinyl tile or other combustible material other than wood flooring,the appliance shall be installed on a metal or wood panel extending the full width and depth of the appliance. Hearth Extension A hearth extension is not required with this fireplace. If a hearth extension is used, do not block the lower control compartment door.Any hearth extension used is for appearance only and does not have to conform to standard hearth extension installation requirements. Shelf Height To provide for the lowest possible shelf surface, use the rear vent model. For top vent models,the venting attached to the top vent should be routed in a way to minimize obstructions to the space above the fireplace. Do not insulate the space between the fireplace and the area above it(Table 9 and Table 10).The minimum height from the base of the fireplace to the underside of combustible materials used to construct a utility shelf in this fashion is shown in Table 9 and Table 10. Table 9:Combustible Shelf Height—Top Vent Top Vent with one 90°Elbow Model Secure Vent® Secure Flex®(flex elbow) DRC2033/DRT2033 44"(1118 mm) 46"(1168 mm) _ DRC2035/DRT2035 47"(1194 mm) 49"(1245 mm) DRC2040/DRT2040 52"(1321 mm) 54"(1372 mm) ! ' � -t,ombustibles Shelf Height or insulation mm) 52"(1321 mm) l in the shaded DRC2045/DRT2045 50" (1270 (see table) area between the appliance and the shelf above it. minummommi 14 Innovative Hearth Products Installation Superior"'DRT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015 Table 10:Combustible Shelf Height—Rear Vent Rear Vent with two 90°Elbows Model >_3"clearance from shelf to Secure Vent® Secure Flex®(flex elbow) top of fireplace and/or vent DRC2033/DRT2033 34"(864 mm) 34"(864 mm) pipe,whichever is higher DRC2035/DRT2035 35 1/2"(902 mm) 351/2"(902 mm) 1 rfooiv,irim DRC2040/DRT2040 401/2"(1029 mm) 401/2"(1029 mm) illig combustibles Shelf Height g or insulation DRC2045/DRT2045 451/2"(1156 mm) 451/2"(1156 mm) (see table) +, in the shaded area between the appliance , and the shelf above it. Figure 6:Combustible Side Clearances Figure 7:Mantel Height At 6"minimum side wall clearance,a i f.---Mantel depth combustible Top View of 18(457) wall can project Fireplace to any length. 16(406) 45° 14(356) 3 1/2" allowed in shaded area (89 mm) "Safe Zone". 12(305)_ , 1- Combustible walls 10(254)— ___ ` shown in dark gray Combustible mantel 8(203) legs may project '4 12 8 beyond either side of the fireplace opening (305)10(203) 6 (102) 2— Hood as long as they are kept in. mm (254) (152) (51) within the shaded area ( ) Fireplace i - ,-. illustrated here. 6" (152 mm) Wall Finishes/Surrounds/Mantels NOTE: Combustible wall finish materials and/or surround materials must not be allowed to encroach the area defined by the fireplace front face (black sheet metal). Never allow combustible materials to be positioned in front of or overlapping the fireplace face (Figure 41). Non-combustible materials,such as surrounds and other fireplace trim,may be installed on the fireplace face,but they must not cover any portion of the removable glass panel or control compartment. Vertical installation clearances to combustible mantels vary according to the depth of the mantel (Figure 7). Mantels constructed of non-combustible materials may be installed at any height above the fireplace opening. However, do not allow anything to hang below the fireplace hood. Minimum clearance requirements include any projections such as shelves,window sills, mantels, etc. above the fireplace. NOTE:To avoid heat-related finish damage,use finish materials rated 175°F,or higher,on the underside of the mantel. INSTALLATION PREPARATION The fireplace is shipped with all gas controls and components installed and pre-wired. Before installing the fireplace, follow these steps: 1. Remove the shipping carton, and retain the front of the carton (used to protect the fireplace during construction). 2. Remove the shipping pad, exposing the front glass door. 3. Remove the glass door(Page 57). NOTE: Place the glass door on the shipping carton to protect its surface. 15 TOWN OF QUEENSBURY FIRE MARSHAL 742 Bay Road, Queensbury, NY. 12804-5902 761-82051761-8206 Fax: 745-4437 Factory Built Gas Fireplace 1 Stove Inspection Report Notice: New York State requires that all UL Listed,factory built appliances be installed according to the instructions and specifications contained in the installation manual accompanying the appliance. No deviation from the manufacturer's instructions or specifications is allowed. Permit#: do 1W -R 3 _ Name: G -Hi L L OVJt , Inspection Date: - r L, Address: Time: G ' 3c) Inspector: F'�' Vii` Rough-in 1 Final: �?c�. h ►-- Appliance Manufacturer: Model#: l� i2T� " .2 m V- Direct Vent _Factory Built Chimney _Flue Size —Double Wall _Triple Wall ®Insulated Yes No NIA Comments Floor Protection Clearances to Combustibles(all sides) �2 3) L/ Firestop(s) Vertical Chase Wall Penetration ✓ +1� Vent Clearance to Combustibles Vent 1 Chimney Termination Chimney height must be 3 feet above roof penetration;2 feet above any combustible construction within 10 feet Gas Shut-off Valve Combustion Air Hearth Extension(if any) Mantel-height above Up opening Witness Operation Tank Placement(if LP) CO Detection CSST Bonding White-Building Department Yellow-Customer Pink-Fire Marshal Town of Queensbury Building & Code Enforcement Office No. (518) 761-8256 Framing 1 Firestopping Inspection Report Inspection request received: Name: C 1 Inspected on: 1 Location: �( (� C, n t Arrive: ` a. Permit No.: j.�f— ' 6' `7 Inspector's Initials: 5 TYPE OF STRUCTURE: Y N NIA COMMENTS: Aftic Access 22"x 30"minimum Jack Studs I Headers Truss Specification Providedj. Bracing I Bridging Joist hangers / Jack Posts 1 Main Beams ✓ Exterior sheeting nailed properly 12"O.C. Headroom 6 ft.8 in. Stairwells 36 in.or more Exterior Deck Bracing Headroom 6 ft.8 in. Notches I Holes 1 Bearing Walls Metal Strapping for Notches Top Plate 1 '/I(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 ft.or less on center Ice and water shield 24 inches from wall separation 1,2,3 hour e wall 2,3,4 hour re6topp 00 enetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side Yz inch or 518 inch Type X Garage side 518 inch Type X Ceiling/wall Windows Habitable Space 1 Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above I below grade 5.0 sf grade Design Professional Sign-off,if required Framing 1 Firestopping Inspection Report . —rU Rough Plumbing 1 Insulation Inspection Report Inspection request received ,j Name c�,r-� Inspected on Location { '2,.. Arrive t' m pm Permit No. 14\ — LkO6 Inspector's Initials Type of Structure . COMMENTS Y N NA Plumbing under slab Rough Plumbing/Nail Plates Plumbing Vent!Vents In Place 1 Yz inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/change of direction Pressure Test Dr !Vent Head 5 P.S.I.or 10 ft.above highest connection for 15 minutes or Pressure Test e upply Piping 4A Head 0 P.S.!for 15 minutes Insulation/Residential Check/Commercial Check Window Seating Tyvek or Similar Exterior Sealant Proper Vent,Attic Vent Door/Window Sealed(No Insulation) Duct!Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape Blower Door Test Air Sealing Town of Queensbury 9 Buildin & Code Enforcement Office No.(518)761.8256 Town of Queensbury Building&Code Enforcement t)rlm Office No.(518)761-8256 Rough Plumbing !Insulation Inspection Report Inspection request received: `�`?. t5 Name: �v' tXrno�v1nn Inspected on: Location: Arrive: a.m� Permit No.: ►4 -'Zi„?, Inspector's Initials: Type of Structure: IMI _ COMMENTS Y N NA Plumbing under slab b 1- 1�>7i � Rough Plumbing/Nail Plates Plumbing Vent/Vents in Place 1 %inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/change of direction '-� ��' Pressure Test Drain/Vent Air/Head 5 P.S.I.or 10 ft. above highest connection for 15 minutes Pressure Test Water Supply Piping Air/ ead P.S.I for 15 minutes Insulation/Residential Check/Commercial Check Window Sealing Tyvek or Similar Exterior Sealant Proper Vent,Attic Vent Door 1 Window Sealed (No Insulation) Duct/Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape Blower Door Test Air Sealing Rough Plumbing!Insulation Inspection Report Town of Queensbury Building &Code Enforcement Office No. (518)761-8256 Framing / Firestopping Inspection Report Inspection request received: Name: b Inspected on: — �— Location: LD Q :":t 76 OF— Arrive: a. Permit No.: 11A — Inspector's Initials: TYPE OF STRUCTURE: o,.J NM V--6 Y N NIA COMMENTS: Framing Attic Access 22"x 30"minimum Jack Studs t Headers Truss Specification Provided Bracing/Bridging Joist hangers Jack Posts t Main Beams Exterior sheeting nailed properly 12"a.C. Headroom 6 ft.8 in. Stairwells 36 in.or more Exterior Deck Bracing Headroom 6 ft.8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate (� , 1 %(w)16 gauge(8)16D nails each side ti/ Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 ft.or less on center Ice and water shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side%inch or 518 inch Type X Garage side 518 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above/below grade 5.0 sf grade Design Professional Sign-off,if required Framing/Firestopping Inspection Report Town of Queensbury Building & Code Enforcement c� `- Office No. (518) 761-8256 Framing 1 Firestopping inspection Report Inspection request received: Name: (.� (���.k--�3�-�'L�� _ Inspected on: Location: Arrive: — a.m. p.m. Permit No.: n 3 Inspector's Initials: TYPE OF STRUCTURE: P'l A Y N NIA COMMENTS: Framing Attic Access 22"x 30"minimum Jack Studs!Headers Truss Specification Provided Bracing 1 Bridging Joist hangers Jack Posts I Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft.8 in. Stairwells 36 in.or more Exterior Deck Bracing Headroom 6 ft. 8 in. Notches 1 Holes 1 Bearing Walls Metal Strapping for Notches Top Plate 1 '/2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 ft,or less on center shield 24 inches from wail Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side'/2 inch or 518 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space I Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above 1 below grade 5.0 sf grade Design Professional Sign-off, if required Framing / Firestopping Inspection Report � o s,< TO Foundation Inspection eport -)& Office No. (518) 751-8256 Date Inspection rFIT#: : V Queensbury Building&Code Enforcement Arrive: aDepart: 742 Bay Rd., Queensbury,NY 12804 Inspector's InitiaNAME: s�A cl"14 �'',�ge_.'u LOCATION: _ �Z C��► til INSPECT ON: TYPE OF STRUCTURE: d 'Z_Cornments Y N N/A V,footings A1C_ E Piers ,, Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Foo ing Drain Stone: inch width 6 inches above footing 6 miI poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper y Foundation Insulati n In /Exterior 1 R - I'liD WK Rough Grade b inch drop within 10 ft. L:\Building&Codes Farms;Building&Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/18/2013 2:44:00 PM '� Foundation Inspection Deport Office No. (518) 761-8256 Date Inspection request iv Queensbury Building &Code Enforcement Arrive: t"—Wo a epart: a p 742 Bay Rd., Queensbury, NY 12804 Inspector's Initi NAME: P RMIT#: � LOCATION: 1 s..�� INSPECT ON: TYPE OF STRUCTURE: —7 �,,,,,�__ Comments Y N NIA Footings Piers no it Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulatio me ' Exterior R- IU Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building & Codes\1nspection Forrns�Foundation Inspection Report.doc Last printed 12/18/2013 2:44:00 PM Foundation Inspection Report Office No. (518) '761-8256 Date Insn!F Queensbury Building&Code Enforcement Arrive: epart: �L% a 742 Bay Rd., Queensbury, NY 12804 Inspecto NAME: OS 0-;��h. ,,ti nl�Jln.�,,," LOCATION: L INSPECTON: TYPE OF STRUCTURE: Comments Y N NIA Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation f Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab i oval Plumbing Under Slab C/Cast/Copper Foundation Insulati n Interi xterior R %1D 111c Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building&Codes\1nspection FormslFoundation Inspection Report.doc Last printed 12/18/2013 2:44:00 PM r1 da CS �fU Sow °`r�!, Foundation Inspection Report - Office No. (518) 761-8256 Date Ins ction r ec ' d Queensbury Building&Code Enforcement Arrive: ai i Depart: -1_5 742 Bay Rd., Queensbury, NY 12804 Inspector's Initials: NAME: RM1T#: ,(� LOCATION: INSPECT ON: / TYPE OF STRUCTURE: !Jn Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. ���••• Foundation/Wallpour Reinforcement in PIace Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior 1 Exterior R- Rough Grade 6 inch drop within 10 ft. L:\Building &Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/18/2013 2:44:00 PM Foundation Inspection Report Office No.(518)761-8256 Date Inspection requ ed Queensbury Building&Code Enforcement Arrive: p Depart: a m 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initial . NAME: ��M�t'��l/Z J� IT#: J L( — °26 LOCATION: eT% INSPECT ON: TYPE OF STRUCTURE: Comments Y N NIA Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing �.� for 48 hours following the placement of the concrete.'0C ���Q�, �..� Materials for this purpose on site. �� Q j Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior I Exterior R- Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/18/2013 2:44:00 PM fa. 0 Foundation Inspection Report Office No. (518)761-8256 Date Insection r es e . Queensbury Building&Code Enforcement Arrive: epart: a m 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials: NAME: Still C'/' (4� PERMIT#: q LOCATION: L INSPECT ON: TYPE OF STRUCTURE: �j Comments r! Y N NIA ootings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement -- ie concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/18/2013 2:44:00 PM CQMcheck Software Version 3.9.3 Envelope Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information Project Type:New Construction Project Title: New Townhouse Apartment Construction Site: Owner/Agent: Designer/Contractor: Cottage Hill Drive Schermerhorn Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-798-0674 Saratoga Springs,NY 12866 rich@schermerhomconstruction.com 518-580-1905 ephall@nycap.rr.00m Section 2: General Information Building Location(for weather data): Warren,New York Climate Zone: 6a g� r�()Py Building Space Conditioning Type(s): Residential Vertical Glazing/Wall Area Pct.: 18% Activity Type(s) Floor Area Multifamily 6165 Section 3: Requirements Checklist Envelope PASSES: Climate-Specific Requirements: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R Value R-Value U-Factor U-Factor(a) Perimeter Orientation: NORTH Exterior Wall 3:Wood-Framed, 16"c.c. 1070 21.0 0.0 0.062 0.051 Door 17:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 18:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 19:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 20:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 21:Glass(>50%glazing):NonmetaI Frame,Pert.Type:Other 40 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Exterior Wall 4:Wood-Framed,16"o.c. 384 21.0 0.0 0.062 0.051 Orientation:EAST Exterior Wall is Wood-Framed, 16"o.c. 780 21.0 0.0 0.062 0.051 Door 1:Insulated Metal,Swinging 20 --- - 0.300 0.500 Door 2:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 3:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 4:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 5:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 6:Insulated Metal,Swinging 20 --- -- 0.300 0.500 Door 7: Insulated Metal,Swinging 20 - - 0.300 0.500 Door 8: Insulated Metal,Swinging 20 - - 0.300 0.500 Door 9:Insulated Metal,Swinging 20 - - 0.300 0.500 Project Title: New Townhouse Apartment Report date: 06125/14 Data filename:Y:1Schermerhom\Cottage Hill Apartmentsl4-plex\Cottage Hill-4.cck Page 1 of 11 Door 10:insulated Metal,Swinging 20 - - 0.300 0.500 Door 11:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 12:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 13:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 14:insulated Metal,Swinging 20 - - 0.300 0.500 Door 15:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 16:Insulated Metal,Swinging 20 - - 0.300 0.500 Exterior Wall 2:Wood-Framed,16"o.c. 624 21.0 0.0 0.062 0.051 Window 1:Vinyl Frame:Double Pane with Low-E,Perf.Type:Other 248 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Orientation:SOUTH Exterior Wall 7:Wood-Framed,16"o.c. 1070 21.0 0.0 0.062 0.051 Door 28:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 29:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 30:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 31:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 32:Glass(>50%glazing):Nonmetal Frame,Perf.Type:Other 40 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Exterior Wall 8:Wood-Framed,16"o.c. 384 21.0 0.0 0.062 0.051 Orientation:WEST Exterior Wall 5:Wood-Framed,16"o.c. 780 21.0 0.0 0.062 0.051 Window 2:Vinyl Frame:Double Pane with Low-E,Perf.Type:Other 217 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Door 22:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 23:insulated Metal,Swinging 20 - - 0.300 0.500 Door 24:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 25:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 26:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 27:Insulated Metal,Swinging 20 -- - 0.300 0.500 Exterior Wall 6:Wood-Framed,16"o.c. 624 21.0 0.0 0.062 0.051 Window 3:Vinyl Frame:Double Pane with Low-E,Perf.Type:Other 496 - - 0.290 0.350 tasting/cert.Product ID:,SHGC 0.65(b) Orientation:UNSPECIFIED ORIENTATION Roof 1:Attic Roof with Wood Joists 3507 38.0 0.0 0.027 0.027 Floor 1:Slat-On-Grade:Unheated,Vertical 4 ft. 529 - 10.0 - - (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestrations product performance must be certfied in accordance with NFRC and requires supporting documentation. Air Leakage,Component Certification,and Vapor Retarder Requirements: ❑ 1. All Joints and penetrations are caulked,Basketed or covered with a moisture vapor-permeable wrapping material installed In accordance with the manufacturers installation instructions. ❑ 2. Windows,doors,and skylights certified as meeting leakage requirements. ❑ 3. Component R-values&U-factors labeled as certified. ❑ 4. No roof insulation is Installed on a suspended ceiling with removable ceiling panels. ❑ 5. 'Other'components have supporting documentation for proposed U-Factors. ❑ 6. insulation installed according to manufacturers Instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the insulation. ❑ 7. Stair,elevator shaft vents,and other outdoor air Intake and exhaust openings In the building envelope are equipped with motorized dampers. ❑ 8. Cargo doors and loading dock doors are weather sealed. ❑ 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are seated with gasket or caulk. ❑ 10.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: ❑ Building entrances with revolving doors. ❑ Doors not intended to be used as a building entrance. ❑ Doors that open directly from a space less than 3000 sq.ft.In area. ❑ Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. ❑ Doors opening directly from a sleeping/dwelling unit. Section 4: Compliance Statement Project Title:New Townhouse Apartment Report date:06/25/14 Data filename:Y:1SchermerhomtCottage Hill ApartmentsW-pleACottage Hill-4.cck Page 2 of 11 Comp//ance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2010 New York Energy Conservation Construction Code requirements in COMche&Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of his/her knowledge,belief,and professional judgment,such plans or specifications are In compliance with this Code. Ethan P.Hall-Architect Name-Title Signature Date Project Mile: New Townhouse Apartment Report date:06/25/14 Data filename:Y:1SchennerhomtCottage Hill Apartmentst4-plex\Cottage Hill-4.cck Page 3 of 11 COMcheck Software Version 3.9.3 Interior Lighting Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information Project Type:New Construction Project Title : New Townhouse Apartment Construction Site: Owner/Agent: Designer/Contractor: Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-798-0674 Saratoga Springs,NY 12866 rich@schermerhomconstruction.com 518-580-1905 ephall@nycap,rr.com Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (tt2) Watts 1 ft2 (B x C) Multifamily 6165 0.7 4316 Total Allowed Watts= 4316 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID:Description!Lamp 1 Wattage Per Lamp 1 Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Multifamily(6165 sq.ft.) Compact Fluorescent 1:Spiral 23W:Electronic: 1 68 32 2176 Total Proposed Watts= 2176 Section 4: Requirements Checklist Interior Lighting PASSES:Design 50%b,-tter than code.Wattage: ❑ 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 4316 2176 YES Controls, Switching, and Wiring: ❑ 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. ❑ 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: ❑ Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. ® Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. ❑ 4. Independent controls for each space(switchloccupancy sensor). Project Title: New Townhouse Apartment ^� e Y Report date: 06/25114 Data filename:YASchermerhomlCottage Hill Apartmentsl4-plexlCottage Hill-4.cck Page 4 of 11 Exceptions: ❑ Areas designated as security or emergency areas that must be continuously illuminated. ❑ Lighting In stairways or corridors that are elements of the means of egress. ❑ 5. Master switch at entry to hotel/motel guest room. ❑ 6. Individual dwelling units separately metered. ❑ T. Medical task lighting or art/history display fighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. ❑ 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of alternate rows of luminaires,aftemate luminaires,or alternate lamps,switching the middle lamp luminaires independently of other lamps,or switching each luminaire or each lamp. Exceptions: ❑ Only one luminaire in space. ❑ An occupant-sensing device controls the area. ❑ The area is a corridor,storeroom,restroom,public lobby or sleeping unit. ❑ Areas that use less than 0.6 WatWsq.ft. ❑ 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: ❑ Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. ❑ 10.Photocell/astronomical time switch on exterior lights. Exceptions. ❑ Lighting Intended for 24 hour use. ❑ 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single4amp ballasts). Exceptions: ❑ Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement., The proposed lighting design represented In this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 New York Energy Conservation Construction Code requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. Ethan P.Hall-Architect Name-Title Signature Date Project Title:New Townhouse Apartment Report date:06/25/14 Data filename:Y.XSchermerhom\Cottage Hill ApartmentsW-plexlCottage Hill-4.cck Page 5 of 11 COiMcheck Software Version 3.9.3 Exterior Lighting Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information Project Type:New Construction Project Title:New Townhouse Apartment Exterior Lighting Zone: 2(Residentially zoned area) Construction Site: Owner/Agent: Designer/Contractor: Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-79MB74 Saratoga Springs,NY 12866 rich@schermerhomconstruction.com 518-580-1905 ephall@nycap.rr.com Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts I Unit (B x C) Main entry 4 ft of door width 20 Yes 80 256 Total Tradable Watts`= 80 256 Total Allowed Watts= 80 Total Allowed Supplemental Watts"= 600 Wattage tradeoffs are only allowed between tradable areas/surfaces, A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C x D) Fixture Fixtures Watt. Main entry(4 ft of door width):Tradable Wattage Compact Fluorescent 1:Spiral 23W:Electronic: 1 8 32 256 Total Tradable Proposed Watts= 256 Section 4: Requirements Checklist Lighting Wattage: 0 1, Within each non-tradable area/surface,total proposed watts must be less than or equal to total allowed watts.Across all tradable areas/surfaces,total proposed watts must be less than or equal to total allowed watts. Compliance:Passes using supplemental allowance watts. Controls, Switching,and Wiring: 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. Cj 3. Lighting not designated for dusk-to-dawn operation is controlled by either a a photosensor(with time switch),or an astronomical time switch. ❑ 4. Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor. ri 5. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. Project Title: New Townhouse Apartment w Report date: 06/25/14 Data filename:Y:ISchermerhom\Cottage Hill Apartmentsl4-plexlCottage Hill-4.cck Page 6 of 11 Exterior Lighting Efficacy: ❑ 6. All exterior building grounds luminaires that operate at greater than 10001 have minimum efficacy of 60 lumen/watt. Exceptions. ❑ Lighting that has been claimed as exempt and Is identified as such In Section 3 table above. ❑ Ughting that is specifically designated as required by a health or life safety statue,ordinance,or regulation. ❑ Emergency lighting that is automatically off during normal building operation. ❑ Lighting that is controlled by motion sensor. Section 5: Compliance Statement Compliance Statement The proposed exterior lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 New York Energy Conservation Construction Code requirements In COMcheck Version 3.9.3 and to comply with the mandatory requirements In the Requirements Chedd{st. Ethan P.Hall-Architect Name-Title Signature date Project Title:Now Townhouse Apartment Report date:06125/14 Data filename:Y:1Schermerhom\Cottage Hill Apartmentst4-plextCottage Hill-4.c ck Page 7 of 11 COMcheck Software Version 3.9.3 Mechanical Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information Project Type:New Construction Project Title: New Townhouse Apartment Construction Site: Owner/Agent: DesignerlContractor: Cottage Hill Drive Schermerhorn Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-798-0674 Saratoga Springs,NY 12866 rich@schermerhomconstnrction.com 518-580-1905 ephall@nycap.rr.com Section 2: General Information Building Location(for weather data): Warren,New York Climate Zone: 6a Section 3: Mechanical Systems List Quanti-- S tem Type&Description 1 HVAC System 1 (Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtulh Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtulh,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 HVAC System 2(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=60 kBtulh Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtulh,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 HVAC System 3(Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtulh Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtufh,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 HVAC System 4(Single Zone): Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtulh Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtulh,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 Water Heater 1: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF 1 Water Heater 2: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF I Water Heater 3: Project Title: New Townhouse Apartment Report date: 06125/14 Data filename:Y:ISchermerhomlCottage Hill Apartmentsl4-plexlCottage Hill-4.cck Page 8 of 11 Electric Storage Water Heater,Capacity.40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF 1 Water Heater 4: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 : O 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) O 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To: HVAC System 2: 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) Ej 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To: HVAC System 3 : Lj 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) C3 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To: HVAC System 4: 0 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) L] 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To:Water Heater 1 : L] 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btu/h(if>12 kW)) 2. First 8 it of outlet piping is Insulated 3. Hot water storage temperature controls that allow setpoint of 90"F for norm-dwelling units and 110"F for dwelling units. Lj 4. Heat traps provided on inlet and outlet of storage tanks Requirements Specific To:Water Heater 2: 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btulh(if>12 kW)) 2. First 8 it of outlet piping is insulated 3. Hot water storage temperature controls that allow setpoint of 90'F for non-dwelling units and 110°F for dwelling units. O 4. Heat traps provided on inlet and outlet of storage tanks Requirements Specific To:Water Heater 3: 0 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater effidency: 0.88 EF(241 SL,Btu/h(if>12 kW)) 2. First 8 ft of outlet piping is insulated 3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units. Lj 4. Heat traps provided on inlet and outlet of storage tanks Requirements Specific To:Water Heater 4: O 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency. 0.88 EF(241 SL,Btu/h(if>12 kW)) 2. First 8 ft of outlet piping is insulated Lj 3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units. Lj 4. Heat traps provided on inlet and outlet of storage tanks Generic Requirements: Must be met by all systems to which the requirement is applicable: D 1. Plant equipment and system capacity no greater than needed to meet loads Exceptfon(s): O Standby equipment automatically off when primary system is operating O Multiple units controlled to sequence operation as a function of load O 2. Minimum one temperature control device per system a 3. Minimum one humidity control device per installed humidification/dehumidification system L] 4. Load calculations per ASHRAE/ACCA Standard 183. Li 5. Automatic Controls:Setback to 55°F(heat)and 85'F(cool);7-day dodo,2-hour occupant override,l0-hour backup Exception(s): L] Continuously operating zones Lj 6. Outside-air source for ventilation;system capable of reducing OSA to required minimum Project Title:New Townhouse Apartment Report date:06/25114 Data filename:Y:\SchermerhomlCottage Hill Apartrnents\4-plexlCottage Hill-4.cck Page 9 of 11 ❑ 7. R-5 supply and return air duct insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between ducts and the building exterior when ducts are part of a building assembly Exceptkun(s): ❑ Ducts located within equipment ❑ Ducts with Interior and exterior temperature difference not exceeding 15°F. ❑ 8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment ❑ 9. Ducts sealed-longitudinal seams on rigid ducts;transverse seams on all ducts;UL 181A or 181 B tapes and mastics ❑ 10.Hot water pipe insulation: 1.5 in.for pipes<=1.5 in.and 2 in.for pipes>1.5 in. Chilled water/refrigeranttbrine pipe Insulation: 1.5 in.for pipes<=1.5 in.and 1.5 in.for pipes>1.5 In. Steam pipe insulation: 1.5 in.for pipes<=1.5 in.and 3 in.for pipes >1.5 in. Exception(s): ❑ Piping within HVAC equipment. ❑ Fluid temperatures between 55 and 105°F. ❑ Fluid not heated or cooled with renewable energy. ❑ Piping within room fan-coil(with AHR1440 rating)and unit ventilators(with AHRI840 rating). ❑ Runouts<4 it in length. ❑ 11.Operation and maintenance manual provided to building owner ❑ 12.Thermostabc controls have 5°F deadband Exception(s): ❑ Thermostats requiring manual changeover between heating and cooling ❑ Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority having jurisdiction. ❑ 13.Balancing devices provided in accordance with IMC 603.17 © 14.Demand control ventilation(DCV)present for high design occupancy areas(>40 person/1000 ft2 in spaces>500 ft2)and served by systems with any one of 1)an airside economizer,2)automatic modulating control of the outdoor air damper,or 3)a design outdoor airflow greater than 3000 cfm. Exception(s): ❑ Systems with heat recovery. ❑ Multiple-zone systems without DDC of individual zones communicating with a central control panel. ❑ Systems with a design outdoor airflow less than 1200 cfm. ❑ Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. ❑ 15.Motorized,automatic shutoff dampers required on exhaust and outdoor air supply openings Exception(s): ❑ Gravity dampers acceptable in buildings<3 stories ❑ 16.Automatic controls for freeze protection systems present ❑ 17.Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70%outside air fraction or specifically exempted Exception(s): ❑ Hazardous exhaust systems,commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. ❑ Systems serving spaces that are heated and not cooled to less than 60'F. ❑ Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. ❑ Heating systems In climates with less than 3600 HDD. ❑ Cooling systems In climates with a 1 percent cooling design wet-bulb temperature less than 64'F. ❑ Systems requiring dehumidification that employ energy recovery in series with the cooling coil. ❑ Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or,a separate make up air supply meeting the following makeup air requirements: a)at least 75 percent of exhaust flow rate,b)heated to no more than 2"17 below room setpoint temperature,c)caroled to no lower than 3°F above room setpoint temperature,d)no humidification added,e)no simultaneous heating and doling. Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2010 New York Energy Conservation Construction Code requirements In COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. Ethan P.Hall-Architect Project Title: New Townhouse Apartment Report date:06/25/14 Data filename:YASchermerhomiCottage Hill ApartmentsW-ple)dCottage Hill-4.dk Page 10 of 11 Name-Title Signature Date Section 6: Post Construction Compliance Statement E] HVAC record drawings of the actual Installation,system capacities,calibration Information,and performance data for each equipment provided to the owner. L3 HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. Lj Written HVAC balancing and operations report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date Project Tide:New Townhouse Apartment Report date:06/25/14 Data filename:Y:%Schenmerhom\Cottage Hill ApartmentsW-piexlCottage Hill-4.cck Page 11 of 11 RUCINSKI HALL ARCHITECTURE SPY`e Ronald Richard Rucinski Ethan Peter Hall 134 Dix Avenue Glens Falls NY 12801 Voice 518 741 0268 Fax 518 741 0274 Email ephall@nycap.rr.com 12C_- bop •'tel� Special Inspection Report To: John O'Brien - Town of Queensbury—Code Enforcement Officer From: Ethan Hall Date: 31 May, 2016 Re: Schermerhorn Residential Properties—Cottage Hill Townhouse Apartments —76 Gentry Lane At the above referenced project location this office performed periodic on site observations of the construction. All items appear to be installed in accordance with the construction drawings. If there are any questions please contact our office. Regards, VT .p � Ethan P. Hall —Architect �» Rucinski Hall Architecture 704N RECEIVED Ci I Z_10t 11R[IA-I;SlacadlSchemierhom\Cottaee Hill ApanmentslPaperworMSpeciai Inspection Letter-76 Gentry L e-31 May 2016.oc 1) s V1— GRAMY Consulting, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 05/31/2016 Mr. Rich Schermerhorn Schermerhorn Real Estate Holdings MAY 3 J 536 Bay Road Ste.2 t Queensbury,NY 12804 TQIfG`4 C)!uQU 1 V,�3JRY ¢Bt?ILD?NG & CODES Inspection Address: 76A Gentry Lane, Queensbury, NY 12804 Report Number: 0531161 Dear Rich: At your request, the Blower Door Inspection to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 05/31/2016. GRAJNY Consulting, LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment, including I'and 2nd floor= 1,408 SF - Volume of the apartment, including 1st and 2"d floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal = 1,094 CFM - ACH50,Actual Changes per Hour at 50 Pascal = 1,094X60/11,876=5.5 <7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- 1%,calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Sfa.w 1! rO " Stan Grajny, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 GRAJNY Consuffing, LLC 09 Hayden Point Loop Diamond Point, IVY 12824 518 221-3240 05/31/2016 Mr. Rich Schermerhorn Schermerhorn Real Estate Holdings 536 Bay Road Ste,2 Queensbury,NY 12804 Inspection Address: 76B Gentry Lane, Queensbury, NY 12804 Report Number: 0531162 Dear Rich: At your request, the Blower Door Inspection to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 05/31/2016. GRAJNY Consulting, LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment, including I'and 2°a floor= 1,408 SF - Volume of the apartment, including I"and 2'floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal= 1,258 CFM - ACH50,Actual Changes per Hour at 50 Pascal= 1,258X60/11,876=6.4<7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- I%, calibrated minimum once per year. Thank you for selecting our company.We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Sfa4--Gra4mV Stan Grajny, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 GFZAJNY Consuffing, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 05/31/2016 Mr. Rich Schermerhorn Schermerhorn Real Estate Holdings 536 Bay Road Ste. 2 Queensbury,NY 12804 Inspection Address: 76C Gentry Lane, Queensbury, NY 12804 Report Number: 0631163 Dear Rich: At your request, the Blower Door Inspection to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 05131/2016. GRAJNY Consulting, LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment, including I"and 2`d floor= 1,408 SF - Volume of the apartment, including 1St and 2"1 floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal= 1,284 CFM - ACH50,Actual Changes per Hour at 50 Pascal= 1,284X60/11,876=6.5 <7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- 1%,calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Sfm,-,Grafi" Stan Grajny, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 GRAJNY Consuffing, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 05/31/2016 Mr. Rich Schermerhorn Schermerhorn Real Estate Holdings 536 Bay Road Ste.2 Queensbury,NY 12804 Inspection Address: 76D Gentry Lane, Queensbury, NY 12804 Report Number: 0531164 Dear Rich: At your request, the Blower Door Inspection to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 05/31/2016. GRAINY Consulting, LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment,including I"and 2nd floor= 1,408 SF - Volume of the apartment, including I"and 21 floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal= 1,083 CFM ACH50,Actual Changes per Hour at 50 Pascal= 1,083X60111,876=5.5 <7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- 1%, calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Sf�Grc��y Stan Grajny, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski Ethan Peter Hall Cf~ 134 Dix Avenue �J Glens Falls NY 12801 + Voice 518 741 0268 Fax 518 741 0274 Email ephall@nycap.rr.com Special Inspection Report To: John O'Brien -Town of Queensbury—Code Enforcement Officer From: Ethan Hall Date: 31 May, 2016 Re: Schermerhorn Residential Properties—Cottage Hill Townhouse Apartments—76 Gentry Lane At the above referenced project location this office performed periodic on site observations of the construction. All items appear to be installed in accordance with the construction drawings. If there are any questions please contact our office. Regards, c. Ethan P. Hall—Architect L J Rucinski Hall Architecture x270 II �� u td MAY 3 ! 2016 ? j; TO 8B1JR,' B'Ull._DNG & CODES %\RI IA-FSlacad\SchemnerhomlC'ottagc Hill ApartmentsWupenv0rk4Special Inspection Letter-76 Gentry Lanc-31 May 201 b.doc