2014-501 TOWN OF QUEENSBURY
IFora 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201
Community Development - Building & Codes (518) 761-8256
CERTIFICATE OF COMPLIANCE
Permit Number: P20140501 Date Issued: Monday, August 08, 2016
This is to certify that work requested to be done as shown by Permit Number P20140501
has been completed.
Tax Map Number: 523400-296-005-0001-013-000-0000
Location: 97 ROUND POND Rd
Owner: MICHAEL J SWEITZER
Applicant: MICHAEL J SWEITZER
This structure may be occupied as a:
Shed / Storage Sheds
By Order of Town Board
TOWN OF n �d QUEENSBURY
Issuance of this Certificate of Compliance DOES NOT relieve the /�\ „ _��/[ / /4 44t
property owner of the responsibility for compliance with Site Plan,
Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
ea
TOWN OF QUEENSBURY
`OMF 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201
a
Community Development- Building&Codes (518) 761-8256
BUILDING PERMIT
Permit Number: P20140501 Application Number: A20140501
Tax Map No: 523400-296-005-0001-013-000-0000
Permission is hereby granted to: MICHAEL J SWEITZER
For property located at: 97 ROUND POND Rd •
in the Town of Queensbury, to construct or place
at the above location in accordance with application together with plot plans and other information hereto filed
and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning
Ordinance.
Type of Construction Value
Owner Address: MICHAEL J SWEITZER
97 ROUND POND Rd Shed/Storage Sheds
QUEENSBURY NY 12804-0000 Total Value
Contractor or Builder's Name /Address Electrical Inspection Agency
Plans&Specifications
2014-501
SHED 140 sq.ft.
$40.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday, October 23,2015
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town Quee bur h d•r , October 23, 2014
SIGNED BY
A-
for the Town of Queensbury.
Director of Building& Code Enforcement
Office Use Only
ACCESSORY STRUCTURE APPLICATION Received
3
DATE 1 d' ( —�!4 Tax Map ID
TAX MAP ID ,-,2q(o - 65 —( -I ` . Perm No. 440 �
i
yif LcW '16) ,i,' , �l + ^; L PermitFee
ZoNFNG !
HT
_ �RetFeel
HISTORIC SITE _Yes ✓ No CCT & J 201 t Approval's
SUBDMSION NAME y Lot
# I IJ I
IWO- �,LEENSBURY
APPLICANT Irene M. SwelterI BUILD.OwWEkODES Michael J Sweitzer
ADDRESS 97 Round Pond Rd. ADDRESS 97 Round Pond Rd
Queensbury, NY 12804 er Queensbury, NY 12804
PHONE 210- • 8011 ! 9 PHONE 518-223-5871
CONTRACTOR HIP Horne Incfall»Finn Prnfes'innRIR COST OF CONSTRUCTION(ESTIMATED): $ /�.�{-p pr ?
?Jane,ADDRESS: 300 Constitution Ave. BUILD/NG ADDRESS: 9 9 'c i no' Road-
Portsmouth,
/�oal
Portsmouth, NH 03801
PHONE: (866) 264-0761
CONTACT PERSON FOR BUILDING&CODES COMPLIANCE PHONE
TYPE OF CONSTRUCTION
I Check all that apply Please indicate measurements as required below
Boathouse 1`t floor sq.ft. I 2nd floor sq.ft. I Total sq.ft. Height
Boathouse with Sundeck
Deck
Detached Garage(#of cars
Dock - -
Pole Barn
Porch-open
"Porch—3 season,Covered,Enclosed -
Shed 140 sq ft 140 sq ft 10 ft.
Other Accessory Structure(s)
is Considered floor area&must comply with FAR(floor area ratio)requirements if located in the WR zone
DECLARATION: I acknowledge no construction activities shall be commenced prior to issuance of a valid permit. i certify that the
application, plans and supporting materials are a true & complete statement description of the work proposed, that all work will
be performed in accordance with the NY State Building Codes, local building laws and ordinances; and in conformance with
local zoning regulations. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of
occupancy. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly
constructed facilities prior to issuance of a certificate of occupancy.
11 have read and agree to the above: Print Name: Irene M Swelter � rG� Date: 10/08/2014
�1 CAx'
Signature: c Date: /On/Gay
Fi
ethd
Residential Final Inspection TAr1kS W
Inspection request received S 16\ 2Q(
Name Mvc. \'zcv Inspected on s es ) 1
Location CO' (2-0u tt %yr) Arrive :+ RAS ;_ pm
Permit No. 2-DA - 531 Inspector's Initials
Type of Structure
Yes No N/A Bathroom Fans,if no window
4" Building Number Address visible from road Plumbing fixtures
Chimney Height/"B"Vent/Direct Vent Foundation insulation to floor/ Sticker on Panel
Location
k
Fresh Air Intake •
3"Plumbing Vent through roof minimum 18" Floor trussrCertificationDuct work ft ds toppingproperly finished/ Blower basement
Test
Roof Complete/Exterior Finish Complete 1.000 sq.ft.
Platform at all exterior doors Emergency egress below grade
Handrail 4 or more risers Gas Furnace shut-off within 30 ft.or within line
Guards at stairs,decks, patios more than 30" of site
above grade 011 Furnace shut-off at entrance to furnace area
Guard at stairwell at 34" or more Furnace/Hot Water Heater operating
Guard at deck, porches 36 "or more Low water shut-off boiler
Handrail Termination at Newell Post or Wall Relief Valve(s) installed/Heat Trap/Water
•
Interior/Exterior Railings 34 "to 38 " Temp 110
Deck Bracing/Handicapped Ramp Compliant Enclosed Stairs Sheetrock Underside minimum
'A" Gypsum
Grade away from foundation 6 " with 10 feet Basement stairs closed rise*4 inches
6"clearance to sill plate
Garage Floor Pitched
Gas Valve shut-off exposed/ regulator 18"above Garage fireproofing/Y hour fire door/door
grade closer
Interior privacy /trim /doors/ main entrance Gas Logs in Sealed or Glass Enclosure
36"
Bathroom/ Kitchen watertight Final Electrical; Energy Saving Light Bulbs 50%
Safety glazing/Window in stairwells safety Final Survey Plot Plan
glazing Arc Fault Breaker Habitable Spaces/Tamper
Interior Smoke Detectors/Carbon Monoxide Proof Receptacles
Detectors Flex Gas Pipe Bonding
Every level: Every Bedroom: As Built Septic System /Sewer Dept. Inspection
Outside every bedroom area: Sticker
Inter Connected: Site Plan /Variance required
Battery backup: Flood Plain Certification, if required
Attic access 30"x 22"x 30"(height) in Okay to issue Temporary/Permanent
accessible area
Certificate of Occupancy OR
Crawl Spaces 18"x 24" access,1 sq.ft.-150 sq. Certificate of Compliance
ft.vents
Yes No N/A
Comments:
Town of Queensbury Building& Code Enforcement Office No.(518)761-8256
a.
NOTICE NOTICE
KRAFT PAPER INSULATION FOAM INSULATION MUST BE
MUST BE COVERED BY COVERED BY A 15 MINUTE
NON-COMBUSTIBLE BARRIER THERMAL BARRIER
} k
\ .
•
i M ' . ` `4 1 r ,-lad =_ _ .e
Ea„ I id
I � � t /1 , 11 .10 iii
; Vc/s1
il
YV I
1 i' I i/\ }
1
a ; CPPV TOWN OF QUEENSBURY
BUILDING DEPARTMENT
Based on our limited examination,compliance T UN OF OLIF _!ti a? ' - I, ii, ,yrl I x�
with our comments shall not be construed as
indicating the plans and specifications are in BUILDING & 'lO ;. '27'.')-1
..
full compliance with the Building Codes of j
New York state. Reviewed B';-' ;/ _ H; OCT 2 3 2014
Date: t_tt r TOWN OF OL EENSBURY
BUILDING& CODES
r,�a•, T.':',
�bJ
.•_:.I 3FIs=s-Ya'.M�+w_ r.•_v
`}.—• wP
r z'r: n+
�>
F
a
i- - + •. / ti� y Stith !r.mt max. r# l ' ref . •
i 0'
ll:
ct
t 7fi \•s fl tz4ix v� I 3TL g ,y�, r � -
4 , ,,
F.: _
. .
. vt
....
li
i _3r h- SNI aes . "'3r,vs r ;ip i `�y�
It*
1fzs's 'f ' 'f"3 stts t3..t _ t.? ' " i.7t4F LB �= �E8ONA :- � y - 1CtLsJO -r ' IrlI.s ---4,1:: £ „� " a _ E , r (c ` t Ynr �� f - � . _„y `\ ae7 -:IDL < ryu.' ici„5 sj s ' r . 4 ! l • �:! r-a [u L_. �s F- pi i= .' ex a4lNfieL 3 ;`E" , y i `� . % u5aa:-..,%. _ r1". -1 >. i
itir. ee•�II� Preparation Guide
Home Installation Please review this important'information about your shed installation
PROFESSIONALS -
c s W5 '' �} .`.
% j
r ? ` �� Welcome and You!
zit cit Your shed will be delivered and installed
3R Yr - by Home Installation Professionals (H.IP.).
'F Our goal is 100%customer satisfaction and
rciAlitel` '�`, with your help we can achieve that goal.
.
S
rc ti
-
-
.
0.-s�`
e
' r
0 Look Ins,
Take=
3.
HIP ,_ # r , rF 3<
a
,
xre' Easy Ste
AomeInstallation , fl`c.
PROFESSIONALS � '� , r4-,.-e '„ `'�-`S- kt k ^,'
mK.d --ci e n$' ham F .. Z Ea.. Ci. .
LAStep 1 : Step2: F
Review Permit, Zoning �/ Prepare and Ma 1c'.
& Special Requirements ® --
Check These Requirements:
Permit fees,zoning,other related costs,and requirements IV(Site must be 150'or less from where [+Access to the site ri -112,i.-:
vary by municipality and the scope of work. , j I our tractor trailer can park. Shed sites delivered in large preIkkk l e-
Pennit - located further than 150'from our make navigation . • . .p•:.s=
I truck's parking spot will incur additional if there is a fence,-riaie:lk.:r
•Check with your town to see if you need a permit. charges.Our trucks are approximately carport,shrubs,stat At. -- -
Note:Installations in Florida, Georgia, the Carolinas, the size of a school bus. obstacles prior to def qty
and Virginia have special requirements and we will - -
contact you to discuss these before contacting_ Level the Ground'
your town. HIP will review the final cost, related fees i �''
and associated permit requirements with you. - w
( • Permit and fees must be paid prior to scheduling your. :tµ�
installation.A copy of your Permit will be required. IIIII
il ,,,• "
Levelwi
Zoning&Special Requirements (leveledeveled vriMzline level) Highest Comer .,___
• Building codes in many towns and counties or yourII
'- - -
i,.
Home Owners Association may require special 6'or less -
foundations or the need to purchase additional items (from level stung to ground)
such as anchor kits,4'x4'runners or other items to ,. -- Ground
meet specific requirements.These need to be - " - - - ___
determined prior to scheduling installation.We can
add these to your order at additional cost v`.t -
•Zoning requirements may include setbacks,height Land grade must be less than a 0'slope from the highest to lowest point with no 1 v rii:(i :.s
stumps in the area.Identify the highest comer using a"line level"and check the he!L i I:Y
restrictions,etc. 3 corners of your site.Line levels are available at any hardware store,orcall usand a:' -,i'
•Shed sizes in our brochure are approximate. one free of charge.If you have purchased a ramp,please make sure this area islevel t", ,
Visit our website for exact outside floor dimensions. Floor sizes are approximate.Before preparing your own foundation orfoo ii t=^-_""
If you require any other technical information, or if using fill,stone or gravel,please call us or visit our website,for detaileed.a;Tr'
let us know and we would be happy to help you. Standard installation is on concrete blocks,see"How We Build Your Shed`.:I.',
r
i" -..-:;aN l=ngiE.labs£x- ;? a'a.,--F.aim' t'' Vb v' ,f”(4.4 wet. 4-.r 2. `.._ . ..>.. .....
Installation Postponement How-7 tzr!
and Cancellation Y'- ..
We do our best to accommodate customer schedules however ,s 4
postponement of an installation by the customer may result in additional il X-r__4 IL.
fees.Please contact HIP immediately if your order needs to be
cancelled. 15%canoe la any product already in production will incur ia
Farr , d }
a minimum 15%cancellation fee � 41 lir _ f �'
if any of the"site requirements"are not fulled,your product may not be "` ` '`'�# +•- �✓.�_.. -`' '`• - ..
installed,and a fee of$150 will be charged for our crew to retum and y '9 .r'4 _+ ._. x_= r'� t- "` - _ -
construct your product once conditions are met If this occurs,delivery "' " - s �..-' " '
of your materials must be accepted and placed on your property in a Truck arrives with Sections are carried to site Wa s Iahe•;a
location accessible to the final site If materials cannot be left at the prefabricated shed and floor is leveled on position .r1•,'.
site a$300 fee for redelivery and reloading will be charged.It is the sections concrete blocks ',ntsy.:;s,:
customer's responsibility to cover the materials with a non-transparent •-•- - .
waterproof material to prevent any unnecessary weathering and/or '•
discoloration.All fees are assessed by H.I.P.at the time of notification. Watch Our Shed Installation'VAP,
=n` ..rte->isi ,, -..µiia, ` s,*e T0.,a,;ths,tet a'3a. y.,..t:x:..,, ":„-,,,,,,„,,:,,,,,-s,,,, -_ . _
ifili:r
7Customer Senn•= ';
K-g711,7 -,f fS ,.�, f V.�. ,y - . �, .�' : i a+`. sem++-: ' 3taWar s "� . -}**
Jvirre .'s ' x r r _' � l S t: note ;i7T ia_ --, 5 Y v`-nam m r ,,,
`-'..�-. 4- z.:' _a �'"*-te.'' T�.za'�."�.�24 �4•'r'*'"�. �.a'�`-`cfl�?sr4",
•
rn . r Step 3 i --: i
Schedule Your Shed
Installation
Clearance around the shed must be Ii Land quality is important:Whenr - - - ; •Start thescheduling process by going to: -
at least 3' from any fences,trees,etc: . choosing your site consider all factors, - www.homeinstalipro.com/faststart
lease remove tree branches, brush . including proper drainage,firmness - ' Enter your phone number and answer the questions "
x other obstacles 3'around perimeter of earth,etc. • to provide us with important information to get your
Df shed and 15'above ground. installation started fast.No web access, no problem! -
We will call you within one week to review your' _ '
order and schedule your installation.-
lark Your Site: . •
• Permit requirements must be finalized prior •
III Level String N to scheduling and accepting an installation date.
(leveled with a line level) -
-----e az.`_ j,_„,y sw,'j«.::,..tvg.x, ^k H _ tpy t l •We want to advise you in advance that our crews
I >a �' "`x ` .,,, - '' ,'•j' s 1 install multiple products a day.The status of one
143 1 n $ vv !:- a fy _.1-s rR-Y h-_f.t4§tk " - maymany ya
installation affect others.We ask far ur
`t * _=
r?;._�-:'; E y��".t.:e;=�' -r-`'"�- �., »���t;=y rf��y-,�1 understanding if an unforeseen event affects an
I.a n a cLenene Footprint 41` installation date or time.
i $ _ +,-+� zs i. „i- gra§ t t'�'-I
I
tx� a
v �z `' �' '- t ..'w ' . •Deliverytime can fluctuate based on seasonal
'' r R` fi - r- rt ' volume and weather conditions. Exposure of
Comer Na: 41. ."' i41',6Oruse Rednag_r Comer R4:1
— r _.._ _ _==a._-__ _ _•__ materials to the weather in transit, upon delivery,
I Optional i and during installation is a normal aspect of
1 Ramp i construction.
I J
Using the five flags provided,please have the site marked(to the actual shed footprint)before delivery. •Our products are installed Monday—Fdday. For your
Indicate the four corners with the white flags and the main or double door location with the red flag convenience, if your site is marked you do not have
(use masking tape for paved surfaces). - to be home for the installation.Once you have
If your site is marked you do not need to be home.We will build the shed as close to the flagged layout accepted an installation date your order cannot be
as possible.If you have very specific placement requirements,you must be home to approve that your changed.
shed is being built in the correct spot.
11.t7--...::..-1a....-'w_.K , i te^+X � , '_ �.�-z `r� z s:33,s Vigra-�at �.vr ts + eueN.-Wiec�05`
Your Shed
Installation Day
rH 3-r}< ":kt Recommendations
t r Ky r� s l ! ei , Project Review -
�s� ; > .nu , wl� , Our installer will review the project with you before leaving the job
t s F F M.
site.If you see something that concerns you during installation or
r - during the final project review please let the builder know.If you
to *- a `� ct "`"j' s- - " were not home at the time of the installation,please perform a
_ -+^-_ _ ° - _:-.—•- — _ prompt inspection of your shed and immediately contact H.I.P.with
Roof trusses and Roof shingles are applied Most sheds are complete any concerns.
sheathing is installed in 2 to 4 hours!
Activate Your Warranty
Activate your warranty at:
www.homeinstallpro.com/activate
at: vevvvv,horn6nstallpfo,com/video
e_ _
allpro.com .
i1 Monday-Friday 8am-5pm 2
ri-rfr« • "' Caring For Your Structure
*,y -t idr, r'�'„ i 1 All H.I.P.structures are sold unfinished(except vinyl)and must be properly prepared and treated within 60 days
/,, - e ' i- of delivery,sooner if possible.'We urge all customers to consult with a professional paint supplier for
t - - - ; - tr' recommendations on suitable products and required quantities for proper coverage.Untreated wood will
r rf-,ii O 1- 4 weather with exposure to the elements Weathenng is not covered under warranty
i -= Ix �' • "+ - ' , Wood Structures(Pine,Cedar,Smart Panel)
.1,-,47.-1 . 1 - :{011.-41.7, _;,,,
•To prevent leaking and premature aging of your shed,we recommend wood structures be thoroughly
prepared before treatment All joints between wall siding boards,window trim,door trim,corner boards,
soffits,fascias,rake trim,vents,and naturally occurring hairline cracks in knots must be properly sealed with
high quality caulking prior to treatment.We strongly recommend nail holes in all material types be filled prior
to treatment.In order to deter knots from bleeding through your finish,pre-treat knots with a suitable product.
"I am very pleased with my •All window sashes and doors must be treated on all sides,edges,and surfaces.
new shed. I was amazed how •Flower boxes and shutters must be removed and treated on all sides,edges,and surfaces.Wall siding
behind flower boxes and shutters must be treated while the components are removed.
quickly and easily it was • For stain or paint to properly adhere to wood products,we recommend a light sanding pnor to treatment
installed and how convenient it We do not recommend the use of clear sealer on pine or cedar. Discoloration of the wood can result.
was from time of purchase to All treatment should be repeated as needed or in accordance with manufacturers instructions.
final construction.Thank you! ••Smart Siding is a pre-primed material,it is NOT top coated,and must be painted.Acrylic latex paint is
required Do not use any oil-based product.
—K MACDONALD, MA 'Delivery between November 1st and February 15th may not allow the owner enough time to treat the structure due to
temperature or weather This will not harm product but some weathenng may occur.If your structure is installed during
this time period,it must be treated pnor to April 15th for the warranty to remain in effect
Post Installation FAQs .
'a y Shingles Aren't Laying Flat - .
_:, - ! This is a normal"condition.Please allow a minimum of 2 full weeks of temperatures
, mAa, above 60°Ffor shingles to seal.
9 $Q.
Ramp Is Too Steep If your site is not level enough,your ramp may end up being too steep.When choosing
your site,be sure it is level within our requirements. -
sa
u Subfloor Sheathing - • - -
°? i...,14z..1,::, -„.,7!: Small gaps between subfloor sheathing sheets are a normal aspect of construction =
r f' =i'4`t:' You maycaulk gaps to fill and seal them ifyou wish Floors m also be painted for
_s - 9P fi
i+�{B • ' additional protection and appearance.Consult with a professional paint and caulk
tSt,j supplier for recommendations.
For Online Information Visit: - .
www.homeinstallpro.com T��`+ Y# `t,C Barrel Bolts Do Not Function Properly
`% ,r..,°T.-J Bolts can become misaligned due to building settling The building can be re-leveled or
Site Prep Guide --=f^ 't adjustments can be made to the barrel bolts.To adjust,loosen all but 1 mounting screw
rzs "y - -
Floor Dimensions "^" tk" iJ':e-23./p and rotate it slightly until the bolt is aligned with the hole,then re-install the screws
_i.-*. f t'f Sonotubes,Slab,and Gravel Pad " "` - =„ See leveling your building below.
Layout Diagram ' My Door Handle Is Loose" - .
Caring for Your Shed �� 'm The'haridle on the nside of your door may come loose over time.To tightener re-install
\� "'`1 1 the handle,Tighten theset screw Onto the flat surface of the square shaft using an Allen..-
Warranty H- r .-wrench.A small amount of WD-40 spray may help with a'sticky lock -
=- - -
Leveling Your Building
�i �
- bs� • , ' When installed on blocks,your building is leveled but over time it may settle causing
t the doors to function improperly.Settling is not covered under warranty.Please visit
tx1... our website fof instructions on how tore-level your building.
"14: IIP _ . .. . .
s. .- Why My Shed LooksTo Be Out of Level
Home Installation '' '-n"eAll sheds are installed level.The photo shows site preparation was not perfouuei by the
PROFESSIONALS r_ ztri
-- - customerto yield a level site before the installation.Land grade in photo is'sloped well
&xr - - over one foot and the site is not level.Plan ahead,better site preparation will yield a more
` desirable outcome.Level the grade and add fill as necessary.
3 H.I P.Welcome Brochure 6/13
LOT 9
LOT g
ROUjVD
�- -- -- ----- -- POND ROAD
NOTES:
) THIS SURVEY WAS PREPARED WITHOUT THE
BENEFIT OF AN ABSTRACT OF TITLE AND IS
THEREFORE SUBJECT TO ANY EASEMENTS,
COVENANTS OR RESTRICTIONS OF RECORD
ANY STATEMENT OF FACTS SUCH DOCUMENT
WOULD DISCLOSE.
2; UNAUTHORIZED ALTERATION OR ADDITION TO A SURVEY
MAP BEARING A LICENSED LAND SURVEYORS SEAL IS A
VIOLATION OF SECTION 7209, SUB- DIVISION 2, OF THE
NEW YORK STATE EDUCATION LAW.
3) ONLY COPIES FROM THE ORIGINAL OF THIS SURVEY
MARKED WITH AN ORIGINAL OF THE LAND SURVEYORS
SEAL SHALL. BE CONSIDERED TO BE VALID TRUE COPIES.
LEGEND
o LR.I RON R:iU F;)UNG
o I.P.F. IRON PIPE FOUND
o LR.S. IRON ROD SET
"a, UTILITY POLE
MAP REFERENCE:
MAP ENTJ,r[) "MAP OF A PAJP:J'�' '. ';0'i
MA!)E FSR 3UIUG PAStiE W.d„N'. P;;N:: SU9JI vi<ION
'i TF P[AN”
PREPARED Bti VANDUSEN III:
DAT;-'', aUNE 24, 1993
,.AST R;.VISEf SEPTEMBER 29, 199.'.
P_r- IN THF OFFit' OFTHE WAPP'�,N JU'i'r
LOT 7
FIL
C # vl
TOWN OF OUEENSBURY
BUILDING AND CODE
�.P OF A SURVEY OF LOT 6 ROUND POND SUBDIVISION
MADE
70F 1.
�w a rNSdURY, COUNTY OF h' ..,... t N"t H rukK
btANo/`SVP~ rl 71) J. BOLSTER
p Ff) I vf) t'RtFYOP
DAVID J. BOLSTER. LLS DATE: APRIL 29, 2004 SCALE: 1"= 30' _R 495 4
PATE Sf ALED
STONE WALL
w —e-
BARBED WIRE FENCE
•
POINT
W.F.F
WOOD FENCE POST
-- +w----
OVERHEAD WIRES
NOW OR FORMERLY
MAP REFERENCE:
MAP ENTJ,r[) "MAP OF A PAJP:J'�' '. ';0'i
MA!)E FSR 3UIUG PAStiE W.d„N'. P;;N:: SU9JI vi<ION
'i TF P[AN”
PREPARED Bti VANDUSEN III:
DAT;-'', aUNE 24, 1993
,.AST R;.VISEf SEPTEMBER 29, 199.'.
P_r- IN THF OFFit' OFTHE WAPP'�,N JU'i'r
LOT 7
FIL
C # vl
TOWN OF OUEENSBURY
BUILDING AND CODE
�.P OF A SURVEY OF LOT 6 ROUND POND SUBDIVISION
MADE
70F 1.
�w a rNSdURY, COUNTY OF h' ..,... t N"t H rukK
btANo/`SVP~ rl 71) J. BOLSTER
p Ff) I vf) t'RtFYOP
DAVID J. BOLSTER. LLS DATE: APRIL 29, 2004 SCALE: 1"= 30' _R 495 4
PATE Sf ALED