Loading...
4.01 4.1 FINANCIAL\3016\Establish Cap Proj Fund 314—Water Dept Switchboard Project—Accept Delaware Proposal—11-31-16 RESOLUTION AUTHORIZING WATER TREATMENT PLANT SWITCHBOARD UPGRADES PROJECT, ESTABLISHMENT OF CAPITAL PROJECT FUND #214 AND ENGAGEMENT OF DELAWARE ENGINEERING, DPC FOR ENGINEERING SERVICES RESOLUTION NO.: , 2015 INTRODUCED BY: WHO MOVED ITS ADOPTION SECONDED BY: WHEREAS, the Town of Queensbury wishes to establish a Capital Project that will provide for the replacement of the switchboard at the Town of Queensbury Water Treatment Plant, and WHEREAS, the Town wishes to establish and fund the Revenue and Expense Accounts for the Capital Project in a total amount of$20,900, and WHEREAS, the Town Water Superintendent solicited and received proposals from three (3) engineering firms for the preparation of engineering plans for the switchboard upgrades, and WHEREAS, Delaware Engineering, DPC submitted the lowest and best proposal for such engineering services related to the Capital Project for the approximate amount of$19,000 as set forth in its November 1, 2016 proposal presented at this meeting, and WHEREAS, accordingly, the Town Board wishes to establish a Capital Project Fund for the Project and authorize such engagement of Delaware Engineering, DPC, and WHEREAS, the Water Superintendent has advised the Town Board that there are times when Change Orders may become necessary for such Project and has requested that the Town Board also authorize him to approve and sign certain Change Orders up to a 10% contingency for Change Orders that he deems necessary or appropriate, NOW, THEREFORE, BE IT RESOLVED, that the Queensbury Town Board hereby authorizes the Water Treatment Plant Switchboard Replacement Project and authorizes and directs the establishment of the Water Treatment Plant Switchboard Replacement Capital Project Fund 4214 in the amount of$20,900 which will establish funding for expenses associated with this Capital Project, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs that funding for such Capital Project shall be by using $20,900 of unappropriated, undesignated Fund Balance 040- 0000-0909 and transferring such balance to the Capital Project as follows: • 040-9950-9030 Transfer to Capital Project - $20,900 • 214-0000-55031 Interfund Revenue - $20,900 • 214-8320-2899 Capital Construction - $20,900 and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and accepts the proposal of Delaware Engineering, DPC dated November 1, 2016 for professional engineering services for the preparation of engineering plans for an approximate amount of$19,000, and 2 BE IT FURTHER, RESOLVED, that the Town Board hereby authorizes the Town Water Superintendent to approve and sign Change Orders pertaining to the Contract up to a 10% contingency or in the total amount not exceeding $1,900 that he deems necessary or appropriate, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Budget Officer to amend the Town Budget, make any adjustments, budget amendments, transfers or prepare any documentation necessary to establish such appropriations and estimated revenues, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to sign any needed agreement with Delaware Engineering, DPC substantially in the form presented at this meeting, as well as any other needed documentation and the Town Supervisor, Water Superintendent and/or Town Budget Officer to take any and all actions necessary to effectuate all terms of this Resolution. Duly adopted this 21St day of November, 2016, by the following vote: AYES NOES ABSENT : 3 Delaware Engineering, DPC WaWI 28 Madison Avenue Extension Tel:518.452.1290 .— Albany,New York 12203 Fax:518.452.1335 November 1, 2016 Chris Harrington, P.E. Water Superintendent and Director of Wastewater Town of Queensbury 823 Corinth Road Queensbury,NY 12804 Subject: Water Treatment Plant Switchboard Upgrades Dear Mr. Harrington: Delaware Engineering D.P.C. (Delaware) is pleased to offer this proposal to provide professional engineering services for the preparation of engineering plans for the Town of Queensbury Water Treatment Plant Switchboard Upgrades. Our proposal also includes preparation of an Arc Flash Study at the water plant. Delaware Engineering and its staff have completed design and construction engineering services for many similar infrastructure projects. In addition, our local presence ensures that we are readily available to meet with Town staff and deal with design and planning issues very quickly. Our proposal to the Town of Queensbury includes the following scope of services: Scope of Services (See Attached) Schedule Delaware will complete the design within 60 days of authorization and provide a copy to the Town for review and comment. Engineering Fee Proposed engineering fees to complete the work are $19,000 and will be billed on a lump sum basis for the tasks listed above. An hourly rate schedule is attached. Our project team consists of engineers, planners and scientists that are leaders in the field of water plant design and construction. We trust that this experience will bring significant benefits to Queensbury and we are available to meet and further discuss this important project at your convenience. S incerely, CybiLL Ablen Amrod, Project Manager Delaware Engineering, D.P.C. 8-12 Dietz Street,Suite 303,Oneonta,New York 13820•Phone(607)432-8073/Fax(607)432-0432 BRANCH OFFICE:6 Townsend Street,Walton,New York 13856•Phone/Fax(607)865-9235 TOWN OF QUEENSDURY WATER TREATMENT PLANT SWITCHGEAR UPGRADES PROJECT UNDERSTANDING PROJECT UNDERSTANDING The Queensbury Water Department is seeking electrical engineering assistance to design the replacement of the outdoor electrical switchboard at the water plant. The electrical design shall include one line diagrams, layout drawings, and specifications. The electrical engineering for this project shall also include an Arc Flash Study at the water plant. Delaware proposes the following Scope of Services for the Queensbury Water Plant based on discussions and a walkthrough with plant staff and our experience with similar projects. SCOPE OF SERVICES This Scope of Services includes the steps necessary to complete electrical design of the Switchboard replacement and an Arc Flash Study. The project includes the development of approved design plans and specifications, bidding assistance, and inspection services for the project. The following represents the scope of services to be provided by Delaware: TASK 1.0— DESIGN Design services include all efforts to secure approval of Final Engineering Plans. 1. Delaware will conduct site visits, meet with Queensbury Water Plant staff and review as-built drawings and any other available information in order to evaluate the existing electrical system. Delaware will make recommendations on the most cost-effective solutions for completing the project, for review and approval. 2. Delaware will prepare preliminary and final design plans and specifications for the project. All contract documents will be prepared in accordance with the Town of Queensbury and New York State requirements. The project is understood to include the design of the following components: a. Replacement of the outdoor electrical switchboard. b. Develop one line diagrams for the system. c. Develop a plan to keep the water plant running while the switchboard is being replaced. DELAWARE ENGINEERING,D.P.G. • TOWN OF QUEENS/AMY WATER TREATMENT SWITCHGEAR UPGRADES SCOPE OF SERVICES 3. Delaware will prepare Contract Documents including plans and technical specifications for the electrical components of the switchboard replacement. Task 1 Deliverables: 1. Preliminary Engineering plans and specifications for review 2 Final Engineering(100%)plans and specifications 3. Engineering Estimate of construction cost TASK 2.0—ARC FLASH STUDY Delaware Engineering will develop a computer model of the electrical components at the water plant and perform an arc flash study. This study shall include: 1. Utility Transformer 2. Major Distribution Equipment 3. Large VFDs 4. MCC main feeds. Task 2 Deliverables: 1. Arc Flash Study. TASK 3.0 — BIDDING SERVICES Delaware Engineering will provide assistance to the Town of Queensbury for the bidding of the project. Delaware Engineering will provide the following Bid Assistance: 1. Delaware Engineering will provide bid documents in digital format on CD-ROM. 2. Our staff will attend pre-bid conferences to answer questions from potential bidders. The Project Engineer will also be available to representatives of the Queensbury Water Plant to provide any information necessary. 3. Delaware will prepare addenda to the bid documents as necessary throughout the bidding process and will be available to answer any questions that arise during the bidding process. 4. Delaware Engineering will review bid proposals and make recommendation for award. DELAWARE ENGINEERING,D.P.C. • TOWN OF QUEENSBURY WATER TREATMENT SWITCHGEAR UPGRADES SCOPE OF SERVICES Task 3 Deliverables: 1. Bid documents in digital format on CD-ROM 2. Addenda to Bid Documents 3. Recommendation for Award TASK4.O — CONSTRUCTION PHASE SERVICES Delaware Engineering will provide inspection for the installation of the switchboard. 1. Delaware staff will visit the site for inspection at critical points during the project to ensure installation is being performed correctly. 2. Delaware Engineering will attend startup of the electrical equipment. Task 4 Deliverables: 1. Record Drawings in reproducible and electronic format 2. Copies of all reports, tests and shop drawings DELAWARE ENGINEERING,D.P.C. • TOWN OF QUEENSBURY WATER TREATMENT PLANT SWITCHGEAR UPGRADES COST PROPOSAL COST PROPOSAL The following cost proposal is based on discussions with the Town and the scope of services included in this proposal. Task Scope of Services Not to Exceed Fee 1.0 Design Service Prepare Design Plans and Specifications $ 8,000 2.0 Arc Flash Study $ 3,000 3.0 Bidding Services $ 3,000 4.0 Construction Phase Services $ 5,000 TOTAL FEE $ 19,000 Engineering Design, Bidding, and Construction Services costs are based on a lump sum fee. DELAWARE ENGINEERING,D.P.C. TOWN OF QUEENSBURY WATER TREATMENT PLANT SWITCHGEAR UPGRADES COST PROPOSAL DELAWARE ENGINEERING, D.P.C. ENGINEERING RATE SCHEDULE YEAR 2016 Billing Category Rate/Hour Technical Typist/Administration $57 -$67 Designer, Technician, Construction Inspector $78-$103 Senior Designer, Technician, Construction Inspector $95- $115 Senior Construction Manager $120-$139 GIS Specialist $95-$105 Engineer/Scientist/Planner I $95 -$105 Engineer/Scientist/Planner II $115 -$130 Engineer/ Scientist/Planner III $120- $135 Senior Engineer/Scientist/ Planner I $125- $140 Senior Engineer/Scientist/Planner II $135- $150 Senior Engineer/Scientist/ Planner Ill $150- $165 Principal Engineer/Scientist $160- $180 Reimbursable Expenses: 1. Mileage @ Federal Rate 2. Travel Expenses (Lodging, Meals) @ Federal Per Diem Rate 3. Telecommunications @ Cost 4. FedEx, UPS, US Postal,Courier @ Cost 5. Subcontract Management @ Cost 6. Other allowable costs @ Cost(Plan Reproductions, Photographs, etc.) 7. In-house Printing: B&W Color A size-814"x 11" $0.05 $ 1.00 Bsize- 11" x17" $0.10 $ 2.00 D size- 24"x 36' $0.50 $15.00 E size- 36"x 48" $ 1.00 $30.00 other sizes $0.10/s.f. $ 2.50/s.f. DELAWARE ENGINEERING,D.P.C.