Loading...
SEP-000798-2016u 40 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building& Codes (518) 761-8256 CERTIFICATE OF, COMPLIANCE Permit Number: SEP-000798-2016 Date Issued: Thursday, March 15, 2018 This is to certify that work requested to be done as shown by Permit Number SEP-000798-2016 has been completed. Tax Map Number: 239.12-2-11 Location: 42 OLD ASSEMBLY POINT RD Owner: Jeff Randles Applicant: Jeff Randles This structure may be occupied as a: Residential Septic Alteration By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Compliance DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, 4 Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. . TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building& Codes (518)761-8256 BUILDING PERMIT Permit Number: SEP-000798-2016 Tax Map No: 239.12-2-I1 Permission is hereby granted to: Crandall Excavation Inc. For property located at: 42 OLD ASSEMBLY POINT RD In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Jeff Randles Septic Disposal-Residential 0.00 Owner Address: 82 Claremont DR,E Total Value 0.00 Vooreesville,NY 12186 Contractor or Builder's Name/Address Electrical Inspection Agency Crandall Excavation Inc. 63 Woodchuck Hill RD Lake George,NY 12845 Plans&Specifications Residential Septic Alteration 40.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,November 23,2017 If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration Adate Dated at the Town of eensbu n ecin ember 23,2016 SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement SEPTIC DISPOSAL PERMIT r 10 Oe Qal DATE 77.0 1Receive"d l ii { NOV l Tff%ap Ips_--( TAX MAP ID IZ–Z^ 1 (+ + Permit Nol. L.. M1__ ... . -Permit Fee, 0 LOCATION OF/NSTALLATIO Apprdvals: APPLICANT JEFP'R4IV>LC^ .7 PHONE/E-MAIL ADDRESS Z E GL la.tZtMONT'. yao'QEt V 1".£ 11 1Y 121tafe INSTALLER/BUILDER: CgAy-t lat L_ F_ArJ VA--niAeC PHONE/E-MAIL 1R 3-CA'3 1 ADDRESS: C`s3 OWNER l kP?t—lG/I.1"LT PHONE/E-MAIL Address CONTACT PERSON FOR BU/LDINO&CODES COMPLIANCE:bffjA'P X ._! 10AG.E".-g—c ( PHONE 374—A4A410S I RESIDENCE INFORMATION 19<05 T.Z"*Z Year Built of bedrooms X Gallons per bedroom ! =Total Daily Flow 1980 or older Garbage grinder installed Y eti 1981-1991 Spa or Hot Tub installed —Y !N 1992-Present PARCEL INFORMATION Topography je!f Flat rolling _Steep slope _%slope Soil Nature Sand Loam Clay Other Groundwater At what depth? -PO &Mee Bedrock/Impervious Material At what depth? a Ga(o at Domestic Water Supply Municipal a (' qer any septic system absorption is_ft.) Percolation Test Rate: per minute per inch(test to be completed by licensed engineering/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION Tank Size gallons(minimum size 1,000 gallons,add 250 gallons to size for each garbage grinder or spa or hot tub) System Type Absorption field with#2 stone Total length l32 ft.;Each trench 16111 _x A+(a_ Seepage Pit with#3 stone How many: size Alternative System Bed or other type? E LJETL a5H RIES Holding Tank System Total required capacity? Tank size of tanks Notes: 1)Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency;2)We will no longer allow systems to be covered until such time as an As-Built plan is received & approved. The installed system must match the septic system layout on file—no exceptions. DEcLARATrON: Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance know by or on behalf of an applicant, shall be void. I have read the regulations and agree to abide by theseALLd all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. Print Name:EPPi1L]G!J Date: 11-1'7-Ile Signature: I hC_ ,--6f /G1 T11 Date: \1— L^T—Vem Town of Queensbury Building&Codes Septic Disposal Permit July 2014 f; fa - Bey ry co E' I• LAKE GEORGE IxC 239. 12- 2- 11 SEP- 000798- 2016 CQ Randles Jeff F tt s LOCATION W W 42 Old Assembly Pt. Rd. z p{ dtiryl I d N PPIF 11Y ` p. Residential Septic Alteration w 11 z ILC z O Qz JIB W SITE v s9; 3 L BVI dip r z I ' it 30• Q W LANDS N/ F OF 2 v` F O JAMEM. WA SHARY W LAKE WATER SUPPLY r N SITE LOCATION MAP TAXMAP VICINITY MAP SCALE: 1" = 2000' F S SCALE: 1" = 400' Eg; 3j 3-_ E V l a D in- Lv 0 Z} I- DWELLING G1 In Z WV OVIO SIHI Pd v H1d0313S 38NV1SIa 3H103 ( 1SV36 W N 0p94 AIIVNOSb3d 3AV 11N3WN30a SIHI NO OHS H a 3 O13 ' S3ON33 ' S332l1 ' 3113M ' S3S( lOH S O W Q o' R. 00, 3 S1O3F80 11V HOGS Pq eAq a° pgv rT, r X965° 3' Q3 i3S8Q 2I0 N33S / 1VH I F J L IL Z B hJ` ld 10` Id Ild3S Z I 0 y SOILS ANALYSIS — TEST PIT DATA JOHN F. ROUSSEAU L eqU eNr PS Ir OCTOBER 14, 2016 TO U R E- 1 1 4 T DONALD E & MARCELLA M. NEED 2 Ter° J` ongy I- i. Z - T OCT. 11, 1958 380- 447 es F- I I n PROJECT DESCRIPTION: THE EXISTING SYSTEM SERVING THE 9"' 4y O F- I ^ al N RANDLES RESIDENCE IS A 1965 ERA SYSTEM LOCATED IN THE E O ( 0 a Ne ss R° W PROXIMITY OF THE HOUSE. THE OWNER IS REQUESTING A OVY` I { N ryl SBUt rP# 3 meg++ z WC o REPLACEMENT SYSTEM WITH THE ABSORPTION FIELD LOCATED Qi ( C G a FURTHER FROM THE LAKESHORE. DUE TO THE SITE TOPOGRAPHY O D sunr o rPgl Q W n SUHLLI _ CO. e s R/ eR PTBz Q W w`, A PUMP SYSTEM WITH THEREFORE BE REQUIRED. TEST PITS A Z > WERE EXCAVATED IN THE AREA OF THE PROPOSED WASTEWATER er ' R/ View G / a ° Rod$ Q r r SYSTEM AND LOGGED BY DENNIS MACELROY, PE. THE SOIL LOGS OF THESE EXCAVATIONS ARE AS FOLLOWS: Date; L ow 4 l- r W y L1 S is A R z TEST PIT # 1 - NORTHEAST CORNER OF TREE AREA 9e 0 - 10" FOREST DUFF, ORGANIC MATERIAL, LOAMY SANDFOR yq°; To 4, 1,%, A® W 10" - 42" FINE LOAMY SAND, BROWN - DRY TOWN OF QUEENSBURY eJ 01ROOTS TO 24", SOME COBBLES/ SMALL BOULDERS BUILDING DEPARTMENT 42" - 66" FINE SAND - BROWN, Based on our limited ex; nination, compliance AREA= UILDING G A FIRMER WITH DEPTH With our comments sha•; . IOi i.} e construed is indicating the plans ano sppecifications arf- .,, 2o38j, 0. 860f AC NO OBSERVATION/ INDICATION OF GROUND WATER OR LEDGE full compliance with the 8uilding Codes of V 5 New York State. GERALD G. H. & FREDAON PARKERSOLOMONF- j O Q n FF-- 1i w TEST PIT # 2 MIDDLE OF TREE AREA GEO. R. & MARILYN WASSERMANF-- 1 w MAY 17, 1966 468- 503 N 27y, E-+ N_ 0 - 10" FOREST DUFF, ORGANIC MATERIAL, LOAMY SAND 69 U1 x s• A 03Z 10" - 41" FINE LOAMY SAND - BROWN, DRY SOILS ANALYSIS — PERC TEST DATA x z 3 R OCTOBER 19, 2016 a N W O o o 41" - 67" FINE LOAMY SAND- BROWN, DRY ANTHONY GEORGE Q a THE FOLLOWING PERCOLATION TESTS WERE PERFORMED BY To y 2 U J$i FIRMER AT DEPTH DONALD E. NOL7E LANDS OF N/ F Q K M ENVIRONMENTAL DESIGN PARTNERSHIP. ALL TEST HOLES WERE OF' ltJ o M 1951 304- 350 24, PRESOAKED TWICE WITH 6" OF WATER AND ALLOWED TO AUG. AS7ROWSKI 2 v m NO OBSERVATION/ INDICATION OF GROUND WATER OR LEDGE LAKE WATER SUPPLY COMPLETELY DRAIN. PERCOLATION TESTS WERE COMPLETED AT LAKE W47ER SUPPLY 12" DEPTH AS PER SHALLOW TRENCH SYSTEMS. 2 E TEST PIT # 3 WEST SIDE OF TREE AREA PT# 1 4 V a 0 - 10" FOREST DUFF, ORGANIC MATERIAL, LOAMY SAND TRIAL 1: 1: 50 TRIAL 2: 2: 10 GRAPHIC SCALE W Q I p TR AL 3: 1: 55 10" - 23" FINE LOAMY SAND - DRY TRIAL 4: 2: 10 1 Z 23" - 65' FINE SAND TO SILTY SAND - DRY pT# 2 U 11 w FIRMER WITH DEPTH TRIAL 1: 1: 45 U) 0 TRIAL 2: 2: 10 40 30 20 10 0 40 80 q NO OBSERVATION/ INDICATION OF GROUNDWATER OR LEDGE TRIAL 3: 2: 15 IN FEET) N 1 INCH = 40 FT. o' a oO c 1 i W rn F' z w CONTRACTOR TO CONFIRM IL r a LOCATION AND DEPTH OF J N Z HOUSE SEWER LATERAL O t0 2000 GAL PRECAST h SB93j, CONCRETE SEPTIC TANK. Z SEE DETAILLANDS NA T ii Z JAMES C. & MARY V `) Yi .`. 51 M. WALSN T^ LAKE WATER SUPPLY ZV 1 L 1- co W a7 y REMOVE EXISTING TREES W N Il AS NEEDED FOR ABSORPTION W Q W. DWELLING FIELD INSTALLATION E" I 0. Luv N) 3) ELJEN GSFdi Dob TRENCHES AT 44 LF Z ZEACH. SEE 683). oAnF q. pppN 33' AND CROSSDSECITIONIT H Q 96 TO 96S qsO R JOHN F. ROUSSEAU Fgse eryTREs rT, (] y O70, Q d C DONALD E. & MARCELLA M. NEED a E r° j CnpN W E I Q OCT. 11, 1958 380- 447 O s9ce s 1 , Z CQ J Z ( 1r VACANT L, O CQ . F 12 e V ry ea` TP@s LAND FC a r F- I m OD a ' Q cu 10 sue° ne \ P myt W r: j a J Co 1 o egsEAlE-, v Tp ReSOSJ w /+ 1Oi V cu 02 eRT 65 RT° t STP SILT FENCE, TYP. U U] A ® T.T. - ' o SEE DETAIL dj r= 4 1. 419W W o 1000 GAL PRECAST oRB ceR< F Z y CONCRETE EFFLUENT 08• wq Rpypge 1{ p' ' idW PUMP TANK. SEE DETAIL Bc, NejT W O z® z z d' E E w I% W z 1l" PVC SDR- 21 AREA= FORCE MAIN 00. 86Of AC V VACANT GERALD G. H. & FREDA LAND z o PARKER SOLOMON TO GEO. R. & MARILYN WASSERMAN odeMAY 17, 1966 468- 503 N,? y9 i ^ O sg 7g. W n o PRECAST CONCRETE Y r 1 DISTRIBUTION BOX ANTHONY GEORGE c+ w 3 SEE DETAIL TO a o E W 3 r DONALD E. NOLTE LANDS N/ F Q 2 oo AUG. 24, 1951 304- 350 LAKE WATER SUPPLY ASTROWSKI U G LAKE WATER SUPPLYo2 ii m C C cc N Q. C GRAPHIC SCALE MAP REFERENCE O I Z BASE INFORMATION " MAP OF SURVEY OF LANDS Q z TO BE CONVEYED TO ROBERT H. & JEANNE F. U 40 30 20 10 0 40 80 W RANDLES", BY JOHN B. VANDUSEN, DATED JULY n 23, 1968 IN FEET) U) 1 INCH = 40 FT. SILT FENCE-\ 5' MN( 10' PREFERRED) FINISHED GRADE HARDWOOD GENERAL NOTES: TOP solL O O POST 1. SILT FENCE SHALL BE PLACED A MINIMUM OF 5 FT. FROM TOE OF SLOPE, 10 FT. PREFERRED, TO PROVIDE SUITABLE BACKFILL ADEQUATE MEA FOR SEDIMENT STORAGE AND FACILITATE MAINTENANCE OF SEDIMENT CONTAINMENT MFA UNDISTURBED 4' DIA PERFORATED PIPE COBBLES, ROCKS TO BE REMOVED) GROUND 2. POSTS MAY BE 125' 0. 25'( MINIMUM) HARDWOOD, TYPICALLY. FOR WIRE MESH BACK USE 2' x2' NOM. HARDWOOD, 12'- 1B' OR STEEL' f' OR' U' POSTS( 11b per IQ. SILT FENCE SHALL BE WOVEN GEOTEX TILE FABRIC( GEOTEX 2130 OR HOLES 5& 7 O' CLOCK hEQUAL). GEO- TEXTILE COVER N w SEDIMENT Z i+• i SLOPE o CONTAINMENT 3. SILT FENCE ASSEMBLES MAY HAVE 4 FT. OR 6 FT. POST SPACING, AND MAY OR MAY NOT HAVE MESH W AREA REINFORCEMENT. SENSITIVE AREAS TO BE PROTECTED MAY NEED TO BE REINFORCED BY USING HEAVY WIRE BANDING STRIPS WO a FENCING FOR ADDED SUPPORT TO PREVENT COLLAPSE j 4 THE EIMO EDGE OF SILT INSTALLED WNH THE POSTS ON THE DOWEAMBE ISSIIDE OFNIMUM OF 6' THE FABRIC. BELOW GROUND. THE FENCE SWILL BE 7, O w, z T4 EWEN GSF UNIT 5. MNGMUM ALLOWABLE SLOPE ll? 1GTI15 CONTRIBUTING RUNOFF TO A SILT FENCE PLACED ON A SLOPE ME: O BOJ, SLOPE MAXIMUM CONCRETE SAND 6' NLN. U z n W If STEEPNESS LENGTH( Rl 2. 1 25 3: 1 50 1. 25' x 1. 25' 12' x 2' NOM. 5: 1 4: FLATTER 00 w I'w FOR WIRE MESH BACK) PLAN N HAROW000 POST 6. MAXIMUM DRAINAGE AREA FOR OVERLAND FLOW TO A SILT FENCE SHALL NOT EXCEED Y4 ACRE PER 1GO FEET OF 4' 0 A OR STEELY OR' U' FENCE, WITH MAXIMUM PONDING DEPTH OF 1. 5 FEET BEHIND THE FENCE; MD EROSION WOULD OCCUR IN THE 1+ y - I tlL/ Q SECTION POSTS 0 Ib/ IF MIN.) FORM OF SHEET EROSION; AND THERE IS NO CONCENTRATION OF WATER FLOWING TO THE BARRIER Q' L 36' - 6' MIN. 3' MIN V f z 7. MEASURESSHALL BE INSPECTED EVERY SEVEN( 7) CALENDAR DAYS. AFTER EACH RAINFALL OF. 5' OR MORE rn WITHIN A 12 HOUR PERIOD, OR DAILY DURING PROLONGED RAINFALL MEASURES SMALLBE CLEANED AN REPAIRED AS REQUIRED. 3' IMPERVIOUS STRATA, BEDROCK, OR Tn WOVEN CEOTEXTILE FABRIC 8. SEDIMENT SHALL BE REMOVED WHEN ACCUMULATION REACHES ONE- HALF OF THE MEASURE HEIGHT. SEDIMENT SEASONAL Z W HIGH GROUNDWATER V L GEOTEX 2130( OR EQUAL) SHALL BE DISPOSED OF AS UNSUITABLE MATERIAL WOVEN WIRE MESH RENFORCEMENT It IF NECESSARY) MIN. 14 GAUGE WITH MAX. 6' OPENING SEDIMENT CONTAINMENT AREA 5' MIN( 10' PREFERRED) E LJ E N GSF CROSS SECTION rW NNN SILT FENCE ASSEMBLY! W 0. `- Ill I4 SEE INSTALLATION NOTES) INSTALLATION NOTES: r NOT TO SCALE z _ 1. FASTENED FABRIC TO WOVEN POSTS WITH TD BE Z FASTENED SECURELY TO FENCE POSTS WffH WIRE TES OR STAPLES. TOE OF SLOPE 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN W WIRE FENCE WITH TES SPACES EVERY 24' AT TOP GENERAL SANITARY NOTES: E'( AND MID SECT ON. Tn 0 W W 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH Q C AIN OTHER THEY SHALL BE OVERLAPPED BY SIX INCHES, 1, MAINTAIN 100SEPARATION BETWEEN SEPTIC SYSTEM AND ANY WELL CONTRACTOR SHALL VERIFY THE I a FL 1 FOLDED AND AR. LOCATION OF ALL EXISTING WELLS PRIOR TO CONSTRUCTION. UNDISTURBEDGROUND 4. MAINTENANCE SMALL BE PERFFORMED AS NEEDED EW N A ZQ AND MATERIAL REMOVED WHEN' BULGES' DEVELOP IN 2. MINIMUM SEPERATION BETWEEN SEPTIC TANK AND BUILDINGS SHALL BE 10 FEET. z O V THE SILT FENCE I" L I N i RETAIN EXISTING VEGETATION, a 3. MINIMUM SEPERATION BETWEEN EDGE OF TRENCHES AND 70E OF FILL ( RAISED SYSTEMS) AND BUILDINGS E- i 4 0 L L.0 IF POSSIBLE '+ SHALL BE 20 FEET, 1 a `! r z 1- T 0) f a EXCAVATE TRENCH, BURY SILT FENCE FABRIC l 4. MINIMUM SEPERATION BETWEEN PROPERTY LINE AND EDGE OF TRENCHES OR TOE OF FILL ( RAISED a m Co J A o AND BACKFILL/ COMPACT EXCAVATED EARTH SYSTEMS) SHALL BE 10 FEET. IL_' 71 z•]y( m W q q. f V a S. MINIMUM SEPERATION BETWEEN WELL AND SEPTIC TANK TO BE 50 FEET. r, W r SECTION 6. ALL CONSTRUCTION TO BE IN COMPLIANCE WITH THE NEW YORK STATE SANITARY CODE. cr d Z o SILT FENCE DETAIL 7. REQUIRED INSPECTIONS ( TO BE PERFORMED BY PROFESSIONAL ENGINEER): rx4~' Q Z SILT FENCE - TEMPORARY) O I% W W NOT TC SCALE A) PRIOR TO PLACEMENT OF SEPTIC TANK OR COMMENCEMENT' OF FI Z THE TILE FIELD CONSTRUCTION. W O B) DURING THE INSTALLATION OF ANY REQUIRED FILL MATERIAL y jCQ0 W ^ dEFE W Y. W z C) PRIOR TO BACKFILLNG TRENCHES. a BACKFILL WITH CLEAN D) FINAL INSPECTION UPON COMPLETION OF THE SYSTEM. tiL PERFORATED 4" PVC GRANULAR MATERIAL LIGHTLY COMPACT WITH 3 DISTRIBUTION PIPE B. CRUSHED STONE SHALL BE CLEAN, DURABLE AND NO SMALLER THAN OR LARGER THAN 1- 1/ 2" DIAMETER. a BACKHOE BUCKET. APPLY EWEN GSF LINT a FINISHED GRADE 4"- 6" OF TOPSOIL SEED SEE DETAILS. 9. WHEN THE TRENCHES HAVE BEEN EXCAVATED, THE SIDES AND BOTTOM SHALL BE RAKED TO SCARIFY ANY rr, AND MULCH. SMEARED SOIL SURFACES. e 11 K FILTER NON- WOVENFABRIC 10. CONSTRUCTION EQUIPMENT NOT NEEDED TO CONSTRUCT THE SYSTEM SHOULD BE KEPT OFF THE AREA TO 2 BE UTILIZED FOR THE ABSORPTION TRENCH SYSTEM TO PREVENT UNDESIRABLE COMPACTION OF THE SOILS. W T w 11. EACH DISTRIBUTION LINE SHALL CONNECT INDIVIDUALLY TO THE DISTRIBUTION BOX AND EXIT AT THE SAME SLOPE FOR THE FIRST 5 FEET TO 10 FEEL— iT FROM THE BOX ( 1/ B" PER FOOT). F q E- 1 cc 12. THE DISTRIBUTION BOX SHALL BE SET LEVEL AND ARRANGED SO THAT EFFLUENT IS EVENLY DISTRIBUTED TO r, o7' I I I _ i fl, EACH DISTRIBUTION LINE. ADEQUATE PROVISIONS SHALL BE TAKEN TO ASSURE STABILITY AND PROVIDE h+ i 3 0 I I I I I I- I I— I I II I_ I I I I I= I I II I I— I I I I— I I— I I1— I I I I— I I I ACCESS FOR INSPECTION OF THE DISTRIBUTION BOX. Q O o PL 13. THE PIPES CONNECTING THE DISTRIBUTION BOX TO THE DISTRIBUTION LINES SHALL BE TIGHT JOINT c < EXISTING GRADE CONSTRUCTION LAID ON UNDISTURBED EARTH OR PROPERLY BEDDED THROUGHOUT ITS LENGTH. O 14. THE SYSTEM DESIGN DOES NOT INCLUDE PROVISIONS FOR GARBAGE GRINDERS. IN THE EVENT THAT W ED 3' MIN SEPARATION GARBAGE GRINDERS ARE TO BE INSTALLED, THE CONTRACTOR SHALL NOTIFY ENGINEER PRIOR TO SEPTIC N TO GROUNWATER INSTALLATION FOR NECESSARY MODIFICATIONS. 18' OR BEDROCK 15. FOOTING DRAINS, SUMP PUMPS OR WATER SOFTENER DISCHARGES SHALL NOT BE CONNECTED INTO THE SEPTIC SYSTEM. 6" THICK CONCRETE NOTE: 16. CONTRACTOR TO COMPLY WITH ALL O. S. HA. AND OTHER STATE AND LOCAL SAFETY REQUIREMENTS DURING Z SAND BED. ABSORPTION FIELD TO BEA CONSTRUCTIONO SHALLOW ABSORPTION TRENCH SYSTEM Z lyj 17. AS PER NEW YORK STATE INDUSTRIAL CODE 53: CALL 1- 800- 962- 7962 TO LOCATE BURIED CABLES, OR J = OTHER UNDERGROUND UTILITIES, NO LESS THAN TWO, OR MORE THAN TEN WORKING DAYS, PRIOR TO Q i ELJEN S. FTRENCHES SECTION A. A' DIGGING, DRIWNG, EXCAVATING, DRMNG POSTS, ETC. U) NOT TO SCALQ J: b REPLACEMENT WASTEWATER SYSTEM: BASIS OF DESIGN HEAVY DUTY GASKETED LOCKING FINISH GRADE FRAME AND COVER. USE CAMPBELL FOUNDARY# 1502A OR EQUAL co REGULATORY AUTHORITY: TOWN OF QUEENSBURY r ASPHALTIC III II III— N • III= IIII— I III II ACCESS D RINGS W o CQ MH GRADE RINGS) CSI DESIGN STANDARDS: NEW YORK STATE DEPARTMENT OF HEALTH ( 10NYCRR APPENDIX 75— A), WASTEWATER TREATMENT STANDARDS SEAL II = - = I 2' I. D. AS PER INDIVIDUAL HOUSEHOLD SYSTEM. FORT MILLER OR EQUAL AS REQUIRED) 1 TOWN OF QUEENSBURY ORDINANCE - CHAPTER 136: SEWERS AND SEWAGE DISPOSAL - PART 1, ON- SITE SEWAGE DISPOSAL INLET SYSTEMS 4' OR 3• MIN. OUTLET N BLDG. SEWER Z L, Z WpA PROJECT DESCRIPTION: THE EXISTING WASTEWATER SYSTEM SERVING THE RANDLES RESIDENCE ON OLD ASSEMBLY POINT ROAD IN A' WATER TIGHT JOINT( TYP.) C-' T SANITARY tJ F1 TEE io PARGE W/ NON— SHR K G O T THE TOWN OF QUEENSBURY IS 50+ YEARS IN AGE AND IT IS THE APPLICANT' S INTENT TO PROVIDE A REPLACEMENT DESIGN FOR THE I" 9 w 4" MIN. INSIDE & OUT EXISTING SYSTEM. THIS PLAN PROPOSES A NEW DESIGN FOR SEPTIC AND PUMP TANKS IN A SIMILAR LOCATION ON THE PROPERTY ALL JOINTS BE Loi FULL 2 O Z LIQUID LEVEL TO BITUMINOUS SANITARY TEE W O" AS THE EXISTING SEPTIC TANK. THE PROPOSED ABSORPTION FIELD WILL BE LOCATED FURTHER AWAY FROM THE LAKESHORE. THE WATERTIGHTANNTERIOR - O EFFLUENT FILTER BYLEAKAGE TESTECOAT < jPOLYLOK PL- 122 NEW SYSTEM WILL CONSIST OF A NEW SEPTIC TANK WITH EFFLUENT FILTER, A PUMP PIT WITH A DUPLEX PUMP ASSEMBLY AND AN PRIOR TO BACKFILOP 300M O BAFFLE WTH 0 EQUAL 4" X18" MIN. rr ABSORPTION FIELD AREA USING ELJEN GSF TECHNOLOGY. 114 0 Z W U r > SOILS ANALYSIS: SOILS INVESTIGATIONS IN THE AREA OF THE PROPOSED ABSORPTION FIELD FOUND A FINE SANDY LOAM TO SANDY 3- 6" 1 Z d I 1• 6'• TO 12'• LAYER i 11—_! SILT TO A DEPTH OF 6'+/- . NO BEDROCK WAS FOUND WITHIN THE 6' TEST HOLE. THE PERCOLATION RATE OF THE EXISTING FINE PEA GRAVEL OR CRUSHED STONE q T M y SANDY SILT SOIL IS IN THE 2- 3 MINUTE/ INCH DESIGN RANGE. SECTION VIEW BEDDING LAYERWW4i M/ NOTE: W WATER SUPPLY: THE CURRENT WATER SUPPLY SERVING THIS LOT IS LAKE GEORGE. NEIGHBORING PROPERTIES TO THE NORTH AND ASPHALTIC INLET INVERT IS 3" ABOVE E r Z SOUTH OF THIS PROPERTY ALSO USE LAKE GEORGE AS THEIR WATER SUPPLY. SEAL 2" MIN) iWi v I PROJECTED FLOWRATE: THE EXISTING RESIDENCE HAS A TOTAL OF FOUR STANDARD BEDROOMS. IT IS THE OWNER' S INTENT TO 0 V L) z In PROVIDE FOR AN EXPANDED SYSTEM DESIGN. BASED ON A SIX( 6) BEDROOM COUNT AND NYS DOH STANDARDS FOR POST 1991 INLETS IFiI OUTLETS L WATER SAVING FIXTURES ® 110 GALLONS PER DAY PER BEDROOM, THE AVERAGE DAILY FLOW ( ADF) IS 660 GALLONS. THIS FLOWRATEjk jI I O yy F/ W DOES NOT INCLUDE THE USE OF A GARBAGE GRINDER ( NOR IS ONE RECOMMENDED) OR A HOT TUB/ SPA. ADDITIONAL FLOWRATE W g N 0: NOTE: INLET PIPE MUST BE INCLUDED IN THE DESIGN SHOULD EITHER OF THESE COMPONENTS BE PART OF THE HOUSE DESIGN. BETWEEN THE SLOPE OFTHE RESTHE IDENTIAL UNIT BAF BAFFLE NOT REQUIRED FOR AND THE SEPTIC TANK TO BE TANKS LESS THAN 10 FT. LENGTH L SEPTIC TANK: THE REQUIRED CAPACITY FOR A SIX BEDROOM FLOWRATE IS 2000 GALLONS. THE RECOMMENDED TANK FOR THIS 1/ 4" PER FT. C V SYSTEM IS A 2000 ( MIN) GALLON PRECAST CONCRETE TANK WITH BAFFLE ( TWO COMPARTMENTS) BY UTOPIA ENTERPRISES OR EQUAL I C. Z r W AND AN EFFLUENT FILTER AT THE DISCHARGE OUTLET. THE FRAME AND COVER FOR THE TANK ACCESS OPENING SHALL BE POLYLOK PLAN VIEW n Z = ACCESS SYSTEM COMPONENTS OR EQUAL ( 22" MIN.). TANK SIZE MIN. LIQUID DEPTH " A" TANK DIMENSIONS " B" " C•' " O" " I" OUTSIDEHEIGHT EFFLUENT FILTER: AN EFFLUENT FILTER, POLYLOK PL- 122 OR EQUAL, SHALL BE INSTALLED ON THE DISCHARGE OUTLET OF THE 2000 GAL 3- s" o' x 13'- O" 4'- 6" 4'- 9" 5- 11" EFq (/ v W SEPTIC TANK. q a ELUENT PUMP PIT AND PUMP ASSEMBLY: SEPTIC TANK EFFLUENT SHALL FLOW TO A PRECAST CONCRETE PUMP PIT, BY UTOPIA a' C L C ENTERPRISES OR EQUAL, HOUSING A DUPLEX PUMP ASSEMBLY AND CONTROLS FOR TIMED DOSING OF THE EFFLUENT. THE EFFLUENT FMC TANK 0200 HEAVY DUTY SEPTIC TANK) E- J zCPUMPS SHALL BE GOULD MODEL 3885 OR EQUAL, CAPABLE OF 15 GPM AT A TDH OF 15 FEET ( MIN). THE CONTROL PANEL WITHAUDIBLE ALARM AND REMOTE LIGHT SHALL BE LOCATED WITHIN MECHANICAL SPACE OF THE HOUSE. THE PUMP CONTROLS SHALL CALE BY UTOPIA DR EQUAL y+ I a Q N INCLUDE A TIMED DOSE ( 2 HOURS PER CYCLE - MINIMUM) WHICH DELIVERS A DOSING VOLUME OF APPROXIMATELY 80% OF THE E—+ _ 4 P.,0 cq qZ PIPING CAPACITY PER CYCLE. A QUARTER TURN VALVE SHALL BE INSTALLED ON THE DISCHARGE PIPING WITHIN THE PUMP TANK TO J ALLOW FOR PROPER DRAIN BACK OF THE FORCE MAIN VOLUME AFTER PUMP SHUTDOWN. THE ACCESS TO THE PUMP PIT SHALL BE POLYLOK ACCESS SYSTEM COMPONENTS ( 30" MIN.) OR EQUAL. THE PUMP PIT SHALL BE VENTED BACK TO THE HOUSE STACK. w Q a Z col W 30" FRAME AND COVER TO BE 1 W CC v FORCE MAIN: THE FORCE MAIN PIPING SHALL BE 1— Yf HDPE PIPE INSTALLED TO THE DISTRIBUTION BOX AT THE FIELD AREA. THE HEAVY DUTY PLASTIC FRAME AND PRECAST PLASTIC W G FORCE MAIN SHALL BE INSTALLED AT A POSITIVE GRADE TO ALLOW IT TO SELF- DRAIN BACK TO THE PUMP PIT. THE FORCE MAIN COVER ASSEMBLY BY POLYLOK RISER BY NECESSARY OR W W a p OTANK OR R EQUAL EQUAL B NECESSARY TI] SHALL ENLARGE TOA 4" PVC PIPE AT LEAST 4' OUTSIDE THE D— BOX. CDA I' Z > FIX FLOAT BRACKET TO TOPOF SECTION. L I-- I 0 r 2 DISTRIBUTION BOX: THE D- BOX SHALL BE A PRECAST CONCRETE BOX BY UTOPIA ENTERPRISES OR EQUAL. SPEED LEVELERS SHALL 5% W W o BE PROVIDED FOR USE IN EACH PIPE INVERT. THE INLET TO THE D- BOX SHALL BEA 4" PVC PIPE ( 4' MIN.) WHICH RECEIVES FLOW 0 ' W FROM THE FORCE MAIN PIPE. 12 t OR ' ' z PRECAST CONCRETE ABSORPTION FIELD: THE PROPOSED ABSORPTION FIELD SHALL BEA ABSORPTION TRENCH CONFIGURATION USING ELJEN GSF UNITS. PUMP CHAMBER ( 1000 GAL 0 Z Q Z THERE SHALL BE THREE LATERALS, EACH OF 44 LF, PROVIDING A TOTAL OF 132 LF FOR THE SIX BEDROOM SYSTEM. TO MAINTAIN J OPTIONAL SEPTIC TANK) W/ 30" OPENING j 0 E E W O: W TIMER BY UTOPIA ENTERPRISES OR EQUAL MAXIMUM VERTICAL SEPARATION THE FIELD SHALL BE CONSTRUCTED AS A SHALLOW ABSORPTION TRENCH SYSTEM AS INDICATED BY 07 GUIDE RAIL OVERRIDE THE CROSS- SECTIONAL VIEW SHOWN ON THIS SHEET. THE AREA OF THE DISPOSAL FIELD SHALL BE APPROXIMATELY 46' X 18'. Of UU') SYSTEM) BY CONERY FLEXIBLE BOOT I O O ALARM TYPE CONNECTOR ( TYP) OL FLOAT MANUFACTURING G AOBE TO CONTROL PANEL a NOTE: 0: 2 AT HOUSE- SEE NOTE o M 1. PIPE JOINTS TO BE SEALED WITH TRANSITION FROM SIDR7 TO ASPHALTIC MATERIALS OR EOUIVALENT. TO SEPTIC TANK CONTRACTOR TO INSTALL X UNION nr 4" PVC SDR 26 AS REQUIRED Q DISCONNECT 1I 4" PVC AT 1% MIN. r, cc 2" STYROFOAM BLUE BOARD 2. INVERT ELEVATIONS OF ALL L F+ icc OVER TOP OF D- BOX OUTLET PIPES MUST BE EOUAL. 4' f Y4 TURN BALL VALVE DRAIN BACK t J. THE SLOPE OF OUTLET PIPES VALVE FOR COLD CLIMATES n a GRADE BETWEEN THE DISTRIBUTION BOX AND SEASONAL APPLICATIONS H Q 1~ AND THE DISTRIBUTOR LATERALS SHOULD BE I/ B" PER FOOT. FLOW 15'± I IIII 11 z REMOVABLE COVER I I I lI I W E- I z TO DISTRIBUTION BOX SEE OTE BALL CHECK VALVE r, O z EXTEND INSULATION 2' w\ N ALLDTOP OF DIR DIRECTIONS I- I I I.-• 1- 40-400 IIII of 1 1/ 2' PVC FORCE MAIN I III_ rL O ENABLERFLOAT BAFFLE I III— I CRUSHED STONE BACKFILL TO O0 N INLET IELEV. 2- MIN T r''':`•_'-•`- ;:: j...•`"-•• SPRINGLINE OF PIPE ( TYP.) I II— III- O O EL7Ul rzCONMAOroR TO USE Sp® 1 ese SUBMERSIBLE EFFLUENT PUMPS; 6" MIN CRUSHED STONE III= NOTE: OUTLET GAUZE FLollc OR APPROVED EQUAL IM er roar M[ tea 71) MODEL 3885 BY GOULDS PUMPS = LEVELING FOUNDATION III— I II - RESSURALL FONNECTIONS TO USE yl I"- 5" II _ — UUNDI RBED• SUBGRADE-_ III— III- - CONTROL INSULATE FORCE MAIN 2' I I— I I I— II- I— II- I— III- 1 I 1= 1 IT I r TI 1— III— III- III- I DOSE PANE LASJE RHOMBUSS IFS Q PVCS LESS r• ~" I — III III— III— I I— III= III— III— III— III— I' — II(— SERIES OR EQUAL O I THAN 4' 12" MIN CLEAN SAND OR PEA GRAVEL FLOAT SETTINGS TO BE DETERMINED J Z BY THE ENGINEER DURING WASTEWATER V SYSTEM STARTUP 0FORCE MAIN{ CONNECTION TO D— BOX DUPLEX PUMP PIT w NOT TO SCALE NOT T SCALE Q e 2 AM' K W, 11141,-, N A ITT M, S: 114 a, IT V,4 E 2 x KA nw, o T AA 4,, k m S 0, Om P, C, t 0 AA TRICAM. N 140JA Ml-tg 4" 45 p, T m YTI N l N N t Y, f k Aon, O pprov ca ilid, gg tq n dei mn app icauf2- gjf A eev pip4)% i, NVN, 3 i Rig 0 Mu N w Oihi— P; Cicl; y% I,, T_z ANl" 4, tl MA,KON J- A d M' TO ale' TFi- O H gerd; lea, or umpl E e ; n was r, ijw. di p or, ec I C G R ar sp Ne on L 0 2, 8 0; l I ' A TED to SMC CEr-, 4'[) AT,. E'! L"","","' TMCTO R OW7 R C ED 11 ARD EL E UDUP CH A Ll I S rof PEC7 ENVIRONMENTAL DESIGNCKPPARTNERSHIP, LLP. 900 Route 146 Clifton Park,NY 12066 P)518.371.7621 (F)518.371.9540 edplip.com Shaping the physical environment January 22, 2018 D E C E 0 V E Town of Queensbury Building & Codes MAR 15 2018 742 Bay Road TOWN OF QUEENSBURY Queensbury, NY 12804 BUILDING 8 CODES Attn: Dave Hatin Re: Randles Wastewater -42 Old Assembly Point Road Dear Dave: In compliance with application approvals granted by the Town of Queensbury I offer the following regarding the referenced project. The design plans,prepared by this office and reviewed and approved by the Town as associated with the wastewater system application, are as follows: Replacement Wastewater System For The Randles Residence Sheet WW-1 Existing Conditions Plan Sheet WW-2 Wastewater System Plan S BUILTSheetWW-3 Site Details Sheet WW-4 Wastewater Details Dated., November 9, 2016 During the course of construction I was on the job site to observe key components of the system installation culminating with the `start-up' of the pump assembly and control panel system on November 2, 2017. Field measurements of the absorption system corners have been provided and since the septic tank and pump tank have been relocated an 'as-built' sketch is provided for the file. Based on my inspection of the system start-up it is my opinion that the wastewater system is in compliance with the intent of the approved design plan and is ready for operation. Dave Hatin ENVIRONMENTAL DESIGN, PARTNERSHIP, LLR January 22, 2018 Shaping the physical environment Page 2 Please contact me should you require any further information. Sincerely, Dennis MacElroy, PE Partner Environmental Design Partnership 4 Glens Falls Technical Park, Box 6 Glens Falls, NY 12801 518) 376=4486 cc: Jeff Randles 2 900 Route 146 Clifton Park,NY 12065 P)518.371.7621 (F)518.371.9540 edpllp.com