CC-000328-2015 TOWN OF QUEENSBURY
QL 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building&Codes (518)761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: CC-000328-2015 Date Issued: Friday, June 9, 2017
This is to certify that work requested to be done as shown by Permit Number CC-000328-2015
has been completed.
Tax Map Number: 296.15-1-2
Location: 7 GENTRY HILL EAST
Owner: Sch Cottage Hill,LLC
Applicant: Schermerhom Properties
This structure may be occupied as a: 6-unit apartments w/garages&FPs
Cottage Hill,Bldg. 11, 14,101 s.f. By Order of Town Board
TOWN OF QUEENSSBURY
Issuance of this Certificate of Occupancy DOES NOT relieve the
property owner of the responsibility for compliance with Site Plan,
Variance,or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building&Codes (518)761-8256
BUILDING PERMIT
Permit Number: CC-000328-2015 69 'LO 14-4 M
Tax Map No: 296.15-1-2 R EV I S E D
Permission is hereby granted to: Sch Cottage Hill,LLC
For property located at: 7 GENTRY HILL EAST EAST
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance
Tvce of Construction
Owner Name: Sch Cottage Hill,LLC Multi-Family-New $140,000.00
Owner Address: 536 BAY RD Total Value $140,000.00
Queensbury,NY 12804
Contractor or Builder's Name/Address Electrical Inspection Agency
Schemerhom Properties
536 Bay RD,Suite 2
Queensbury,NY 12804
Plans&Specifications
unit apartments w/garages&FPs
Cottage Hill,Bldg.11,14,101 s.f.
PERMIT FEE PAID-THIS PERMIT EXPIRES: Saturday,September 17,2016
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town o ueens / / �JWed a� ber 17,2014
SIGNED BY: /a/ for the Town of Queensbury.
Director of Building&Code Enforcement
------------- r sV.jno10
OFFICE USE ONLY
TAX MAP NO.A���. ) a1 PEP.MIT NO. ov- OvAl ;
FEES: PERMIT; !a.r&CP.EATi0N 51[Y� -ENGINEERING ( �
__________________________ffapplicable)I'
RINCIPAL STRUCTURE. APPLICATION FOR ZONING APPROVAL & BUILDING
PERMIT
A PERMIT MUST BE OBTAINED BEFORE BEGINNING CONSTRUCTION. APPLICATION IS SUBJECT TO REVIEW
BEFORE ISSUANCE OF A VAUD PERMIT FOR CONSTRUCTION-
APPLICANTIBUILDER: 554* 'E94k2f+J W:rA ..OWNER: 6A"
6s&0 15A'E wy/w 'emtAPIE Z ADDRESS:
PHONE NO. eat
�g '� CXo PHONE NOS-
RN
7�-
CONTACT PERSON FOR BUILDING&CODES COMPLIANCE `i ew p`g PHONE: 5*-CA041,�7
LOCATION OF PROPERTY:eU1wit4Ea z II V 1 t 1'C J 6p'1166ft Glu,
Sta$.
HAS THERE BEEN A SITE PLAN REVIEW;VARIANCE OR SUBDIVISION APPROVAL? tl0 YES ❑ NO
IF SO, INDICATE APPLICATION NO.AND DATE OF APPROVAL:
PLEASE INDICATE MEASUREMENTS AS REQUIRED BELOW:
CHECK ALL THAT
APPLY TO YOUR z tr p y d W U-
PROJECT0 00 F O F 1 O = _
LL Q O U
W O J 0 z O 1-F O F 0-' W z
Z Q Q :- fA N VJ O U- f- It 0_ 2 ca
SINGLE FAMILY
TWO-FAMILY /
(NO of UNITS Y
%A 1'P
TOWNHOUSE
BUSINESS OFFICE
RETAIL-
MERCANTILE
FACTORY OR
INDUSTRIAL
ATTACHED ✓ �w
GARAGE(1,2,3)
OTHER
Town ol Queensbury Community Development Office'742 Bay Road, Queensbury NY 12904
Revised 4/14/2010
IF COMMERCIAL OR INDUSTRIAL-NAME OF BUSINESS: Crm-Aam Wm, -t'pWPIp(Sa-5
ESTIMATED CONSTRUCTION COSTA 14010M FUEL TYPE: plpr. (%,S
HEAT TYPE: -HOW MANY FIREPLACE(S):_(*___AND/OR WOODSTOVES(S):��
ZONING CATEGORY: ARE THERE WETLANDS ON THIS SITE?
IS THIS A HISTORIC SITE? No
PROPOSED USE OF BUILDING OR ADDITION: u !
ARE THERE STRUCTURES NOT SHOWN ON PLOT PLAN? RQ
ARE THERE EASEMENTS ON PROPERTY? Y�OIA�1V
1 acknowledge no construction activities shall be commenced prior to issuance of a valid
permit. I certify that the application, plans, and supporting materials are a true and
complete statement/description of the work proposed, that all work will be performed in
accordance with the NY State Building Codes, local building laws and ordinances, and in
conformance with local zoning regulations. I acknowledge that prior to occupying the
facilities proposed, I or my agents will obtain a certificate of occupancy. I also understand
that I/we are required to provide an as-built survey by a licensed land surveyor of all newly
constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree t h above.
Signed Avoe
��IlG10>�4`
Town of Queensbury`Community Development Office742 Bay Road, Queensbury NY 12804
Office Use Only
Town of Queensbury Building & Codes Received:
Tax Map ID:
FUEL BURNING APPLIANCE &CHIMNEY APPLICATION Permit No.:
Permit Fee: $
Application is hereby made to the Building & Codes Office for the issuance of a Building & Use Permit pursuant to the NYS Fire Prevention &
Building Code. The applicant or owner agrees to comply with all applicable laws,ordinances, regulations,and all conditions that are part of these
requirements and also will allow all inspectors to enter premises to perform required inspections.
Important Note To Applicant: Rough-In and Final Inspections Are Required:
Date R 3yrZ4
Owner �� � InstailedBw7der z�1�12!g
Address ae�� Address
Phone ] �Zej$— (�tj e� Phone
Location of proposed construction and/or installation: &PTTA - AILL —tb WA W,S Afm
Contact Person for Building&Codes Compliance: �QtJ +AyL
Subdivision Name: 4-H Lr
Fuel BimingAppliainceformation Wood Coal Pellet Gas 01built'n
Furnace, Gars a Only)
If Factory Built,Please Provide: Manufacturer Name: AM Mode!No.
Listed By: Number.
Chimney Information
Masonry" ✓check one _Black —Brick _Stone
Flue ✓check one _Tile _Steel Size in Inches
Material ✓check one _Double Wall _Triple Wall _Insulated Direct Vent _Chimney Liner
If Non-Masonry,please provide: Manufacturer Name: Model No.
Signatures:
Print Name: 'i1, A94qJZAA11r
Signature: Date: O 4M-k
ADDITIONAL NOTE: CONSTRUCTION/INSTALLATION MUST CONFORM TO NYS FIRE PREVENTION&BUILDING CODE
AND/OR MANUFACTURER REQUIREMENTS. CONSULT AVAILABLE TOWN OF QUEENSBURY HANDOUTS REGARDING
REQUIRED INSPECTIONS.
a
INSPECTION WORKSHEET (FM-002949-2017)
Town of Queensbury-Building and Codes-Fire Marshal
742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal
Case Number: CC-000328-2015 Case Module: Permit
Inspection Date: 06/09/2017 Inspection Status: Passed
Inspector: Gary Stillman Inspection Type:ype: OCC-Inspections
Job Address: 7 GENTRY HILL EAST Parcel Number: 296.15-1-2
Queensbury,NY 12804
Contact Type Company Name Name
Granted Permission [Sch Cottage Hill,LLC]
Contractor
[Schermerhorn Properties]
Primary Owner [Sch Cottage Hill,LLC]
Checklist Item Passed Comments
Fire Marshal YES Denny Davis
Truss ID Signage FC505.3 YES
Clearance to Electrical FC 605.3 YES
Electrical Wiring Enclosed/Labeled FC605.3.1 YES
Combustibles in Equipment Rooms FC 315.2.3 YES
F.D.Signage-FC510 YES
Interior Finishes FC803-804 YES
Smoke Detectors FC907 YES
CO Detectors FC610 YES
Clearance to Sprinkler/Ceiling FC315.2.1 18"/24" YES
Sprinkler System Annual YES Received letter from FireTek this date
Sprinkler FDC YES
Knox Box:installed/checked FC506 YES
Occupancy Cycle YES R
'dd4
Stillman,Gary(Inspector)
Jun 09,2017
Page(1)
flRETEK
SPRINKLER SYSTEMS, LLC
58 Hudson River Rd. a Waterford. NY 12188
Phone: (518)244-3772 Fax: (518)238-2608
06/08/17
Mr. Mike Palmer
Fire Marshall
Town of Queensbury
742 Bay Rd.
Queensbury,NY 12804
RE: Cottage Hill Apts.
7 Gentry Hill East
Queensbury,NY
Mike,
The installation of the fire sprinkler system, at the above address, has been completed. The system is on and
operational. To the best of my knowledge the installation conforms to NFPA 13R. Should you require anything
further, please give me a call.
Sincerely,
TAX
Bob Wood
Vice President
COMMONWEALTH ELECTRICAL INSPECTION SERVICE,INC.
Main Office 176 Doe Run Road-Manheirn,PA 17545
MUNICIPAL CERTIFICATE - ELECTRICAL APPROVAL
2-15-2jak
Permit No. ..............................Cert. Id 0 t4975 Cut-in Card No.....................................
Owner.........!!!Lt
1"12Ai6AI�IP-1
.................. .................. ..............................
Location...
................
InstallatioryConsisting
—......� j....................... A. .. .. ..............
.............................
In .........................................Lic.No...................................................
The conditions following governed the issuance of this certificate,and any certificate previously issued is
cancelled:-
This certificate only covers the electrical equipment acid installation conditions as of date. Upon the
introduction of additional equipment or alterations,application shall be promptly made for inspection.
Inspectors of this Company shall have the privilege of making inspKl—o at any time, and if its
rules are violated,the Company shall have the right to r��e s certifi
.......... ........
Date../.2-..—Zq..17............ INSPECTOR ......... ...................
Meniher N.F.P.A..I.A.F.I.
COMcheck Software Version 3.9.3
Envelope Compliance Certificate
2010 New York Energy Conservation Construction Code
Section 1: Project Information
Project Type:New Construction _:. ' i 0 1U14
Project Title: New Townhouse Apartment
Construction Site: Owner/Agent: Designer/Contractor:
Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall
Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture
Queensbury,NY 12804 627 Maple Ave
518-798-0674 Saratoga Springs,NY 12866
rich@schemerhommnstwction.com 518-580-1905
ephall@nycap.rr.com
Section 2: General Information
Building Location(for weather data): Warren,New York
Climate Zone: 6a
Building Space Conditioning Type(s): ResidentialA11(
Py
Vertical Glazing/Wall Area Pct.: 11%
AArtJ_vlty TviceJSJ Floor Area
Multifamily 10621
Section 3: Requirements Checklist
Envelope PASSES:Design 3%better than code.
Climate-Specific Requirements:
Component Name/Description Gross Cavity Cont. Proposed Budget
Area or R-Value R-Value U-Factor U-Factor(a)
Perimeter
Orientation:NORTH
Exterior Wall 3:Wood-Framed, 16"o.c. 1070 21.0 0.0 0.062 0.051
Door 17:Insulated Metal,Swinging 18 - - 0.300 0.500
Door 18:Insulated Metal,Swinging 18 - - 0.300 0.500
Door 19:Insulated Metal,Swinging 18 0.300 0.500
Door 20:Insulated Metal,Swinging 18 - - 0.300 0.500
Door 21:Glass(>50%glazing):Nonmetal Frame,Pert.Type:Other 40 - - 0.290 0.350
testing/cert. Product ID: ,SHGC 0.65(b)
Exterior Wall 4:Wood-Framed, 16"o.c. 384 21.0 0.0 0.062 0.051
Orientation:EAST
Exterior Wall 1:Wood-Framed, 16"o.c. 1160 21.0 0.0 0.062 0.051
Door 1: Insulated Metal,Swinging 20 - - 0.300 0.500
Door 2: Insulated Metal,Swinging 20 0.300 0,500
Door 3: Insulated Metal,Swinging 20 - - 0.300 0.500
Door 4: Insulated Metal,Swinging 20 0.300 0.500
Door 5: Insulated Metal,Swinging 20 - - 0.300 0.500
Door 6: Insulated Metal,Swinging 20 - - 0.300 0.500
Door 7: Insulated Metal,Swinging 20 - - 0.300 0.500
Door 8:Insulated Metal,Swinging 20 - - 0.300 0.500
Door 9:Insulated Metal,Swinging 20 - - 0.300 0.500
Project Title: New Townhouse Apartment Report date: 06/13/14
Data filename:Y:\Schennerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.ock Page 1 of 11
Door 10:Insulated Metal,Swinging 20 - - 0.300 0.500
Door 11:Insulated Metal,Swinging 20 - - 0.300 0.500
Door 12:Insulated Metal,Swinging 20 - - 0.300 0.500
Exterior Wall 2:Wood-Framed,16"o.c. 848 21.0 0.0 0.062 0.051
Window 1:Vinyl Frame:Double Pane with Low-E,Perf.Type:Other 186 - - 0.290 0.350
testing/cert.Product ID:,SHGC 0.65(b)
Orientation:SOUTH
Exterior Wall 7:Wood-Framed, 16"o.c. 1070 21.0 0.0 0.062 0.051
Door 28:Insulated Metal,Swinging 18 - - 0.300 0.500
Door 29:Insulated Metal,Swinging 18 - - 0.300 0.500
Door 30:Insulated Metal,Swinging 18 - - 0.300 0.500
Door 31:Insulated Metal,Swinging 18 - - 0.300 0.500
Door 32:Glass(>50%glazing):Nonmetal Frame,Pert.Type:Other 40 - - 0.290 0.350
tesfing/cert.Product ID:,SHGC 0.65(b)
Exterior Wall 8:Wood-Framed,16"o.c. 384 21.0 0.0 0.062 0.051
Orientation:WEST
Exterior Wall 5:Wood-Framed,16'o.c. 1160 21.0 0.0 0.062 0.051
Window 2:Vinyl Frame:Double Pane with Low-E,Ped.Type:Other 217 - - 0.290 0.350
testingloert.Product ID:,SHGC 0.65(b)
Door 22:Insulated Metal,Swinging 20 - - 0.300 0.500
Door 23:Insulated Metal,Swinging 20 - - 0.300 0.500
Door 24:Insulated Metal,Swinging 20 - - 0.300 0.500
Door 25:Insulated Metal,Swinging 20 - - 0.300 0.500
Door 26:Insulated Metal,Swinging 20 - - 0.300 0.500
Exterior Wall 6:Wood-Framed,16'o.c. 848 21.0 0.0 0.062 0.051
Window 3:Vinyl Frame:Double Pane with Low-E,Ped.Type:Other 310 - - 0.290 0.350
testing/cert.Product ID:,SHGC 0.65(b)
Orientation:UNSPECIFIED ORIENTATION
Roof 1:Attic Roof with Wood Joists 5213 38.0 0.0 0.027 0.027
Floor 1:Slab-On-Grade:Unheated,Vertical 4 ft. 449 - 10.0 - -
(a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements.
(b)Fenestrations product performance must be certfied in accordance with NFRC and requires supporting documentation.
Air Leakage,Component Certification,and Vapor Retarder Requirements:
❑ 1. All joints and penetrations are caulked,Basketed or covered with a moisture vapor-permeable wrapping material installed in accordance
with the manufacturer's installation instructions.
❑ 2. Windows,doors,and skylights certified as meeting leakage requirements.
❑ 3. Component R-values&1.1-factors labeled as certified.
❑ 4. No roof insulation is installed on a suspended ceiling with removable calling panels.
❑ 5. 'Other'components have supporting documentation for proposed U-Factors.
❑ 6. Insulation installed according to manufacturer's instructions,in substantial contact with the surface being insulated,and in a manner that
achieves the rated R-value without compressing the insulation.
❑ 7. Stair,elevator shaft vents,and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized
dampers.
❑ 8. Cargo doors and loading dock doors are weather sealed.
❑ 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are sealed with gasket or caulk.
❑ 10.Building entrance doors have a vestibule equipped with self-closing devices.
Exceptions:
❑ Building entrances with revolving doors.
❑ Doors not intended to be used as a building entrance.
❑ Doors that open directly from a space less than 3000 sq.ft.in area.
❑ Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors.
❑ Doors opening directly from a sleeping/dwelling unit.
Section 4: Compliance Statement
Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2010 New York
Energy Conservation Construction Code requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the
Requirements Checklist.
Project Title: New Townhouse Apartment Report date:06/13/14
Data filename:Y:\Schermerhom\Cottage Hill Apartments\6-plex\Cottage HIII-6 plex.cck Page 2 of 11
When a Registered Design Professional has stamped and signed this page,they are attestin that to the best of his/her knowledge,belief,and
professional judgment,such plans or specifications are in compliance wlt Cod
Ethan P.Hall-Architect /Q�6
Name-Title �j P£sTLcp lYh Date
d
°aaokl
Project Title:New Townhouse Apartment Report date:06/13/14
Data filename:Y:\Schennerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 3 of 11
COMcheck Software Version 3.9.3
Interior Lighting Compliance
Certificate
2010 New York Energy Conservation Construction Code
Section 1: Project Information
Project Type: New Construction
Project Title: New Townhouse Apartment
Construction Site: Owner/Agent: Designer/Contractor:
Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall
Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture
Queensbury,NY 12804 627 Maple Ave
518-798-0674 Saratoga Springs,NY 12866
rich@schen-erhomconstruction.com 518-580-1905
ephall@nycap.n.00m
Section 2: Interior Lighting and Power Calculation
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts I R2 (B x C)
Multifamily 10621 0.7 7435
Total Allowed Watts= 7435
Section 3: Interior Lighting Fixture Schedule
A 8 C D E
Fixture ID:Description/Lamp I Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Multifamily(10621 sq.ft.)
Compact Fluorescent 1:Spiral 23W:Electronic: 1 102 32 3264
Total Proposed Watts= 3264
Section 4: Requirements Checklist
Interior Lighting PASSES: .- code.
Lighting Wattage:
C] 1. Total proposed watts must be less than or equal to total allowed watts.
Allowed Watts Proposed Watts Complies
7435 3264 YES
Controls, Switching,and Wiring:
Lj 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to
vertical fenestration.
F-1 3. Daylight zones have individual lighting controls independent from that of the general area lighting.
Exceptions:
Q Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device.
Q Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a
separate switch for general area lighting.
F1 4. Independent controls for each space(switch/occupancy sensor).
Project Title: New Townhouse Apartment Report date: 06/13/14
Data filename:Y:\Schermerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 4 of 11
Exceptions:
Areas designated as security or emergency areas that must be continuously illuminated.
Lighting in stairways or corridors that are elements of the means of egress.
L1 5. Master switch at entry to hotel/motel guest room.
El 6. Individual dwelling units separately metered.
L3 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control
of the nonexempt lighting.
B. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either
controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps,switching the middle
lamp luminaires independently of other lamps,or switching each luminaire or each lamp.
Exceptions:
Only one luminaire in space.
An occupant-sensing device controls the area.
The area is a corridor,storeroom,restroom,public lobby or sleeping unit.
O Areas that use less than 0.6 Wattstsq.tt.
❑ 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.(t.
Exceptions:
❑ Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security.
O 10.PhotocelVastronomical time switch on exterior lights.
Exceptions:
❑ Lighting intended for 24 hour use.
❑ 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts).
Exceptions:
LJ Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair.
Section 5: Compliance Statement
Compliance Statement., The proposed lighting design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 New York
Energy Conservation Construction Code requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the
Requirements Checklist. A
A�W
Ethan P.Hall-Architect f� , 4,4
Name-Title 91nature Date
Project Title:New Townhouse Apartment Report date:06/13/14
Data filename:YASchemrerhom\Cottage Hill Aparbnents\6-plex\Cottage Hill-6 plex.cck Page 5 of 11
COMcheck Software Version 3.9.3
Exterior Lighting Compliance
Certificate
2010 New York Energy Conservation Construction Code
Section 1: Project Information
Project Type: New Construction
Project Title: New Townhouse Apartment
Exterior Lighting Zone: 2(Residentially zoned area)
Construction Site: Owner/Agent: Designer/Contractor:
Cottage Hill Drive Schennerhom Residential Holdings Ethan P.Hall
Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture
Queensbury,NY 12804 627 Maple Ave
518-798-0674 Saratoga Springs,NY 12866
rich@schermerhomconstruction.com 518-580-1905
ephall@nycap.rr.com
Section 2: Exterior Lighting Area/Surface Power Calculation
A B C D E F
Exterior ArealSurface Quantity Allowed Tradable Allowed Proposed
Watts Wattage Watts Watts
I Unit (B x C)
Main entry 6 ft of door width 20 Yes 120 384
Total Tradable Watts'= 120 384
Total Allowed Watts= 120
Total Allowed Supplemental Watts"= 600
Wattage tradeoffs are only allowed between tradable areas/surfaces.
"A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Section 3: Exterior Lighting Fixture Schedule
A B C D E
Fixture ID:Description I Lamp I Wattage Per Lamp I Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Main entry(6 ft of door width):Tradable Wattage
Compact Fluorescent 1:Spiral 23W:Electronic: 1 12 32 384
Total Tradable Proposed Watts= 384
Section 4: Requirements Checklist
Lighting Wattage:
1. Within each non-tradable area/surface,total proposed watts must be less than or equal to total allowed wafts.Across all tradable
areas/surfaces,total proposed watts must be less than or equal to total allowed watts.
Compliance:Passes using supplemental allowance watts.
Controls, Switching,and Wiring:
-1 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting.
F-1 3. Lighting not designated for dusk-to-dawn operation is controlled by either a a photosensor(with time switch),or an astronomical time
switch.
O 4. Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor.
O 5. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours.
Project Title: New Townhouse Apartment Report date: 06/13/14
Data filename:Y:\Schennerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 6 of 11
Exterior Lighting Efficacy:
Lj 6. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumenlwatt.
Exceptions:
❑ Lighting that has been claimed as exempt and is identified as such in Section 3 table above.
I] Lighting that is specifically designated as required by a health or fife safety statue,ordinance,or regulation.
L] Emergency lighting that is automatically off during normal building operation.
L] Lighting that is controlled by motion sensor.
Section 5: Compliance Statement
Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications
and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 New York
Energy Conservation Construction Code requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the
Requirements Checklist.
Ethan P. Hall-Architect 'b
Name-Title nature Date
Project Title: New Townhouse Apartment Report date:06/13/14
Data filename:Y:\Schermerhom\Cottage Hill Apartments\6-plexlcottage Hill-6 plex.cck Page 7 of 11
COMcheck Software Version 3.9.3
Mechanical Compliance Certificate
2010 New York Energy Conservation Construction Code
Section 1: Project Information
Project Type: New Construction
Project Title: New Townhouse Apartment
Construction Site: Owner/Agent: Designer/Contractor:
Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall
Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture
Queensbury,NY 12804 627 Maple Ave
518-798-0674 Saratoga Springs,NY 12866
rich@schermerhomconstruction.com 518-580-1905
ephall@nycap.rr.com
Section 2: General Information
Building Location(for weather data): Warren,Now York
Climate Zone: 6a
Section 3: Mechanical Systems List
Quantft system Type&Description
1 HVAC System 1 (Single Zone):
Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtu/h
Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et
Cooling: 1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser
No minimum efficiency requirement applies
Fan System: None
1 HVAC System 2(Single Zone):
Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtu/h
Proposed Efficiency=93.00%Et,Required Efficiency=60.00%Et
Cooling: 1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser
No minimum efficiency requirement applies
Fan System: None
1 HVAC System 3(Single Zone):
Heating:1 each-Central Furnace,Gas,Capacity=60 kBtu/h
Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et
Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser
No minimum efficiency requirement applies
Fan System: None
1 HVAC System 4(Single Zone)
Heating: 1 each-Central Furnace,Gas,Capacity=60 kBtu/h
Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et
Cooling: 1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser
No minimum efficiency requirement applies
Fan System: None
1 HVAC System 5(Single Zone):
Heating: 1 each-Central Fumace,Gas,Capacity=60 kBtu/h
Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et
Cooling: 1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser
No minimum efficiency requirement applies
Fan System: None
1 HVAC System 6(Single Zone):
Project Title:New Townhouse Apartment Report date:06/13/14
Data filename:Y:\Schermerhorn\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 8 of 11
Heating:t each-Central Furnace,Gas,Capacity=60 kBtu/h
Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et
Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtulh,Air-Cooled Condenser
No minimum efficiency requirement applies
Fan System: None
1 Water Heater 1:
Electric Storage Water Heater,Capacity:40 gallons
Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF
1 Water Heater 2:
Electric Storage Water Heater,Capacity:40 gallons
Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF
1 Water Heater 3:
Electric Storage Water Heater,Capacity:40 gallons
Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF
1 Water Heater 4:
Electric Storage Water Heater,Capacity:40 gallons
Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF
1 Water Heater 5:
Electric Storage Water Heater,Capacity:40 gallons
Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF
1 Water Heater 6:
Electric Storage Water Heater,Capacity:40 gallons
Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF
Section 4: Requirements Checklist
Requirements Specific To: HVAC System 1 :
❑ 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE)
❑ 2. Specified equipment consists of field-assembled components-efficiency documentation provided
Requirements Specific To: HVAC System 2 :
1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE)
O 2. Specified equipment consists of field-assembled components-efficiency documentation provided
Requirements Specific To: HVAC System 3 :
Lj 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE)
❑ 2. Specified equipment consists of field-assembled components-efficiency documentation provided
Requirements Specific To: HVAC System 4:
Lj 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE)
❑ 2. Specified equipment consists of field-assembled components-efficiency documentation provided
Requirements Specific To: HVAC System 5:
Lj 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE)
0 2. Specified equipment consists of field-assembled components-efficiency documentation provided
Requirements Specific To: HVAC System 6 :
L3 1. Equipment minimum efficiency: Central Fumace(Gas): 80.00%Et(or 78%AFUE)
❑ 2. Specified equipment consists of field-assembled components-efficiency documentation provided
Requirements Specific To:Water Heater 1 :
❑ 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Bluth(If>12
kW))
❑ 2. First 8 ft of outlet piping is insulated
O 3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units.
iJ 4. Heat traps provided on inlet and outlet of storage tanks
Requirements Specific To:Water Heater 2 :
1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btu/h(if>12
kW))
Q 2. First 8 ft of outlet piping is insulated
Project Title: New Townhouse Apartment Report date: 06/13/14
Data filename:YASchermerhom\Cottage Hill Apartmentsk6-plex\Cottage Hill-6 plex.ock Page 9 of 11
3. Hot water storage temperature controls that allow setpoint of 90"F for non-dwelling units and 110°F for dwelling units.
4. Heat traps provided on inlet and outlet of storage tanks
Requirements Specific To: Water Heater 3 :
❑ 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Bluth(if>12
kW))
2. First 8 ft of outlet piping is insulated
3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110`F for dwelling units.
Ll 4. Heat traps provided on inlet and outlet of storage tanks
Requirements Specific To: Water Heater 4:
1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btulh(if>12
kW))
(] 2. First 8 ft of outlet piping is insulated
3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units.
E] 4. Heat traps provided on inlet and outlet of storage tanks
Requirements Specific To: Water Heater 5:
1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Bluth(if>12
kW))
2. First 8 it of outlet piping is insulated
3. Hot water storage temperature controls that allow setpoint of 90`F for non-dwelling units and 110°F for dwelling units.
O 4. Heat traps provided on inlet and outlet of storage tanks
Requirements Specific To:Water Heater 6 :
❑ 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btulh(if>12
kW))
2. First 8 it of outlet piping is insulated
3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110°F for dwelling units.
4. Heat traps provided on inlet and outlet of storage tanks
Generic Requirements: Must be met by all systems to which the requirement is applicable:
L] 1. Plant equipment and system capacity no greater than needed to meet loads
Exception(s):
❑ Standby equipment automatically off when primary system Is operating
❑ Multiple units controlled to sequence operation as a function of bad
❑ 2. Minimum one temperature control device per system
❑ 3. Minimum one humidity control device per installed humidificationldehumldifimbon system
4. Load calculations per ASHRAE/ACCA Standard 183.
5. Automatic Controls:Setback to 55°F(heat)and 85°F(cool);7-day dock,2-hour occupant override,10-hour backup
Exception(s):
L] Continuously operating zones
6. Outside-air source for ventilation;system capable of reducing OSA to required minimum
❑ 7. R-5 supply and return air duct insulation in unconditioned spaces
R-8 supply and return air duct insulation outside the building
R-8 insulation between ducts and the building exterior when ducts are part of a building assembly
Exception(s):
❑ Ducts located within equipment
El Duds with interior and exterior temperature difference not exceeding 15°F.
8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment
9. Ducts sealed-longitudinal seams on rigid ducts;transverse seams on all ducts;UL 181A or 181 B tapes and mastics
1 O.Hot water pipe insulation: 1.5 in.for pipes<=1.5 in.and 2 in.for pipes>1.5 in.
Chilled water/refrigerant/brine pipe insulation: 1.5 in.for pipes<=1.5 In.and 1.5 in.for pipes>1.5 in.
Steam pipe insulation: 1.51n.for pipes<=1.5 in.and 3In.for pipes >1.51n.
Exception(s):
L] Piping within HVAC equipment.
L] Fluid temperatures between 55 and 105°F.
Fluid not heated or cooled with renewable energy.
Piping within room fan-coil(with AHRI440 rating)and unit ventilators(with AHRIB40 rafing).
p Runouts<4 ft in length.
11.0peration and maintenance manual provided to building owner
Project Title: New Townhouse Apartment Report date:06/13114
Data filename:YASchermerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 10 of 11
❑ 12.Thernostatic controls have 5°F deadband
Exception(s):
❑ Thermostats requiring manual changeover between heating and cooling
❑ Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority
having jurisdiction.
❑ 13.Balancing devices provided in accordance with IMC 603.17
❑ 14.Demand control ventilation(DCV)present for high design occupancy areas(>40 person/1000 ft2 in spaces>500 fl2)and served by
systems with any one of 1)an air-side economizer,2)automatic modulating control of the outdoor air damper,or 3)a design outdoor
airflow greater than 3000 cfm.
Excephon(s):
❑ Systems with heat recovery.
❑ Multiple-zone systems without DDC of individual zones communicating with a central control panel.
❑ Systems with a design outdoor airflow less than 1200 cfm.
❑ Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm.
❑ 15.Motorized,automatic shutoff dampers required on exhaust and outdoor air supply openings
Exceptlon(s):
❑ Gravity dampers acceptable in buildings<3 stories
❑ 16.Automafic controls for freeze protection systems present
❑ 17.Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70%outside air fraction or specifically exempted
Exception(s):
❑ Hazardous exhaust systems,commercial kitchen and clothes dryer exhaust systems that the Intemational Mechanical Code
prohibits the use of energy recovery systems.
❑ Systems serving spaces that are heated and not cooled to less than 60°F.
❑ Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy.
❑ Heating systems in climates with less than 3600 HDD.
❑ Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64°F.
❑ Systems requiring dehumidification that employ energy recovery in series with the cooling coil.
❑ Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air
volume to 50 percent or less of design values or,a separate make up air supply meeting the following makeup air requirements:
a)at least 75 percent of exhaust flow rete,b)heated to no more than 2°F below mom setpoint temperature,c)cooled to no lower
than 3°F above room setpoint temperature,d)no humidification added,e)no simultaneous heating and cooling.
Section 5: Compliance Statement
Compliance Statement., The proposed mechanical design represented In this document is consistent with the building plans,specifcations
and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2010 New
York Energy Conservation Construction Code requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the
Requirements Checklist. (�/ '/�//�K/��c����/ /�
Ethan P.Hall-Architect / gw
Name-Title S ature Date
Section 6: Post Construction Compliance Statement
❑ HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment
provided to the owner.
❑ HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor.
❑ Written HVAC balancing and operations report provided to the owner.
The above post construction requirements have been completed.
Principal Mechanical Designer-Name Signature Date
Project Title: New Townhouse Apartment Report date:06/13/14
Data filename:Y:\Schermerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 11 of 11
INSPECTION WORKSHEET (FMGAS-003023-201 7)
Town of Queensbury-Building and Codes-Fire Marshal
742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal
Case Number: CC-000328-2015 Case Module: Permit
Inspection Date: 06/09/2017 Inspection Status: Passed
Inspector: Gary Stillman Inspection Type: Gas Fireplace/Stove
Job Address: 7 GENTRY HILL EAST Parcel Number: 296.15-1-2
Queensbury,NY 12804
Contact Type Company Name Name
Granted Permission [Sch Cottage Hill,LLC]
Contractor [Schermerhorn Properties]
Primary Owner [Sch Cottage Hill,LLC]
Checklist Item Passed Comments
General Comments YES Superior Fireplace-model#DRT2033TMN
SERIAL#A15J227139 unit A
A15L293542 unit B
A15L293541 unit C
A15l023143 unit D
A15l023152 unit E
A16E116965 unit F
Building Inspection notes YES 6 Fireplaces/6 unit building
Floor Protection YES
Clearances to Combustibles(all sides) YES
Firestop(s)-Wall Penetration YES
Vent Clearance to Combustibles YES
Vent Chimney Termination YES
Gas Shut-off Valve YES
Combustion Air YES
Mantel-height above fp opening YES Return to verify,see page 15 of installation manual for mantle
clearances
6/9/17 ok
Witness Operation YES Return to verify
6/9/17 ok
CO Detection YES Return to verify
6/9/17 ok
CSST Bonding YES Return to verify
Stillman,Gary(Inspector)
Jun 09,2017 Page(1)
INSPECTION WORKSHEET (FMGAS-OO7925-2016)
Town of Queensbury-Building and Codes-Fire Marshal
742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal
Case Number: CC-000328-2015 Case Module: Permit
Inspection Date: 12/23/2016 Inspection Status: Partial Pass
Inspector: Gary Stillman Inspection Type: Gas Fireplace/Stove
Job Address: 7 GENTRY HILL EAST Parcel Number: 296.15-1-2
Queensbury,NY 12804
Contact Type Company Name Name
Primary Owner [Sch Cottage Hill,LLC]
Contractor [Schermerhom Properties]
Granted Permission [Sch Cottage Hill,LLC]
Checklist Item Passed Comments
Firestop(s)-Wall Penetration YES
Vent Clearance to Combustibles YES
Combustion Air YES
Vent Chimney Termination YES
Clearances to Combustibles(all sides) YES
Mantel-height above fp opening NO Return to verify,see page 15 of installation manual for mantle
clearances
CO Detection NO Return to verify
Floor Protection YES
General Comments YES Superior Fireplace-model#DRT2033TMN
SERIAL#A15J227139 unit A
A15L293542 unit B
A15L293541 unit C
A151023143 unit D
A151023152 unit E
A16E116965 unit F
Building Inspection notes YES 6 Fireplaces/6 unit building
CSST Bonding NO Return to verify
Gas Shut-off Valve YES
Witness Operation NO Return to verify
Stillman,Gary(Inspector)
Dec 23,2016 Page(1)
Innovative Hearth Products Installation
Superior"M 0RT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015
r•
Table 7:Horizontal vent termination clearances for buildings with combustible and noncumbustible exteriors
inside Gwpo Outside Corner Recessed location
See Table68 ` N��///)-li
o - H -
-Gi- ,7' Q ,�;j/
\ Fixed B—E \ I ����/
Close El O Fixed B.Icony Balcony wM PetlleularSitleWall`Opel 8 M 7 _../
' Iii '
OY TERMINATION CAP O AIR SUPPLY INLET M GAS METER Q RESTRICTEDAREA
9
(TERMINATION PROHIBITED)
U.S.Installation** Canadian Installation
A Clearance above grade,veranda,porch,desk,or balcony 12"(300 mm)** 12"(300 mm)*
B Clearance to window or door that may be opened 6"(150 mm) 6"(150 mm)
for fireplaces<10,000 Btu/h(3 kW), for fireplaces<10,000 Btu/h(3 kW),
9"(230 mm) 12"(300 mm)
for fireplaces>10,000 Btu/h(3 kW),and<50,000 Btu/h for fireplaces>10,000 Btu/h(3 kW)
(15 kW),
12"(300 mm)
for fireplaces>50,000 Btu/h(15 kW)**
C Clearance to permanently closed window 9"(229 mm) 12"(305 mm)
recommended to prevent window condensation recommended to prevent
window condensation
0 Vertical clearance to ventilated soffit located above the 18"(458 mm) 18"(458 mm)
termination within a horizontal distance of 18"(458 mm)
E Clearance to unventilated soffit 12"(305 mm) 12"(305 mm)
F Clearance to outside corner 5"(127 mm) 5"(127 mm)
minimum minimum
G Clearance to inside corner 6"(152 mm)minimum 6"(152 mm)minimum
H Clearance to each inside of center line extended above 36"(910 mm) 36"(910 mm)
meter/regulator assembly within a height of 15 ft above the meter/regulator assembly** within a height of 15 ft above the meter/
regulator assembly*
I Clearance to service regulator vent outlet 36"(910 mm)** 36"(910 mm)*
J Clearance to nonmechanical air supply inlet to building or 6"(150 mm) 6"(150 mm)
the combustion air inlet to any other fireplace for fireplaces<10,000 Btu/h(3 kW), for fireplaces<10,000 Btu/h(3 kW),
9"(230 mm) 12"(300 mm)
for fireplaces>10,000 Btu/h(3 kW)and<50,000 Btu/h(15 kW), for fireplaces>10,000 Btu/h(3 kW)
12"(300 mm)
for fireplaces>50,000 Btu/h(15 kW)**
K Clearance to a mechanical air supply inlet 36"(910 mm)above if within 10 ft(3 m)horizontally** 72"(1830 mm)
L Clearance above paved sidewalk or paved diveway located 84"(2130 mm)$ 84"(2130 mm)#
on public property
M Clearance under veranda,porch,deck or balcony 12"(300 mm)*$ 12"(300 mm)`$
N Depth of alcove(maximum) 72"(1830 mm)** 72"(1830 mm)*
o Clearance to termination(alcove) 6"(15.2 mm)** 6"(15.2 mm)*
P Width of alcove(minimum) 36"(910 mm)** 36"(910 mm)*
Q Clearance to combustible above(alcove) 18"(457 mm)** 18"(457 mm)*
* In accordance with the current CSA-B149.1 National Gas And Propane Installation Code
*` In accordance with the curent ANSI Z223.1/NFPA 54 National Fuel Gas Codes
$ A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings
*$ Only permitted if veranda,porch,deck,or balcony is fully-open on a minimum two sides beneath the floor
13
Innovative Hearth Products Installation
Superiorrm DRT2000 and DRC2000 nirect-Vent Gas Fireplaces 900004-00,04/2015
MINIMUM CLEARANCES TO COMBUSTIBLES
Fireplace And Vent Clearances
The fireplace is approved with zero clearance to combustible materials on all sides (Table 8),with the following
exception:The unit may not be recessed (allowance made for mantel legs/side trim in Figure 6). When the unit is
installed with one side flush with a wall,the wall on the other side of the unit must not extend beyond the front edge
of the unit(Figure 6).
Table 8:Minimum Clearances *
1"(26mm)to wrapper for 45"model,all
Back others 1/2"(13mm)to wrapper
0"(0 mm)to Spacers
Sides 1/2"(13 mm)to wrapper
0"(0 mm)to Spacers**
Top Standoffs 0"(0 mm)to top standoffs
Floor 0"(0 mm)
From Bottom of Unit to Ceiling 64"(1626 mm)
Vent 3"(76 mm)—Top****
1"(25.4 mm)—Sides and Bottom
Front Service Clearance— 36"(914 mm)
clearance immediately in front of viewing area(s)
*3"(76 mm)above any horizontal/inclined vent component.
**See Page 19 for clearance requirements to the nailing flange located at each side of the unit and any screw heads adjacent to it.
***Top vent clearance can be reduced to 2"on horizontal runs when first elbow is located at least 6 ft above the fireplace.
The fireplace must be mounted on a fully supported base extending the full width and depth of the unit.The fireplace
may be located on or near conventional construction materials. However, if installed on combustible materials,such
as carpeting, vinyl tile or other combustible material other than wood flooring,the appliance shall be installed on a
metal or wood panel extending the full width and depth of the appliance.
Hearth Extension
A hearth extension is not required with this fireplace. If a hearth extension is used, do not block the lower control
compartment door.Any hearth extension used is for appearance only and does not have to conform to standard
hearth extension installation requirements.
Shelf Height
To provide for the lowest possible shelf surface, use the rear vent model. For top vent models,the venting attached
to the top vent should be routed in a way to minimize obstructions to the space above the fireplace. Do not insulate
the space between the fireplace and the area above it (Table 9and Table 10).The minimum height from the base
of the fireplace to the underside of combustible materials used to construct a utility shelf in this fashion is shown in
Table 9 and Table 10.
Table 9:Combustible Shelf Height—Top Vent
Top Vent with one 90°Elbow
Model
Secure Vent® Secure Flex®(flex elbow)
DRC2033/DRT2033 44"(1118 mm) 46"(1168 mm)
DRC2035/DRT2035 47"(1194 mm) 49"(1245 mm)
DRC2040/DRT2040 52"(1321 mm) 54"(1372 mm) No or combustibles
insulation
Shelf Height in the shaded
DRC2045/DRT2045 50"(1270 mm) 52"(1321 mm) (see table) area between
the appliance
and the shelf
above it.
14
Innovative Hearth Products Installation
SuperiorTM DRT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015
Table 10:Combustible Shelf Height—Rear Vent
Rear Vent with two 90°Elbows
Model >_3"clearance from shelf to
Secure Vent® Secure Flex®(flex elbow) top of fireplace and/or vent
DRC2033/DRT2033 34"(864 mm) 34"(864 mm) pipe,whichever is higher
DRC2035/DRT2035 351/2"(902 mm) 351/2"(902 mm) I �1n11
DRC2040/DRT2040 40 1/2"(1029 mm) 401/2"(1029 mm) 1' ,combustibles
Shelf Height 'p or insulation
�
DRC2045/DRT2045 451/2"(1156 mm) 451/2"(1156 mm) (see table) tj in the shaded
, area between
the appliance
/ j and the shelf
above it.
Figure 6:Combustible Side Clearances Figure 7:Mantel Height
At 6"minimum
side wall
clearance,a H--Mantel depth
combustible Top View of \ 18(457)
wall can project
to any length. / Fireplace \,
1 16(406)
Combustible materials 14(356)
3 1/2" allowed in shaded area
(89 mm) "Safe Zone". 12(305)
.,,_,..
Combustible walls 10(254)
pi
} 1 shown in dark gray
8(203)
Combustible mantel
i legs may project 12 8 4
beyond either side of (305) (203) (102) + Hood
-j the fireplace opening 10 6 2
_ - - as long as they are kept in.(mm) (254) (152) (51) Ar
within the shaded area Fireplace
y - -1--,H illustrated here.
6"
(152 mm)
Wall Finishes/Surrounds/Mantels
NOTE: Combustible wall finish materials and/or surround materials must not be allowed to encroach the area defined
by the fireplace front face (black sheet metal). Never allow combustible materials to be positioned in front of or
overlapping the fireplace face (Figure 41).
Non-combustible materials,such as surrounds and other fireplace trim,may be installed on the fireplace face,but they
must not cover any portion of the removable glass panel or control compartment.
Vertical installation clearances to combustible mantels vary according to the depth of the mantel (Figure 7). Mantels
constructed of non-combustible materials may be installed at any height above the fireplace opening. However, do
not allow anything to hang below the fireplace hood.
Minimum clearance requirements include any projections such as shelves,window sills, mantels,etc.above
the fireplace.
NOTE:To avoid heat-related finish damage,use finish materials rated 175°F,or higher,on the underside of the mantel.
INSTALLATION PREPARATION
The fireplace is shipped with all gas controls and components installed and pre-wired. Before installing the fireplace,
follow these steps:
1. Remove the shipping carton, and retain the front of the carton (used to protect the fireplace during construction).
2. Remove the shipping pad, exposing the front glass door.
3. Remove the glass door(Page 57).
NOTE: Place the glass door on the shipping carton to protect its surface.
15
Town of Queensbury Building &Code Enforcement
Office No. (518)761-8256
Framing I Firestopping Inspection Report
Inspection request received:
Name: /t( — ra T�. �/� Inspected on:
Location: 6 "4-r t' f7zjks Arrive:
t�
Permit No.: � Inspector's Initials:
TYPE OF STRUCTURE:, Y
Y N NIA COMMENTS:
Framing
Attic Access 22"x 30"minimum
Jack Studs/Headers
Truss Specification Provided
Bracing/Bridging
Joist hangers
Jack Posts/Main Beams
Exterior sheeting nailed properly
12"O.C.
Headroom 6 ft.8 in.
Stairwells 36 in.or more
Exterior Deck Bracing
Headroom 6 ft.8 in.
Notches/Holes/Bearing Walls
Metal Strapping for Notches Top Plate
1 %(w)16 gauge(8)16D nails each side
Draft stopping 1,000 sq.ft.floor trusses
Anchor Bolts 6 ft or less on center
ce and water shield 24 inches from wall
Fire separafion 1,2,3 hour
Fire wall 2,3,4 hour
Firestopping
Penetration sealed
16 inch insulation in cavity min.
Garage Fire Separation
House side%inch or 5/8 inch Type X
Garage side 518 inch Type X
Ceiling/wall
Windows Habitable Space/Bedrooms
24 in.(H)
20 in.(W)
5.7 sf above/below grade
5.0 sf grade —71
Design Professional Sign-off,if required
Framing I Firestopping Inspection Report
(�honl
Foundation Inspection Report
Office No. (518) 761-8256 Date Inspection re eiv
! SIS
Queensbury Building&Code Enforcement Arrive: Im epart: . m/
742 Bay Rd.,Queensbury,NY 12804 Inspector's Initial .
NAME: rnkW VVQY" P IT#: I g"q?4 —
LOCATION: )Q*. I\ , A OZt INSPECT ON: q1 to 17815
TYPE OF STRUCTU :
Comments
Y N N/A bc!LU � — Z
Footings
Piers
„. Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Reinforcement in Place
Footing Dowels or Keyway in place
Foundation Dampproofmg
Foundation Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
+/ mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:\Building &Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc
Last printed 12/9/2014
Town of Queensbury Building&Code Enforcement `FRA
Office No. (518)761-8256 1 3
Rough Plumbing I Insulation Inspection Report
Inspection request received: 1 It m 15
Name: r/6wYh Inspected on: 611011 15
Location: '� � 1 CatAoLnj 414 fjA 'r Arrive: n p.m.
Permit No.: Inspector's Initials: —
Type of Structure: °i'S -
COMMENTS
Y N NA '1 G
Plumbing under slab Tl�y l b
Rough Plumbing I Nail Plates
Plumbing Vent/Vents in Place
1 Yz inch minimum Drain Size
Washing Machine Drain 2 inch minimum IF—133�� OE�i
Cleanout every 100 feet I change of direction
Pressure Test
D in ent
e
P .I. or 10 ft. above highest connection for 15 minutes
ressure Test
Water Supply Piping
Air I Head
50 P.S.I for 15 minutes
Insulation I Residential Check I Commercial Check
Window Sealing
Tyvek or Similar Exterior Sealant
Proper Vent,Attic Vent
Door/Window Sealed(No Insulation)
Duct I Hot Water Piping Insulation
If required unheated spaces
Combustion Air Supply for Furnace
Duct work sealed properly I No duct tape
Blower Door Test
Air Sealing
Rough Plumbing I Insulation Inspection Report
Foundation Inspection Report
Office No. (518)761-8256 Date Inspection request received:
Queensbury Building&Code Enforcement Arrive: am/pm Depart:t am/pm
742 Bay Rd.,Queensbury, NY 12804 Inspector's Initial • /
CCC
NAME: sckN aN')�,, ON� PERMIT#:
LOCATION: v\ Au INSPECT ON: �,�— �� y
TYPE OF STRUCTURE: botQ
IComments
1 Y N N/A
Footings
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Reinforcement in Place
Footing Dowels or Keyway in place
Foundation Dampproofing
Foundation Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
U Building&Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc
Last printed 12/18/2013 2:44:00 PM
Foundation Inspection Report
Office No. (518) 761-8256 Date Inspection request received: 7
Queensbury Building&Code Enforcement Arrive: am/p�m- Depa4ff,-3,
742 Bay Rd.,Queensbury,•NY 112804/ Inspector's Initials:('
NAME: C r lLr PERMIT#:
LOCATION: / ANSPECT ON: '17-oLd
TYPE OF STRUCTUR "
C,Gl.4Comments
Qd (I U Y N UN/A
Footings
Piers
Monolithic Slab �
Reinforcement in Place a�
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
o ation'IWaAlpour
Reinforcement in Place 7
Footing Dowels or Keyway in place �-- L
Foundation Dampproofing
Foundation Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:\Building&Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc
Last printed 12/18/2013 2:44:00 PM
6 P/
Foundation Inspection Report
P P
Office No. (518) 761-8256 Date Inspection request received:
Queensbury Building&Code Enforcement Arrive: am/prn Depart: �m/pm
742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials: ✓ ✓
NAME: � - — p PERMIT#: CPO/
LOCATION: (I INSPECT ON:
TYPE OF STRUCTU .
-4V� Comments
Y N N/A
Footings
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
M u rpose on site.
Foun tion/Wallpour Of
Reinforcement in Place �7 , —2—
Footing
Footing Dowels or Keyway in place
Foundation Dampproofing J `l
Foundation Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:\Building&Codes Forms\Building&Codes\Inspection Farms\Foundation Inspection Report.doc
Last printed 12/18/2013 2:44:00 PM
Foundation Inspection Report c
Office No. (518)761-8256 Date Inspection reques v 7 0
Queensbury Building&Code Enforcement Arrive: epart: I Z ZZ a42jj,7
742 Bay Rd., Queensbury, NY /12804 / Inspector's Initial . /
NAME: S C k F1 t1 G CVQ—AJ MIT#:
LOCATION: l Ger` ( � 4 ;/ INSPECT ON:
TYPE OF STRUCTURE:
50G. `71/ Connnents
Y N N/A
ootings
Piers
Monolithic Slab
Reinforcement in Place
The contractor is responsible for
providing protection from freezing
for 48 hours following the placement
of the concrete.
Materials for this purpose on site.
Foundation/Wallpour
Reinforcement in Place
Footing Dowels or Keyway in place
Foundation Dampproofing
Foundation Waterproofing
Footing Drain Daylight or Sump
Footing Drain Stone:
12 inch width
6 inches above footing
6 mil poly for wet areas under slab
Backfill Approval
Plumbing Under Slab
PVC/Cast/Copper
Foundation Insulation Interior/Exterior
R-
Rough Grade 6 inch drop within 10 ft.
L:\Building&Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doC
Last printed 12/18/2013 2:44:00 PM
RUCINSKI HALL ARCHITECTURE
Ronald Richard Rucinski
Ethan Peter Hall
627 Maple Avenue �JG
Saratoga Springs NY 12866
Voice 518 580 1905
Fax 518 584 5012
Email ephall@nycap.rr.com
Transmittal 10 2014
C!-
To: Dave Hatin—Town of Queensbury—Code Enforcement Officer
From: Ethan Hall
Date: 10 September, 2014
Re: Schermerhorn Cottage Hill Bldg. #1; —6 unit Townhouse apartment building
Attached are two (2) 11x17 copies of the building plans for the 6 unit Townhouse apartment
building #12 Gentry Lane, building permit application, Com-Check Energy Code Compliance,
building structural calculations and the contract between Schermerhorn Construction and Grajny
Consulting LLC for the blower door test for the units.
This is a 6 unit townhouse apartment building for which a full size set of building plans was
previously submitted for Building #18 Gentry Hill North.
If there are any questions please let me know.
Y:\Schermerhom\Cottage Hill Apartments\Paperwork\Transmittal-2 10 Sept 2014.doe 1
GRAMY Consulting, LLC
69 Hayden Point Loop
Diamond Point, NY 12824
518 221-3240
06/08/2017
Mr. Rich Schermerhorn
Schermerhorn Real Estate Holdings
536 Bay Road Ste. 2
Queensbury,NY 12804
Inspection Address: 7A Gentry Hill East, Queensbury, NY 12804
Report Number: 0608171
Dear Rich:
The Blower Door Test to verify infiltration rate of the subject property, as per
requirements of the NYS 2010 Energy Conservation Construction Code was performed
on 06/08/2017. GRAJNY Consulting, LLC is pleased to submit the following report.
The following data was provided:
- Square Footage of the apartment, including I'and 2"°floor= 1,408 SF
- Volume of the apartment, including Pt and 2"°floor= 11,876 CF
Based on above,the following test data was collected:
- Infiltration Rate of the apartment at 50 Pascal= 1,058 CFM
- ACH50, Actual Changes per Hour at 50 Pascal= 1,058X60/11,876=5.3 <7
The Instruments used for test were provided by the Energy Conservatory Digital Gauge
DG-3 rated accuracy= +/- 1%, calibrated minimum once per year.
Thank you for selecting our company. We appreciate the opportunity to be of service.
Please call this office if there are any questions.
Sincerely,
Stow Grafi"
Stan Grajny, PE
RESNET HERS Energy Rater 5609922
NYS PE 065406-1
GRAMY Consulting, LLC
69 Hayden Point Loop
Diamond Point, NY 12824
518 221-3240
06/08/2017
Mr. Rich Schermerhorn
Schermerhorn Real Estate Holdings
536 Bay Road Ste. 2
Queensbury,NY 12804
Inspection Address: 713 Gentry Hill East, Queensbury, NY 12804
Report Number: 0608172
Dear Rich:
The Blower Door Test to verify infiltration rate of the subject property, as per
requirements of the NYS 2010 Energy Conservation Construction Code was performed
on 06/08/2017. GRAJNY Consulting, LLC is pleased to submit the following report.
The following data was provided:
- Square Footage of the apartment, including I'and 2"°floor= 1,408 SF
- Volume of the apartment, including Pt and 2"°floor= 11,876 CF
Based on above,the following test data was collected:
- Infiltration Rate of the apartment at 50 Pascal= 1,134 CFM
- ACH50, Actual Changes per Hour at 50 Pascal= 1,134X60/11,876-5.7<7
The Instruments used for test were provided by the Energy Conservatory Digital Gauge
DG-3 rated accuracy= +/- 1%, calibrated minimum once per year.
Thank you for selecting our company. We appreciate the opportunity to be of service.
Please call this office if there are any questions.
Sincerely,
Stow Grafi"
Stan Grajny, PE
RESNET HERS Energy Rater 5609922
NYS PE 065406-1
GRAMY Consulting, LLC
69 Hayden Point Loop
Diamond Point, NY 12824
518 221-3240
06/08/2017
Mr. Rich Schermerhorn
Schermerhorn Real Estate Holdings
536 Bay Road Ste. 2
Queensbury,NY 12804
Inspection Address: 7C Gentry Hill East, Queensbury, NY 12804
Report Number: 0608173
Dear Rich:
The Blower Door Test to verify infiltration rate of the subject property, as per
requirements of the NYS 2010 Energy Conservation Construction Code was performed
on 06/08/2017. GRAJNY Consulting, LLC is pleased to submit the following report.
The following data was provided:
- Square Footage of the apartment, including I'and 2"°floor= 1,408 SF
- Volume of the apartment, including Pt and 2"°floor= 11,876 CF
Based on above,the following test data was collected:
- Infiltration Rate of the apartment at 50 Pascal= 1,198 CFM
- ACH50, Actual Changes per Hour at 50 Pascal= 1,198X60/11,876-6.0 <7
The Instruments used for test were provided by the Energy Conservatory Digital Gauge
DG-3 rated accuracy= +/- 1%, calibrated minimum once per year.
Thank you for selecting our company. We appreciate the opportunity to be of service.
Please call this office if there are any questions.
Sincerely,
Stow Grafi"
Stan Grajny, PE
RESNET HERS Energy Rater 5609922
NYS PE 065406-1
GRAMY Consulting, LLC
69 Hayden Point Loop
Diamond Point, NY 12824
518 221-3240
06/08/2017
Mr. Rich Schermerhorn
Schermerhorn Real Estate Holdings
536 Bay Road Ste. 2
Queensbury,NY 12804
Inspection Address: 7D Gentry Hill East, Queensbury, NY 12804
Report Number: 0608174
Dear Rich:
The Blower Door Test to verify infiltration rate of the subject property, as per
requirements of the NYS 2010 Energy Conservation Construction Code was performed
on 06/08/2017. GRAJNY Consulting, LLC is pleased to submit the following report.
The following data was provided:
- Square Footage of the apartment, including I'and 2"°floor= 1,408 SF
- Volume of the apartment, including Pt and 2"°floor= 11,876 CF
Based on above,the following test data was collected:
- Infiltration Rate of the apartment at 50 Pascal= 1,118 CFM
- ACH50, Actual Changes per Hour at 50 Pascal= 1,118X60/11,876-5.6 <7
The Instruments used for test were provided by the Energy Conservatory Digital Gauge
DG-3 rated accuracy= +/- 1%, calibrated minimum once per year.
Thank you for selecting our company. We appreciate the opportunity to be of service.
Please call this office if there are any questions.
Sincerely,
Stow Grafi"
Stan Grajny, PE
RESNET HERS Energy Rater 5609922
NYS PE 065406-1