Loading...
RC-000333-2015 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000333-2015 Date Issued: Monday, April 24, 2017 This is to certify that work requested to be done as shown by Permit Number RC-000333-2015 has been completed. Tax Map Number: 296.15-1-2 Location: 83 GENTRY LN Owner: Schermerhorn Properties Applicant: Schermerhom Properties This structure may be occupied as a:Townhouse 6 units watt.garage Bldg#5 83 Gentry Lane By Order of Town Board TOWN OF QUEEp1SBURY Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance,or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Q_ W� Community Development-Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: RC-000333-2015 b9 X`q ,A 7-1 Tax Map No: 296.15-1-2 REVISED Permission is hereby granted to: Schermerhom Properties For property located at: 83 GENTRY LN In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Schemerhom Properties Multi-Family-New $140,000.00 Owner Address: 536 Bay RD,Suite 2 Total Value $140,000.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency Richard Schertnerhom 536 Bay RD,2 Queensbury,NY 12804 Plans&Specifications Townhouse 6 units w/att.garage Bldg#5 83 Gentry Lane PERMIT FEE PAID-THIS PERMIT EXPIRES: Sunday,September 11,2016 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Qu e n Th79t 7,2015 SIGNED BY: r,Z'y-'-^ he Town of Queensbury. Director of Building&Code Enforcement (o ----------------------------------------------------_-------__"----_ ,"_"-."___ r" �� X010 OFFICE USE ONLY I ; P TAX MAP NO.. PERMITNO. �y� E FEES: PERMITQ 7I.�. , P,EATION J� IOD ENGINEERING Al Ik ) ; a (if appiTca-b-�_ ) ' ------------------------------ - - -------------- PRINCIPAL STRUCTURE. APPLICATION FOR ZONING APPROVAL & BUILDING PERMIT A PERMIT MUST BE OBTAINED BEFORE BEGINNING CONSTRUCTION. APPLICATION IS SUBJECT TO REVIEW BEFORE ISSUANCE OF A VALID PERMIT FOR CONSTRUCTION. APPLICANT/BUILDER: l5q)OW04 agN T4:VA W-OWNER: 6AM ADDRESS: 6sfo 13A'E kw Swr1s Z ADDRESS: Qum( mwi"— PHONE NOS_!e2jQ,::r —Qro'14 PHONE NOS.FWA* �+ CONTACT PERSON FOR BUILDING&CODES COMPLIANCE- "p-i4n� PHPHONE: 031 E: 51�'�D�6—LQdF� LOCATION OF PROPERTY:BUIU01146i A 6 C� �� `A'1Ti� alLt' HAS THERE BEEN A SITE PLAN REVIEW;VARIANCE OR SUBDIVISION APPROVAL? LFII/YES ❑ NOS$. IF SO, INDICATE APPLICATION NO.AND DATE OF APPROVAL: PLEASE INDICATE MEASUREMENTS AS REQUIRED BELOW: CHECK ALL THAT APPLY TO YOUR z 0 p y d Cl PROJECT Oit 1 Co= _ Lu IL LL w o an d z cJ �� p� � w � z ¢ ¢ - m Nm 0 L HLL axCa SINGLE FAMILY TWO-FAMILY / (NO.rof UNITS V 3� 5�21�i �1►114 3,4'<(on TOWNHOUSE BUSINESS OFFICE RETAIL- MERCANTILE FACTORY OR INDUSTRIAL ATTACHED A GARAGE(1,2,3) I� / OTHER Town of Queensbury'Community Development Office'742 Bay Road, Queensbury NY 12804 Revised 4/14/2010 IF COMMERCIAL OR INDUSTRIAL-NAME OF BUSINESS: CtsPTIO J lVt -MW A1)VA6W=, ESTIMATED CONSTRUCTION COSTA 14010M FUEL TYPE: t4hrr. 814S HEAT TYPE: *HOW MANY FIREPLACE(S):_ 0_AND/OR WOODSTOVES(S):_ ZONING CATEGORY: ARE THERE WETLANDS ON THIS SITE? IS THIS A HISTORIC SITE? Olo PROPOSED USE OF BUILDING OR ADDITION: JQLQ[44Q,t� -(L,- ?4PA0 MWV ARE THERE STRUCTURES NOT SHOWN ON PLOT PLAN? NQ ARE THERE EASEMENTS ON PROPERTY? [wry I acknowledge no construction activities shall be commenced prior to issuance of a valid Permit. I certify that the application, plans, and supporting materials are a true and complete statement/description of the work proposed, that all work will be performed in accordance with the NY State Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 1 acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. I also understand that 11we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree t h above. Signed �II„1Yi�uirvni 'Cr ij:-3...C..'.t� vi _� Chl:v,...:� C :i 1, .1! ... ..._ `r Town of Queensbury Community Development Office' 742 Bay Road, Queensbury NY 12804 Office Use Only Town of Queensbury Building & Codes Received: Tax Map ID: FUEL BURNING APPLIANCE &CHIMNEY APPLICATION Permit No.: Permit Fee: $ Application is hereby made to the Building & Codes Office for the issuance of a Building & Use Permit pursuant to the NYS Fire Prevention & Building Code. The applicant or owner agrees to comply with all applicable laws,ordinances,regulations, and all conditions that are part of these requirements and also will allow all inspectors to enter premises to perform required inspections. Important Note To Applicant Rough-In and Final Inspections Are Required: Date 4e " Owner �1. fJ Installer/Builder 0467 Address 6Xy VA.( Address awantwWAti > Phone 900 VS I Phone Location of proposed construction and/or installation: f'y*W*uRILL -AbagAwsy Apm Contact Person for Building&Codes Compliance: n0AfQI AI VU p. t-fit Subdivision Name: &ZEMV21St� Fuel Buming Appliance Information Wood Coal Pellet Gas OH Stove Fire lace Insert Fre lace,facto built' { e Fr lace,Mason Furnace, Gare a only) *If Factory Built, Please Provide: Manufacturer Name: Model No.jg4—=& Listed By: Number. Chimney Information Masonry" check one _Block _Brick Stone Flue ✓check one Tile _Steel ,Size in Inches Mater al ✓check one _Double Wall _Triple Wall _Insulated Direct Vent _Chimney Liner "If Non-Masonry,please provide: Manufacturer Name: Model No. Signatures: Print Name: -1;AL#U7— Signature: Date: ADDITIONAL NOTE: CONSTRUCTIONANSTALLATION MUST CONFORM TO NYS FIRE PREVENTION&BUILDING CODE AND/OR MANUFACTURER REQUIREMENTS. CONSULT AVAILABLE TOWN OF QUEENSBURY HANDOUTS REGARDING REQUIRED INSPECTIONS. GRAJNY Consulting, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 QC &-_2->-a>-2015 04/22/2017 S3Q0 .3 �N; MnaSNo7lne-__ Mr.Rich Schermerhorn 3n��p�WL1p1 Schermerhom Real Estate Holdings �tOZ 536 Bay Road Ste.2 I7 Z �d b Queensbury,NY 12804 MAYS Inspection Address: 83A Gentry Lane, Queensbury, NY 12804 Report Number: 0422171 Dear Rich: The Blower Door Test to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 04/22/2017. GRAJNY Consulting,LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment, including 1"and 21 floor= 1,408 SF - Volume of the apartment,including I"and 2'floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal= 1,140 CFM - ACH50,Actual Changes per Hour at 50 Pascal= 1,140X60/11,876=5.8<7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- 1%,calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Sfaw Grajwy Stan Grainy, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 GRAJNY Consulting, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 04/22/2017 Mr.Rich Schermerhorn Schermerhorn Real Estate Holdings 536 Bay Road Ste. 2 Queensbury,NY 12804 Inspection Address: 836 Gentry Lane, Queensbury, NY 12804 Report Number: 0422172 Dear Rich: The Blower Door Test to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 04/22/2017. GRAINY Consulting, LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment, including 1s`and 2""floor= 1,408 SF - Volume of the apartment, including 1"and 2'floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal= 1,251 CFM - ACH50,Actual Changes per Hour at 50 Pascal= 1,251X60/11,876=6.3 <7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- 1%,calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Sfaw 6jra4" Stan Grainy, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 GRAJNY Consulfing, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 04/22/2017 Mr. Rich Schermerhorn Schermerhorn Real Estate Holdings 536 Bay Road Ste.2 Queensbury,NY 12804 Inspection Address: 83C Gentry Lane, Queensbury, NY 12804 Report Number: 0422173 Dear Rich: The Blower Door Test to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 04/22/2017.GRAJNY Consulting,LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment, including 1"and 21 floor= 1,408 SF - Volume of the apartment,including 1"and 2'floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal= 1,227 CFM - ACH50,Actual Changes per Hour at 50 Pascal= 1,227X60/11,876=6.2<7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- 1%, calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Stow Graf" Stan Grajny, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-1 RAJNY Consulfing, LLC 69 Hayden Point Loop Diamond Point, NY 12824 518 221-3240 04/22/2017 Mr. Rich Schermerhom Schermerhorn Real Estate Holdings 536 Bay Road Ste.2 Queensbury,NY 12804 Inspection Address: 83D Gentry Lane, Queensbury, NY 12804 Report Number: 0422174 Dear Rich: The Blower Door Test to verify infiltration rate of the subject property, as per requirements of the NYS 2010 Energy Conservation Construction Code was performed on 04/22/2017.GRAJNY Consulting,LLC is pleased to submit the following report. The following data was provided: - Square Footage of the apartment, including I"and 21 floor= 1,408 SF - Volume of the apartment,including 1"and 2od floor= 11,876 CF Based on above,the following test data was collected: - Infiltration Rate of the apartment at 50 Pascal= 1,127 CFM - ACH50,Actual Changes per Hour at 50 Pascal= 1,127X60/11,876=5.7<7 The Instruments used for test were provided by the Energy Conservatory Digital Gauge DG-3 rated accuracy=+/- 1%,calibrated minimum once per year. Thank you for selecting our company. We appreciate the opportunity to be of service. Please call this office if there are any questions. Sincerely, Sta.w Graf" Stan Grajny, PE RESNET HERS Energy Rater 5609922 NYS PE 065406-I GRAJNY Consulting, LLC. 69 Hayden Point Loop Diamond Point, NY 12824 Invoice REPORT NO.: 0422170 INSPECTION DATE: 04/22117 PREPARED FOR: Mr. Rich Schermerhorn Schermerhorn Real Estate Holdings 536 Bay Road Ste. 2 Queensbury, NY 12804 PROPERTY INSPECTED: 83 Gentry Lane—4 Apartments Queensbury, NY 12804 Description Amount 83 Gentry-4 Apartments. — Blower Door Test, Report and Inspection 300 Plan Review & Improvement Analysis & Site Visit Site Visit, Insulation and Thermal Bypass Inspection Site Testing Blow Door, Duct Blasting, CAZ & Inspection) Provider Fee (Cost) :d I TOTAL $ 300 Thank you for your business Payment of this invoice is due upon receipt. The late payment charge rate of interest is 1.5%monthly(18.0%per annum), after 30 days INSPECTION WORKSHEET (FM-001915-2017) Town of Queensbury-Building and Codes-Fire Marshal 742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal Case Number: RC-000333-2015 Case Module: Permit Inspection Date: 04/21/2017 Inspection Status: Passed Inspector: Mike Palmer Inspection Type: OCC-Inspections Job Address: 83 GENTRY LN Parcel Number: 296.15-1-2 Queensbury,NY 12804 Contact Type Company Name Name Architect [Rucinski-Hall Architecture] Applicant [Schermerhorn Properties] Contractor Schermerhorn,Richard Primary Owner [Schermerhorn Properties] Granted Permission [Schermerhorn Properties] Checklist Item Passed Comments Fire Marshal YES Exit Access FC1014&FC1029 YES Exit Enclosure FC1020&FC1029 YES Exit Discharge FC1024&FC1029 YES Locks and Latches FC1008&FC1029.2 YES Truss ID Signage FC505.3 YES Electrical Wiring Enclosed/Labeled FC605.3.1 YES Combustibles in Equipment Rooms FC 315.2.3 YES F.D.Signage-FC510 YES Smoke Detectors FC907 YES CO Detectors FC610 YES Clearance to Sprinkler/Ceiling FC315.2.1 18"/24" YES Sprinkler System Annual YES Sprinkler FDC YES Knox Box:installed/checked FC506 YES Occupancy Cycle YES R Denny Palmer,Mike(Inspector) Apr 21,2017 Page(1) r" �3 FILRETEK w -L S P R IN KLR SYSTEMS, LLC 58 Hudson River Rd. • Waterford, NY 12188 Phone: (518)244-3772 Fax: (518)238-2608 04/18/17 Mr. Mike Palmer Fire Marshall Town of Queensbury 742 Bay Rd. Queensbury,NY 12804 RE: Cottage Hill Apts. 83 Gentry Lane Queensbury,NY Mike, The installation of the fire sprinkler system, at the above address, has been completed. The system is on and operational. To the best of my knowledge the installation conforms to NFPA 13R. Should you require anything further, please give me a call. Sincerely, Bob Wood Vice President Town of Queensbury-Building and Codes-Fire Marshal 742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal Case Number: RC-000333-2015 Case Module: Permit Inspection Date: 04/21/2017 Inspection Status: Passed Inspector: Mike Palmer Inspection Type: Gas Fireplace/Stove Job Address: 83 GENTRY LN Parcel Number: 296.15-1-2 Queensbury,NY 12804 Contact Type Company Name Name Architect [Rucinski-Hall Architecture] Applicant [Schermerhorn Properties] Contractor Schermerhorn,Richard Primary Owner [Schermerhorn Properties] Granted Permission [Schermerhorn Properties] Checklist Item Passed Comments General Comments YES Superior Fireplace-model DRT2033TMN SERIAL#unit A-A16E116966 B-A16E116968 c-A16E095382 D-A16E116961 Building Inspection notes YES Floor Protection YES Clearances to Combustibles(all sides) YES Firestop(s)-Wall Penetration YES Vent Clearance to Combustibles YES Vent Chimney Termination YES Gas Shut-off Valve YES Combustion Air YES Mantel-height above fp opening YES See page 15 for mantel clearances Return to verify Ok 4/21/17 Witness Operation YES Return to verify Ok 4/21/17 CO Detection YES Return to verify Ok 4/21/17 CSST Bonding YES Return to verify Ok 4/21/17 Denny Palmer,Mike(Inspector) Apr 21,2017 Page(1) INSPECTION WORKSHEET (FMGAS-OO76OO-2016) Town of Queensbury-Building and Codes-Fire Marshal 742 Bay Road-(518)761-8256 Building(518)761-8206 Fire Marshal Case Number: RC-000333-2015 Case Module: Permit Inspection Date: 12/09/2016 Inspection Status: Partial Pass Inspector: Gary Stillman Inspection Type: Gas Fireplace/Stove Job Address: 83 GENTRY LN Parcel Number: 296.15-1-2 Queensbury,NY 12804 Contact Type Company Name Name Contractor Schermerhorn,Richard Primary Owner [Schermerhorn Properties] Applicant [Schermerhorn Properties] Granted Permission [Schermerhorn Properties] Architect [Rucinski-Hall Architecture] Checklist Item Passed Comments Vent Clearance to Combustibles YES CSST Bonding NO Return to verify Vent Chimney Termination YES Witness Operation NO Return to verify Mantel-height above fp opening NO See page 15 for mantel clearances Return to verify Floor Protection YES Firestop(s)-Wall Penetration YES General Comments YES Superior Fireplace-model DRT2033TMN SERIAL#unit A-Al6E116966 B-A16E116968 c-A16E095382 D-A16E116961 Gas Shut-off Valve YES Building Inspection notes YES Clearances to Combustibles(all sides) YES Combustion Air YES CO Detection NO Return to verify j Stillman,Gary(Inspector) Dec 09,2016 Page(1) Innovative Hearth Products Installation SuperiorTM 0RT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015 Table 7:Horizontal vent termination clearances for buildings with combustible and noncumbustible exteriors MsiM Corner Outside Corner Recessed lculion See Taole6 8 f Nip P o —G1— zilP11 --I See 4N\ —O Fixedl —._9__'_0 5, I!IiI:I! ij1T1 iiii Balcony with Perpendicular Bide WallB A. � M I al / IJ—K�l VI H ❑y TERMINATION CAP 0 AIR SUPPLY INLET Q GAS METER 0 RESTRICTEDAREA 1 (TERMINATION PROHIBITED) U.S.Installation** Canadian Installation* A Clearance above grade,veranda,porch,desk,or balcony 12"(300 mm)** 12"(300 mm)* B Clearance to window or door that may be opened 6"(150 mm) 6"(150 mm) for fireplaces<10,000 Btu/h(3 kW), for fireplaces<10,000 Btu/h(3 kW), 9"(230 mm) 12"(300 mm) for fireplaces>10,000 Btu/h(3 kW),and<50,000 Btu/h for fireplaces>10,000 Btu/h(3 kW) (15 kW), 12"(300 mm) for fireplaces>50,000 Btu/h(15 kW)** C Clearance to permanently closed window 9"(229 mm) 12"(305 mm) recommended to prevent window condensation recommended to prevent window condensation D Vertical clearance to ventilated soffit located above the 18"(458 mm) 18"(458 mm) termination within a horizontal distance of 18"(458 mm) E Clearance to unventilated soffit 12"(305 mm) 12"(305 mm) F Clearance to outside corner 5"(127 mm) 5"(127 mm) minimum minimum G Clearance to inside corner 6"(152 mm)minimum 6"(152 mm)minimum H Clearance to each inside of center line extended above 36"(910 mm) 36"(910 mm) meter/regulator assembly within a height of 15 ft above the meter/regulator assembly** within a height of 15 ft above the meter/ regulator assembly* I Clearance to service regulator vent outlet 36"(910 mm)** 36"(910 mm)* J Clearance to non mechanical air supply inlet to building or 6"(150 mm) 6"(150 mm) the combustion air inlet to any other fireplace for fireplaces<10,000 Btu/h(3 kW), for fireplaces<10,000 Btu/h(3 kW), 9"(230 mm) 12"(300 mm) for fireplaces>10,000 Btu/h(3 kW)and<50,000 Btu/h(15 kW), for fireplaces>10,000 Btu/h(3 kW) 12"(300 mm) for fireplaces>50,000 Btu/h(15 kW)** K Clearance to a mechanical air supply inlet 36"(910 mm)above if within 10 ft(3 m)horizontally** 72"(1830 mm)* L Clearance above paved sidewalk or paved diveway located 84"(2130 mm)$ 84"(2130 mm)$ on public property M Clearance under veranda,porch,deck or balcony 12"(300 mm)*$ 12"(300 mm)*$ N Depth of alcove(maximum) 72"(1830 mm)** 72"(1830 mm)* 0 Clearance to termination(alcove) 6"(15.2 mm)** 6"(15.2 mm)* P Width of alcove(minimum) 36"(910 mm)** 36"(910 mm)* 0 Clearance to combustible above(alcove) 18"(457 mm)** 18"(457 mm)* * In accordance with the current CSA-B149.1 National Gas And Propane Installation Code ** In accordance with the curent ANSI Z223.1/NFPA 54 National Fuel Gas Codes $ A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings *$ Only permitted if veranda,porch,deck,or balcony is fully-open on a minimum two sides beneath the floor 13 Innovative Hearth Products Installation SuperiortM DRT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015 MINIMUM CLEARANCES TO COMBUSTIBLES Fireplace And Vent Clearances The fireplace is approved with zero clearance to combustible materials on all sides (Table 8),with the following exception:The unit may not be recessed (allowance made for mantel legs/side trim in Figure 6).When the unit is installed with one side flush with a wall,the wall on the other side of the unit must not extend beyond the front edge of the unit (Figure 6). Table 8:Minimum Clearances * 1"(26mm)to wrapper for 45"model,all Back others 1/2"(13mm)to wrapper 0"(0 mm)to Spacers Sides 1/2"(13 mm)to wrapper 0"(0 mm)to Spacers** Top Standoffs 0"(0 mm)to top standoffs Floor 0"(0 mm) From Bottom of Unit to Ceiling 64"(1626 mm) Vent 3"(76 mm)—Top**** 1"(25.4 mm)—Sides and Bottom Front Service Clearance— 36"(914 mm) clearance immediately in front of viewing area(s) *3"(76 mm)above any horizontal/inclined vent component. **See Page 19 for clearance requirements to the nailing flange located at each side of the unit and any screw heads adjacent to it. ***Top vent clearance can be reduced to 2"on horizontal runs when first elbow is located at least 6 f1 above the fireplace. The fireplace must be mounted on a fully supported base extending the full width and depth of the unit.The fireplace may be located on or near conventional construction materials. However, if installed on combustible materials,such as carpeting, vinyl tile or other combustible material other than wood flooring,the appliance shall be installed on a metal or wood panel extending the full width and depth of the appliance. Hearth Extension A hearth extension is not required with this fireplace. If a hearth extension is used, do not block the lower control compartment door.Any hearth extension used is for appearance only and does not have to conform to standard hearth extension installation requirements. Shelf Height To provide for the lowest possible shelf surface, use the rear vent model. For top vent models, the venting attached to the top vent should be routed in a way to minimize obstructions to the space above the fireplace. Do not insulate the space between the fireplace and the area above it(Table 9and Table 10).The minimum height from the base of the fireplace to the underside of combustible materials used to construct a utility shelf in this fashion is shown in Table 9 and Table 10. Table 9::Combustible Shell Height—Top Vent Top Vent with one 90°Elbow Model Secure Vent® Secure Flex®(flex elbow) DRC2033/DRT2033 44"(1118 mm) 46"(1168 mm) DRC2035/DRT2035 47"(1194 mm) 49"(1245 mm) t Irfl�11 DRC2040/DRT2040 52"(1321 mm) 54"(1372 mm) combustibles or Shelf Heightinsulation or DRC2045/DRT2045 50"(1270 mm) 52"(1321 mm) in the shaded (see table) area between the appliance and the shelf above it. 14 Innovative Hearth Products Installation SuperiorrM DRT2000 and DRC2000 Direct-Vent Gas Fireplaces 900004-00,04/2015 Table 10:Combustible Shelf Height—Rear Vent Rear Vent with two 90°Elbows Model >_3"clearance from shelf to Secure Vent® Secure Flex®(flex elbow) top of fireplace and/or vent DRC2033/DRT2033 34"(864 mm) 34"(864 mm) pipe,whichever is higher DRC2035/DRT2035 35 1/2"(902 mm) 35 1/2"(902 mm) �illll•n DRC2040/DRT2040 401/2"(1029 mm) 401/2"(1029 mm) / �,No Shelf eight G combustibles DRC2045/DRT2045 451/2"(1156 mm) 45 1/2"(1156 mm) (see table) g, or insulation lif in the shaded Y area between , the appliance ,/ and the shelf above it. Figure 6:Combustible Side Clearances Figure 7:Mantel Height At 6"minimum side wall clearance,a combustible F. —Mantel depth ---►1 wall can project / Top View of 18(457) to any length. Fireplace 16(406) T i r 45°' Combustible materials 14(356) 3 1/2" allowed in shaded area -- (89 mm) "Safe Zone". 12(305) 1 ---- Combustible walls 10(254) ____ shown in dark gray 8(203) Combustible mantel legs may project beyond either side of 12 8 4 Hood the fireplace opening (3 2 10(203)6(102)2 _ _ as long as they are kept in. mm (254) (152) (51) within the shaded area ( ) n� i s- illustrated here. Fireplace 6" (152 mm) Wall Finishes/Surrounds/Mantels NOTE: Combustible wall finish materials and/or surround materials must not be allowed to encroach the area defined by the fireplace front face(black sheet metal). Never allow combustible materials to be positioned in front of or overlapping the fireplace face (Figure 41). Non-combustible materials,such as surrounds and other fireplace trim,may be installed on the fireplace face,but they must not cover any portion of the removable glass panel or control compartment. Vertical installation clearances to combustible mantels vary according to the depth of the mantel (Figure 7). Mantels constructed of non-combustible materials may be installed at any height above the fireplace opening. However, do not allow anything to hang below the fireplace hood. Minimum clearance requirements include any projections such as shelves,window sills, mantels,etc.above the fireplace. NOTE:To avoid heat-related finish damage,use finish materials rated 175°F,or higher,on the underside of the mantel. INSTALLATION PREPARATION The fireplace is shipped with all gas controls and components installed and pre-wired. Before installing the fireplace, follow these steps: 1. Remove the shipping carton,and retain the front of the carton (used to protect the fireplace during construction). 2. Remove the shipping pad, exposing the front glass door. 3. Remove the glass door(Page 57). NOTE: Place the glass door on the shipping carton to protect its surface. 15 Town of Queensbury Building &Code Enforcement I'.3 Office No.(518)761-8256 Framing I Firestopping Inspection Report Inspection request received: q Z LOLS Name: c yA/y>1Pa/hQNr1 Inspected on: I2-OA Location: SI �ZJcme* a Arrive: a.rtY(p.rq/ Permit No.: ` � —14,1-1 Inspector's Initials: • �� TYPE OF STRUCTURE: AvtS Y N NIA COMMENTS: Framing Attic Access 22"x 30"minimum Jack Studs/Headers 1 (o l 3 Truss Specification Provided Bracing/Bridging Joist hangers Jack Posts/Main Beams Exterior sheeting nailed properly 12"O.C. Headroom 6 ft.8 in. Stairwells 36 in.or more Exterior Deck Bracing Headroom 6 ft.8 in. Notches/Holes/Bearing Walls Metal Strapping for Notches Top Plate 1 Y2(w) 16 gauge(8) 16D nails each side Draft stopping 1,000 sq.ft.floor trusses Anchor Bolts 6 fk or less on center �c Ice and water shield 24 inches from wall Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side'%inch or 5/8 inch Type X Garage side 5/8 inch Type X Ceiling/wall Windows Habitable Space/Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above/below grade 5.0 sf grade Design Professional Sign-off,if required Framing I Firestopping Inspection Report 1N� Foundation Inspection Report Office No. (518) 761-8256 Date Ins ection re e rec i SIBS Queensbury Building&Code Enforcement Arrive: 4 Depart: am/ 742 Bay Rd., Queensbury,NY 12804 hispector's Initials: d /' NAME: YYYy kVNQgn P T#: LOCATION: CAA 85 (fin y'{�1U� INSPECT ON: Qz�S� 2<t5 TYPE OF STRUCTURE: v IU}S Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofmg Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: X12 inch width 6 inches above footing -4m*poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulatio Interio terror r7 R_ 'Jr L FNS E�c Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building &Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/9/2014 Town of Queensbury Building&Code Enforcement Office No.(518)761-8256 Rough Plumbing 1 Insulation Inspection Report Inspection request received: �t 5 Name: Inspected on: Location: Arrive: t- M. Permit No.: i LJ� Inspector's Initials: ` Type of Structure: \� COMMENTS Y N NA Plumbing under slab Rough Plumbing/Nail Plates Plumbing Vent/Vents in Place 1 '/2 inch minimum Drain Size Washing Machine Drain 2 inch minimum Cleanout every 100 feet/change of direction Pressure Test Djaig/Vent A' d .S . or 10 ft. above highest connection for 15 minutes ressure Test Water Supply Piping Air/Head Z 50 P.S.I for 15 minutes Insulation/Residential Check/Commercial Check Window Sealing Tyvek or Similar Exterior Sealant Proper Vent, Attic Vent Door I Window Sealed (No Insulation) Duct I Hot Water Piping Insulation If required unheated spaces Combustion Air Supply for Furnace Duct work sealed properly/No duct tape Blower Door Test Air Sealing Rough Plumbing I Insulation Inspection Report J�kQ (A'3s to Foundation Inspection Report r4m,� Office No. (518)761-8256 Date Inspection reques a ived: Queensbury Building&Code Enforcement Arrive: I in Depart: Z=1,�� 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials: NAME: rrlvItN h PERMIT LOCATION: INSPECT ON: to IsT TYPE OF STRUCTURE: t0r( Comments Y N N/A � Footings 11 Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Zj Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior r R- ugh Grade 6 inch drop within 10 ft. L:\Building&Codes Forms\Building &Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/9/2014 Foundation Inspection Report Office No. (518) 761-8256 Date Inspection requ rec Queensbury Building&Code Enforcement Arrive: "-0Z� pm epart: am/� 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials: . //�� NAME: v ERMIT#: �-L�421 LOCATION: INSPECT ON: to Cl)?A 15 TYPE OF STRUCTURE: Comments Y N I N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rougb Grade 6 inch drop within 10 ft. L:\Building &Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/9/2014 Ma,) Foundation Inspection Report Office No. (518) 761-8256 Date Inspection ues iv t: l lq I15 Queensbury Building&Code Enforcement Arrive: epart: 742 Bay Rd., Queensbury,NY 12804 Inspector's Initia NAME: �cHa�✓r �1✓�.v IT#: LOCATION: �1 tl� �J Gee to SPECT ON: to I'al toll TYPE OF STRUCTURE: Alp)!- Comments 2 e� =�vc� Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab wiWekfill Approval Pl mg Under Slab C/Cast/Copper Foundation Insulatio erior r Z R- Rough Grade 6 inch drop within 10 ft. L:\Building &Codes Forms\Building&Codes\Inspection Forms\Foundation Inspection Report.doc Last printed 12/9/2014 Foundation Inspection Report Office No. (518)761-8256 Date Ins ecfion r c i Arrive: ed• 15 Queensbury Building&Code Enforcement Ave: p epar 742 Bay Rd.,Queensbury,NY 12804 Inspector's Initials: /� NAME: r� PE T#: `� - 12'� LOCATION: INSPECT ON: (01�171J1s TYPE OF STRUCTURE: J W v1hQAJ Sf Comments Y N N/A Footings Piers Monolithic Slab Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of tie c -ncrete. --- -- - - - Materials for this purpose on site. Foundation/Wallpour Reinforcement in Place Footing Dowels or Keyway in place Foundation Dampproofing Foundation Waterproofing Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing 6 mil poly for wet areas under slab Backfill Approval Plumbing Under Slab PVC/Cast/Copper Foundation Insulation Interior/Exterior R- Rough Grade 6 inch drop within 10 ft. L:\Building&Codes Fortes\Building&Codes\Inspection Fortes\Foundation Inspection Report.doc Last printed 12/9/2014 COMcheck Software Version 3.9.3 Envelope Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information /U16 Project Type:New Construction Project Title: New Townhouse Apartment Construction Site: Owner/Agent: Designer/Contractor: Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-798-0674 Saratoga Springs,NY 12866 rich@schermerhomconstmction.cwm 518-580-1905 ephall@nycap.rr.com Section 2: General Information Building Location(for weather data): Warren,New York Climate Zone: 6a Building Space Conditioning Type(s): Residential Vertical Glazing/Wall Area Pct.: 11% Activity Tyoe(sl Floor Area Multifamily 10621 Section 3: Requirements Checklist Envelope PASSES:Design 30.1.better than code Climate-Specific Requirements: Component Name/Description Gross Cavity Cont. Proposed Budget Area or R-Value R-Value U-Factor U-Factoria) Perimeter Orientation:NORTH Exterior Wall 3:Wood-Framed, 16"o.c. 1070 21.0 0.0 0.062 0.051 Door 17:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 18:Insulated Metal,Swinging 18 0.300 0.500 Door 19:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 20:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 21:Glass(>50%glazing):Nonmetal Frame,Pert,Type:Other 40 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Exterior Wall 4:Wood-Framed, 16"o.c. 384 21.0 0.0 0.062 0.051 Orientation:EAST Exterior Wall 1:Wood-Framed,16"o.c. 1160 21.0 0.0 0.062 0.051 Door 1:Insulated Metal,Swinging 20 0.300 0.500 Door 2:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 3:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 4:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 5:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 6:Insulated Metal,Swinging 20 0.300 0.500 Door 7:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 8: Insulated Metal,Swinging 20 - - 0.300 0.500 Door 9:Insulated Metal,Swinging 20 - - 0.300 0.500 Project Title: New Townhouse Apartment Report date: 06/13/14 Data filename:Y:\Schemierhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.ock Page 1 of 11 Door 10:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 11:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 12:Insulated Metal,Swinging 20 - - 0.300 0.500 Exterior Wall 2:Wood-Framed, 16"o.c. 848 21.0 0.0 0.062 0.051 Window 1:Vinyl Freme:Double Pane with Low-E,Perf.Type:Other 186 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Odentation:SOUTH Exterior Wall 7:Wood-Framed,16"o.c. 1070 21.0 0.0 0.062 0.051 Door 28:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 29:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 30:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 31:Insulated Metal,Swinging 18 - - 0.300 0.500 Door 32:Glass(>50%glazing):Nonmetal Frame,Pert.Type:Other 40 - - 0.290 0.350 testinglcert Product ID:,SHGC 0.65(b) Exterior Wall 8:Wood-Framed,16"o.c. 384 21.0 0.0 0.062 0.051 Orientation:WEST Exterior Wall 5:Wood-Framed,16"o.c. 1160 21.0 0.0 0.062 0.051 Window 2:Vinyl Frame:Double Pane with Low-E,Perf.Type:Other 217 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Door 22:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 23:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 24:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 25:Insulated Metal,Swinging 20 - - 0.300 0.500 Door 26:Insulated Metal,Swinging 20 - - 0.300 0.500 Exterior Wall 6:Wood-Framed,16"o.c. 848 21.0 0.0 0.062 0.051 Window 3:Vinyl Frame:Double Pane with Low-E,Perf.Type:Other 310 - - 0.290 0.350 testing/cert.Product ID:,SHGC 0.65(b) Orientation:UNSPECIFIED ORIENTATION Roof 1:Attic Roof with Wood Joists 5213 38.0 0.0 0.027 0.027 Floor 1:Slab-On-Gmde:Unheated,Vertical 4 ft. 449 - 10.0 - - (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestrations product performance must be certfied in accordance with NFRC and requires supporting documentation. Air Leakage, Component Certification,and Vapor Retarder Requirements: El 1. All joints and penetrations are caulked,gasketed or covered with a moisture vapor-permeable wrapping material installed in accordance with the manufacturers installation Instructions. ❑ 2. Windows,doors,and skylights certified as meeting leakage requirements. i] 3. Component R-values&U-factors labeled as certified. ❑ 4. No roof insulation is installed on a suspended ceiling with removable ceiling panels. ❑ S. 'Other components have supporting documentation for proposed U-Factors. EJ 6. Insulation installed according to manufacturers instructions,in substantial contact with the surface being insulated,and in a manner that achieves the rated R-value without compressing the Insulation. Lj 7. Stair,elevator shaft vents,and other outdoor air intake and exhaust openings in the building envelope are equipped with motorized dampers. ❑ B. Cargo doors and loading dock doors are weather sealed. 9. Recessed lighting fixtures installed in the building envelope are Type IC rated as meeting ASTM E283,are sealed with gasket or caulk. 10.Building entrance doors have a vestibule equipped with self-closing devices. Exceptions: )] Building entrances with revolving doors. Q Doors not intended to be used as a building entrance. E] Doors that open directly from a space less than 3000 sq.ft.in area. LJ Doors used primarily to facilitate vehicular movement or materials handling and adjacent personnel doors. L] Doors opening directly from a sleeping/dwelling unit. Section 4: Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed envelope system has been designed to meet the 2010 New York Energy Conservation Construction Code requirements in COMcheck Version 3.9.3 and to comply with the mandatory requirements in the Requirements Checklist. Project Title: New Townhouse Apartment Report date:06113114 Data filename:YASchermerhom\Cottage Hill Apartments\6-plexlCottage Hill-6 plex.ock Page 2 of 11 When a Registered Design Professional has stamped and signed this page,they are attesting that to the best of histher knowledge,belief,and professional judgment,such plans or specifications are in compliance with is Code Ethan P.Hall-Architect 4 Name-Title Si Cf Date 7000- Project ®00-Project Title: New Townhouse Apartment Report date:06/13114 Data filename:Y:\Schermerhom\Cottage Hill Apartments\6-plex\Cottage HIII-6 plex.ock Page 3 of 11 COMcheck Software Version 3.9.3 Interior Lighting Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information Project Type:New Construction Project Title:New Townhouse Apartment Construction Site: Owner/Agent: Designer/Contractor: Cottage Hill Drive Schemierhom Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-798-0674 Saratoga Springs,NY 12866 rich@schermerhomwnstruction.com 518-580-1905 ephall@nycap.rr.ccm Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (f@) Watts I ft2 (B x C) Multifamily 10621 0.7 7435 Total Allowed Watts= 7435 Section 3: Interior Lighting Fixture Schedule A B C D E Fixture ID: Description I Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Multifamily(10621 sq.R.) Compact Fluorescent 1:Spiral 23W:Electronic: 1 102 32 3264 Total Proposed Watts= 3264 Section 4: Requirements Checklist Interior Lighting PASSES: Design 56%better than code. Lighting Wattage: F-I 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 7435 3264 YES Controls, Switching,and Wiring: ❑ 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. -1 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: Ll Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. ❑ Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. O 4. Independent controls for each space(switch/ocoupancy sensor). Project Title: New Townhouse Apartment Report date: 06/13/14 Data filename:Y:\Schennerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 4 of 11 Exceptions: ❑ Areas designated as security or emergency areas that must be continuously illuminated. ❑ Lighting in stairways or corridors that are elements of the means of egress. ❑ 5. Master switch at entry to hotel/motel guest room. ❑ 6. Individual dwelling units separately metered. ❑ 7. Medical task lighting or artihistory display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. ❑ 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps,switching the middle lamp luminaires independently of other lamps,or switching each luminaire or each lamp. Exceptions: ❑ Only one luminaire in space. ❑ An occupant-sensing device controls the area. ❑ The area is a corridor,storeroom,restroom,public lobby or sleeping unit. ❑ Areas that use less than 0.6 Watts/sq.ft. ❑ 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: ❑ Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. ❑ 10.Photocell/astronomical time switch on exterior lights. Exceptions: ❑ Lighting intended for 24 hour use. ❑ 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions. ❑ Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement: The proposed lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 New York Energy Conservation Construction Code requirements in COMcheck Versio 3.9.3 andtoto co�th the mandatory requirements in the Requirements Checklist. Ethan P. Hall-Architect /N /D, : Name-Title Signature Date Project Title: New Townhouse Apartment Report date:06113/14 Data filename:Y:\Schennerhom\Cottage Hill Apartments\6-plex\Cottage HIII-6 plex.cck Page 5 of 11 COMcheck Software Version 3.9.3 Exterior Lighting Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information Project Type:New Construction Project Title :New Townhouse Apartment Exterior Lighting Zone: 2(Residentially zoned area) Construction Site: Owner/Agent: Designer/Contractor: Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-798-0674 Saratoga Springs,NY 12866 rich@schermerhomconsWction.com 518-580-1905 ephall@nyrap.m.com Section 2: Exterior Lighting Area/Surface Power Calculation A B C D E F Exterior Area/Surface Quantity Allowed Tradable Allowed Proposed Watts Wattage Watts Watts /Unit (Bx C) Main entry 6 ft of door width 20 Yes 120 384 Total Tradable Watts'= 120 384 Total Allowed Watts= 120 Total Allowed Supplemental Watts"= 600 Wattage tradeoffs are only allowed between tradable areas/surfaces. A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Section 3: Exterior Lighting Fixture Schedule A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lampsl #of Fixture (C X D) Fixture Fixtures Watt. Main entry(6 ft of door width):Tradable Wattage Compact Fluorescent 1:Spiral 23W:Electronic: 1 12 32 384 Total Tradable Proposed Watts= 384 Section 4: Requirements Checklist Lighting Wattage: rl 1. Within each non-tradable area/surface,total proposed watts must be less than or equal to total allowed watts.Across all tradable areas/surfaces,total proposed watts must be less than or equal to total allowed watts. Compliance:Passes using supplemental allowance watts. Controls, Switching, and Wiring: ❑ 2. All exemption claims are associated with fixtures that have a control device independent of the control of the nonexempt lighting. Lj 3. Lighting not designated for dusk-to-dawn operation is controlled by either a a photosensor(with time switch),or an astronomical time switch. 4. Lighting designated for dusk-to-dawn operation is controlled by an astronomical time switch or photosensor. ❑ 5. All time switches are capable of retaining programming and the time setting during loss of power for a period of at least 10 hours. Project Title: New Townhouse Apartment Report date: 06/13/14 Data filename:Y:\Schennerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 6 of 11 Exterior Lighting Efficacy: ❑ 6. All exterior building grounds luminaires that operate at greater than 100W have minimum efficacy of 60 lumenlwatt. Exceptions: ❑ Lighting that has been claimed as exempt and is identified as such in Section 3 table above. LJ Lighting that is specifically designated as required by a health or life safety statue,ordinance,or regulation. ❑ Emergency lighting that is automatically off during normal building operation. ❑ Lighting that is controlled by motion sensor. Section 5: Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed lighting system has been designed to meet the 2010 New York Energy Conservation Construction Code requirements in COMcheck Version 3.9.3 and to cort7ply with the mandatory requirements in the Requirements Checklist. �� Ethan P.Hall-Architect Name-Title Signature Date Project Title: New Townhouse Apartment Report date:06113114 Data filename:Y:\Schennerhom\Cottage HIII Apartments\6-plex\Cottage HIII-6 plex.cck Page 7 of 11 COMcheck Software Version 3.9.3 Mechanical Compliance Certificate 2010 New York Energy Conservation Construction Code Section 1: Project Information Project Type:New Construction Project Title:New Townhouse Apartment Construction Site: Owner/Agent: Designer/Contractor: Cottage Hill Drive Schermerhom Residential Holdings Ethan P.Hall Queensbury,NY 12804 536 Bay Road Rucinski Hall Architecture Queensbury,NY 12804 627 Maple Ave 518-798-0674 Saratoga Springs,NY 12866 rich@schermerhomconstruction.com 518-580-1905 ephall@nycap.rr.com Section 2: General Information Building Location(for weather data): Warren,New York Climate Zone: 6a Section 3: Mechanical Systems List uantl System Type&Der riotign 1 HVAC System 1 (Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=60 kBtu/h Proposed Efficlency=93.00%Et,Required Efficiency=80,00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 HVAC System 2(Single Zone): Heating:1 each-Central Furnace,Gas,Capacity=60 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 HVAC System 3(Single Zone): Heating: 1 each-Central Fumace,Gas,Capacity=60 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling: 1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 HVAC System 4(Single Zone): Heating:1 each-Central Fumace,Gas,Capacity=60 kBtu/h Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtu/h,Air-Cooled Condenser No minimum effidency requirement applies Fan System: None 1 HVAC System 5(Single Zone): Heating:1 each-Central Fumace,Gas,Capacity=60 kBtulh Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Cooling:1 each-Field-Assembled DX System,Capacity=45 kBtulh,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 HVAC System 6(Single Zone): Project Title: New Townhouse Apartment Report date: 06/13/14 Data filename:Y:\Schermerhom\Cottage Hill Apartments%6-plex\Cottage Hill-6 plex.cck Page 8 of 11 Healing:1 each-Central Furnace,Gas,Capacity=60 kBtulh Proposed Efficiency=93.00%Et,Required Efficiency=80.00%Et Coding:1 each-Field-Assembled DX System,Capacity=45 kBtuth,Air-Cooled Condenser No minimum efficiency requirement applies Fan System: None 1 Water Heater 1: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF 1 Water Heater 2: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF 1 Water Heater 3: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF 1 Water Heater 4: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF 1 Water Heater 5: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF 1 Water Heater 6: Electric Storage Water Heater,Capacity:40 gallons Proposed Efficiency:89.00 EF,Required Efficiency:0.88 EF Section 4: Requirements Checklist Requirements Specific To: HVAC System 1 : 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) O 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Speck To: HVAC System 2 : Ej 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) ❑ 2. Specified equipment consists of fieldassembled components-efficiency documentation provided Requirements Specific To: HVAC System 3 : C] 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) ❑ 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To: HVAC System 4 : ❑ 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To: HVAC System 5: O 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) ❑ 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To: HVAC System 6 : ❑ 1. Equipment minimum efficiency: Central Furnace(Gas): 80.00%Et(or 78%AFUE) Lj 2. Specified equipment consists of field-assembled components-efficiency documentation provided Requirements Specific To:Water Heater 1 : 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,MUM(if>12 kW)) 2. First 8 It of outlet piping is Insulated 3. Hot water storage temperature controls that allow setpdnt of 90'F for non-dwelling units and 110°F for dwelling units. 4. Heat traps provided on inlet and outlet of storege tanks Requirements Specific To:Water Heater 2 : 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Muth(if>12 kW)) L3 2. First 8 I of outlet piping is insulated Project Title: New Townhouse Apartment Report date:O6N3114 Data filename:YASchermerhom\Cottage Hill Apartments%6-plex\Cottage Hill-6 plex.cck Page 9 of 11 3. Hot water storage temperature controls that allow setpoint of 90'F for non-dwelling units and 110°F for dwelling units. 4. Heat traps provided on inlet and outlet of storage tanks Requirements Specific To:Water Heater 3 : 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btu/h(If>12 kW)) 2. First 8 ft of outlet piping is insulated ❑ 3. Hot water storage temperature controls that allow setpoint of 90"F for non-dwelling units and 110T for dwelling units. ❑ 4. Heat traps provided on inlet and outlet of storage tanks Requirements Speck To: Water Heater 4 : ❑ 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btulh(if>12 kW)) ❑ 2. First 8 ft of outlet piping is insulated 3. Hot water storage temperature controls that allow setpoint of 90T for non-dwelling units and 110°F for dwelling units. 4. Heat traps provided on inlet and outlet of storage tanks Requirements Specific To:Water Heater 5 : Lj 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btu/h(if>12 kW)) ❑ 2. First 8 It of outlet piping is insulated ❑ 3. Hot water storage temperature controls that allow setpoint of 90°F for non-dwelling units and 110T for dwelling units. ❑ 4. Heat traps provided on inlet and outlet of storage tanks Requirements Specific To: Water Heater 6 : ❑ 1. Water heating equipment meets minimum efficiency requirements: Electric Water Heater efficiency: 0.88 EF(241 SL,Btulh(if>12 kW)) 2. First 8 ft of outlet piping is insulated ❑ 3. Hot water storage temperature controls that allow setpoint of 90"17 for non-dwelling units and 110'F for dwelling units. ❑ 4. Heat traps provided on inlet and outlet of storage tanks Generic Requirements: Must be met by all systems to which the requirement is applicable: 1. Plant equipment and system capacity no greater than needed to meet loads Except/on(s): ❑ Standby equipment automatically off when primary system is operating [ Multiple units controlled to sequence operation as a function of bad 2. Minimum one temperature control device per system 3. Minimum one humidity control device per installed humidficabon/dehumidification system 114. Load calculations per ASHRAE/ACCA Standard 183. 5. Automatic Controls:Setback to 55°F(heal)and 85°F(cool);7-day dock,2-hour occupant override,10-hour backup Exception(s): I] Continuously operating zones 6. Outside-air source for ventilation;system capable of reducing OSA to required minimum 7. R-5 supply and return air duct Insulation in unconditioned spaces R-8 supply and return air duct insulation outside the building R-8 insulation between duds and the building exterior when duds are part of a building assembly Exception(s): ❑ Ducts located within equipment ❑ Duds with interior and exterior temperature difference not exceeding 15T. B. Mechanical fasteners and sealants used to conned duds and air distribution equipment ❑ 9. Duds sealed-longitudinal seams on rigid duds;transverse seams on all duds;UL 181A or 181 B tapes and mastics ❑ 10.Hot water pipe insulation: 1.5 in.for pipes<=1.5 in.and 2 in.for pipes>1.5 In. Chilled water/refigeranWdne pipe insulation: 1.5 in.for pipes<=1.5 in.and 1.5 in.for pipes>11.5 in. Steam pipe Insulation: 1.5 in.for pipes<=1.5 in.and 3 in.for pipes >1.51n. Exception(s): C] Piping within HVAC equipment. EJ Fluid temperatures between 55 and 105T. p Fluid not heated or cooled with renewable energy. Piping within room fan-coil(with AHRI440 rating)and unit ventilators(with AHRIB40 rating). Runouts<4 it in length. Ej 11.Operation and maintenance manual provided to building owner Project Title: New Townhouse Apartment Report date:06/13/14 Data filename:Y:\Schermerhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 10 of 11 12.Thennostatic controls have 5°F deadband Exception(s): Thermostats requiring manual changeover between heating and cooling p Special occupancy or special applications where wide temperature ranges are not acceptable and are approved by the authority having jurisdiction. 13.Balancing devices provided in accordance with IMC 603.17 ri 14.Demand control ventilation(DCV)present for high design occupancy areas(>40 person11000 ft2 in spaces>500 R2)and served by systems with any one of 1)an air-side economizer,2)automatic modulating control of the outdoor air damper,or 3)a design outdoor airflow greater than 3000 cfm. Exception(s): p Systems with heat recovery. ❑ Multiple-zone systems without DDC of individual zones communicating with a central control panel. p Systems with a design outdoor airflow less than 1200 cfm. p Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm. ❑ 15.Motorized,automatic shutoff dampers required on exhaust and outdoor air supply openings Exception(s): LI Gravity dampers acceptable in buildings<3 stories U 16.Automatic controls for freeze protection systems present ❑ 17.Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70%outside air fraction or specifically exempted Exception(s): ❑ Hazardous exhaust systems,commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits the use of energy recovery systems. C] Systems serving spaces that are heated and not cooled to less than 60°F. 0 Where more than 60 percent of the outdoor heating energy is provided from site-recovered or site solar energy. Heating systems in climates with less than 3600 HDD. ❑ Cooling systems in climates with a 1 percent cooling design wet-bulb temperature less than 64'17. ❑ Systems requiring dehumidification that employ energy recovery in series with the cooling coil. p Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air volume to 50 percent or less of design values or,a separate make up air supply meeting the following makeup air requirements: a)at least 75 percent of exhaust flow rate,b)heated to no more than 2°F below mom setpoint temperature,c)cooled to no lower than YF above room setpoint temperature,d)no humidification added,e)no simultaneous heating and cooling. Section 5: Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,specifications and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 2010 New York Energy Conservation Construction Code requirements In COMcheck Version 3.9 an c ply with the mandatory requirements in the Requirements Checklist. Ethan P. Hall-Architect rtM Name-Title tignatuns Date Section 6: Post Construction Compliance Statement ❑ HVAC record drawings of the actual installation,system capacities,calibration information,and performance data for each equipment provided to the owner. ❑ HVAC O&M documents for all mechanical equipment and system provided to the owner by the mechanical contractor. Lj Written HVAC balancing and opera0ons report provided to the owner. The above post construction requirements have been completed. Principal Mechanical Designer-Name Signature Date Project Title: New Townhouse Apartment Report date: 06/13114 Data filename:Y:\Schemierhom\Cottage Hill Apartments\6-plex\Cottage Hill-6 plex.cck Page 11 of 11