Loading...
SEP-002401-2019 05022019INSPECTION WORKSHEET (SEP-002401-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000362-2015 Case Module:Permit Inspection Date:Thu May 2, 2019 Inspection Status:Passed Inspector:John O'Brien Inspection Type:Septic Job Address:Parcel Number:3-23 Wedgewood DR Bldg. 1 Queensbury, NY 12804 302.9-1-28.1 Contact Type Company Name Name Primary Owner SCHERMERHORN WEDGEWOOD LLC Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN Granted Permission Schermerhorn Properties Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN Architect Rucinski-Hall Architecture Checklist Item Passed Comments Building Inspector Notes YES 4/10/19 Septic System Partial Approval - 2 Septic Systems - Forward an email stating you have inspected the septic system and approve the installation based on the approved septic system design. - Submit As-Built Septic Plan - Install clean out at 45 degree bend before 22.5 degree bend to distribution box. 5/2/19 Septic System Approved - Received Certified As-Built Septic Plot Plan for Wedgewood Apartments. Type of Water: Municipal / Well Water YES Municipal Absorbtion Fields: Total Length YES 2 Septic Systems @ 420' May 02, 2019 Page (1) INSPECTION WORKSHEET (SEP-002401-2019) Checklist Item Passed Comments Length of Each Trench YES (2) 7 @ 60' Depth of Trenches YES West System 18"-30" East System 18"-24" Size of Stone YES #2 Building to Tank YES 4" sch40 Tank to Distribution Box YES 4" sdr35 pvc Distribution box to Field / Pit YES 4" pvc to 4" pvc perforated InletOutlet Pipes & Baffles YES No filter as per engineer Engineer Report and As-Built YES - Forward an email stating you have inspected the septic system and approve the installation based on the approved septic system design. - Submit As-Built Septic Plan - Install clean out at 45 degree bend before 22.5 degree 5/2/19 Septic System Approved - Received Certified As-Built Septic Plot Plan for Wedgewood Apartments. Location of system on property YES West Septic System Installed to the west side of building #1. East Septic System Installed to the east of building #1 and the leach field is behind building #3 May 02, 2019 Page (2) INSPECTION WORKSHEET (SEP-002401-2019) Checklist Item Passed Comments System Use Status YES 4/10/19 Septic System Partial Approval - 2 Septic Systems - Forward an email stating you have inspected the septic system and approve the installation based on the approved septic system design. - Submit As-Built Septic Plan - Install clean out at 45 degree bend before 22.5 degree bend to distribution box. Note: Once I receive the email and as-built drawing from the engineer the septic system can be backfilled. 5/2/19 Septic System Approved - Received Certified As-Built Septic Plot Plan for Wedgewood Apartments. May 02, 2019 Page (3) O'Brien, John (Inspector)