SEP-002401-2019 05022019INSPECTION WORKSHEET (SEP-002401-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000362-2015 Case Module:Permit
Inspection Date:Thu May 2, 2019 Inspection Status:Passed
Inspector:John O'Brien Inspection Type:Septic
Job Address:Parcel Number:3-23 Wedgewood DR Bldg. 1
Queensbury, NY 12804
302.9-1-28.1
Contact Type Company Name Name
Primary Owner SCHERMERHORN WEDGEWOOD
LLC
Applicant Schermerhorn R.E. Holdings VANDERWARKER, DARREN
Granted Permission Schermerhorn Properties
Contractor Schermerhorn R.E. Holdings VANDERWARKER, DARREN
Architect Rucinski-Hall Architecture
Checklist Item Passed Comments
Building Inspector Notes YES 4/10/19 Septic System Partial Approval - 2 Septic Systems
- Forward an email stating you have inspected the septic
system and approve the installation based on the approved
septic system design.
- Submit As-Built Septic Plan
- Install clean out at 45 degree bend before 22.5 degree bend
to distribution box.
5/2/19 Septic System Approved
- Received Certified As-Built Septic Plot Plan for Wedgewood
Apartments.
Type of Water: Municipal / Well Water YES Municipal
Absorbtion Fields: Total Length YES 2 Septic Systems @ 420'
May 02, 2019 Page (1)
INSPECTION WORKSHEET (SEP-002401-2019)
Checklist Item Passed Comments
Length of Each Trench YES (2) 7 @ 60'
Depth of Trenches YES West System 18"-30"
East System 18"-24"
Size of Stone YES #2
Building to Tank YES 4" sch40
Tank to Distribution Box YES 4" sdr35 pvc
Distribution box to Field / Pit YES 4" pvc to 4" pvc perforated
InletOutlet Pipes & Baffles YES No filter as per engineer
Engineer Report and As-Built YES - Forward an email stating you have inspected the septic
system and approve the installation based on the approved
septic system design.
- Submit As-Built Septic Plan
- Install clean out at 45 degree bend before 22.5 degree
5/2/19 Septic System Approved
- Received Certified As-Built Septic Plot Plan for Wedgewood
Apartments.
Location of system on property YES West Septic System Installed to the west side of building #1.
East Septic System Installed to the east of building #1 and
the leach field is behind building #3
May 02, 2019 Page (2)
INSPECTION WORKSHEET (SEP-002401-2019)
Checklist Item Passed Comments
System Use Status YES 4/10/19 Septic System Partial Approval - 2 Septic Systems
- Forward an email stating you have inspected the septic
system and approve the installation based on the approved
septic system design.
- Submit As-Built Septic Plan
- Install clean out at 45 degree bend before 22.5 degree bend
to distribution box.
Note: Once I receive the email and as-built drawing from the
engineer the septic system can be backfilled.
5/2/19 Septic System Approved
- Received Certified As-Built Septic Plot Plan for Wedgewood
Apartments.
May 02, 2019 Page (3)
O'Brien, John (Inspector)