SEQRA Findings Aviation Mall - 8-6-2001 revised 8-27-2001 L:\PamW\StaffNotes\2001\August\SEQRA Findings Aviation Mall-8-6-Ol.doc
Lc'
\is,ecl /\rI27 2001
TOWN OF QUEENSBURY
PLANNING BOARD
PYRAMID COMPANY OF GLENS FALLS
AVIATION MALL RENOVATION AND EXPANSION
SEQRA FINDINGS STATEMENT
This SEQRA Findings Statement has been prepared in accordance with provisions of
Article 8 of the Environmental Conservation Law and its implementation regulations in 6
NYCRR Part 617 (collectively, "SEQRA"). The Town of Queensbury Town Board ("Town
Board"), acting as SEQRA Lead Agency (with the consent of other involved agencies) for the
above-referenced action, has determined that all of the procedural and other requirements of
SEQRA have been met, that consistent with the social, economic and other essential
considerations from among the reasonable alternatives thereto, the action to be approved
minimizes or avoids adverse environmental effects to the maximum extent practicable, adverse
environmental impacts revealed in the environmental impact statement process will be
minimized or avoided by incorporating as conditions to the decision those mitigation measures
identified as practicable.
The Town of Queensbury Planning Board concurs with the Town of Queensbury Town
Board and makes the following findings and determinations. These findings and determinations
are based on due consideration of the record, including the Petition for Zone Change,
Environmental Assessment Form, the Draft Environmental Impact Statement ("DEIS"), the
Addendum to the DEIS ("Addendum"), the Final Environmental Impact Statement ("FEIS"), the
analyses and recommendations of various involved and interested agencies, and the analyses,
comments and recommendations of the Town's independent consultants, the Applicant's
consultants, and members of the public. These findings and determinations are also based on the
general, specific and detailed knowledge of the Town of Queensbury Planning Board of the site
and the surrounding community.
I. BACKGROUND
1. APPLICATION AND PROCEDURE
In April, 1998, the Applicant submitted a petition for zone changes (the "Petition") to the
Town Board as well as an application for site plan approval to the Town of Queensbury Planning
Board ("Planning Board"). The Petition requested that the lands located between Aviation Mall
and the Northway/Exit 19 interchange ("Northwest Lands") be re-zoned to Enclosed Shopping
Center - 25 Acres ("ESC-25A") and that certain amendments be made to the ESC-25A
regulations to accommodate an expansion of Aviation Mall by ±850,000 square feet of gross
leaseable area ("SF GLA") and associated multi-level parking facilities and other site
improvements ("Original Project").
In April, 2001, due to substantive environmental comments and other factors, the
Applicant proposed to modify the Original Project by substantially reducing its size. This
modification will accommodate a ±125,000 SF GLA building addition, eliminate ±23,500 SF
GLA of existing mall space and reallocate ±34,000 SF GLA of previously approved but not yet
constructed space for a n�t�:��X�pa�..s���ao����nion f ±70,000 SF GLA�1�AMo(" dified Project" HJs net
12an ) su �n �:)f 101A500 SF tne Av�ation MaH Upon
completion, the overall size of Aviation Mall will be±661,000 SF GLA ("Expanded Mall"). The
Town Board resumed consideration of the Applicant's petition for zone change.
On May 4, 1998, the Town Board determined the proposed action was a Type I action
under SEQRA, and made a determination that the Original Project may have a significant impact
on the environment and determined the DEIS to be complete. On June 8, 1998, a public hearing
on SEQRA and the zone change was held during a joint session of the Town Board and Planning
Board. The public comment period closed on June 18, 1998.
Upon introduction of the Modified Project, the Applicant submitted the Addendum which
explained the modification of the Applicant's proposal. The Addendum contained detailed
analyses prepared by the L.A. Group, P.C. and John Collins Engineers, P.C. The Addendum
concluded that the DEIS fully and adequately identified and assessed the reasonably foreseeable
environmental impacts for the Modified Project and Possible Future Development and that the
conclusions in the DEIS remain valid in light of the modification. On May 14, 2001, the Town
Board determined that the Addendum was complete and commenced a public comment period
on the Addendum and the DEIS which closed on June 18, 2001. Based on comments received
during the comment period, the Modified Project received broad support from the public. On
July 16, 2001, the Town Board determined the FEIS to be complete.
NYSDOT is an involved agency for SEQRA purposes. The Town Board, as lead agency,
filed the EIS and other materials required to be filed pursuant to SEQRA with NYS DOT. It
actively sought input from NYSDOT before and after the SEQRA comment period. The
Addendum was filed with NYSDOT on May 16, 2001. The NYSDOT did not comment during
the comment period. It did not comment prior to adoption of the FEIS. NYS DOT provided
comment on the Project in correspondence dated August 2, 200L.
The Town Board has thoroughly considered traffic impacts. It retained Sear-Brown
Group, Inc., an engineering firm with expertise in traffic analysis. Sear-Brown thoroughly
examined and commented on the TIS, and its concerns have been addressed.
The Town Board recognizes and appreciates the expertise of NYSDOT relating to traffic
matters along its highway system. As an involved agency, NYSDOT will have an opportunity to
seek to address any concerns it has as part of issuance of its own approvals.
It is unnecessary and unreasonable to further delay adoption of the Findings Statement.
The Town Board and the Applicant have proceeded in good faith regarding this project.
NYSDOT did not timely comment on the EIS; NYSDOT must issue its own approval in
connection with the project (including any substantive conditions); and a timely decision by the
Town Board is critical to the continuation of this important economic development project.
2. SITE LOCATION AND DESCRIPTION
2
Aviation Mall is an enclosed regional shopping center located on±56 acres of land in the
Town of Queensbury, New York ("Existing Mall"). The Existing Mall currently contains
±591,000 SF GLA including retail, theaters and restaurants. The Existing Mall is generally
bounded by the Northway (Interstate 87) Exit 19 interchange to the west, Aviation Road to the
north, various commercial uses and U.S. Route 9 to the east, and the lands of Niagara Mohawk
Power Corporation occupied by power lines to the south ("Existing Site"). The Existing Mall is
serviced by three access drives to Aviation Road.
The Existing Site is currently zoned ESC-25A. The Northwest Lands are currently zoned
Highway-Commercial - 1 Acre ("HC-IA") and the Applicant's Petition seeks to rezone these
lands to ESC-25A. The Existing Site and the Northwest Lands are referred to collectively as the
"Expanded Site".
The topography of the Existing Site is relatively level and generally slopes from west to
east. A steep slope exists from the developed areas on the Northwest Lands to the Existing Site.
Also, the periphery of the site has steeper slopes than those of the existing uses on the Northwest
Lands. The existing commercial/retail buildings on the Northwest Lands are on-grade with
Aviation Road. These are no bedrock outcroppings on the Expanded Site and the soils are
suitable for construction and drainage.
3. MODIFIED PROJECT
The Modified Project seeks to add a±125,000 SF GLA building addition to the Existing
Mall and will redevelop ±23,500 SF GLA of the Existing Mall and reallocate ±34,000 SF GLA
of previously approved but not yet constructed space. This will result in a net expansion of
±70,000
70 000 SF nGLA.
Mffl The building addition is proposed on they north side of the Exist ��� to
a ion �)fl" 101,,500
... .. .ting Mall.
This area is currently occupied by existing buildings, internal roads and paved parking areas. As
part of the Modified Project, the Applicant has proposed to relocate the internal ring road and to
extend the existing left-turn-only driveway to the west, establish landscaping and reserve parking
areas in the event that additional parking is needed or desired. Details regarding the location and
configuration of the Modified Project are contained in the site plans.
4. POSSIBLE FUTURE DEVELOPMENT
While there is currently no site development plan for the Northwest Lands, the Town
Board considered the reasonably foreseeable environmental impacts of possible future
development of the Northwest Lands due to the Petition. This possible future development was
assumed to involve the demolition or renovation of the existing buildings on the Northwest
Lands, development of up to an additional ±150,000 SF GLA (free-standing commercial/retail
space or attached to the Existing Mall), establishment of parking and internal circulation,
creation of access to Aviation Road and to the Aviation Mall internal ring road and establishment
of suitable landscaping ("Possible Future Development"). Upon completion of the Possible
Future Development, the overall size of Aviation Mall will be ±811,000 SF GLA ("Future
Expanded Mall").
5. PARKING
3
The Existing Mall is served by parking fields located on all sides. The total number of
existing parking spaces is 2,831. The Modified Project will reduce the number of parking spaces
to,provide 2, 689 parking spaces for a ratio of 4.06 spaces per 1,000 SF GLA. In the event the
Applicant determines it to be necessary or appropriate, reserve parking areas identified on the
site plans can be constructed consistent with Town approvals-to provide additional spaces.
6. LANDSCAPING AND SCREENING
The design of the Modified Project concentrates landscaping along the existing Aviation
Road and the internal ring road in the vicinity of Department Store "E". These plantings and
other landscaping will soften the view of the Expanded Mall from Aviation Road. Because the
majority of landscaping is placed along the periphery, the benefit of this visual diversity and
screening will be enjoyed by the traveling public and those not at the Expanded Mall. Similarly,
once undertaken, these same design factors will be utilized in the Possible Future Development.
Further information detailing the species, placement and quantities of trees, shrubs and plants for
the Modified Project is contained in the site plans and will be subject to the review of the Town
of Queensbury Planning Board.
7. LIGHTING
Outdoor lighting for the Modified Project, including the parking areas, will be designed
to minimize glare and light spill off the Existing Site. The design and location of lighting
fixtures and poles will be established as approved by the Queensbury Planning Board during site
plan review for the Modified Project and any Possible Future Development, respectively.
8. ACCESS AND INTERNAL CIRCULATION
The Expanded Mall will utilize the three existing driveways from Aviation Road. The
westerly and easterly full service driveways and traffic signals will continue to be used. The
existing center driveway will be extended west and the internal ring road improved to facilitate
access to the Modified Project.
Changes to the internal ring road in the vicinity of the Modified Project and the
associated parking field layout are designed to enhance internal circulation of the Expanded
Mall. Public transportation by GGFTC buses will continue to be accommodated.
While there is no current plan to do so, in the event the Town causes an extension of
Foster Avenue to be constructed, the Applicant has expressed a willingness to consider
reasonable site improvements to facilitate such an extension.
II. PROJECT IMPACTS
1. MUNICIPAL REVENUES AND FINANCES
a. Modified Proiect
4
The Modified Project will have a significant positive economic impact as it is anticipated
to create ±223 full time equivalent construction jobs with a payroll of $6,250,000. In addition,
±137 full time equivalent jobs are anticipated once the Modified Project is complete with an
annual payroll of$2,000,000. These jobs and revenues will generate additional expenditures in
the local economy, through direct and multiplier effects, of approximately ±$3,800,000 annually.
Additional projected tax revenues, from real property taxes, school taxes, and sales taxes, are
anticipated to total almost $500,000 annually. This growth of the tax base more than offsets any
municipal costs associated with the Modified Project.
b. Possible Future Development
The Possible Future Development will also generate significant positive economic impact
when a site development plan is proposed. The Possible Future Development would generate
approximately $9,800,000 in new wages, 425 construction and full time equivalent jobs,
$3,600,000 of expenditures in the local economy and projected increased tax revenues of
approximately $1,035,000 annually.
2. LAND USE AND ZONING
The Existing Site is zoned ESC-25A which permits enclosed shopping centers with site
plan approval. The Northwest Lands are currently zoned HC-lA which permits commercial and
retail uses. These lands are currently occupied by a variety of commercial buildings including a
former restaurant, hotel, and gas station/convenience store. The proposed zone change logically
extends the ESC-25A onto the Northwest Lands to create a uniform zoning district
encompassing the Expanded Site. The typical retail, restaurant and theater uses in an enclosed
shopping center are generally permitted in the HC-lA zoning district and allow the Modified
Project and Possible Future Development to take advantage of the site design and building layout
flexibility of the ESC-25A district.
The Aviation Road corridor (as well as the Route 9 corridor to the east) are currently
heavily developed with a variety of commercial uses. The Queensbury Comprehensive Land
Use Plan ("QCLUP") identifies this area of Aviation Road near the Northway Exit 19
interchange as the "commercial center" of the Town. The redevelopment of the existing
commercial uses is consistent with such long range plans and prevents commercial sprawl.
Surrounding zoning districts include HC-lA, Plaza-Commercial - 1 Acre supporting substantial
commercial development.
Given these factors, the Town Board finds that amendment of the zoning classification
and zoning map for the Northwest Lands to ESC-25A would result in appropriate zoning for the
uses contemplated for this area and is consistent with the QCLUP.
The Petition requests certain amendments to the regulations for uses in the ESC-25A
zone to allow for greater flexibility in site design and building layouts to accommodate the
Modified Project and any Possible Future Development. The amendments apply to building
height, density, setbacks, permeability, parking and to the permitted and accessory uses in an
ESC-25A zone. Taking into account the Modified Project and the Possible Future Development,
and the extent to which impacts have been evaluated pursuant to SEQRA and subject to the
5
modifications described below, the requested amendments are consistent with the QCLUP and
the character of the area.
The Applicant requested that the maximum building height be changed to 80 feet. Given
topography of the site and the method of calculation of height set forth in the Zoning Law, an
increase in the maximum height limitation to 80 feet is appropriate, provided the building face of
each building which directly fronts on Aviation Road continues to be subject to the 50-foot
height limit. This requirement will ensure that such a building face will appear at a height
consistent with other existing and future structures along this section of the Aviation Road
corridor.
The Applicant also requested that building setbacks and buffer zones, including the travel
corridor overlay, be measured from the edge of pavement within the highway right-of-way along
Aviation Road. The Town Board found that such requested modification is inconsistent with the
Town's Ordinance. However, the Town Board also found there is adequate ROW along the
Aviation Road Corridor through I-87 east to New York State Route 9. The Town Board
modified the Travel Corridor Overlay Zone (§179-28) to reduce this setback to forty feet (40')
consistent with the setbacks of the ESC zone. Access drives, to the extent located within the
highway right-of-way, are intended to be excluded in making such measurements. The Planning
Board concurs.
A small section of the existing right-of-way boundary for Aviation Road in front of the
Northwest Lands protrudes substantially into the Northwest Lands creating an irregularly shaped
boundary line. These protrusions were created in connection with the recent NYSDOT Aviation
Road/Northway bridge replacement and are not caused in any way by the Applicant. It is
consistent with the character of the area and the QCLUP to exclude these areas in determining
any setback for the Modified Project or the Possible Future Development.
The Applicant requested that the minimum permeability for the ESC-25A zone be
reduced to 12%. Establishment of the minimum permeability for the ESC-25A zone at 14.5%is
appropriate to accommodate the intensity of development considered during this SEQRA review.
3. COMMUNITY SERVICES AND FACILITIES
a. Police Protection
The Expanded Site will receive primary police protection from the Warren County
Sheriffs Department. The Applicant also maintains an on-site security force. Police protection
is adequate to serve the current needs of the Town and to accommodate the Expanded Mall and
Future Expanded Mall.
b. Fire Protection
The Queensbury Central Fire Department will provide fire protection services to the
Expanded Site. The Expanded Mall will be serviced by on-site municipal hydrants and an in-
building fire-suppression system. Fire protection is adequate to serve the current needs of the
Town and to accommodate the Expanded Mall and Future Expanded Mall.
6
C. Ambulance and Medical Services
The West Glens Falls Emergency Service provides emergency medical services to the
Expanded Site. The Glens Falls Hospital is the closest major medical facility and several
alternate health care facilities are nearby. These facilities are more than adequate to handle the
current needs of the Town and to accommodate the Expanded Mall and Future Expanded Mall.
d. Education
The Expanded Site is located within the Queensbury School District. As a
commercial/retail use, little demand is created for educational facilities. The Queensbury School
District has adequate facilities to serve the current needs of the Town and to accommodate the
Expanded Mall and Future Expanded Mall.
e. Solid Waste Disposal
The solid waste generated at the Expanded Site will be handled by the Town's transfer
stations and the Warren/Washington County Solid Waste Facility. These facilities have
sufficient capacity to accommodate the Town's current needs and to accommodate the Expanded
Mall and Future Expanded Mall.
L Water and Sewer Services
The Queensbury Central Water District will provide municipal water to the Expanded
Site. The municipal water facilities are adequate for the needs of the Town and the Expanded
Mall. The Expanded Site is part of the Queensbury Central Sewer District. Sewer service
facilities are adequate to meet the current needs of the Town and accommodate the Expanded
Mall and Future Expanded Mall.
g. Utilities
The Expanded Site is already serviced by telephone, electric and natural gas services.
Adequate telephone, electric and natural gas services exist to accommodate the Expanded Mall
and Future Expanded Mall.
4. CULTURAL RESOURCES
There will be no significant impact upon cultural resources. The Modified Project and
Possible Future Development will occur on lands that have been excavated and/or paved during
prior development. No historic structures or sites exist on or adjacent to the Existing Site and
Northwest Lands.
5. TOPOGRAPHY AND SLOPE
The topography of the Expanded Site are predominantly gentle to rolling slopes with the
exception of a hill on the west end of the site and some steeper slopes around the periphery of the
site. The majority of the site has less than a 10% slope. No significant impacts to topography
and slopes will occur due to the Modified Project or Possible Future Development.
6. GEOLOGY
The Existing Site and Northwest Lands consist of very deep sand deposits. No bedrock is
expected to be encountered during construction of the Modified Project and Possible Future
Development. No impacts to geology have been identified.
7. AIR QUALITY
No impact to air quality as a result of the Modified Project and Possible Future
Development and air quality standards will continue to be met.
8. TRAFFIC
In its review of traffic issues, the Town Board reviewed an April, 2001 Traffic Impact
Study ("TIS") prepared by John Collins Engineers, P.C. ("JCE")'. This Traffic Impact Study
was also submitted to the New York State Department of Transportation ("NYSDOT"), the
Adirondack-Glens Falls Transportation Commission ("AGFTC"), the Town's independent
consultant, the Sear-Brown Group, Inc. ("Sear-Brown"), and the Town's Planning Staff. The
Town Board has received detailed comments and input from Sear-Brown and general comments
from the AGFTC concerning accommodation of mass transportation. The Town Board did not
receive any comments from the NYSDOT in connection with the Traffic Impact Study for the
Modified Project and Possible Future Development. The absence of comments from the
NYSDOT in no way relieves the project applicant of meeting any and all specific requirements
NYSDOT may have for the issuance of a highway work permit. The applicant will be
responsible for all improvements required by the NYSDOT and such improvements will not take
the place of mitigation measures described herein.
a. Modified Proiect
The TIS utilized the traffic counts contained in the March 19, 2001 traffic study prepared
by Creighton Manning Engineering ("CME") and approved by the NYSDOT to establish a Year
2000 existing traffic volume. Taking into account background traffic growth, the traffic volumes
for the Modified Project were established. Capacity analyses for the Modified Project were
conducted to predict operating conditions at the key studied intersections upon opening of the
Expanded Mall.
The applicant's TIS concluded that the Modified Project would not result in any
significant traffic impacts and that acceptable levels of service would be maintained at key
intersections studied. This conclusion was based on implementation of a signal coordination
plan as provided in the March 19, 2001 CME Study. The applicant defined "acceptable" as a
level of service E. The NYSDOT generally determines acceptability on a case by case basis
given various factors such as level of service, existing geometries, overall volumes, system
coordination, etc. For the Aviation Road/Route 9 intersection, the traffic analysis indicates a
An earlier traffic impact study was prepared in April, 1998 by JCE in connection with the Original Project. Due
to the reduction in scale of the Modified Project and Possible Future Development, the impacts and mitigation
measures contained in that study are no longer relevant. The April, 1998 JCE traffic impact study has been
replaced by the TIS.
8
projected level of service D for the 2002 no build condition. A reduced level of service of E is
projected for the 2002 build condition during the Saturday Peak hour. The intersection of
Aviation Road and Route 9 falls under the jurisdiction of the NYSDOT. Whereas the decrease
in level of service is minimal, the Town recognizes that the NYSDOT has the authority to
determine significance on this reduction.
The conclusions reached in the TIS appear to be consistent with those in the CME traffic
study. To date, no formal proposal has been made by the Town and/or NYSDOT for specific
improvements at the intersection of Aviation Road/Route 9. Whereas the present status of the
cost or nature of such improvements is unknown, and that the Modified Project will contribute
traffic to the present low level of service intersection, the Town Board found and the Planning
Board concurs that it would not be appropriate to require construction of specific highway
improvements by the Applicant at this time. However, the Town Board concluded and Planning
Board finds that the Applicant does contribute to the reduction in the highway system levels of
service and is therefore responsible to contribute a fair share proportion toward future
improvements necessary for the Town and/or NYSDOT to undertake for the resolution of
cumulative impacts on the highway system. The Applicant's contribution will therefore be
calculated at a rate of$1.00 per square foot of net building area increase, to be paid to the Town
at the time of issuance of building permit. The net increase is measured at 101,500 square feet
for the Modified Project. This contribution is a minimum and does not preclude the possible
inclusion of the subject property in any future general assessments made by the Town under
general municipal taxing authority. The contribution also does not preclude the possible
mitigation measures which NYSDOT may require. It is anticipated that NYS DOT will require
signal timing and coordination for the affected intersections. This fee shall not be in lieu of
signal coordination and associated upgrades to any controller and/or signals. The contribution
can be petitioned for reduction if NYSDOT's required mitigation measures necessitate direct
improvements to the Aviation Road/Route 9 intersection by the Applicant. The Applicant's
contribution may not be applied to such other improvements which may be required by
NYSDOT.
b. Possible Future Development
The TIS also analyzed the potential traffic impacts arising from the Possible Future
Development. The TIS recommended that the westerly driveway be re-striped to provide a right
turn exit lane and that signal turning modifications be made to maintain acceptable levels of
service at the key studied intersections. The TIS also recommended that the existing traffic
signal at the easterly driveway be re-timed. In the event that the actual site plan for the
Northwest Lands is smaller than assumed in the TIS, the impacts and required mitigation
measures for the Possible Future Development will apply to such a smaller proposal but would
be proportionately less. In addition, the Applicant has expressed a willingness to make a
financial or other contribution on a rate based on the amount of SF GLA constructed. This fee
will be $1.00/sq. ft. of GLA payable upon issuance of a building permit.
9
9. NOISE AND VIBRATION
Due to the proximity of the Northway, Aviation Road and U.S. Route 9, existing noise
from vehicles will be the predominant source of noise in the area. Other than intermittent, short-
term construction noise, the Modified Project and Possible Future Development will not generate
any significant types of noise or vibration. As a result, no impacts from noise or vibration will
occur for the Expanded Mall or Future Expanded Mall.
10. VISUAL RESOURCES
The Modified Project and Possible Future Development will not negatively impact the
visual character of the surrounding area, which is currently developed with a large variety of
commercial uses along the Aviation Road and Route 9 corridors.
a. Modified Proiect
The Modified Project includes planting of trees and shrubs in the vicinity of Department
Store "E" to add visual diversity and soften views of the Expanded Mall from Aviation Road and
the Northway interchange. Photosimulations depicting the views of Department Store "E" were
reviewed by the Town Board as well as a planting plan illustrating the types, quantity and
location of the trees and shrubs to be provided. Such landscaping will be of a variety of tree and
plant materials, which are compatible with local soils and climate conditions. The concentration
of the plantings along Aviation Road and the internal ring road effectively places the screening
and visual diversity in the areas where the traveling public and those not on the site will view the
Expanded Mall.
b. Possible Future Development
While no site development plan exists for the Northwest Lands, the Town Board
evaluated the reasonably foreseeable potential visual impacts associated with the Possible Future
Development. Due to topography of the Expanded Site and other development considerations,
the Possible Future Development, whether one or two stories, will be consistent with the height
of typical structures along this corridor and that of the current height limit for the ESC-25A zone
(50').
Such redevelopment will be an improvement over the existing condition on the
Northwest Lands. The entrance to the Town from Exit 19 will be revitalized with new
commercial/retail activity. The Applicant has made sincere efforts to secure a tenant or tenants
to utilize the current buildings until a site development plan is proposed. Such activity will
contribute to such revitalization of the area. A redevelopment of the Northwest Lands as
contemplated in the Possible Future Development will result in a more unified design and
establishment of landscaping to replace the various outdated structures. As a result, the Possible
Future Development will be an improvement over the existing condition.
Views of the Possible Future Development will be limited due to the change in elevation
and curvature of Aviation Road, and the speed of travel of vehicles in this area. Views of the
Expanded Mall and Possible Future Development would primarily be from vehicles traveling on
Aviation Road. Plantings along Aviation Road and the Northway/Exit 19 ramp would likely be
10
incorporated into such a design and would serve to soften and partially screen views of the
Possible Future Development from this area.
11. HYDROLOGY AND SOILS
Soils have adequate bearing strength to support the buildings and site improvements
identified for the Modified Project and the typical commercial/retail buildings likely to be
utilized for the Possible Future Development using standard foundation engineering techniques.
No aquifers exist under the Expanded Site and no discharge to groundwater will occur for the
Modified Project or Possible Future Development. As a result, no impacts on hydrology will
occur for the Expanded Mall or Future Expanded Mall.
12. VEGETATION AND WETLANDS
No rare, threatened or endangered plant species will be affected by the Modified Project
or Possible Future Development. In 1998, a comprehensive survey of plant species was
completed by the L.A. Group, P.C. to catalogue all plant species located on the site. No wild
blue lupine, which can be habitat for the Karver Blue Butterfly, was found. In addition, the
Expanded Site is currently developed with buildings, pavement and/or landscaped and vegetated
areas that would not accommodate wild blue lupine or Karver Blue habitat. As a result, there
will no significant adverse impact on vegetation as a result of the Modified Project or Possible
Future Development.
There are no designated New York State Freshwater Wetlands or federally designated
wetlands on the Expanded Site. Therefore, there will no impact on wetland resources for the
Expanded Mall or Future Expanded Mall.
13. WILDLIFE
No rare, threatened or endangered species exist on the Expanded Site or will be impacted
by the Modified Project or Possible Future Development. No impacts to wildlife will occur as a
result of the Expanded Mall or Future Expanded Mall.
14. CLIMATE
No impacts on climate will occur as a result of the Expanded Mall or Future Expanded
Mall.
15. UTILITIES AND DRAINAGE
a. Modified Proiect
The site improvements to accommodate the Modified Project will generally be made
within areas which are currently paved or within areas already improved by the Existing Mall
building. Existing stormwater system which includes subsurface collection, detention ponds and
eventual release to local stormwater facilities currently servicing these areas. The Town Board
and the Town's independent consultant have determined that the existing stormwater system has
sufficient excess capacity to accommodate run-off from the Modified Project and existing release
11
rates of stormwater will not therefore change. As a result, the Expanded Mall will not have a
significant adverse impact on groundwater quality or quantity. The Planning Board concurs with
this finding.
b. Possible Future Development
The overall program for Possible Future Development will be designed to conform to the
approved pre-development release rates. Such redevelopment would also involve areas primarily
covered by buildings and paved areas. Due to the excellent drainage of the soils on the
Expanded Site and excess capacity of the existing stormwater system, stormwater run-off can be
accommodated with moderate improvements to the existing stormwater system.
III. ALTERNATIVES
The Town Board and Town of Queensbury Planning Board .......have identified and
examined reasonable alternatives to the proposed action. Alternatives analyzed include alternate
locations, alternative project sizes, alternative project layouts and no action.
1. Alternative locations for the proposed action were analyzed. Due to the nature of
an enclosed shopping center, it is necessary to locate such new commercial/retail
space at the Existing Mall as an expansion. The Modified Project is intended to
act as a catalyst to promote redevelopment of the Northwest Lands. The
Applicant does not own or control any land to the south or east of the Existing
Site. Accordingly, no alternative locations are currently feasible.
2. A smaller project was analyzed as an alternative to the Original Project. The
Modified Project is a smaller alternative to the Original Project. The impacts
associated with such a smaller alternative, both positive and negative, will be less
than those identified for the Original Project.
3. A larger project was also analyzed. Such a project could require multi-level
construction or additional lands. While more municipal revenues would be
generated, such a project would generate larger impacts on traffic, require
additional lands caping/buffering and greater usage of community services,
utilities and generation of solid waste.
4. Alternate project layouts were also analyzed. Multi-level parking facilities and
reconfiguration of the buildings and parking areas were considered. Due to the
current development on the Expanded Site, the impacts associated with such an
alternative would be no different in degree or nature than those for the Original
Proj ect.
5. The No Action alternative was analyzed. Without the proposed action, the
Existing Mall would remain. This alternative will eliminate the opportunity to
provide additional commercial/retail opportunities for Queensbury residents and
visitors and eliminate the significant economic benefit to municipal revenues and
employment opportunities of the Modified Project and Possible Future
Development.
12
IV. MITIGATION MEASURES
Approval of the proposed action in accordance with the measures herein described will
minimize or avoid identified significant adverse environmental effects. The following
practicable mitigative measures, or other measures providing the same or similar mitigative
effect, are incorporated as conditions to the Town Board's decision on the proposed action. The
Planning Board concurs.
1. Grading will be limited to those areas determined necessary by the Applicant for
the Modified Project and any Possible Future Development.
2. During construction of the Modified Project and any Possible Future
Development, fugitive dust control measures shall be implemented as necessary
to minimize the generation of fugitive dust during construction activities via a
water-spraying program or other appropriate means.
3. The Applicant shall require that contractors use and maintain emission control
equipment on vehicles working within the site of the Modified Project and any
Possible Future Development during construction.
4. A soil erosion and sediment control plan shall be implemented during
construction.
5. During construction of the Modified Project and any Possible Future
Development, disturbed areas will be revegetated and/or landscaped as soon as
practicable.
6. Roadway and interior road improvements, if any, identified in the TIS to be
constructed by the Applicant for the Modified Project shall be constructed prior to
issuance of the certificate of occupancy.
7. Roadway and interior road improvements, if any, identified in the TIS to be
constructed by the Applicant for the Possible Future Development shall be
constructed prior to issuance of the certificate of occupancy.
8. The Applicant shall pay an amount equal to $1.00 per SF GLA constructed, such
amount representing a contribution to the costs of intersection and related
improvements to be constructed in connection with the Modified Project and any
Possible Future Development and those planned by the Town for the Route 9/254
intersection. Amounts to be contributed to the Route 9/254 intersection
improvements shall be paid upon issuance of the building permit for the Modified
Project and any Possible Future Development, respectively. In addition, the
applicant shall develop a signal coordination plan and implement said plan in
consultation with NYSDOT. This does not preclude the NYSDOT from requiring
additional mitigation.. This traffic impact mitigation fee may also be utilized by
the Town for traffic improvements at other locations which are reasonably related
to the function of the Route 9/254 intersection.
13
9. Landscaping shall be established in accordance with a planting plan as approved
by Queensbury Planning Board during site plan review for the Modified Project
and any Possible Future Development, respectively.
10. The Applicant shall use commercially reasonable efforts to occupy the former
Seven Steers Restaurant. If a tenant has not committed to occupy such space
within 60 days of this Findings Statement, the Applicant shall submit an interim
landscaping plan to the Town Planning Board for the Northwest Lands along
Aviation Road.
11. In the event that the Town determines to construct a road connecting the site to
Foster Avenue (located southeasterly of the Expanded Mall), the Applicant shall
cooperate with the Town regarding establishment of a mutually acceptable
connection of such road to the site and the Applicant shall be financially
responsible for the cost of any related site improvements occurring on its
property.
V. CONCLUSION
In conclusion, the Town of Queensbury Planning Board hereby finds that it has given
adequate consideration to the Petition, EAF, DEIS, Addendum and the FEIS relevant to the
proposed action.
The Town of Queensbury Planning Board hereby finds that the requirements of SEQRA
have been met and that consistent with the social, economic and other essential considerations
from every reasonable alternative thereto, the action to be carried out, funded or approved is one
which, on balance, minimizes or avoids adverse environmental impacts to the maximum extent
practicable, and is consistent with social, economic and other considerations by incorporating as
conditions to the decision those mitigative measures that were identified as practicable.
14