RC-000800-2016 TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building&Codes (518)761-8256
CERTIFICATE OF OCCUPANCY
Permit Number: RC-000800-2016 Date Issued: Monday, April 10, 2017
This is to certify that work requested to be done as shown by Permit Number RC-000800-2016
has been completed.
Tax Map Number: 295.11-1-8
Location: 33 BONNER DR
Owner: Patricia Daly,Edward Daly
Applicant: Edward Daly
This structure may be occupied as a:Residential Alterations 1118 s.f.
Repairs after dryer fire By order of Town Board
TOWN
^OF QUEENSSBBURY
Issuance of this Certificate of Occupancy DOES NOT relieve the
property owner of the responsibility for compliance with Site Plan,
Variance,or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
ft-- I
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building& Codes (518)761-8256
BUILDING PERMIT
Permit Number: RC-000800-2016
Tax Map No: 295.11-1-8
Permission is hereby granted to: Patricia Daly,Edward Daly
For property located at: 33 BONNER DR
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance
Tyne of Construction
Owner Name: Patricia Daly Single Family-Alteration $110,000.00
Owner Address: 33 BONNER DR Total Value $110,000.00
Queensbury,NY 12804
Contractor or Builder's Name/Address Electrical Inspection Agency
Saxon Restoration
PO Box 364
Ballston Spa,NY 12020
Plans&Specifications
Residential Alterations 1118 s.f.
Repairs after dryer fire
$167.70 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday,December 8,2017
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Town of� ury; huts emb 8,2016
SIGNED BY: for the Town of Queensbury.
Director of Building&Code Enforcement
c FR.kNCIPAL STRUCTURE APPLICATION Office Use Only
Date: 2.2.0/b Permit No.
Tax Map ID Permit Fee 2.G-600 • ZOI to
Zone Historic? _Yes /No Rec Fee
Subdivision Name Lot# Sit lrw. s�z86
Subdivision#
Project Location 33 'BoNWERJ7/ii2=,QVeeHtibv/y
TOWN BD.RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family,duplexes/two-family, multiple family,
apartments,condominiums,townhouses,and/or manufactured&modular homes,but not mobile homes. This is in addition to the
permit fee(s).
PrimaryOwner(s)
bDu/ARD T�ti (Wi -k -?Ccyi clq�
Address 33 -J�l)NNER T(IVC / �Uf2✓lSl✓v✓ ,N
Phone/Email 5-(F-- 8 a 1 _ q y6 9
Applicant
L D WA R-D '9FI<Y
Address
33 BOnnt12 I t ✓z Irl✓/ N. Y
Phone/Email
Contractor
Address
Phone
Contact Person for Building& Codes Compliance: 66 Phone 7q Z cf y
TYPE OF CONSTRUCTION
✓Check all that apply New Addition Alteration Ifloor sf 2,d floor sf Total sf Height
Single Family
Two-Family
Multi-Family
(#of units
Townhouse
Business Office
Retail-Mercantile OVVPI
BUILDING CODES
Factory-Industrial
Attached Garage
(1, 2, 3, 4+)
Other
Town of Queensbury Building&Codes Principal Structure Application revised January 2016
If commercial or industrial please indicate name of business
Proposed use of building or addition
Source of Heat(circle one) Gas Oil Propane Solar Other
Fireplace: Complete a separate application for Fuel Burning
Appliances & Chimneys IV'4
Are there structures not shown on plot plan? A/C
Are there easements on the property? Ale
Site Information:
a. Dimensions or acreage of lot /OC , X /7S-' /� `�o a r✓rs)
b. Is this a corner lot? _Yes v-No
c. Will the grade be changed as a result of construction Yes ✓No
d. Public water or Private well (circle one) ublic Private
e. Sewer or Private Septic System (circle one) Sewerrivate
Value of all work to be performed (labor or materials) $ /0 a D D
DECLARATION:
1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be
completed within a 12 month period.
2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and
department approval.
3. I certify that the application, plans and supporting materials are a true and complete statement /
description of the work proposed, that all work will be performed in accordance with the NYS
Building Codes, local building laws and ordinances,and in conformance with local zoning regulations
4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate
of occupancy.
5. I also understand that I /we are required to provide an as-built survey by a licensed land surveyor of
all newly constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree/to the,above:
PRINT NAME: DATE: /00/ /(,
SIGNATURE: (S?Wa(zD WAL-Y DATE: u !D
For office use only
Operating Permit Issued: _Yes _No
Occupancy Type
Construction Classification
Assembly Occupancy Limit
Special Conditions
Town of Queensbury Building&Codes Principal Structure Application Revised January 2016
REScheck Software Version 4.6.3
Compliance Certificate :
Project EDWARD AND PATRICIA DALY DEC. 06 2018
Energy Code: 2015 IECC -
Location: Glens Falls, New York
Construction Type: Single-family
Project Type: New Construction
Orientation: Unspecified
Conditioned Floor Area: 1,144 ft2
Glazing Area 14% FILE COPY
Climate Zone: 6 (7635 HDD)
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
33 BONNER DRIVE
QUEENSBURY, NY 12804
Compliance: Passes using UA trade-off
Compliance: 2.6%Better Than Code Maximum UA: 195 Your UA: 190
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area
Cavity Cont.
Perimeter
Ceiling 1: Flat Ceiling or Scissor Truss 1,144 53.0 0.0 0.025 29
Wall 1:Wood Frame, 16"o.c. 1,261 15.0 6.3 0.050 52
Orientation: Unspecified
Window 1:Wood Frame:Double Pane with Low-E 119 0.350 42
Orientation: Unspecified
Door 1: Glass 55 0.350 19
Orientation: Unspecified
Door 2: Solid 41 0.100 4
Orientation:Unspecified
Basement Wall 1:Solid Concrete or Masonry 9B0 19.0 0.0 0.045 44
Orientation:Unspecified
Wali height:7.0'
Depth below grade: 6.5'
Insulation depth:7.0'
Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version 4.6.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
�[y
I?ti HrS
Name-Title -�JRAi iSNhtl CL G[� iz'c'�-I(�
Nle Slgnat - Date
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 1 of 9
REScheck Software Version 4.6.3
Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0%were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verlfed Pield Verified
rr Pre-Inspection/PIAn Review — Value Value Complies) Comments/Assumptions
& Fie ID
103.1, Construction drawings and ❑Complies
103.2 documentation demonstrate ❑Does Not
[PRI J' energy code compliance for the ❑Not Observable
building envelope.Thermal
envelope represented on ❑Not Applicable
construction documents.
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for []Not Observable
[PR31' lighting and mechanical systems. ❑Not Applicable
Systems serving multiple
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions. ___
1302.1, Heating and cooling equipment is Heating: Heating: .❑Complies
1403.7 sized per ACCA Manual S based Btu/hr— Btu/hr_ ❑Does Not
11112J' on loads calculated per RCCA Cooling: Cooling: ❑Not Observable
21 Manual J or other methods Btu/hr_ Btu/hr
_ ❑Not Applicable
approved by the code official.
Additional Comments/Assumptions:
I 1 I High Impact(Tier 1) 12 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3)
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 2 of 9
Section Plans Verified Field Verified#
foundation Inspection Value Value Complies? Comments/Assumptions
1402.1.1 Conditioned basement wall R- R-_ ❑complies See the Envelope Assemblies
[FO411 insulation R-value.Where interior R- R- ❑Does Not table for values. i
Insulation is used,verification
may need to occur during ❑Not Observable
Insulation Inspection. Not ❑Nat Applicable
required In warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies i
(FO511 insulation installed per ❑Does Not
manufacturer's instructions. []Not Observable
❑Not Applicable
402.2.9 Conditioned basement wall _ft _it ❑Complies See the Envelope Assemblies
[FO6]1 Insulation depth of burial or ❑Does Not table for values. I
distance from top of wall.
[]Not Observable i
❑Not Applicable
303.2.1 A protective covering is installed ❑Complies
[F011]2. to protect exposed exterior ❑Does Not
Insulation and extends a ❑Not Observable
minimum of 6 in. below grade. ❑Not Applicable
403,9 Snow-and ice-melting system ❑Complles
IFO12]Z controls installed. []Does Not
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 ,Low Impact(Tier 3)
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 3 of 9
Section Plans Verified Field Verified
r% framing/Rough-in Inspection Value Value Complies? Comments/Assumption=_
&Re .10 _
402.1.1, Door U-factor. U-_ U-_ ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR111
❑Not Observable
❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U-_ ❑Complies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values.
402.3.3, ❑Not Observable
402.5 6 ❑Not Applicable '
[FR211 —
1303.1.3 U-factors of fenestration products ❑Complies
[FR411 are determined in accordance ❑Does Not
with the NFRC test procedure or ❑Nat Observable
taken from the default table. ❑Not Applicable
402.4.1.1 Air barrier and thermal barrier _ ❑Complies
[FR23]1 Installed per manufacturer's ❑Does Not
instructions.
❑Not Observable
[]Not Applicable
402.4.3 Fenestration that is not site bullt ❑Complies T �^
[FR20]1 is listed and labeled as meeting []Does Not
AAMA/WDMA/CSA 101/1.5.2/A440 ❑Not Observable
or has infiltration rates per NFRC
400 that do not exceed code ❑Not Applicable
_limits.
I402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]2 sealed at housing(nterlorfinish []Does Not
and labeled to Indicate s2.0 cfm []Not Observable
leakage at 75 Pa. ❑Not Applicable
403.2.1 Supply and return ducts in attics ❑Complies
[FR1211 Insulated >= R-8 where duct is ❑Does Not
>=3 Inches in diameter and >_ ❑Not Observable
R-6 where< 3 inches.Supply and
return ducts in other portions of ❑Not Applicable
the building Insulated>= R-6 for
diameter>=3 inches and R-4.2 !
for<3 inches in diameter.
:403.3.3.5 Building cavities are not used as ❑Complies :
[FR1511 ducts or plenums. []Does Not
❑Not Observable
❑Not Applicable j
X403.4 HVAC piping conveying fluids R-_ R-_ ❑Complies
[FR17]2 above 105 OF or chilled fluids []Does Not
below 55 OF are insulated to aR-
❑Not Observable
3. ❑Not Applicable
'403.4.1] Protection
oI g ion of insulation on HVAC Elco❑Dompes Not
❑Not Observable
❑Not Applicable
403.5.3 Hot water pipes are insulated to R-_ R-_ ❑Complies
[FR18]1 aR-3. ❑Does Not
❑Not Observable
❑Not Applicable
403.6 Automatic or gravity dampers are ❑Complies
[FR19]2 Installed on all outdoor air []Does Not
intakes and exhausts. ❑Not Observable
❑Not Applicable
1 High Impact(Tier 1). --_j 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) -
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Unt]tled.rck Page 4 of 9
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) _ 3 Low Impact(Tier 3)
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 5 of 9
aeci-tar� i „arts Verified Field lerif9ea
3nsuiatioes inspection r Complies? Commen&s/lP,sstarrp:ic�esn
Se
Value Value
Recq.i0I I i.
1303.1 All installed insulation is labeled ❑Complies
j[IN13iz or the installed R-values ❑Does Not
provided. ❑Not Observable
❑Not Applicable I
1402.1.1, Wall insulation R-value. If this is a R- R-_ ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least Y2 of the ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall
[IN311 exterior,the exterior insulation F] mass E] mass []Not Observable !
requirement applies(FRl0). ❑ Steel ❑ Steel ❑Not Applicable
303.2 Wall insulation Is installed per J ❑Complies �I
[IN411 manufacturer's instructions. ❑Does Not
[]Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 ,High Impact(Tier 1) 2._!Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 6 of 9
... i ne Verfv:e,:< � Field V riflesi
,<7a: ?n�f*eeetun Frovis[rns �t2iub Value Complies? i i:onIn•IenYslt sumo tans
402.1.1, Ceiling insulation R-value. R- R-_ ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2• ❑ Steel El Steel ❑Not Observable
[Fill' 6 ❑Not Applicable
[Fill'
303.1.1.1, Ceiling insulation installed per ❑Complies
303.2 manufacturer's Instructions. ❑Does Not
[F1211 Blown insulation marked every
❑
300 ft2. Not Observable
❑Not Applicable
402.2.3 Vented attics with air permeable ❑Complies
(FI22]2 insulation include baffle adjacent ❑Does Not
to soffit and eave vents that
extends over Insulation. ❑Not Observable
❑Not Applicable
402.2.4 Attic access hatch and door R-_ R-_ ❑Complies
[F1311 insulation all-value of the ❑Does Not
adjacent assembly. ❑Not Observable
❑Not Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50=_ ACH 50=_ ❑Complies
[FI17]1 ach In Climate Zones 1-2, and ❑Does Not
<-3 ach in Climate Zones 3-8. ❑Not Observable
❑Not Applicable
403.2.3 Duct tightness test result of<=4cftn/100 cfm/100 ❑Complies
[F1411 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not
<=3 cfm/100 ft2 without air ❑Not Observable
handler @ 25 Pa. For rough-in
tests,verification may need to ❑Not Applicable
occur during Framing Inspection.
-- to -- -. hoo ----- - -._ -
403.3.2 Ducts are pressure tested to cfm/100 dm/100 ❑Complies
[FI2711 determine air leakage with ft' ft2 ❑Does Not
either: Rough-in test:Total
leakage measured with a ❑Not Observable
pressure differential of 0.1 inch ❑Not Applicable
w.g.across the system Including
the manufacturer's air handler
enclosure if Installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g.across the entire system
including the manufacturer's air
handler enclosure.
403.3.2.1 Air handler leakage designated ❑Complies '.
[FI2411 by manufacturer at<=2%of ❑Does Not
design air flow. ❑Not Observable
❑Not Applicable
403.1.1 Programmable thermostats ❑Complies
[FI9]2 installed for control of primary ❑Does Not
heating and cooling systems and ❑Not Observable
Initially set by manufacturer to
code specifications. ❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[FI10]2 on heat pumps. ❑Does Not
❑Not Observable
❑Not Applicable
403.5.1 Circulating service hot water ❑Complies
[Fill]2 systems have automatic or ❑Does Not
accessible manual controls. ❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 (Medium Impact(Tier2) 3-Low Impact(Tier3)
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 7 of 9
3 c-c1an- _ -- - Plats Verified i Fie",dvewfle6 -. -- - --- -- -_ .__
Final inspection Provisions I UPmplles7 I Con meats/Assam•i=a3,
.L• Req.it-) VrSue latae •..
i403.6.1 All mechanical ventilation system ❑Complies
I,[FI25]2 fans not part of tested and listed []Does Not
HVAC equipment meet efficacy ❑Not Observable
and air flow limits.
j ❑Not Applicable
1403.2 Hot water boilers supplying heat ❑Complies
;[F126]' through one-or two-pipe heating ❑Does Not
systems have outdoor setback []Not Observable
control to lower boiler water
temperature based on outdoor ❑Not Applicable
I temperature.
403.5.1.1 Heated water circulation systems ❑Complies
JF128]2 have a circulation pump.The []Does Not
system return pipe is a dedicated
return pipe or a cold water supply []Not Observable
pipe. Gravity and thermos- ❑Not Applicable
syphon circulation systems are
not present.Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy.Controls
automatically turn off the pump
j when water is In circulation loop
Is at set-point temperature and
--no-demand for hot water exists.
1403.5.1.2 Electric heat trace systems ❑Complies
�[F129]2 comply with IEEE 515.1 or UL ❑Does Not
i 515.Controls automatically
adjust the energy Input to the [:]Not Observable
i heat tracing to maintain the ❑Not Applicable
I desired water temperature in the
piping.
403.5.2 Water distributlon systems that ❑Complies
[F13012 have recirculation pumps that ❑Does Not
pump water from a heated water ❑Not Observable
supply pipe back to the heated ❑Not Applicable
water source through a cold
water supply pipe have a
demand recirculation water
system.Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 1044F.
;403.5.4 Drain water heat recovery units ❑Complies
![F13112 tested in accordance with CSA ❑Does Not
855.1.Potable water-side
pressure loss of drain water heat ❑Not Observable
j recovery units<3 psi for ❑Not Applicable
individual units connected to one
or two showers.Potable water-
side pressure loss of drain water
heat recovery units<2 psi for
j individual units connected to
three or more showers.
1404.1 75%of lamps in permanent ❑Complies
i[F16]1 fixtures or 75%of permanent ❑Does Not
fixtures have high efficacy lamps.
Does not apply to low-voltage []Not Observable
lighting. ❑Not Applicable
;404.1.1 Fuel gas lighting systems have ❑Complies
(F12313 no continuous pilot light. ❑Does Not
❑Not Observable
❑Not Applicable
Impact(Tier i) T j Medium Impact(Tier 2) 3_ Low Impact(Tier 3)
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 8 of 9
.:_r•f:C::
{: Finai 4rtSK5 P.LCien W;Ji'I5i G:?5 'ian8 !v €flea CI )•'i 1,ld P'.e'i.'E'.: E:�Y�*zi2 s? -.or:^.Y;t�nts/n.SSe}R?y^eSfs3�3
h. il
a'ue 'o;ftre
401.3 Compliance certificate posted. ❑Complies
[F]7)2 ❑Does Not
[]Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[F11813 mechanical and water heating ❑Does Not
systems have been provided. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 !Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: EDWARD AND PATRICIA DALY Report date: 12/04/16
Data filename: Untitled.rck Page 9 of 9
Above-Grade Wall 21.30
Below-Grade Wall 19.00
Floor 0.00
Ceiling / hoof 53.00
Ductwork (unconditioned spaces):
Window 0.35
Door 0.35
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments
Edward K. LaPoint. PE
N 00
8 Ward Lane, PO Box 190
Cleverdale, New York 12820 0
518-744-4411 p
eklapointpeagmail.com
Q .v
September 29, 2016 U r
o
Mr. Gregg Thomas Ca
103 Stockbridge Court
Ballston Spa, New York 12020 p Q
FILE COPY c0 75
Re: Engineering Assessment and Recommendations c
Ed Daily, Single Family Residence located on (
uJ o o
33 Bonner Drive, Queensbury, New York 12804 �+m
Fire Damage and Replacement Nco �
Dear Gregg:
Regarding the above referenced project, the engineer (Edward K. LaPoint, PE) was
contacted on behalf of the owner (Ed Daily) to perform an engineering assessment and
provide recommendations for moving forward.
1. The structure is a one story single family wood framed residence built in 1974. The
home has been extensively damaged by a dryer fire.
2. The engineer recommends the following repairs:
1. Replace and change the existing electrical system with a 200 amp service with
40 individual circuits.
2. Install hard wired inter-connected smoke and carbon monoxide detectors with
battery back-ups in each bedroom, hallway, and basement.
3. Spray and seal all exposed lumber.
4. Install a new triple 2 x 10 inch floor girder under the master bedroom.
5. Install a new high efficiency gas hot air furnace and duct work.
6. Install a new high efficiency insulated electric hot water heater.
7. Install a new high efficiency central air conditioner.
8. Remove and replace the wall framing and stud partitions in the damaged
bedroom #2.
9. Remove and replace the entire roof system including rafters, ridge beam, collar
ties, sheeting,felt, shingles, proper vents, and snow and ice shield.
6 Install high density R-19 and R-38 in walls and ceiling respectively. A6 q-q Q Ea�,��/�
511 r Install R-13 blanket insulation in basement and R-19 at the sill cavitiesy
12. Install new doors and windows through-out providing the required, light
ventilation, and egress (see attached schedule). Q. 15 uJ Rei
Please feel free to contact me if you have any questions or comments. O PC
Si �gl
ECEOWE
Edward K. La�bmt, PE D
8 Ward Lane, PO Box 190 D
Cleverdale, New York 12820 NOV 2 1 2016
518-744-4411
eklapointpe(aDamail.com TOWN OF QUEENSBURY
BUILDING 8 CODES
Page 1 of 1
Manual S Compliance Report Job:
Date: Dec 06, 2016
Entire House By:
PAUL WHITE
UUEENSBURY,NY 12804
Project Information
For: DALY
[F1 L COP�
Cooling
Design Conditions
Outdoor design DB: 85.0°F Sensible gain: 8735 Btuh Entering coil DB: 75.0°F
Outdoor design WB: 71.0°F Latent gain: 335 Btuh Entering coil WB: 62.5°F
Indoor design DB: 75.0'F Total gain: 9070 Btuh
Indoor RH: 50% Estimated airflow: 583 cfm
Manufacturer's Performance Data at Actual Design Conditions U �
Equipment type: Split AC I
Manufacturer: YorkModel: YCD18B21+F,PE'E30(1,2)24 F:
J
Actual airflow: 583 cfm
Sensible capacity: 0 Btuh 0%of load TOWN OF QUEEfJSBURY
Latent capacity: 0 Btuh 0%of load BUILDING& CODES
Total capacity: 0 Btuh 0%of load SHR: 0%
Heating Equipment
Design Conditions
Outdoor design DB: -4.0°F Heat loss: 31823 Btuh Entering coil DB: 70.0'F
Indoor design DB: 70.0°F
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Gas furnace
Manufacturer: York Model: TM9V040A10MP11
Actual airflow: 583 cfm
Output capacity: 38000 Btuh 119'/e of load Temp. rise: 50 OF
Meets are all requirements of ACCA Manual S.
WPI htSOft 2016-Dec-0709:01:01
9 Right-Sui(e®Universa12017 77.0.16 RSU25116 Page 1
r�C9Usem\scoLLlangeworthylDommentslYorkIDALY.mp Cate=MJ8 Front Door faces: N
Residential Plans Examiner Review • Form
^`
RIPER 1
ACCP. for HVAC SystemD—sign (Loads, Equipment, 15 Mar 09
Header Information
Contractor: REQUIRED ATTACHMENTS ATTACHED
Manual J1 Form(and supporting worksheets): Yes ❑ No ❑
Mechanical license: or MJ1AE Form'(and supporting worksheets): Yes ❑ No ❑
OEM performance data(heating,cooling,blower): Yes ❑ No ❑
Building plan#: Manual D Friction Rate Worksheet: Yes ❑ No ❑
Duct distribution sketch: Yes ❑ No ❑
Home address(Street or Lot#,Block,Subdivision): , Entire House
HVAC • D CALCULATION •
f)Qqign Conditions Building Construction Information
Winter Design Conditions Building
Outdoor temperature: -4 °F Orientation: Front Door faces North
Indoor temperature: 70 =F Nmt ,East,West,Sm4h,Northaast,Nmth..%Southeast Southwest
Total heat loss: 31823 Btuh Number of bedrooms: 0
Conditioned floor area: 2259 fir
Summer Design Conditions Number of occupants: 0
Outdoor temperature: 85 'F
Indoor temperature: 75 'F Windows R +
Grains difference: 28 grAb @50% RH Eave overhang depth: 0 ft
Sensible heat gain: 9705 Btuh Internal shade: none
Latent heat gain: Blinds,drapes,ate. cava
9 373 Btuh ospil Y4ns„
Total heat gain: 10078 Btuh Number of skylights: 0
HVAC EQUIPMENT • 1
Heating EnWnment Data Cooling Equipment Data Rlower Data
Ee�uiWnt l ppe: Gas furnace Et�ui�menl lxvpe: Split AC Heating cfin: 583
u ec•,Hae Pump,Boiler,Ne. Ir onditlo Heat pump,ate. Cooling Cfm' 583
Model: York Model: York Static pressure: 0 in H2O
TM9V040A10MP11 YCD18B21+F,PE'E30(1,2)24 Fan's rated external static pressure for design
ahflm
Heating output caJacit%: 8000 Btuh Total cooling rapacity: 0 BluthHeatpumpe-capae at InterdesIgnou oorconditioru
Sensible cooling capacity: 0 Bluh
Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh
Design airflow: 583 cfrn Longest supply duct: 0 ft Duct Materials Used
Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct:
Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft
Available static pressure(ASP): 0 in H2O Friction rate:
M.N..Rate-ASP+1TELx IM0 iN100ft Branch duct: Sheet metal
I declare the load calculation,equipment, equipment selection and duct design were rigorously performed based on the building plan i
listed above. I understand the claims made on these forms will be subject to review and verification.
Contractor's printed name:
Contractor's signature: Date:
MunicipalityReserved for County, Town
'Home qualifies for MJ1AE Form based on Abridged Edition Checklist
'I' VVrightsoft: Righ1SWte®U nmersal 2017 17.0.16 RSU25116
Project Summa Job:
Date: Dec 06, 3016
Entire House By:
PAUL WHITE
DUEENSBURY.NY 12804
Pro*ect Information
For: DALY
Notes:
Desicin Information
Weather: Glens Falls AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db -4 OF Outside db 85 OF
Inside db 70 OF Inside db 75 OF
Design TO 74 OF Design TD 10 OF
Daily range M
Relative humidity 50 %
Moisture difference 28 gr/Ib
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 31823 Btuh Structure 8735 Btuh
Ducts 0 Btuh Ducts 0 Btuh
Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh
(gone)
0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 31823 Btuh Use manufacturer's data n
Rate/swing multiplier 0.90
Infiltration Equipment sensible load 7861 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 0 Structure 335 Btuh
Duds 0 Btuh
Central vent(0 dm) 0 Btuh
Heating Cooling (none)
Area(ftp 2259 2259 Equipment latent load 335 Btuh
Volume
6777 6777
Airchanges/hour 0.32 0.16 Equipment total load 8197 Btuh
Equiv.AVF(cfm) 36 18 Req.total capacity at 0.70 SHR 0.9 ton
Heating Equipment Summary Cooling Equipment Summary
Make York Make York
Trade YORK Trade ADP
Model TM9V040A10MP11 Cond YCD18B21
AHRI ref 4733111 Coil F,PE•E30(1,2)24
Efficiency 96 AFUE EffiRencfy 8953433 11.0 EER, 14 SEER
Heating input 40000 Btuh Sensible cooling 12250 Btuh
Heating output 38000 Btuh Latent cooling 5250 Btuh
Temperature rise 60 OF Total cooling 17500 Btuh
Actual air flow 583 cfm Actual air flow 583 dm
Air flow factor 0.018 dm/Btuh Air flow factor 0.067 dm/Btuh
Static pressure 0 in H2O Static pressure 0 in H2O
Space thermostat Load sensible heat ratio 0.96
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wri htsoft 2016-oar.-0709.01:01
g Right-Sulle®U niversal 201717.0.16 RSU25116 Pagel
ACC'k C:lllsemisco0.langewonhytDocument$%YorMDALYaup Calc=MJB Fmnt Dwr faces: N
AED Assessment Job:
Date: Dec 06, 2096
Entire Mouse By:
PAUL WHITE
oUFENSBURY,NY 12804
Project • •
For: DALY
Design Conditions
Location: Indoor: Heating Cooling
Glens Falls AP, NY, US Indoor temperature (°F) 70 75
Elevation: 335 ft Design TD(°F) 74 10
Latitude: 43°N Relative humidity(%) 50 50
Outdoor: Heating Cooling Moisture difference(gr/Ib) 51.8 27.6
Dry bulb(°F) -4 85 Infiltration:
Daily range (°F) - 20 ( M )
Wetbulb(°F) - 71
Wind speed (mph) 15.0 7.5
Test for • Exposure
Dourly Glazing Load
10'00D--
9,000--
8,000--
7,00&-
6,000--
5,000--
4,00D-
0,9,8,7 6,5,4,
3,000--
2,000--
1,000-
0
,2,1, 0
8 9 10 11 12 13 14 15 16 17 18 19 20
Har of lar
/ Harly ,r A rege i AEDlinit
Maximum hourly glazing load exceeds average by 26.0%.
House has adequate exposure diversity (AED), based on AED limit of 30%.
AED excursion: 0 Btuh
_ +I+- wri htsoft 2016-Dec-0709:01:01
9 Right-Suile®Universa12D 17 77.0.16 RSU2571fi page 1
a Cl',C1Users\scolt.langeworlhy\Dowments\York\DALY.mp Gale=MJ6 Front Door faces: N
Right-J® Worksheet job:
Entire House Date: Dec 06,2016
PAUL WHITE By:
QUEENSBURY,NY 12804
I Room name Entire House Rooml
2 Exposed wall 318.0 8 142.0 it
3 Room height 9.0 11 d 9.0 It heal/mol
4 Room dimensions45.0 x 28.0 ft
5 Room area 2259.0 ft' 1170.0 ft'
Ty Construction U-value Or HTM Area (f P) Load Area (ft-) Load
number (Btuhl"T (Btuh/fl- I or perimeter (h) I (Bluh) I or perimeter (ft) I (stub)
Heat Cool Gross NIP/S Heat Cool Gross WP/S Heat Cool
6 W 158-8s3cb0.100 n 5.99 0.21 900 852 5106 176 405 405 245894
�C ID-c2ov 0.570 n 42.18 16.36 48 0 2025 795 0 0 0 0
W 158-Bs3c-6 0.100 a 5.91 0.18 531 475 2808 85 234 210 1242 38
`G 7Qc2ov 0.570 a 42.18 58.17 56 0 2362 3257 24 0 1012 1396
17 15B-Bs3o-6 0.100 s 5.93 0.20 900 815 4832 160 405 405 2458 94
1D-c2ov 0.570 s 42.18 30.57 64 0 2700 1957 0 0 0 0
11P0 0.290 a 21.46 Q23 21 21 451 131 0 0 0 0
ltl 15840s 6 0.100 w 6.01 0.21 531 510 3067 109 234 234 1420 55
--D 11P0 0.290 w 21.46 6.23 21 21 451 131 0 0 0 0
C 16B-30ad 0.032 2.37 1.44 1213 1213 2872 1747 124 124 294 179
F 21A.24t 0.025 1.85 0.00 1170 1170 2165 0 1170 1170 2165 0
F 21A-241 0.025 1.85 0,00 43 43 80 0 0 a 0 0
6 c)AED excursion g
82
Envelope loss/gain 28917 8538 1 11048 1938
12 a) Infiltration 2907 1967298 88
b) Room ventilation 0 0 1 0 0
13 Internal gains: Occupants 230 0 0101
p 0
Applianceslother 0 0
Subtotal(lines 6 to 13) 31623 8735 1 12346 2026
Less external load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
74 Subtotal 37823 8735 72346 202fi
15 Duct loads 0% 0% 0 0 -0%
Nr re� reoad(Cfm) I I I 375831 85831 1 1 12�61 202ota
3551
Calculations aooroved by ACCA to meet all requirements of Manual J 8th Ed
WrlightsQft Right-Sulte®Universal 2017 17.0.16 RSU25116 2076-Oeo-0709:01:01
AUDI+ Page 1
C:\Userslscott.IangeworihylDocuments\York7DALV.mp Calc=MJB Front Door faces: N
Right-J® Worksheet Job:
Entire Douse Date: Dec 06,2016
PAUL WHITE By:
DUEENSBURY,NY 12804
1 Room name LIVING KITCHEN
2 Exposed well 33.0 R 22.0 It
3 Room height 9.0 R heal/mol 9.0 it heat/mot
4 Room dimensions 19.0 x 14.0 ft 9,0 x 13,0 fl
5 Room area 266.0 ft2 117.0 ft'
Ty Consauctlon U-value Or I HTM I Area (ft2) Load Area (ft') I Load
number (Btuh/fl;•F (Btuh/ft2) or perimeter (ft) (Bluh) or perimeter (ft) (Blah)
Heat 11 Cool Gross N/P/S Heat Cool Gross WP/S Heat Cool
6 V" 158-Bs3c-6 0.100 n 5.99 021 171 147 860 23 0 0 0 0
1
0
-c2ov 0.570 n 42.18 16.36 24 0 1012 393 0 0 0 0
VE
15B-as3c-6 0.100 a 5.91 0.18 0 0 0 0 0 0 0 0
—C 1D-c2ov 0.570 a 42.18 58.17 0 0 0 0 0 0 0 0
11 tj15B-8s3" 0.100 s 5.93 0.20 0 0 0 0 81 81 492 19
iD-c2ov 0.570 s 42.18 30.57 0 0 0 0 0 0 0 0
11P0 0.290 s 21 AS 6.23 0 0 0 0 0 0 0 0
l215B-W" 0.100 w 6.01 0.21 126 126 765 29 117 96 555 13
LO 11P0 0.290 w 21.46 623 0 0 0 0 21 21 451 131
C 16B-30ad 0.032 - 2.37 1.44 266 266 630 383 117 117 277 168
F 21A-241 0.025 1.85 0.00 0 0 0 0 0 0 0 0
F 21A-241 0.025 1.85 0.00 0 0 0 0 9 9 17 0
61 c)AEG excursion -fib -27
Envelope loss/gain 3287 762 1 1790 304
12 a) Infilbatlan 1 302 20 201 14
b) Room ventilation 0 0 0 0
13 Internal gains: Occupants@ 2300 0 0 0
ce
Applians/other 0 0
Subtotal(lines 61013) 1 1 3568 782 1 1992 318
Less wdemal load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 3568 782 1992 318
15 Duct loads -M 0% o 0 -an o3s o 0
Total room laad 3568 782 1992 318
Air requued(cgn) fi5 52 37 21
Calculations approved by ACCA to meet all reauirements of Manual J 8th Ed.
_ -!'+ Wrigistnoft 2016-Dec-0709.V:01
Right-Suile®Universal 201717.0.18 RSU25116
"c'n C:\Usem'scog.IangeworthylDocumenUlYoridDALY.mp Calc=MJe Front Doorfaces: N Paget
Right-A) Worksheet Job:
Entire House Date: Dec 06,2016
PAUL WHITE By:
QUEENSBURY.NY 12804
I Room name DINING STAIRS
2 Exposed wall 19.0 ft 3.0 If
3 Room height 9.0 0 hea/wal 9.0 ft heaccoal
4 Room dimenslons 13.0 x 13.0 ft 3.0 x 14.0 ft
5 Room area 169.0 ft' 42.0 ft'
Ty Construction U-value Or I HTM I Area (f1') I Load I Area (ft' I Lord
number (Stuh/fP-`F (Bluhlft.) or perimeter (ft) (Bb1h) or perimeter (ft) (a art
Heal Cool Gross NIPIS HeelCod Gross NIPIS Heat Cool
6 V11 15&Bs3c6 0.100 n 5.99 0.21 0 0 0 0 27 27 164 6
�-G 1D-c2ov 0.570 n 42.18 18.36 0 0 0 0 0 0 0 0
Yy 15B-8s3a6 0.100 a 5.91 0.18 54 54 328 13 0 0 0 0
�G113"a V 0.570 a 42.18 58.17 0 0 0 0 0 0 0 0
1; 'L15B-8: 0.100 s 5.93 0.20 117 64 318 0 0 0 0 0
10-c2ov 0.570 a 42.18 30.57 32 0 1350 978 0 0 0 0
11"a0.290 s 21.48 6.23 21 21 451 131 0 0 0 0
4y 1586s3o-8 0.100 w Sot 021 0 0 0 0 0 0 0 0
�--D IPO 0.290 w 21.46 6.23 0 0 0 0 0 0 0 0
C 1813-30ad 0.032 2.37 1.44 169 188 400 243 42 42 99 6D
F 21A-241 0.025 - 1.85 O.OD 0 0 0 0 0 0 0 0
F 21A-24t 0.025 - 1.85 0.00 13 13 24 0 0 0 0 0
61 c)AED excursion 781 6
Envelope losstgain 2870 1546 263 61
12 a) Infiltration 174 12 27 2
b) Room ventilation 0 0 0 0
13 Internal gains: Occupants 230 0 0 0 0
Appliances/other 0 0
Subtotal(lines 6 to 13) 3044 1556 291 63
Le as external load 0 0 ]J63
Less transfer 0 0
Redistributlon 0 0
14 Subtotal 3044 1558 15 Duct loads -0% 0% 0 0 -0% 0%
Total rem load 3044 1558 291 63
Air required(fin) 56 109 5 4
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrfght5oft 2016Dec-07 09:01:01
Rlg tslYore®UNvers l 2017Cale- 17.0.18 RSUor faces:
Pae 3
'K`�A C:\Users\scull.langewonhylDowments\York1DALY.rup Celc=MJe Front Door fews: N 9
Dight-J® Worksheet Job:
Entire House Date: Dec 06,2016
PAUL WHITE By:
OUEENSBURV,NY 12804
1 Room name POWDER BATH
2 Exposed wall 5.0 it 5.0 it
3 Room height 9,0 it heel/cool 9.0 it hee0wol
4 Room dimensions 5.0 x 5.0 ft 5.0 x 9.0 It
5 Room area 25.0 ft' 45.0 fl'
Ty Construction U-value Or I HTM I Area (it-) I Load I Area (f N) Load
number (Btuh/fP-°F (Btuh/fl3) or perimeter (ft) (Btuh) or perimeter (it) (Stuh)
Host Cool Gross NIP/S Heal Cool Gross WPIS Hest Cool
e W 15B-8s3ce 0.100 n 5.99 0.21 45 37 214 5 0 0 0 0
�G 10.c2av 0.570 n 42.18 16.36 8 0 337 131 0 0 0 0
lar
15B-8s3" 0.100 a 5.91 0.18 0 0 0 0 0 0 0 0
�C 10.e2ov 0.570 a 42.18 58.17 0 0 0 0 0 0 0 0
11 15B-W 6 0.100 s 5.93 0.20 0 0 0 0 45 45 273 10
1D-aov 0.570 s 42.18 30.57 0 0 0 0 0 0 0 0
11PO 0.290 s 21.46 6.23 a 0 0 0 0 0 0 0
W 158-8s3r s 0.100 w 6.01 0.21 a 0 0 0 0 0 0 a
�--D 11P0 0.290 w 21.48 6.23 0 0 0 0 0 0 0 0
C 16&30ad 0.032 2.37 1.44 25 25 59 36 45 45 107 65
F 21A-241 4025 1.85 0.00 0 0 0 0 0 0 0 0
F 21A-24t 0.025 1.85 0.00 0 0 0 0 0 0 0 0
6 e)AED excursion 1 -14 .6
Envelope losstgain 611 158 1 380 fig
12 a) Infiltration 46 3 463
b) Room ventilation 0 0 0 0
13 Internal gains: Occupants@ 230 0 0 0 0
Appliances/other 0 0
Subtotal(lines 6 to 13) 656 161 425 72
Less external load 0 0 0 0
Less transfer 0 0 0 0
Redisbibudon 0 0 0 0
14 Subtotal 655 161 425 72
15 Duet loads -0%1 0% 0 0 -0% 0% 0 0
Total room loatl 656 161 425 72
Airrequlred(chn) 12 11 8 5
Calculations aooroved by ACCA to meet all requirements of Manual J 8th Ed.
_ -F}t wrightsoft 2016.DBG0709:01:01
RlghtSulleO Universal 2017 17.0.16 RSU25118
'u'C:\Users\s it.langeworlhy\Documents\Vork\DALV.mp Cale=MJB Frond Door faces: N Paga4
Right-A) Worksheet Job:
Entire House Date: Dec 06,2016
By:
PAUL WHITE
OUEENSSURY,NY 12804
1 Room name BED 1 BED 3
2 Exposed wall 37.0 ft 24.0 ft
3 Roam height 9.0 ft heat/cool 9.0 ft hest/cool
4 Roam dlmenslons 16.0 x 14.0 ft 12.0 x 7.0 ft
5 Roam area 224.0 ft' 84.0 fP
Ty Construction I U-valueOr HTM I Area (f P) Load I Area (ft') I Load
number (Btuh/fti'F (Btuh/ft') or perimeter (0) (BWh) or perimeter (ft) (BWh)
Heat Cool Gross N/P/S Heal Cool Gross WP/S Heat Cool
6 " "
15a3cb 0.100 n 5.99 0.21 144 128 755 22 108 108 655 25
iD-c2ov 0.570 n 42.18 16.36 18 0 675 262 0 0 0 0
VII i6B-8s3c-6 0.100 a 5.91 0.18 126 110 646 18 0 0 0 0
-G iD.c2ov 0.570 a 42.18 58.17 16 0 675 931 0 0 0 0
11 Y)I 15B-as3c-6 0.100 s 5.93 0.20 63 63 382 15 108 92 537 14
L�-pG 1D-c2ov 0.570 s 42.18 30.57 0 0 0 0 16 0 675 489
11P0 0.290 a 21.46 6.23 0 0 0 0 0 0 0 0
VII 15B-8s3" 0.100 w 6.01 021 0 0 0 0 0 0 0 0
�D 11P0 0.290 w 21.46 6.23 0 0 0 0 0 0 0 0
C 168-30ad 0.032 - 2.37 1.44 224 224 530 323 84 84 199 121
F 21A-241 0.025 - 1.85 0.00 0 0 0 0 0 0 0 0
F 21A-241 0.025 - 1.85 0.00 0 0 0 0 12 12 22 0
61 c)AED exwrsion -1pg g2
Em,elope loss/gain 3664 1461 1 1 20881 742
12 a) InfJtratbn 338 23 219 15
b) Room ventilation 0 0 0 0
13 Internal gains: Ocwpants® 230 0 0 0 0
Applianoes/other 0 0
Subtotal(lines 6 to 13) 4002 1484 2308 757
Less external load 0 0 0 0
Less transfer 0 0 0 0
Redistribution 0 0 0 0
14 Subtotal 4002 1464 2308 757
15 Dud loads -0% 0% 0 0 -0% 0% 0 0
Total mom load 40021 1484 2308 757
Ak requited(dm) 731 99 42 51
Calculations aooroved by ACCA to meet all reauirements of Manual J 8th Ed.
-F1+ wrightSp{* 2016-Dee-0709:01:01
Right-Suila®Universai 2017 17.0.16 RSU25716
�'c'p'C:\Usemiswft.langewonhylDac wtslYork(DALY.mp Calc=MJS Front Door faces: N Pege5
Right-A) Worksheet Job:
Entire House Date: Dec 06,2016
PAUL WHITE By.
QUEENSBURY,NY 12804
1 Room name BED 2
2 Exposed wall 28.0 A
3 Room height 9.0 ft heat/cool
4 Room dimensions 9.0 x 13.0 ft
5 Room area 117.0 ft-
Ty
PTy j Consmn:fian IYvalue Or FITM Area (ft') Load Area Load
number (Btuh/ft;T (Bluhlft2) or perimeter (ft) I (Blah) I or perimeter
Heat Cool Gross NIP/5 Heal Cool Gross N/P/S Heat Cool
6 Yy 15B-803 6 0.100 n 5.99 021 0 0 0 0
�--G 1D-c2ov 0.570 n 42.18 16.36 0 0 0 0
Vt 15&816 0.100 a 5.91 0.18 117 101 592 16
�G 1D-aov 0.570 a 42.18 58.17 16 0 675 931
11 15B-8s3a6 0.100 s 5.93 0.20 81 65 373 8
i D-c20v 0.570 a 42.18 30.57 16 0 675 489
11P0 0.290 s 21.46 6.23 0 0 0 0
Vy 15B-Bs3" 0.100 w 6.01 021 54 54 328 13
�p 11P0 0.290 w 21.46 6.23 0 0 0 0
C 16B.30ad 0.032 2.37 1.44 117 117 277 168
F 21A-211 0.025 1.85 0.00 0 0 0 0
F 21A.24t 0.025 1.85 0.00 9 9 17 0
6 c)AED excursion -128
Envelope loss/gain 2936 1496
12 a) infiltration 256 17
b) Roomven91a0cn 0 0
13 Internal gains: Occupants® 230 0 0
Appfancestother 0
Subtotal(lines 6 to 13) 3192 1514
Less external load 0 0
Less transfer 0 0
Redistribution 0 0
14 Subtotal 3192 1514
15 Dud loads -0% 0% 0 0
Tetel room load 3192 1514
Air required War) 59 101
l I
Calculations aooroved by ACCA to meet all requirements of Manual J 8th Ed.
-111+ Wrightsoft Right-Sulle®Universa1201717.0.16 RSU25116 2016-Dec-07 09:01:01
AC"C..A C:%Usems woO.langewormy%Documents\York%DALY.rep Cade=M.18 Front Door fares: N Pape 6
BONNEf2, DRIVE �
+I Q 17.o'+ SS.o NbUSE�GARA6E 25.0' a' a
0
IELEC, PIOLEIR -
ap r-y
i 1 — — 35 Ioo.D'
1 t
+1
_O
L a to ? Z ik
O
d IQ ? UW Q
(h I U I
CD y
T- y N L _
O
C co
p EXISTING
O r Houses cAR,
0o o
44'OX2Co O 14'-OK
Q 'Cj
K Tk2TD.DECK
� � O 3� 2�_8�o
m
-a .L r-- Cowc, `JI
CoQ
r C C (FILLLD Ili
r W Oo'
1,62 (n CHAIN -INK FENCE.)
CV C) M
lfl
gTOWNc E0vieov 2 i 201sFILE COPY OF QUEENSBURYLDING& CODES
100.0' W 600-3o,W 100.0' loo.o'
N PLOT PLAN: SCALE
EDWAP—D k PA` IZ.ICiA -QALY
33 eoNNEpl :DQ \JE2 auEF-Hse�QR*Y, Nee �-(012K
W E 5cALE: Asf. DA.Awu BYE GW14
VATF. II-IG-Iro REVI5CDt
5 - 17)50o sr 0.401'7 AC) (SLOT PLAW No 10.03.16 1A
ui � i �I S R ;i{)�e o o / / 3 � � ' 0 �-- i B S, 9 r ! _�— --•-
04
MAP OF SECTION TWO
- �j i� "r "•`�' �ii FRANKLYN MANOR
.,.... ��. c W 1 ,...
-•, -��� ._J nu InRV� >.;:'."j.-,. � A SUBDIVISION OWNED BY
DO _- _ - _ _ ,-_ _ "'+ FRANK V_ SITTERT••.LYN CHASE
O __._ ..� - — .- •-_�-`- .era u wm ..w nr
O —••W._. ._.._
O
O
M
r
rn
as
a
F
z
Z
H
RC -oaoi�a3-zz\(O
RAJNY onsulfing, LLC
69 Hayden Point Loop
Diamond Point, NY 12824
518 221-3240
04/03/2017
Saxon Restoration—Mr.Gregg Thomas
PO Box 364
Ballston Spa,NY 12020
Inspection Address: 33 Bonner Drive, Queensbury NY 12804
Report Number: 0403173
Dear Gregg:
The Blower Door Test to verify infiltration rate of the subject property was perfonned on
04/03/2017. This was done to verify mandatory requirement of 2015 IECC Code as
amended by the 2016 NYS Uniform Code Supplement. This report does not imply that
full compliance of above codes has been met,only verified the infiltration rate.
GRAJNY Consulting, LLC is pleased to submit the following report.
The following data was provided:
- Square Footage of the house, including conditioned basement=2,236 SF
- Volume of the house, including conditioned basement= 16,770 CF
Based on above,the following test data was collected:
- Infiltration Rate, including conditioned basement at 50 Pascal=694 CFM
- ACH50,Actual Changes per Hour at 50 Pascal=694X60/16,770=2.5 <3
The Instruments used for test were provided by the Energy Conservatory Digital Gauge
DG-3 rated accuracy=+/- I%,calibrated minimum once per year.
Thank you for selecting our company. We appreciate the opportunity to be of service.
Please call this office if there are any questions.
Sincerely,
�S0t oFNE G►ygy�
Stan Grainy, PE II
NYS HERS Energy Rater 5609922 tl