Loading...
RC-000718-2016 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-000718-2016 Date Issued: Wednesday, November 29, 2017 This is to certify that work requested to be done as shown by Permit Number RC-000718-2016 has been completed. Tax Map Number: 308.8-2-38 Location: 28 LEO ST Owner: Rayanne Morin,KEVIN MORIN Applicant: Rob Ross Constructing This structure may be occupied as a: Residential Addition 256 s.f. By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the n property owner of the responsibility for compliance with Site Plan, G•Z+nrr/ Variance,or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: RC-000718-2016 Tax Map No: 308.8-2-38 Permission is hereby granted to: Rayanne Morin,KEVIN MORIN For property located at: 28 LEO ST In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Rayanne Morin Single Family-Addition $20,000.00 Owner Address: 28 LEO ST Total Value $20,000.00 Queensbury,NY 12804 Contractor or Builders Name/Address Electrical Inspection Agency Plans&Specifications Residential Addition 256 s.f. $100.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Tuesday,October 31,2017 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiation date.) Dated at the Town o ueensb on 12016 SIGNED BY: GNNnnn��77i___"III���/// Ad *�1for the Town of Queensbury. Director of Building&Code Enforcement PRINCIPAL STRUCTURE APPLICATION Office Use Only Received Date: O 3— 16 Tax Map ID r ZUlb Permit No. — D Tax Map ID 30,4?, K- 2. -_35, permit Fee 4100 I d() Zone Rec Fee Historic Site _Yes _ No ---Site Plan# Subdivision Name Lot# Subdivision# Project Location J.Jj� L ap St G?,, ,,A,V TOWN BD.RESOLUTION 86-2013: $850 recreation fee for new dwelling units—single family,duplexes/two-family, multiple family,apartments, condominiums,townhouses,and/or manufactured &modular homes,but not mobile homes. This is in addition to the permit feels). Applicant Owner p awn e Pl `� G`=rirac: ; c vi Address — r S4, / Address �� ( 2p Or• Try e✓,S 1 1-k ,l Q t+ ec-s b� Phone/E-mail �l Phone/E-mail 7 Og Contact Person for Building&Codes Compliance: Aron Ras S Phone �L60 I'i OS TYPE OF CONSTRUCTION ✓Check all that apply New Addition Alteration 11 floor sf 2°d floor sf Total sf Height Single Family Two-Family Multi-Family (#of units Townhouse Business Office Retail-Mercantile Factory-Industrial Attached Garage (1, 2, 3, 4+) Other If commercial or industrial please indicate of business Town of Queensbury Building&Codes Principal Structure Application Revised September 2015 Proposed use of building or addition i✓e w K;Jt,uQvl Source of Heat(circle one) Oil Propane Solar Other Fireplace: Complete a separate application for Fuel Burning Appliances& Chimneys N Are there structures not shown on plot plan? /t/C7 Are there easements on the property? Site Information a. Dimensions or acreage of lot J > .3 b. Is this a corner lot? /✓o 11 c. Will the grade be changed as a result of construction _ Yes _ No d. Public water or Private well /2' 1; C_ e. Sewer or Private Septic System PPi JL+7 1 C value of all work to be performed (labor or materials) $ dI�OCXI� DECLARATION. 1. I acknowledge no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If work is not complete by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the application,plans and supporting materials are a true and complete statement/description of the work proposed,that all work will be performed in accordance with the NYS Building Codes,local building laws and ordinances,and in conformance with local zoning regulations 4. I acknowledge that prior to occupying the facilities proposed, I or my agents will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: // PRINT NAME: Il o��t �- N2,o.5 S i DATE: j Li- � ' I b SIGNATUREDATE: For office use only Operating Permit Issued: _Yes —No Occupancy Type Construction Classification Assembly Occupancy Limit Special Conditions Town of Queensbury Building&Codes Principal Structure Application Revised September 2015 RE check Software Version 4.6.3 Compliance Certificate Project Morin job Energy Code: 2015 IECC 308.8-2-38 RC-000718-2016 Location: Glens Falls, New York Construction Type: Single-family Morin, Rayanne & Kevin Project Type: Addition 28 Leo Street Climate Zone: 6 (7635 HDD) Permit Date: Residential Addition 256 s.f. Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 28 Leo Kevin&Rayeanne Morin Rob Ross Queensbury 28 Leo Rob Ross Contracting Queensbury 56 First st Glens Falls, NY 12801 518-743-9519 iCompliance: Passes using UA trade-off Compliance: 3.6%Better Than Code Maximum UA: 55 Your UA: 53 The%Better or Worse Than Code Index reflects how close to compliance the house Is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Assembly Gross Area Cavity Cont. U-Factor UA Perimeter Ceiling 1: Flat Ceiling or Scissor Truss 256 38.0 0.0 0.030 8 Wall 1:Wood Frame, 16"o.c. - 326 19.0 0.0 0.060 16 Window 1:Vinyl/Fiberglass Frame:Double Pane 4 0.350 1 Door 1:Solid 20 0.150 3 Door 2:Glass UU i ]. 7 LU ib 33 0.220 7 Crawl 1:Solid Concrete or Masonry 256 0.0 13.0 0.063 10 Wall height: 5.0' Depth below grade:4.0' Insulation depth: 3.0' Floor 1:All-Wood joistrrruss:Over Outside Air 256 30.0 0.0 0.033 8 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.3 and to comply with the mandatory requirements listed in the REScchheck Inspection Checklist. / I l�ib Rl`:�S ce. ii CC,( �.11(q CYntr ✓ /[:.�"t t ✓'/i'�O I L' �� ��6 Name-Title Signature Date Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 1 of 9 REScheck Software Version 4.6.3 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and -❑Complies 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the u� building envelope.Thermal ❑Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR3)1 lighting and mechanical systems. ❑Not Observable Systems serving multiple ❑Not Applicable 10 dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACOA Manual 5 based Btu/hr Btu/hr ❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: [-]Not Observable y1 Manual J or other methods Btu/hr Btu/hr approved by the code official ❑Not Applicable Additional Comments/Assumptions: 11 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 13 1 Low Impact(Tier 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 2 of 9 Section Plans Verified Field Verified # Foundation Inspection Req.ID Value Value Complies? Comments/Assumptions & 402.2.11 Unvented crawl space wall R- R- ❑Complies See the Envelope Assemblies [FO711 insulation 11-value. R- R- ❑Does Not table for values. ❑Not Observable ❑Not Applicable 303.2 Unvented crawl space wall ❑Complies [FOB]' insulation Installed per ❑Does Not c manufacturer's instructions. []Not Observable ❑Not Applicable 402.2.11 Unvented crawl space continuous ElComplies [F0911 vapor retarder installed over ❑Does Not exposed earth,joints overlapped ❑Not Observable by 6 in.and sealed,extending at least 6 in, up and attached to the ❑Not Applicable wall. 402.2.11 Unvented crawl space wall _in. _in. ❑Complies See the Envelope Assemblies [FO10]1 insulation depth of burial or ❑Does Not -table for values. ��. distance from top of wall. []Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies [F011]2 to protect exposed exterior El Does Not insulation and extends a ❑Not Observable minimum of 6 in. below grade. ❑Not Applicable 403.9 Snow-and ice-melting system ❑Complies [FO121' controls Installed. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) Low Impact(Tier 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 3 of 9 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Re .ID 402.1.1, Door U-factor. U-_ U-_ ❑Complies See the Envelope Assemblies 402.3.4 ❑Does Not table for values. [FR111 []Not Observable 8 ❑Not Applicable 402.1.1, Glazing U-factor(area-weighted U-_ U-_ ❑Complies see the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, ❑ 402.3.6, Not Observable 402.5 ❑Not Applicable [FR2]1 8 303.1.3 U-factors of fenestration products ❑Complies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or ❑Not Observable taken from the default table. ❑Not Applicable j 402.4.1.1 Air barrier and thermal barrier ❑Complies [FR23]1 installed per manufacturer's ❑Does Not 0 instructions. ❑Not Observable ❑Not Applicable 402.4.3 Fenestration that is not site built ❑Complies [FR2011 is listed and labeled as meeting ❑Does Not HAMA/WDMA/CSA 101/I.5.2/A440 or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies [FR16]' sealed at housinglnterior finish ❑Does Not and labeled to indicate s2.0 cfm ❑Not Observable leakage at 75 Pa. ❑Not Applicable 403.2.1 Supply and return ducts in attics ❑Complies [FR12]1 insulated>=R-8 where duct is []Does Not >=3 inches in diameter and >_ R-6 where<3 inches.Supply and ❑Not Observable return ducts in other portions of ❑Not Applicable the building insulated>=R-6 for diameter>=3 inches and R-4.2 for<3 Inches in diameter. 403.3.3.5 Building cavities are not used as ❑Complies [FR15]3 ducts or plenums. ❑Does Not ❑Not Observable ❑Not Applicable 403.4 HVAC piping conveying fluids R-_ R-_ ❑Complies [FR17]' above 105 QF or chilled fluids []Does Not below 55 9F are insulated to alk- - 3. []Not Observable ❑Not Applicable 403.4.1 Protection of Insulation on HVAC ❑Complies [FR24]1 piping. []Does Not 10 ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R-_ R-_ ❑Complies [FR18]2 all-3. ❑Does Not ❑Not Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR19]' Installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ❑Not Applicable 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 4 of 9 Additional Comments/Assumptions: 11 High Impact(Ter 1) 2 Medium Impact(Tier 2) 3{;:Low Impact(Tier 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 5 of 9 section Plans Verified Field Verified # Insulation Inspection value Value Complies? Comments/Assumptions &Re .ID 303.1 All installed insulation is labeled []Complies [IN1312 or the installed R-values []Does Not Jprovided. ❑Not Observable ❑Not Applicable 402.1.1, Floor insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN111 ❑ Steel ❑ Steel � []Not Observable ❑Not Applicable 303.2, Floor insulation installed per ❑Complies 402.2.7 manufacturer's instructions and ❑Does Not [IN211 in substantial contact with the ❑Not Observable y,, underside of the subfloor, or floor framing cavity Insulation is in ❑Not Applicable contact with the top side of sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value.If this is a R- R-_ ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least%of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN311 exterior,the exterior insulation 0 requirement applies(FR10). ❑ Steel ❑ Steel ❑Not Applicable 303.2 Wall insulation is installed per ❑Complies [IN411 manufacturer's instructions. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 11 High Impact Merl) 2 1 Medium Impact Mer 2) tg Low Impact(Tier 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 6 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Re .ID 402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies 402.2.1, Wood table for values. 402.2.2, ❑ ❑ Wood ❑Does Not 402.2.6 ❑ Steel L] Steel []Not Observable [Fill' ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ❑Does Not [F1211 Blown insulation marked every 300 ft'. ❑Not Observable ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies [F122]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that extends over insulation. ❑Not Observable ❑Not Applicable 402.2.4 Attic access hatch and door R-_ R-_ ❑Complies (FI311 Insulation ZR-value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50=_ ACH 50=_ ❑Complies [FI1711 ach in Climate Zones 1-2,and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cftn/100 ❑Complies [1714]1 cfm/100 ft2 across the system or ft' i ft2 ❑Does Not <=3 cfrn/100 ft2 without air ❑Not Observable handler @ 25 Pa.For rough-in tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F12711 determine air leakage with ft' ft' ❑Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 Inch ❑Not Applicable w.g. across the system Including the manufacturer's air handler enclosure If Installed at time of test.Postconstmction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies [F12411 by manufacturer at<=2%of ❑Does Not design air flow. []Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies [FI912 installed for control of primary ❑Does Not heating and cooling systems and ❑Not Observable initially set by manufacturer to code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies [F]10]2 on heat pumps. ❑Does Not ❑Not Observable ❑Not Applicable 403.5.1 Circulating service hot water ❑Complies [FI111' systems have automatic or ❑Does Not accessible manual controls. []Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 7 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Re .ID 403.6.1 All mechanical ventilation system ❑Complies [F125]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy ❑Not Observable and air flow limits. ❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies [FI26]2 through one-or two-pipe heating ❑Does Not systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor ❑Not Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies [F126]' have a circulation pump.The ❑Does Not system return pipe is a dedicated [-]Not Observable return pipe or a cold water supply ❑Not pipe.Gravity and thermos- Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy.Controls automatically tum off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies [FI29]2 comply with IEEE 515.1 or UL ❑Does Not 515. Controls automatically adjust the energy input to the ❑Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies [F130]2 have recirculation pumps that ❑Does Not pump water from a heated water ❑Not Observable supply pipe back to the heated water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system.Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 1049F. 403.5.4 Drain water heat recovery units ❑Complies (F131]2 tested in accordance with CSA ❑Does Not 855.1. Potable water-side ❑Not Observable pressure loss of drain water heat recovery units< 3 psi for ❑Not Applicable individual units connected to one or two showers.Potable water- side pressure loss of drain water heat recovery units<2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent ❑Complies [FI6]' fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. ❑Not Observable Does not apply to low-voltage lighting. ❑Not Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [F123]3 no continuous pilot light. ❑Does Not ❑Not Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 8 of 9 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Re .ID 401.3 Compliance certificate posted. ❑Complies [F17]2 ❑Does Not []Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [F118]3 mechanical and water heating ❑Does Not systems have been provided. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1 Low Impact(Ter 3) Project Title: Morin job Report date: 10/17/16 Data filename: C:\Users\owner\Documents\REScheck\morin job.rck Page 9 of 9 2015 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 19.00 Below-Grade Wall 13.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.35 Door 0.22 ,Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments