CC-000410-2017 TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building&Codes (518)761-8256
CERTIFICATE OF, OCCUPANCY
Permit Number: CC-000410-2017 Date Issued: Friday,June 29, 2018
This is to certify that work requested to be done as shown by Permit Number CC-000410-2017
has been completed.
i
'fax Map Number: 308.20-1-6
Location: 66 CAREY RD
Owner: Northeastern Power Systems
Applicant: JAG I,LLC
This structure may be occupied as a:Commercial Addition 11,400 s.f:
Northeast Power Systems Inc. By Order of Town Board
Cross Ref: Site Plan Review P-SP-43-2017 TOWN OF QUEENSBURY
Issuance of this Certificate of Occupancy DOES NOT relieve the
property owner of the responsibility for compliance with Site Plan, 4.,t1)
Variance,or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
i
TOWN OF QUEENSBURY
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
Community Development-Building&Codes (518)761-8256
BUILDING PERMIT
Permit Number: CC-000410-2017
Tax Map No: 308.20-1-6
Permission is hereby granted to: JAG I,LLC
For property located at: 66 CAREY RD
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance
Tvne of Construction
Owner Name: Northeastern Power Systems Factory-Industrial-Addition $700,000.00
Owner Address: 66 Carey RD Total Value $700,000.00
Queensbury,NY 12804
Contractor or Builder's Name/Address Electrical Inspection Agency
JAG 1,LLC
175 Broad ST,Suite 320
Glens Falls,NY 12801
Plans&Specifications
Commercial Addition 11,400 s.f.
Northeast Power Systems Inc.
Cross Ref. Site Plan Review P-SP-43-2017
$2,622.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Thursday,August 9,2018
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensb before the a 'ratio date.
Dated at the Town o Queens We August 9,2017
SIGNED BY: for the Town of Queensbury.
Director of Building&Code Enforcement
Office Use Only
lot
ADDITION/ALTERATION PERMITPermit#:
Q00
APPLICATION Permit dee: $ � 0
Town ofQccn.sbum _s _ ._.._.
742 Bay Road,Queensbury,NY 12804 JUL O pice#;I - �nyZ
P:518-761-8256 www.gueensbury.net 3 i�i
_ t
Project Location: 66 Carey road, Queensbury SOWN OF QUEENSB iRY
Tax Map ID #: 308.20-1-6 Subdivision Name:
CONTACT INFORMATION:
• Applicant:
Name(s): JAG I, LLC
Mailing Address, C/S/Z: 175 Broad Street, Suite 320 Glens Falls NY 12801
Cell Phone: ( ) 361-1254 Land Line: 812-0808
Email: tim@jaggroupllc.com
Primary Owner(s):
Name(s): Northeast Power Systems Inc.
Mailing Address, C/S/Z: 66 Carey road, Queensbury NY 12804
Cell Phone: Land Line: 792-4776
Email:
• Contractor(s):
Business Name: JAG I, LLC
Contact Name(s). Tim Barber .
Mailing Address, C/S/Z: 175 Broad Street, Suite 320 Glens Falls NY 12801
Cell Phone: ( ) 361-1254 Land Line: 812-0808
Email: tim@jaggroupllc.com
Architect(s)/Engineer(s):
Business Name: JAG I, LLC / Cotler Architecture
Contact Name(s): Tim Barber
Mailing Address, C/S/Z: 175 Broad Street, Suite 320 Glens Falls NY 12801
Cell Phone: ( _) 361-1254 Land Line: 812-0808
Email: tim@jaggrouplic.com
Contact Person for Building & Code Compliance: Tim Barber
Cell Phone: ( _) 361-1254 Land Line: �_) 812-0808
Email: tim@jaggroupllc.com
Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017
PROJECT INFORMATION:
TYPE: X Commercial Residential
WORK CLASS:
Single-Family _Two-Family _Multi-Family (#of units )
Townhouse X Business Office Retail
X Industrial/Warehouse Garage (#of cars ) _Other (describe )
ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE:
1st floor: 11400 1st floor:
2nd floor: 2nd floor:
3rd floor: 3rd floor:
41h floor: 4th floor:
Total square feet: 11400 Total square feet:
ADDITIONAL PROJECT INFORMATION:
1. Estimated Cost of Construction: $ 700,000
2. If Commercial project, what is the proposed use: Storage and office
3. Source of Heat (circle one): Gas Oil Propane Solar Other
Fireplaces need a separate Fuel Burning Appliances &Chimney Application
4. Are there any structures not shown on the plot plan? YES NO Explain:
5. Are there any easements on the property? YES NO
6. SITE INFORMATION:
a. What is the dimensions or cr of the parcel? 4.58 acres
b. Is this a corner lot? YES NO
c. Will the grade be changed as a res the construction? YES NO
d. What is the water source? PUBLIC PRIVATE WELL
e. Is the parcel on SEWER or a PRIVATE SEPTIC system? Septic
Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017
DECLARATION:
1. 1 acknowledge that no construction shall be commenced prior to issuance of a valid permit and will be
completed within a 12 month period.
2. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to
fees and department approval.
3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or
description of the work proposed, that all work will be performed in accordance with the NYS Building
Codes, local building laws and ordinances, and in conformance with local zoning regulations.
4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate
of occupancy.
5. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all
newly constructed facilities prior to issuance of a certificate of occupancy.
I have read and agree to the above:
PRINT NAME: Timothy F. Barber
SIGNATURE: 2 DATE: July 7, 2017
Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017
SEPTIC DISPOSAL PERMIT APPLICATION Office use Only
742 Bay Road,Queensbury,NY 12804
7nwn ofCjueensbun- q Permit#:
P:518-761-8256 www.gueensbury.net Q
Tax Map ID#: 308.20-1-6 Permit Fee:$ ; Invoice#:
Project Location: 66 Carey Road Queensbury Septic Variance? Yes No
Primary Owner(s) Northeast Power Systems Inc.
Mailing Address 66 Carey road, Queensbury NY 12804
Phone & Email 792-4776
Installer/Builder JAG I, LLC
Mailing Address 175 Broad Street, Suite 320 Glens Falls NY 12801
Phone & Email 812-0808 tim@jaggroupllc.com
Engineer ABD Engineers LLP
Mailing Address 411 Union Street Schenectady, NY 12305
Phone & Email 377-0315
Contact Person for Building&Code Compliance: Tim Barber Phone: 361-1254
RESIDENCE INFORMATION:
Year Built #of bedrooms X gallons per bedroom =total daily flow Garbage Grinder Yes No
1980 or older Installed? (circle one)
1981-1991 Spa or Hot Tub Yes No
Installed? (circle one)
1992-Present 255
PARCEL INFORMATION:
Topography X Flat Rolling Steep Slope %Slope
Soil Nature X Sand Loam Clay Other
Groundwater At what depth? greater than 9.5'
Bedrock/Impervious material At what depth? greater than 9.5'
Domestic Water Supply _XMunicipal _Well (if well,water supply from any septic system absorption is_ft.)
Percolation Test Rate:___I_per minute per inch (test to be completed by licensed engineer/architect)
PROPOSED SYSTEM FOR NEW CONSTRUCTION:
Tank size 11000 gallons (min. size 1,000 gallons, add 250 gallons for each garbage cylinder or spa/hot tub
System Absorption field with#2 stone Total length 184 ft.; Each Trench 46 ft. See drawings
Seepage Pit with #3 stone How many: ;Size:
Alternative System Bed or other type:
Holding Tank System Total required capacity? ;tank size ;#of tanks
NOTES: 1.Alarm system &associated electrical work must be inspected by a Town approved electrical inspection
agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved.
The installed system must match the septic layout on file—no exceptions.
Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material
representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I
have read the regulations and agree to abide by these and all r quirements of the Town of Queensbury Sanitary Sewage
Disposal Ordinance.
PRINT NAME: Timothy F. Barber DATE: 7/7/17
SIGNATURE: 2 DATE: 7/7/17
Town of Queensbury Building&Code Enforcement Revised February 2017
INSPECTION WORKSHEET (BINS-004436-2018)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000410-2017Case Module:Permit
Inspection Date:06/19/2018Inspection Status:Partial Pass
Inspector:John O'BrienInspection Type:Commercial Final Inspection
Job Address:66 CAREY RDParcel Number:308.20-1-6
Queensbury, NY 12804
Contact TypeCompany NameName
Granted PermissionJAG I, LLC,
ContractorJAG I, LLC,
ApplicantJAG I, LLC,
EngineerABD Engineers LLC,
ArchitectCotler Architecture,
Primary OwnerNortheastern Power Systems,
Checklist ItemPassedComments
Blower Door Test CertificationYES-Blower Door Test results from Stonehenge Associates.
Chimney / B Vent / Direct Vent LocationYES
Chimney Rain Cap InstalledYES
Plumbing Vent Through Roof/Roof completeYES
Ext Finish /Grade Complete/6 in 10ft or EquivalentYES
Doors 36 inch wLever Hand Panic Hardware, if reqYES
Exits At Grade Or Platform 36 (w) x 44 (l)YES
Gas Shut-off Exposed & Regulator (18) Above GradeYES
Floor Bathroom Watertight Other Floors OkayYES
Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES-Downspout on HW Tank Relief Valve
Gas Furnace Shut OffYES
HVAC Vent Terminal 10' from Lot Line & OpeningsYES
Firewalls, 2 Hr, 3 Hr / Fire Dampers / Fire DoorsYES-Add seals on fire door
Attic Access 30 x 20 x 30 (h)YES
H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsYES-Install Trap wrap on lav.
-Install mirror. Bottom of mirror 40― max from floor.
Handicapped Bath/Parking Lot SignageYES-Install Unisex Handicapped Sign at Bathroom.
-Install Handicapped Sign and no parking Sign at
designated location.
Low flow toilet 1.3 gal/flushing cycle -YES
showerhead/faucet
Universal Symbol of Access displayed - on all H/CYES-Install universal symbol in handicapped parking space.
signs
Final Electrical / Flex Gas Piping BondedYES
Site Plan Variance requiredNO
As-built Septic System Layout RequiredYES
Bldg Access All Sides 20ft Drivable SurfaceYES
Jun 19, 2018Page (3)
INSPECTION WORKSHEET (BINS-004436-2018)
Checklist ItemPassedComments
Engineer or Architect ApprovalYES-Provide a Final Approval Letter from Mike Hutsenpiller
signing off on the structural elements of the project.
-Provide a final reporter and certified septic system
as-built from the engineer.
-Provide a Final Approval Letter from the Architect
signing off on the project that the building was built in
accordance with the approved plans and specifications.
Special InspectionsYES-Submit all soil compaction, concrete testing, and
structural inspections from Construction Technologies.
Provide a Final Approval Letter from Construction
Technologies stating that all special inspection were
completed as per the approved plans.
-Provide an Air Balancing Report from Albany
Mechanical.
Jun 19, 2018Page (4)
INSPECTION WORKSHEET (BINS-004436-2018)
Checklist ItemPassedComments
OK to Issue Temporary C/ONO6/4/18 Final Inspection Not Approved
-Submit all soil compaction, concrete testing, and
structural inspections from Construction Technologies.
Provide a Final Approval Letter from Construction
Technologies stating that all special inspection were
completed as per the approved plans.
-Blower Door Test results from Stonehenge Associates.
-Provide an Air Balancing Report from Albany
Mechanical.
-Provide a Final Approval Letter from Mike Hutsenpiller
signing off on the structural elements of the project.
-Provide a final reporter and certified septic system
as-built from the engineer.
-Provide a Final Approval Letter from the Architect
signing off on the project that the building was built in
accordance with the approved plans and specifications.
-Install Unisex Handicapped Sign at Bathroom.
-Install Handicapped Sign and no parking Sign at
designated location.
-Install universal symbol in handicapped parking space.
-Install Trap wrap on lav.
-Install mirror. Bottom of mirror 40― max from floor.
-Complete all Fire Marshal’s Items
-Complete all site items as per approved site plan.
6/19/18 Final Inspection Not Approve
-Complete all site items as per approved site plan.
Jun 19, 2018Page (5)
INSPECTION WORKSHEET (BINS-004436-2018)
Checklist ItemPassedComments
OK to Issue C/ONO6/4/18 Final Inspection Not Approved
-Submit all soil compaction, concrete testing, and
structural inspections from Construction Technologies.
Provide a Final Approval Letter from Construction
Technologies stating that all special inspection were
completed as per the approved plans.
-Blower Door Test results from Stonehenge Associates.
-Provide an Air Balancing Report from Albany
Mechanical.
-Provide a Final Approval Letter from Mike Hutsenpiller
signing off on the structural elements of the project.
-Provide a final reporter and certified septic system
as-built from the engineer.
-Provide a Final Approval Letter from the Architect
signing off on the project that the building was built in
accordance with the approved plans and specifications.
-Install Unisex Handicapped Sign at Bathroom.
-Install Handicapped Sign and no parking Sign at
designated location.
-Install universal symbol in handicapped parking space.
-Install Trap wrap on lav.
-Install mirror. Bottom of mirror 40― max from floor.
-Complete all Fire Marshal’s Items
-Complete all site items as per approved site plan.
6/11/18 Final Inspection Not Approved
Remaining a Items:
-Provide a Final Approval Letter from Mike Hutsenpiller
signing off on the structural elements of the project.
-Provide a final reporter and certified septic system
as-built from the engineer.
-Complete all site items as per approved site plan.
6/19/18 Final Inspection Not Approve
-Complete all site items as per approved site plan.
O'Brien, John (Inspector)
Jun 19, 2018Page (6)
INSPECTION WORKSHEET (BINS-004083-2018)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:CC-000410-2017Case Module:Permit
Inspection Date:06/11/2018Inspection Status:Partial Pass
Inspector:John O'BrienInspection Type:Commercial Final Inspection
Job Address:66 CAREY RDParcel Number:308.20-1-6
Queensbury, NY 12804
Contact TypeCompany NameName
Architect\[Cotler Architecture\],
Contractor\[JAG I, LLC\],
Applicant\[JAG I, LLC\],
Engineer\[ABD Engineers LLC\],
Granted Permission\[JAG I, LLC\],
Primary Owner\[Northeastern Power Systems\],
Checklist ItemPassedComments
Blower Door Test CertificationYES-Blower Door Test results from Stonehenge Associates.
Chimney / B Vent / Direct Vent LocationYES
Chimney Rain Cap InstalledYES
Plumbing Vent Through Roof/Roof completeYES
Ext Finish /Grade Complete/6 in 10ft or EquivalentYES
Doors 36 inch wLever Hand Panic Hardware, if reqYES
Exits At Grade Or Platform 36 (w) x 44 (l)YES
Gas Shut-off Exposed & Regulator (18) Above GradeYES
Floor Bathroom Watertight Other Floors OkayYES
Relief Valve ,Heat Trap/Water Temp 110 deg or lessNO-Downspout on HW Tank Relief Valve
Gas Furnace Shut OffYES
HVAC Vent Terminal 10' from Lot Line & OpeningsYES
Firewalls, 2 Hr, 3 Hr / Fire Dampers / Fire DoorsNO-Add seals on fire door
Attic Access 30 x 20 x 30 (h)YES
H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsYES-Install Trap wrap on lav.
-Install mirror. Bottom of mirror 40? max from floor.
Handicapped Bath/Parking Lot SignageYES-Install Unisex Handicapped Sign at Bathroom.
-Install Handicapped Sign and no parking Sign at designated location.
Low flow toilet 1.3 gal/flushing cycle - showerhead/faucetYES
Universal Symbol of Access displayed - on all H/C signsYES-Install universal symbol in handicapped parking space.
Final Electrical / Flex Gas Piping BondedYES
Site Plan Variance requiredNO
As-built Septic System Layout RequiredNO
Bldg Access All Sides 20ft Drivable SurfaceYES
Jun 11, 2018Page (1)
INSPECTION WORKSHEET (BINS-004083-2018)
Checklist ItemPassedComments
Engineer or Architect ApprovalNO-Provide a Final Approval Letter from Mike Hutsenpiller signing off on
the structural elements of the project.
-Provide a final reporter and certified septic system as-built from the
engineer.
-Provide a Final Approval Letter from the Architect signing off on the
project that the building was built in accordance with the approved
plans and specifications.
Special InspectionsNO-Submit all soil compaction, concrete testing, and structural
inspections from Construction Technologies. Provide a Final Approval
Letter from Construction Technologies stating that all special
inspection were completed as per the approved plans.
-Provide an Air Balancing Report from Albany Mechanical.
OK to Issue Temporary C/ONO6/4/18 Final Inspection Not Approved
-Submit all soil compaction, concrete testing, and structural
inspections from Construction Technologies. Provide a Final Approval
Letter from Construction Technologies stating that all special
inspection were completed as per the approved plans.
-Blower Door Test results from Stonehenge Associates.
-Provide an Air Balancing Report from Albany Mechanical.
-Provide a Final Approval Letter from Mike Hutsenpiller signing off on
the structural elements of the project.
-Provide a final reporter and certified septic system as-built from the
engineer.
-Provide a Final Approval Letter from the Architect signing off on the
project that the building was built in accordance with the approved
plans and specifications.
-Install Unisex Handicapped Sign at Bathroom.
-Install Handicapped Sign and no parking Sign at designated location.
-Install universal symbol in handicapped parking space.
-Install Trap wrap on lav.
-Install mirror. Bottom of mirror 40? max from floor.
-Complete all Fire Marshal?s Items
-Complete all site items as per approved site plan.
Jun 11, 2018Page (2)
INSPECTION WORKSHEET (BINS-004083-2018)
Checklist ItemPassedComments
OK to Issue C/ONO6/4/18 Final Inspection Not Approved
-Submit all soil compaction, concrete testing, and structural
inspections from Construction Technologies. Provide a Final Approval
Letter from Construction Technologies stating that all special
inspection were completed as per the approved plans.
-Blower Door Test results from Stonehenge Associates.
-Provide an Air Balancing Report from Albany Mechanical.
-Provide a Final Approval Letter from Mike Hutsenpiller signing off on
the structural elements of the project.
-Provide a final reporter and certified septic system as-built from the
engineer.
-Provide a Final Approval Letter from the Architect signing off on the
project that the building was built in accordance with the approved
plans and specifications.
-Install Unisex Handicapped Sign at Bathroom.
-Install Handicapped Sign and no parking Sign at designated location.
-Install universal symbol in handicapped parking space.
-Install Trap wrap on lav.
-Install mirror. Bottom of mirror 40? max from floor.
-Complete all Fire Marshal?s Items
-Complete all site items as per approved site plan.
6/11/18 Final Inspection Not Approved
Remaining a Items:
-Provide a Final Approval Letter from Mike Hutsenpiller signing off on
the structural elements of the project.
-Provide a final reporter and certified septic system as-built from the
engineer.
-Complete all site items as per approved site plan.
O'Brien, John (Inspector)
Jun 11, 2018Page (3)
CO check Software Version 4.3.6.1
Envelope Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title:
Location: Glens Falls,New York
Climate Zone: 6a
Project Type: Addition
Construction Site: Owner/Agent: Designer/Contractor:
66 Carey Road NEP51 Geoff Rousseile
Queensbury,New York 12804 66 Carey Road Electric Concepts, LLC
Queensbury,New York 12804 P.O. Box 5473
Clifton Park,New York 12065
516-376-9586
ectic123@aol.com
Building Area Floor Area
1-Manufacturing Faeilij�:Nonresidential 11400
Envelope Assemblies
(a)Budget Ll-factors are used for software baseline calculations ONLY,and are not code requirements.
Envel..• • building •• be assigned to at least one . r
FILE COPY
308.20-1-6 CC-000410-2017 JUL 7 5 2037
Northeastern Power Systems
66 Carey Road -- REVISED PLANS
Comm. Addition 11, 400 s.f.
Project Title:, R� Report date: 07/19117
Data filenarne: Page I of 9
COMcheck Software Version 4.3.5.1
Interior Lighting Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title:
Project Type: Addition
ConstR,ction Site: Owner/Agent, Designer!Contractor.
66 Carey Road NEPSI Geoff Rousselle
Queensbury, New York 12804 66 Carey Road Electric Concepts, LLC
Queensbury,New York 12804 P.O.Box 5473
Clifton Park,New York 12065
518-376-9586
ecllc123@aol.com
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2
1-Mancufacturing/Warehouse(Manufacturing:Low Bay(<25ft.Floor to Ceiling Height)) 9000 1.19 10710
2-Office(Manufacturing:Low Bay(<25ft.Floor to Ceiling Height)) 2400 1.19 2856
Total Allowed Watts= 13566
Proposed Interior Lighting Power
A B C D E
Fixture ID: Description 1 Lamp/Wattage Per Lamp!Ballast Lamps/ I'1 of Fixture (C X D)
Fixture Fixture Watt.
1-,Minufagjuring1W.a ehpu .(Marlgf8 t ring Lbw 6a} (<25ft Floor to Ceiling Heiphtl)
LED:LED 1:Lithonia IBH24000LMS0080MD208OZ:Other: 2 "30 46 1380
2=C�fie(MnufactturingLQw Bay{<25ft Floor to Ceiling Height))
LED:LED 2:Lithonia 2RTL4 48 EZILP835:Other. 2 29 35 1015
Total Proposed Watts= 2395
Interior Lighting Compliance Statement
Cornpiiance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist,
Project Title Report date: 07/19/17
Data filename: Page 2 of 9
COMcheck Software Version 4.3,5.1
Exterior Lighting Compliance Certificate
Project Information
Energy Code: 20151ECC
Project Title:
Project Type: Addition
Exterior Lighting Zone 2(Light industrial area with limited nighttime use)
Construction Site: Owner,Agent: Designer/Contractor:
66 Carey Road NEP51 Geoff Rousselle
Queensbury,New York 12804 66 Carey Road Electric Concepts,LLC
Queensbury, New York 12804 P.O.Box 5473
Clifton Park,New York 12065
518-376-9556
ecllc123@aol.com
Allowed Exterior Lighting Power
A B C D E
Area/Surface Category Quantity Allowed Tradable Allowed Watts
Watts f Wattage (B X C)
Perimeter(Walkway<10 feet wide) 320 ft of 0.7 Yes 224
Total Tradable Watts(a)= 224
Total Allowed Watts= 224
Total Allowed Supplemental Watts(b)= 600
(a)Wattage tradeoffs are only allowed bemeen tradable areasfsurfaces.
(b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces.
Proposed Exterior Lighting Power
q B G D E
Fixture ID:Description i Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixture Watt.
Perimeter(Walkway<10 feet wide 320 ft of walkway length)'Tradable Wattage
LED:LED 3:Lithonia WST 2 1OA700/40K S:Other, 2 6 46 276
_ Total Tradable Proposed Watts 276
Exterior Lighting Compliance Statement
CornpJiance Statenfent: The proposed exterior lighting design represented in this document is consistent with the building pians,
specifications;and other calculations submitted with this permit application.The proposed exterior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Project Title: Report date: 07119!:17
Data filename: Page 3 of 9
iCQMcheck Software Version 4.3.5,1
Mechanical Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title:
Location: Glens Falls,New York
Climate Zone: 6a
Project Type, Addition
Construction Site: Owner/Agent: Designer/Contractor:
66 Carey Road NEPSI Geoff Rousselle
Queensbury, New York 12804 66 Carey Road Electric Concepts,LLC
Queensbury,New York 12804 P.O.Box 5473
Clifton Park,New York 12065
518-376-9586
eclic123@aol.com
Mechanical Systems List
Quantity System Type&description
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications,and other calculations submitted tivith this permit application,The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.3.5.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Project Title: Report date: 07119(17
Data filename: Page 4 of 9
COMcheck Software Version 4.0.2.8 ti ,
Mechanical Compliance CertificateN Z o
O J Or
N (L
CD E
Project Information O d W
N
Energy Code: 2014 New York Energy Conservation Construction Code
Project Title: NEPSI V
L
Location: Warren County, New York W3 � �
Climate Zone: 6a
Project Type: New Construction C Q
.�
Construction Site: Owner/Agent: DesignerlContractor. I d i a
66 CAREY RD, JAG I LLC ALban Mechanical Services Inc. N �
QUEENSBURY, NY 12804 175 Broad St 15 Albany Ave.
Glens Falls, NY 12801 Green Island,NY 12183 00 t U E
518-812-0808 518-273-5541 O O CD C
M Z (D
Additional Efficiency Package
Unspecified
Mechanical Systems List FILE COPY
Quantity System Type& Description
1 HVAC System 1 (Single Zone):
Heating:1 each-Central Furnace,Gas,Capacity=120000 kBtu/h
Proposed Efficiency=92.00%Et,Required Efficiency=80.00%Et
Cooling:1 each-Split System,Capacity=60000 kBtu/h,Air-Cooled Condenser,No Economizer,Economizer exception:High
Efficiency Equipment
Proposed Efficiency=13.00 EER,Required Efficiency=9.50 EER
Fan System: None
1 HVAC System 2(Unknown):
Heating:1 each-Unit Heater,Gas,Capacity=175000 kBtu/h
Proposed Efficiency=82.00%Ec, Required Efficiency=80.00%Ec
Fan System: None
Mechanical Compliance Statement
Compliance Statement. The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application.The propo d mechanical systems have been
designed to meet the 2014 New York Energy Conservati n onstruction C e requir e s in COMcheck Version 4,0.2.8 and to
comply with the mandatory requirements listed in the tion Checkli
'-
st. x
—Y
��
Name-Title at Dat
OF K'z
fC"
&. U.
AUG
C� 2011
n
Project Title: NEPSI Report date: 07/28/17
Data filename: C:\Users\Tom\Documents\JAG\nepsi\nepsi.cck Page 1 of 9
COMcheck Software Version .2.8
Inspection Checklist
Energy Code: 2014 New York Energy Conservation Construction Code
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
Plan Review -� Complies? � Comments/Assumptions
& Req.ID.L:_.
C103.2 Plans, specifications,and/or []Complies
[PR2)1 calculations provide all information ODoes Not
:with which compliance can be ONot Observable
determined for the mechanical
systems and equipment and ONot Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
:engineering standards and
! handbooks,
C406 Plans, specifications, and/or []Complies
(PR9)1 calculations provide all information []Does Not
with which compliance can be
;determined for the additional energy []Not Observable
efficiency package options. ONot Applicable
Additional Comments/Assumptions:
1 IHigh Impact(Tier i _.1,) 2 Med+um Impact(Tier 2) 3 low Impact(Tier 3)
_ l _ __.
Project Title: NEPSI Report date: 07128/17
Data filename: C:\Users\Tom\DocumentsvAG\nepsi\nepsi.cck Page 2 of 9
[-Section ,
# Footing/ Foundation Inspection I Complies? Comments/Assumptions
&Re,.i Q j
C403.2.4. Freeze protection and snowlice OComplies
5` melting system sensors for future ODoes Not
[F09}3 connection to controls.
ONot Observable
ONot Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1} �Niedium Impact(Ter 2) 3 'LowImpact(Tier 3)
Project Title: NEPSI Report date: 07/28/17
Data filename: C:\Users\Tom\DocumentsVAG\nepsi\nepsi.cck Page 3 of 9
Seetio>n
MechI nspe Rough-In Plan, Verified Field Verified Complies? Comments/Assumptions
& Req.IC? Inspection Value Value
C403.2.3 HVAC pment equiefficiency Efficiency. Efficiency: ❑Complies See the Mechanical Systems list
[ME55]2 verified. ❑Does Not for values.
❑Not Observable
------- '❑Not Applicable
C403.2.5. Demand control ventilation ❑Complies
1 provided for spaces >500 ft2 and ❑Does Not
[ME59]1 >25 people/1000ft2 occupant
density and served by systems ONot Observable
with air side economizer,auto 'ONot Applicable
modulating outside air damper
:control,or design airflow>3,000
cfm.
C403.2.7 ;HVAC ducts and plenums R- R- ❑Complies
[ME60]2 insulated.Where ducts or ❑Does Not
plenums are installed in or under
a slab,verification may need to ❑Not Observable
occur during Foundation ;❑Not Applicable
Inspection.
C403.2.8 :HVAC piping insulation thickness. in. p in. ❑Complies
(ME61]1 Where piping is installed in or ❑Does Not
under a slab,verification may ❑Not Observable
need to occur during Foundation '
Inspection. ❑Not Applicable
C403.2.8 'HVAC piping insulation thickness. : in. µ — in. ❑Complies
[ME61]2 Where piping is installed in or ❑Does Not
under a slab,verification may ;❑Not Observable
need to occur during Foundation i
Inspection, ONot Applicable f
C403.2.8 Thermally ineffective panel ❑Complies
(ME41]3 surfaces of sensible heating ❑Does Not
panels have insulation>=R-3.5. ❑Not Observable
__. ONot Applicable
C403.2.7 Ducts and plenums sealed based ❑Complies !
[ME10]2 on static pressure and location. ❑Does Not
ONot Observable
ONot Applicable
C403.2.7. Ductwork operating >3 in.water ❑Complies
1.3 column requires air leakage ❑Does Not
[ME11]3 testing.
ONot Observable
i ONot Applicable
C403.2.7. Ductwork operating >3 in.water ❑Complies
1.3 column requires air leakage ❑Does Not
[ME11]3 testing.
❑Not Observable
ONot Applicable
C403.3.1, Air economizers provided where ❑Complies
C403.3.1, required, meet the requirements ❑Does Not
1 for design capacity,control
[ME62]1 :signal,ventilation controls,high- ❑Not Observable
limit shut-off,integrated ONot Applicable
economizer control,and provide
a means to relieve excess
outside air during operation.
C408.2.2 Air outlets and zone terminal ❑Complies 3
1 devices have means for air ❑Does Not
(ME53]3 balancing.
If ❑Not Observable
❑Not Applicable
1High Impact{Tier 1} 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: NEPSI Report date: 07/28/17
Data filename: C:1Users\Tom\DocumentsUAG\nepsi\nepsi.cck Page 4 of 9
section
# Mechanical Rough in Pians Verified Field Verified Complies?
&_Re ID;
Inspection Value Value p Comments/Assumptions
q ____.._.---._
0403.4=2 :VAV fan motors>=5.0 hp to be VSD ❑ VSD �..- ❑Complies
[ME66]2 driven by variable speed drive, ❑ Vane axial ❑ Vane axial ODoes Not
have a vane-axial fan with fan fan []Not Observable
variable pitch blades,or have ❑ Other ❑ Other CJNot Applicable
controls to limit fan motor
demand.
__------ .._.-._._
0403.4.2 VAV fan motors>=5A hp to be VSD VSD OComplies
[ME6612 driven by variable speed drive, ❑ Vane axial ❑ Vane axial ❑Does Not
have a vane-axial fan with fan fan
variable pitch blades, or have ❑ Other ❑ Other ❑Not Observable
controls to limit fan motor ❑Not Applicable
demand.
C403.2.6 Exhaust air energy recovery on ',❑Complies-- __ �
(ME57]1 :systems meeting Table C403.2.6 ODoes Not
❑Not Observable i
❑Not Applicable '
�_.._._.. ..--_ _�_— � -. --_�.. _.__._.- ----_._ .._... _ ..____.-.__ _ _._..__._,._._ ..-.........-_..._- _
C403.2.11 Unenclosed spaces that are ❑Complies
(ME71]2 heated use only radiant heat. "ODoes Not
❑Not Observable
ONot Applicable
-._ .__.-.._._..___...............
C403.4.7 Hot gas bypass limited to: <=240 ❑Complies
(ME35]1 kBtu/h-50%>240 kBtu/h-25% ❑Does Not
❑Not Observable
[]Not Applicable
�C403.3.4 Sleeping rooms in Group R-1 ❑Complies
E[ME76]3 occupancies are provided with ❑Does Not
dedicated system to
automatically control HVAC ❑Not Observable
systems and energy consumption ❑Not Applicable
during unoccupied periods. I
Controls are designed to raise
cooling and lower heating
temperature set points by at
least 4°F when room is
unoccupied.
0403.3.4 Sleeping rooms in Group R-1 OComplies
[ME76]3 occupancies are provided with %❑poes Not
dedicated system to
automatically control HVAC j=1Not Observable
systems and energy consumption ❑Not Applicable
during unoccupied periods.
Controls are designed to raise
cooling and lower heating
3 temperature set points by at
least 4°F when room is
6_633.3
unoccupied.
All air-conditioning equipment ❑Complies
[ME77]3 and air-handling units with direct ❑Does Not
expansion cooling and a cooling
! capacity of at least 110 kBtu/h ❑Not Observable
have VAV supply fans.Supply fan ❑Not Applicable
controls are configured to reduce
the airflow to no more than the
larger of the following at cooling
demands no larger than 50%of
j the cooling capacity: 1.two-
thirds of the full fan speed,or 2.
the volume of outdoor air
required to meet ventilation
requirements.
1 High Impact(Tier i) 2 Medium Impact{Tier 2} 3 Low Impact(Tier 3)
Project Title: NEPSI Report date: 07/28/17
Data filename: C:\Users\Tom\Documents\AG\nepsi\nepsi.cck Page 5 of 9
Additional Comments/Assumptions:
1High Impact(Tier 1) ; 2 i Medium Impact(Tier 2^)'^ 3n Low Impact(Tier 3) „T^
Project Title: NEPSI Report date: 07/28/17
Data filename: C:\Users\Tom\Documents�AG\nepsi\nepsi.cck Page 6 of 9
Section _. ,,-____.,......_.I._r_,......
# Final Inspection Complies? Comments/Assumptions `
C. Reda€) -
IC403.2.4. Heating and cooling to each zone is OComplies
2 controlled by a thermostat control. ODoes Not
[FI47]3 Minimum one humidity control device
per installed ONot Observable
humidification/dehumidification ONot Applicable
I system.
1�C403.2.4 Heating and cooling to each zone is OComplies €
2 controlled by a thermostat control. Oboes Not
j[F!47]3 Minimum one humidity control device
per installed ONot Observable
humidification/dehumidification ONot Applicable
system.
C403.2.4. Thermostatic controls have a 5 OF OComplies
2 deadband. Oboes Not
(F138]3
ONot Observable
ONot Applicable
,C403.2.4. Temperature controls have setpoint OComplies
2 overlap restrictions. ODoes Not
[F120]3
,ONot Observable
,ONot Applicable
?C403.2.4, Each zone equipped with setback— --OComplies
3 controls using automatic time clock or 'ODoes Not
[F]39]3 programmable control system. ONot Observable'
:ONot Applicable
C403.2.4. Automatic Controls:Setback to 55°F OComplies
3 (heat)and 85°F (cool); 7-day clock, 2- ODoes Not
[F140]3 hour occupant override, 10-hour
backup ONot Observable I
ONot Applicable
_-_._-.__..___._.._.___
C408.2.5. Furnished HVAC as-built drawings OComplies
1 submitted within 90 days of system ODoes Not
[FI7]3 acceptance.
ONot Observable
ONot Applicable
C303.3,C4 Furnished O&M manuals for HVAC OComplies
08.2.5.2 systems within 90 days of system ODoes Not
[FI8]3 acceptance.
ONot Observable:
ONot Applicable
C408.2.5. An air and/or hydronic system OComplies
3 balancing report is provided for HVAC Oboes Not
�(F143]1 systems.
ONot Observable
ONot Applicable
0408.2.3. HVAC control systems have been OComplies
2 tested to ensure proper operation, `ODoes Not
[FI10]1 calibration and adjustment of controls.`ONot Observable
ONot Applicable
6403.2.2 HVAC and-and quipment 'OComplies
i[F127]3 capacity does not exceed calculated ODoes Not
loads. .ONot Observable
ONot Applicable
C408.2.1 iCommissioning plan developed by OComplies
[FI28]1 :registered design professional or ODoes Not
;approved agency.
[]Not Observable;
ONot Applicable
�1 'High Impact(TrerVl)T I `1Medium Impact(Tier 2)W� 3 Low Impact(Tier 3) -V
Project Title: NEPSI Report date: 07/28/17
Data filename: C:\Users\Tom\DocumentsVAG\nepsi\nepsi.cck Page 7 of 9
Section
--_�_-..___
# Final Inspection Complies? Comments/Assumptions
C408.2.4 :Preliminary commissioning report ❑Complies
[F129]1 completed and certified by registered ❑Does Not
design professional or approved Not Observable
agency. D
❑Not Applicable
C408.2.5. `Final commissioning report due to ❑Complies
4 :building owner within 90 days of ❑Does Not
[F130]1 'receipt of certificate of occupancy.
❑Not Observable
❑Not Applicable 1
C408.2.3. HVAC equipment has been tested to ❑Complies
1 ensure proper operation. ❑Does Not
[FI31]1
[]Not Observable
❑Not Applicable
C408.2.3. :Economizers have been tested to '❑Complies
3 ensure proper operation. ❑Does Not
[FI32]L ❑Not Observable
❑Not Applicable
C406 Efficient HVAC performance,efficient :❑Complies ��
[F134]1 ;lighting system, or on-site supply of ❑Does Not
renewable energy consistent with
what is shown the approved plans. ❑Not Observable
❑Not Applicable
Additional Comments/Assumptions: _
1 High Impact(Tier 1) 2 jMedium Impact(Tier 2) 3 ;Low Impact(Tier 3)
--—�,
Project Title: NEP51 Report date: 07/28/17
Data filename: C:\Users\Tom\DocumentsVAG\nepsi\nepsi.cck Page 8 of 9
Project Title: NEPSI Report date: 07/28/17
Data filename: C:\Users\Tom\DocumentsvAG\nepsi\nepsi.cck Page 9 of 9
• JAG I,LLC
175 Broad Street, Suite 320
Glens Falls,NY 12801
Phone(518) 812-0808
Fax(518) 812-0044
LETTER OF TRANSMITTAL
TO: Queensbury Code Enforcement FROM:Tim Barber
PROJECT NAME:NEPSI
ATT: John O'brien PROJECT NUMBER:1705
PAGE: 1 OF 1
DATE: August 3,2017
ENCIOSED PLEASE FIND THE FOLLOWING: (circled) PICK-UP
PRINTS BY MAIL
SPECIFICATIONS SAMPLES VIA FAX
SHOP DRAWINGS SUBMITTALS HAND DELIVERED
SEPIA/MYLAR OVERNIGHT MAIL
DRAWING NO. LATEST DATE QUANTITY DESCRIPTION
Set 8/2/17 2 Copies Revised permit drawings—Full set
N/A 7/19/17 2 Copies Signed and stamped lighting comcheck
N/A 7/28/17 2 Copies Signed and stamped mechanical comcheck
PLEASE EXPEDITE ACCORDINGLY
FOR APPROVAL X PER YOUR REQUEST FOR FILE
FOR CORRECTION FOR COORDINATION FOR INFORMATION
FOR ESTIMATING FOR FABRICATION FOR RECORD ONLY
Should contents of transmittal not be as described above,notify this office immediately. Otherwise,
We will assume that the transmittal and accompanying documents arrived intact.
REMARKS: COPIES TO: File
AUTHORIZED SIGNATURE DATE: August 3,2017
. . 0 . . . . . . . . . . . . 0 . . . . . . . .
Building:40x60
Date/Time:6/16/2017 1:03 PM EST Control#: P2017061F"--
Cust Quote Nbr: Project Calculations Project Name: Neps 308.20-1-6 CC-000410-2017
Northeastern Power Systems
66 Carey Road -- REVISED PLANS
This page covers the following frame lines: Comm. Addition 11 , 400 s.f.
1
GLOBAL X : POSITIVE INTO BUILDING (KIPS)
MAIN FRAME COLUMNS FSW IST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0 };z
Roof Live 0 0 0 0 0 !--
Roof Snow* 0 0 0 0 0
Wind to Right 0 0 0 0 025
Wind to Front 1 1 0 3 2 JUL 2011
Wind to Back -1 -1 0 -2 -2 ;
Seismic to Back 0 0 0 0 0 ���•�., ya ��st ae� ,'
Seismic to Front 0 0 0 0 0
GLOBAL Y : POSITIVE UPWARD (KIPS) _•...
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 1 2 0 2 1
Collateral Dead 1 2 0 2 1
Roof Live 2 6 0 6 2
Roof Snow* 4 12 0 12 5
Wind to Left -2 -4 0 -4 -2 FILE
tlL COPY
Wind to Right -2 -7 0 -7 -3 r
Wind to Front -3 -9 0 -9 -3
Wind to Back -3 -9 0 -9 -3
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW IST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 8.00 8.00 0.00 8.00 8.00
Base Plate Length 14.00 14.00 0.00 14.00 14.00
Anchor Bolt Quantity 4 4 0 4 4
Anchor Bolt Diameter 0.75 0.75 0.00 0.75 0.75
BRACING REACTIONS
BRACING CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 0 0 0 0
Wind to Back 0 0 0 0
Seismic to Front 0 0 0 0
Seismic to Back 0 0 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 0 +/- 0 0 0
Wind to Back +/- 0 +/- 0 0 0
Seismic to Front +/- 0 +/- 0 0 0
Seismic to Back +/- 0 +/- 0 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
Building:40x60 eQuote
Date/Time:6/16/2017 1:03 PM EST Control#: P201706161703
Cust Quote Nbr: Project Calculations Project Name:Nepsi Page:2
This page covers the following frame lines:
2
GLOBAL X : POSITIVE TO RIGHT (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 3 0 0 0 -3
Collateral Dead 3 0 0 0 -3
Roof Live 6 0 0 0 -6
Roof Snow* 20 0 0 0 -20
Wind to Left 3 0 0 0 9
Wind to Right -13 0 0 0 5
Wind to Front -5 0 0 0 4
Wind to Back -7 0 0 0 7
Seismic to Right -2 0 0 0 -2
Seismic to Left 2 0 0 0 2
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 4 0 0 0 5
Collateral Dead 5 0 0 0 5
Roof Live 10 0 0 0 11
Roof Snow* 35 0 0 0 37
Wind to Left -8 0 0 0 -12
Wind to Right -17 0 0 0 -13
Wind to Front -10 0 0 0 -10
Wind to Back -15 0 0 0 -16
Seismic to Right -1 0 0 0 1
Seismic to Left 1 0 0 0 -1
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW IST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Right 0 0 0 0 0
Seismic to Left 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 10.00 0.00 0.00 0.00 10.00
Base Plate Length 14.00 0.00 0.00 0.00 14.00
Anchor Bolt Quantity 4 0 0 0 4
Anchor Bolt Diameter 1.25 0.00 0.00 0.00 1.25
BRACING REACTIONS
BRACING CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 3 3 0 0
Wind to Back -3 -3 0 0
Seismic to Front 2 2 0 0
Seismic to Back -2 -2 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 4 +/- 6 0 0
Wind to Back +/- 4 +/- 6 0 0
Seismic to Front +/- 3 +/- 4 0 0
Seismic to Back +/- 3 +/- 4 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
Building:40x60 QUote
Date/Time:6/16/2017 1:03 PM EST Control#: P201706161703 E
Cust Quote Nbr: Project Calculations Project Name:Nepsi Page:3
This page covers the following frame lines:
3
GLOBAL X : POSITIVE INTO BUILDING (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 -1
Wind to Back 0 0 0 0 -1
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 1 2 0 2 1
Collateral Dead 1 2 0 2 1
Roof Live 2 6 0 6 2
Roof Snow* 4 11 0 11 4
Wind to Left -2 -4 0 -4 -2
Wind to Right -2 -7 0 -7 -3
Wind to Front -3 -9 0 -9 -3
Wind to Back -3 -9 0 -9 -3
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW IST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 8.00 8.00 0.00 8.00 8.00
Base Plate Length 14.00 14.00 0.00 14.00 14.00
Anchor Bolt Quantity 4 4 0 4 4
Anchor Bolt Diameter 0.75 0.75 0.00 0.75 0.75
BRACING REACTIONS
BRACING CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 3 3 0 0
Wind to Back -3 -3 0 0
Seismic to Front 2 2 0 0
Seismic to Back -2 -2 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 4 +/- 6 0 0
Wind to Back +/- 4 +/- 6 0 0
Seismic to Front +/- 3 +/- 4 0 0
Seismic to Back +/- 3 +/- 4 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supportinq building bracing reactions.
Endwall bracing is not included in these reactions.
Building:90x100 Quote
Date/Time:6/16/2017 1:03 PM EST Control#: P201706161703
Cust Quote Nbr: Project Calculations Project Name: Nepsi Page:4
This page covers the following frame lines:
1
GLOBAL X : POSITIVE INTO BUILDING (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 2 3 3 3 2
Wind to Back -1 -3 -3 -3 -1
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 1 3 2 3 1
Collateral Dead 1 2 2 2 1
Roof Live 3 7 5 7 3
Roof Snow* 5 19 9 19 5
Wind to Left -2 -5 -4 -9 -3
Wind to Right -3 -9 -5 -5 -2
Wind to Front -3 -9 -6 -9 -3
Wind to Back -3 -9 -6 -9 -3
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 8.00 8.00 10.00 8.00 8.00
Base Plate Length 14.00 14.00 15.00 14.00 14.00
Anchor Bolt Quantity 4 4 4 4 4
Anchor Bolt Diameter 0.75 0.75 0.75 0.75 0.75
BRACING REACTIONS
BRACING CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 0 0 0 0
Wind to Back 0 0 0 0
Seismic to Front 0 0 0 0
Seismic to Back 0 0 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 0 +/- 0 0 0
Wind to Back +/- 0 +/- 0 0 0
Seismic to Front +/- 0 +/- 0 0 0
Seismic to Back +/- 0 +/- 0 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
Building:90x100 +eQuote
Date/Time:6/16/2017 1:03 PM EST Control#: P201706161703
Cust Quote Nbr:Project Calculations Project Name:Nepsi Page:5
This page covers the following frame lines:
2,4
GLOBAL X : POSITIVE TO RIGHT (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 7 0 0 0 -7
Collateral Dead 7 0 0 0 -7
Roof Live 16 0 0 0 -16
Roof Snow* 54 0 0 0 -54
Wind to Left -15 0 0 0 21
Wind to Right -21 0 0 0 15
Wind to Front -18 0 0 0 17
Wind to Back -17 0 0 0 18
Seismic to Right -2 0 0 0 -2
Seismic to Left 2 0 0 0 2
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 8 0 0 0 8
Collateral Dead 7 0 0 0 7
Roof Live 15 0 0 0 15
Roof Snow* 52 0 0 0 52
Wind to Left -15 0 0 0 -21
Wind to Right -21 0 0 0 -15
Wind to Front -16 0 0 0 -20
Wind to Back -20 0 0 0 -16
Seismic to Right -1 0 0 0 1
Seismic to Left 1 0 0 0 -1
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Right 0 0 0 0 0
Seismic to Left 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW IST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 10.00 0.00 0.00 0.00 10.00
Base Plate Length 22.00 0.00 0.00 0.00 22.00
Anchor Bolt Quantity 8 0 0 0 8
Anchor Bolt Diameter 1.25 0.00 0.00 0.00 1.25
BRACING REACTIONS
BRACING CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 0 0 0 0
Wind to Back -8 -8 0 0
Seismic to Front 0 0 0 0
Seismic to Back -13 -13 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 6 +/- 6 0 0
Wind to Back +/- 6 +/- 6 0 0
Seismic to Front +/- 8 +/- 8 0 0
Seismic to Back +/- 8 +/- 8 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
Building:90x100 eQuott
Date/Time:6/16/2017 1:03 PM EST Control#: P201706161703
Cust Quote Nbr:Project Calculations Project Name:Nepsi Page:6
This page covers the following frame lines:
3
GLOBAL X : POSITIVE TO RIGHT (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 8 0 0 0 -8
Collateral Dead 7 0 0 0 -7
Roof Live 17 0 0 0 -17
Roof Snow* 59 0 0 0 -59
Wind to Left -17 0 0 0 23
Wind to Right -23 0 0 0 17
Wind to Front -19 0 0 0 18
Wind to Back -18 0 0 0 19
Seismic to Right -3 0 0 0 -3
Seismic to Left 3 0 0 0 3
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 9 0 0 0 9
Collateral Dead 7 0 0 0 7
Roof Live 17 0 0 0 17
Roof Snow* 58 0 0 0 58
Wind to Left -17 0 0 0 -23
Wind to Right -23 0 0 0 -17
Wind to Front -18 0 0 0 -22
Wind to Back -22 0 0 0 -18
Seismic to Right -1 0 0 0 1
Seismic to Left 1 0 0 0 -1
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Right 0 0 0 0 0
Seismic to Left 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW IST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 10.00 0.00 0.00 0.00 10.00
Base Plate Length 26.00 0.00 0.00 0.00 22.00
Anchor Bolt Quantity 10 0 0 0 8
Anchor Bolt Diameter 1.25 0.00 0.00 0.00 1.25
BRACING REACTIONS
BRACING CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 8 8 0 0
Wind to Back 0 0 0 0
Seismic to Front 13 13 0 0
Seismic to Back 0 0 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 6 +/- 6 0 0
Wind to Back +/- 6 +/- 6 0 0
Seismic to Front +/- 8 +/- 8 0 0
Seismic to Back +/- 8 +/- 8 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
Building:90x100 eQU ote
Date/Time:6/16/2017 1:03 PM EST Control#: P201706161703
Cust Quote Nbr: Project Calculations Project Name:Nepsi Page:7
This page covers the following frame lines:
5
GLOBAL X : POSITIVE INTO BUILDING (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Y : POSITIVE UPWARD (KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 1 2 2 2 1
Collateral Dead 1 2 1 2 1
Roof Live 3 5 4 5 3
Roof Snow* 6 12 11 12 6
Wind to Left -2 -4 -5 -7 -4
Wind to Right -4 -7 -5 -4 -2
Wind to Front -4 -7 -6 -7 -4
Wind to Back -4 -7 -6 -7 -4
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
GLOBAL Z : POSITIVE COUNTERCLOCKWISE (FT-KIPS)
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL TYP INT
INT. INT. INT. COLUMNS COLUMNS CORNER COLUMNS
Dead 0 0 0 0 0
Collateral Dead 0 0 0 0 0
Roof Live 0 0 0 0 0
Roof Snow* 0 0 0 0 0
Wind to Left 0 0 0 0 0
Wind to Right 0 0 0 0 0
Wind.to Front 0 0 0 0 0
Wind to Back 0 0 0 0 0
Seismic to Back 0 0 0 0 0
Seismic to Front 0 0 0 0 0
BASE PLATE AND ANCHOR BOLT INFORMATION
MAIN FRAME COLUMNS FSW 1ST TYP LAST BSW FSW WIND BSW WIND ENDWALL COLUMNS
INT. INT. INT. COLUMNS COLUMNS CORNER TYPICAL
Base Plate Width 8.00 8.00 10.00 8.00 8.00
Base Plate Length 14.00 14.00 15.00 14.00 14.00
Anchor Bolt Quantity 4 4 4 4 4
Anchor Bolt Diameter 0.75 0.75 0.75 0.75 0.75
BRACING REACTIONS
BRACING CONDITION: NUM OF BRACED BAYS: 0
(NOTE: BRACING GLOBAL X LOADS ARE PERPENDICULAR TO FRAME GLOBAL X LOADS)
(NOTE: FOR WALLS WITH AN X BRACING CONDITION,BRACING GLOBAL Y LOADS ARE ADDITIVE TO FRAME GLOBAL Y
GLOBAL X : POSITIVE TO RIGHT ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL.** LEFT COL. RIGHT COL.
Wind to Front 0 0 0 0
Wind to Back 0 0 0 0
Seismic to Front 0 0 0 0
Seismic to Back 0 0 0 0
GLOBAL Y : POSITIVE TO UPWARD ENDWALL INPLANE BRACING
LEFT COL. RIGHT COL. LEFT COL. RIGHT COL.
Wind to Front +/- 0 +/- 0 0 0
Wind to Back +/- 0 +/- 0 0 0
Seismic to Front +/- 0 +/- 0 0 0
Seismic to Back +/- 0 +/- 0 0 0
*(The Snow Reaction provided is the maximum of: Roof Snow, Unbalanced Snow, and User Override Snow.)
** The user must combine the lean to bracing reactions with supporting building bracing reactions.
Endwall bracing is not included in these reactions.
FIRE MARSHAL'S OFFICE
Town of Queensbury
742 Bay Road, Queensbury, NY 12804
" Home of Natural Beauty ... A Good Place to Live "
PLAN REVIEW
NEPSI
Carey Road
CC-000410-2017
7/12/2017 FILE COPY
9000sf addition warehouse
2500 sf office addition
The following comments are based on review of drawings:
• Verify fire extinguisher location
• CO detection required
• Verify operation of exit / Emergency lighting.
• Lock / latches shall comply with Chapter 10 of 2015 IBC.
• Verify paths of egress
• Verify storage
• Install Knox Box and main entrance for FD use
• Truss ID required at all ingress and egress points
• Complete fire alarm system submittals required including:
- Contractors license
- Complete system layout
- Spec. sheets for all equipment and appliances
- Central station monitoring
- FM witness inspection before CO
- NFPA 72 completion report
- NFPA 72 Inspection and Testing report
Fire Marshal 's Office - Phone: 518-761-8206 - Fax: 518-745-4437
firemarshal@queensbury.net - MM.queensbury.net
� f
Michae J Palmer
Fire Marshal
742 Bay Road
Queensbury NY 12804
firemarshal@queensbury.net
Fire Marshal 's Office • Phone: 518-761-8206 • Fax: 518-745-4437
-flrenmrshal@queensburj.net - 7VIV .queensbu�.net