Loading...
CC-000668-2017 AUK TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: CC-000668-2017 Date Issued: Tuesday, July 31, 2018 This is to certify that work requested to be done as shown by Permit Number CC-000668-2017 has been completed. Tax Map Number: 302.8-2-66.12 Location: 106 EVERTS AVE Owner: Don Scoville, Steve Scoville Applicant: Don Scoville This structure may be occupied as a: Self-Storage Facility,Building B 6300 By Order of Town Board TOWN OF QUEENSBURY Jssuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development-Building&Codes (518)761-8256 BUILDING PERMIT Permit Number: CC-000668-2017 Tax Map No: 302.8-2-66.1 Permission is hereby granted to: Everts Avenue Self Storage For property located at: 106 EVERTS AVE In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Tvne of Construction Owner Name: Don Scoville Business Office-New $350,000.00 Owner Address: Total Value $350,000.00 Contractor or Builder's Name/Address Electrical Inspection Agency McKenna Construction 19 Sisson RD Moreau,NY 12828 Plans&Specifications Self-Storage Facility,Building B 6300 s.f. $192.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Monday,November 5,2018 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of ueensb rid er 3,2017 SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement Dfiice Use 0ill�; Per alit'n: CC- �� •,1��� PRINCIPLE STRUCTURE PERMIT I � APPLICATION Permit Fee: $ 12 bl � 76ctiui of CLueensbun 742 Bay Road,Queerisbuiry,NY 12804 =pec gee: $ PO 518-761-8256 www.gueensbury.net !invoice#: DD1 c 'ic lob1 Project Location. 1� z Az' �Ny e' , &-1b(q .b 'tax Map I® #o 'fn2- Jb ' l..-�pko . I Subdivision Name, DOWN BD. RESOLUTION 66-2013: $850 recreation tee for new dwelling units: single family,duplexes/two-family, multiple family, apartments, condominiums, townhouses, and/or manufactured & modular homes, but not mobile homes. This Is In addition to the permit fee(s). CONTACT INFORMATION. ® Applicant Name(s): 3t"2-)�y avclk..) Mailing Address, C/S/Z: co "V%g UU,.��c , ky��lfio,,4 Ny Cell Phone: (t)le ) iQ- Land Line: Std ) 4 DQ2lQ0 Email: t)emv,)i5y-yi _ 15 � L5 � V L5 Primary Owner(s): D '- Name(s): FOCT 2 4 7111117 Mailing Address, C/S/Z: Cell Phone: Land Line: �_) i OWN OF QUEENSBURY Email: ® Contractor(s): Business Name: MC. ¢inY.q C6r-St-ruck;Q.►) " 6ccn'.va, -;Qv, LLC Contact Name(s): SV- ,wr, Wy t7y1y1, Mailing Address, C/S/Z: t oke Kd nD it 216 Cell Phone: ( 5►b tFb2'�- Land Lind: S► ) b�- Email: L-bAr" y-, Cal .�Q- ,ciD w, ® Architect(s)/Engineer(s): Business Name: Contact Name(s): Mailing Address, C/S/Z: �tcxA �i�,., Cell Phone: Land Line: 6o0 ) 35b - 352A Email: Contact Person for Building & Code Compliance: "�)bn sc50-V1lk-, Cell Phone: ( '.,) It b • 2\�jg Land Line: 5\ ) �4S - 1t4 S Email: d► Sc-Dy Town of Queensbury Building&Code Enforcement Principle Structure Application Revised February 2017 PROJECT INFORMATION: TYPE: Commercial X id I WORK CLASS: ^Single-Family Two-Family ____Multi-Family(#of ) Townhouse Business Office _Retail —HoteUMotel Industrial/Warehouse Garage(#of cars _} X Other(describe SELF-STORAGE j STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1sT floor:_12,6 0 SF �b 1sT floor: 21 floor: �- 2"d floor: 31 floor: Total square feet: 40 floor: Total square feet: -2,6W SF 1 30 6 S r ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: 5 35o,oo } 2. Proposed use of the building: SELF STORAGE FACILITY 3. If Commercial or Industrial,indicate the name of the business: 'Ever�s ��e►,.+L2 Se� S'tarAge 4. Source of Neat (circle one): Gas Oil Propane Solar Other: Ek'Ar IC� (Fireplaces need a separate Fuel Suming Appliances&Chimney Application,one per appliance) 5. Are there any structures not shown on the plot plan? YES NO xplain: b. Are there any easements on the property? YES NO (F.TL ac e�Lt–�.r�i� 6 • r r Qo55 /131.F> 7. SITE INFORMATION: a.What is the dimensions or acreage of the parcel? 3.26 b. Is this a corner lot? YES ptof c.Will the grade be changed as a resuthe construction? YES NO d.What is the water source? PUBLIC PRIVATE WELL N/A e. Is the parcel on SEWER or a PRIVATE SEPTIC system? N/A Town of Queensbury DAft&code Enforcement Principle SWcture Appf-adon Revised February 2017 DECLARATION: I. I acknowledge that no construction shall commence prior to issuance of a valid b u i I ding per rnit and work will be completed within a 12 month period. 2. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: W , scoy SIGNATURE: DATE: Town of Queensbury Building&Code Enforcement Principle Structure Application Revised February 2017 Trachte BuRdi.ng Systems, Inc. Project Calculations Per 2015 International Building Code with 2016 New York Supplement IBS D � �Mfg OCT 14 2017 Steve Scoville TOWN qF QUEENSBURY Queensbury, NY BUIE.DING& CODES TBS Plan Number: P-44124 July 28, 2017 Table of Contents Building A-9'4"eave Pages A1-A8 Buildings A&B—8'-4"eave Pages B 1-B8 Prepared BY OF Njy Michael L.Prochaska �� �,�� n Reviewed_By F Q 084269 Matthew D. FESS 1 '� "- 01 eidner Ok 7.08.30 09:10:22-05'00' 302.8-2-66.1 CC-000668-2017 Everts Avenue Self Storage 106 Everts Avenue, Building B New Comm. Unheated 6300 s.f. TRACHTE BUILDING SYSTEMS, INC. PROJECT CALCULATIONS CUSTOMER="SL-ie Scoville' PREPARED BY='Michael L Prochaska' LOCATION:='Queerbury,NY' REVIEWED_BY PLAN_NUMBER='P44124' BUILDING:='A_94'eave' CODEBODY= '2015 IBC with 2016 New York Supplement' BUfLDING DESCRIPTDN BAY WIDT H bay=10ft PURLIN BRIDGING v •,o• ROOF PITCH Rte =0.25 in BUILDING HEIGHT Int:=90+4in ROOF MATERIAL Roof:='$SR• ft - BUILDING WIDTH wk 30ft PURLIN SPACING Pw,,:=511 ROOF ANGLE g= 1.19.* BUILDING LENGTH lerio:=21011 INT.PARTITION PALL Ptpa,d:='yes ROOF TYPE Type 'Lean-to' FLOOR TO FLOOR kAw:=011 INT.LATERAL BRIDGING B6*:='no' RISK CATEGORY UseGroup-'I• Use's or"A' FOUNDATION SLOPE Fri:=0% S"LOAD SEISMIC LOAD GROUND SNOW LOAD Po ANALYSIS PROCEDURE EQUIVALENT LITERAL FORCE SNOW EXPOSURE CATEGORY Ear,, BUILDING FRAME SYSTEM BFS=light Frame Wall w!Shear Panels' SNOW IMPORTANCE FACTOR IS=0.8 SEISMIC SITE CUSS Skdws='D• THERMAL FACTOR G'=1.2 SHORT PERIODSPECTIAL ACC. SS:%--0.234 SNOW EXPOSURE Exp:='Partar 1 SECOND PERIOD SPECTRAL ACC. Si0.081 ROOF LIVE LG1AD 4:_2w FLAT ROOF SNOW LOAD Pr=40.psf SPECTRAL RESPONSE ACC. SDS=0.2.5 UNBALANCE SNOW LOAD Purbawxw=40•psf SPECTRAL RESPONCE ACC. SDI =0.13 SNOW LOAD USED N DESIGN PS=40-psi RESPONSE FATOR Response=6.5 RAN SURCHARGE RainStx targe=O.psf SEISMIC DESIGN CATEGORY QAC=•B' WIND LOAD SEISM IC RESPONSE COFFICIENT Cs=0.04 WIND VELOCITY V := 105no Vaad=81-mph WIND EXPOSURE CATEGORY E w='C' EDGE STRIP WIDTH a=3ft DEAD LOAD COMPONENTS AND CLADDING 2t ROOF DEAD L0AD OR= 2'psf ENDWALL GRT FEG=251psf PARTITION DEAD LOAD DP—3•psf S[DEWALL GIRT FSG=24•psf ADDITIONAL LONG.DEAD LOAD DL_0-0 PURLIN Fpm_—23•psf ADDITIONAL TRANS,DEAD LOAD D—4q MAIN VAND FORCE Method$ BASE SH LONGUMNAL TRANSVERSE WALL (Suc tim and Pressme) Fw= 17.%psf SBSMIC VL= 19%R) VT,=93 lb ROOF FR=B.Psf WIND VLW= 1505 lb VT,=631 Fo P44124a_94em.m,scd Al 728/2017 ' A_ MCHOR NFORMATION EDGE DISTANCE EdgeDistanoe:=3 CONCRETE STRENGTH Concrete:=2500 (�N:_ .65 Table 2-ESR-2525 4)V,,:=.6 Tale 3-ESR-2526 (OVc:_ .65 Table 3-ESR-2526 dl,-.375;-0.375n k.5:=0.5n nominal anchor dameter(table i ESR 2526) bei 375:= 1.425m f*.5is= 1.652in tsar.e_3s:=2.502kh effective embecinent(tabie 2 ESR 2526) Car.375:=3•25in Cao.&2S=3in Gac_.5_3.5 4in critical edge distance(table 1 ESR 2525) *M:= 1.0 nodficgen factor for cra ckW and u►crafced concrete(tabet 2 ESR 2526) kc:=17 effectiveness factor forcradced con aete(table 2 ESR 2526) NP:=04 characteristic putout strength,cracked concrete(table 2 ESR 2526) le 375= 1.426iin le 5_15 1.652in Ie-.5-3.5:=2.502n khad bearing length of andor(table 3 ESR 2526) Nm .315:=10.3kip Nw 5=16.86dp steel 9rergh in tension(table 2 ESR 2526) Vsa 315 4•825kip Vsa S:=7.981ap steel drergA in shea(table 3 ESR 2526) Corner Anchor n,:= 1 numberofboasatcolu n rat c:=2.75in dstance between boles from edge 2 slc=0n dstance between toles along edge 1 2.75i n dstance of bots fan edge 1 32 c:=pn dstarce between bots along edge 2 eNc:=an dstance from resultant tendon load to centrad of anchors in tension ev c:=pin ci stance from sulfant shear toad b centroid of andhors in shear F3ctedor An&oo ne:=2 number of bots at coksm Case:=2.75in dstance between bolls torn edge 2 Ste:=an dstance between bolts along edge 1 c,2_,:= 100in dstance of bots Iran edge 1 S2-e:=5m dstance between bots along edge 2 eNe:-pn dstance from resultant tendon load to centroid of andors in tension e„_e:=Oin dstance from sultant sheaf load b astroid of arnctm in sheer It�for Andror 1 number of bots at column qa1 ;=100in dnstance between bots from edge 2 St i:=an dstance between bots*M edge 1 CQ i:_ 100in distance of bots from edge 1 s2-j:-an dstance between bots along edge 2 eN i:=pk, dstance from resultant tension load b centroid of anchors in tension e r i an distance from sutant sfhearload to centroid of andors in shear P44124a 8'4eave.xmcd A2 7128/2017 � h P� ap AMQB EQRCE aUMMARY SHEAR UPLI WIND/LONGITUDINAL I INTERIOR V„j=81b N,j=242 lb WIND/LONGITUDINAL/EXTERIOR Vw=721b Nw= 155 lb WIND/TRANSVERSE/INTERIOR V,*-42 lb N„t= 175 lb WIND I TRANSVERSE/EXTERIOR Vw=2101b Nw=284 lb SESMIC/LONGITUDINAL IINTERIOR Vd=591b Nd=—781b S8SMIC/LONGITUDINAL/EXTERIOR Vse=59 lb Nw=441b SEISMIC/TRANSVERSE/INTERIOR Va= 12 lb N8_—244 lb SOSMIC/TRANSVERSE IEXTERIOR Vs=59 lb Nse,=—67 lb ULTIMATE 4QAg6 FOR AN04M Tension(Interim) Tension(Exterior) Shear(Interim) Shear(E)terior? Tension]=940.831b TerxWi =2247.7811b Sheol=940.83 ib Shearx=2247.78 lb Bott Intaraiction C wKk Applied Lipli t/Tension+Applied Sheer/Sheer<12 LongiAdirial Transverse Inl eriorAnchors Wind Anchori„r=027 V" AndvL,t=0.23 Siesmic And"L l=0.06 Sbsmic AnchorL t=0.01 6deriorAnchors Wind Anchor,o=0,101 Wind Andsore,w=0.22 Siesmc Anchors A=0.06 Siesnic Andior$a=0.03 CortnerArd s V1hd Androrc w=0.13 VVirxi Andxxr,„s=0.13 Sissmic Andxx� =0 Siesrnic Androrc =0 LENGTH OF ANCHOR Interior Lergtly=`2-W Exletior Lerlgllxx='2 5rrr' DWAETBR OF ANC NOR Irtmb Diameter}='3/8 in' Exterior Dia neWx='318 in' P44124a_9'4eave-*nW A3 7/28!2017 S ' PANEL CHECK PANEL CAPACITY Val= 53-pff LONGITUDINAL SHEAR PANEL REQUIRED PanelL =36.95ft LONGITUDNAL.SHEAR PANEL Park =210ft TRANSVERSE SHEAR PANEL REQUIRED PaaLegyT= 11.9 ft TRANSVERSE SHEAR PANEL Pane{T=30ft LONGITUDNALSHEAR WALL Pam ='ce OF PANEL.CHECK IS'01C NO STRAP BRACES REQUIRED FOR LATERAL FORCE RESISTNG SYSTEM BUT STRAPS TRANSVERSE SHEAR WALL �T='ak' MAY BE REQUIRED FOR ANCHORING) STRAP BRACES OF REQUIRED) LONGITUDNAL StapsL =0 TRANSVERSE SttapsT=0 Allowable Tension in Shap Ta=2470.061b GAUGE OF STRAP GV=16 STRAP WIDTH ws=2-in La*udrd SUpAn* Brace=43.034eg TranswrseftapAngle Braoe,,*T=43.03H* UxVh curial Tension an Strap T :—�Pwwcl,� or,0, magVL,,VL„���"„/�T T�=00 Transverse Tension on �VTs,VT�r) Strap TT=�PxielChedT='ok',0, a�eT TT=Oib COMPRESSION MEMBER V,, V,. OR OR -- V,, V7„ height uP1ift T roce rc erbN V 1 i Brace boy P,� pdote:C.ornpression member to be desigied seperatelr,see acickional calaiatiorr>. Compression memeber needed only when Strapsr>0) P44124a W4eave.wncd A4 712812017 INPUT VALUES PURLIN BRIDGING SPACING PA gpape=B0 DEPTH OF PURLIN webp:=7 HE IGHT OF HORIZONTAL BRACINGBridgei-IeigM=4.98 ft JAMB SUPPORT StubPostd:='no' WIDTH OF INTERIOR COLUMN weed:=3.5 CORNER COWMN UNBRACED LENGTH(y& Coram=3.32 It SDE WALL COLUMN webs:=3.5 ComwWumbersw x 2 SDEWALL GIRT webG:=webs Girt miber:=1 END WALL COWMN webE 3.5 ColumnNw bwEw:=2 ENDWALL GRT webGE:=webE EGA :=1 END CLOSET COLUMN(JAMB) LEMIC EYPC=3.5 Cok»wNurnber 1 (Use egm 3.5 or 55 br rie widti d Sloe Wal, END CLOSET COLUMN(HDR) webEc:-3.5 CakmnNumberE-C:= 1 End Wal or End Clwet Cohmns) STUB POST HEADER(L) wetH:-9 5.5',9'.10'or l? MembetsHL= 1 STUB POST HEADER(S) webHs:=5.5 5.5',9';10`or 17 t = 1 LOAD COIIBtMATIO LCI =D+MAX(S Lr) EQUATION 16-10 LC2=D+MAX(.75S,75Lr) EQUATION 16-11 LC3=D+MAX(.6W..7E) EQUATION 16.12 LC4=D+..45W+MA)q.75S,75L.r) EQUATION 16-13 LC5=D+..525E+.75S EQUATION 16-14 LC6=.6D+MAX(.6W,.7E) EQUATION 16.15 EQUATION 16-16 P'URLN IWOMT1ON PURLIN LOADS UNIFORM LOAo END REACTION MOMENT Lcl wp„*, =2120 Rp jnj = 1058 Ib MPurld =2645 b•ft LC4 wwrwrl = 1800 RRd 4=8981b Mp,w=22451b•ft LC6 wp,"=--62•pff Rp w_—311 lb Mp,,"= —7781b.ft LC6 wa*&=45-0 Rpdn6w= —3691b RK4,6,p=—321 b Mpk_—1054 lb-ft PURLIN MemberpR=7 x 16g%50ksi Cee Pullin' WpR=0.879 L,,pR= 118.5•b Lm = 118.5-m LFR= 118.Sin LyPR_M= 1185 in Lfg_.M= 118.5 STUB POST HEADEW STUB POST HEADER LOADS RBa-nQ.N LC1 RH, = 1058 th MH, =5290 lb-ft LC4 RHt-8981b MHw=4491 b•ft LC5 RHS=—311 b Lim=—1555 lb-ft MEMBER SIZES INTERACTIQN VNGm STUB POST HEADERS McMberH='9 x 3.2 x 14ga 50 ksi Stub Header' WH=0.915 Hewed e<gth= 10 ft STUB POST HEAD92 BRACING L.xH= 120-in LyH= 12" LIH= 120-in SMALL STUB POST HEADERS MemberHs= '5.5 x 3.2 x 18ga 33 ksi Stub Headee IIH,.,S-0.902 SHU ngth=5ft SMALL STUB POST HEADER BRACING LxHs=60-in LyHS=Win LtHs=60-in P44124a_9'4eave.xmW A5 7!28/2017 INTERIOR COLUMNS INTER cf%M LOADS g.�_.L�Ao MOMENT LCI P11 =2116 b M11 =0 LC3 PM= 3801b MG=0 LC4 P14 = 1872 Ib My=232.43 b.ft (Moment due to 5 psf horizontal load) LC5 P15= 1699 Ib M15=232.43 b•ft MEbMR SIZE IWERACTION INTERIOR COLUMN Member,=`3.63 x 2 x 16ga,50 ksi hWior Coksm' lntl=0.901 INTERIOR COLUMN BRACING bx = 113-in Lys- 12-in L>!= 113-in JAMS4 JAMB LOADS A) l l4 Q 1�Q MOMENT LC1 P,ayt = 1058 b NA LC3 P jw y =2881b M jw p = 185lb•ft LC3 Pim= 1521b NA LC4 Pjsm=984 b MjWiD4= 139lb-ft LC5 P,w,=882 lb NA JAMB UNIFORM LOAD sw*,= 132•pft wEwj a=75-pif JAMB APPLIED MOMENT JambMoment= 185b EWJambMoment= 105b4 JAMB AXIAL LOAD P,r,1 = 10581b JAMB MOMENT CAPACITY *W y w=971 b•ft JAMB AXIAL CAPACITY P =56''31 Ib JAMB CHECK JambChe&='0k' EWJambChe&='0k' MEMBER SIZE END WALL HEADER MOMENT CAPACT lY EWhw4w,m mft=2972 lb-ft ENDWALL HEADERAPPLIED MOMENT Eygfeder =2545b-ft LARGE END WALL HEADER CHECK EWheader che(*16=*16in_EW Header O.K.' EWheader_d*ck22= '22b_EW Header O.K.' SIDE WALL CQ�I f�llS SIDE WALL LOADS SDE WALL MOMENT LCI PSW1 = 1058 b M,w=0lt)-ft LC3 PSW3=2881b LC4 Pym=9841b MEMBER S17ES INTEMOON SDE WALL COLUMN Membersw_'3.63 x 1.5 x 18ga 33 ksi Coksm' Intsw=0.393 SDE WALL COLUMN BRACING Lx;= 12Wn Lys=40-in LIS=40-in P44124a 9'4eaw.xmod A6 7/28/2017 END WAL.LCMMNS END WALL LOADS A)W LO UNIFORM LOAD ANT LC1 PEW1 = 1058 b NA NA LC3 PEYY3 =288b wEy3=""PIf MEW= 652 lb-ft LC4 PEM -984 b wEW4=39-pff MEW4 =489 b•ft MEMBER SIZES INTaAC-TI2N END WALL COLUMN MemberEW='3.63 x 1.5 x 169a 50 ksi CoMxm' 'ntEW=0.569 END WALL COLUMN BRACING LxE= 113-In LYE= 45-in LtE=45-in GIRTS GIRT LOADS UNIFORM LOAD E ID BUMION MQMENT SIDE WALL GRT IN MIDZONE wGS=48"Pft R(jS=241 lb MGS=602b-ft SIDE WALL GRT IN END ZONE wGs,_57'pff RGSe= 285 b M(je 714 bft GRT IN MIDZONE wGE_56'Pff RGE=2821b MGE= 176lb•ft GRT IN END ZONE wGEe=68-PK RGEe=341 b MCr,=213 bft MEMBER SIZES INTERACTION SIDE WALL GRT(M I)) Merrbwm='3.5 x 1.75 x 16ga 50 ksi GRA' Irda=0.560 END WALL GIRT(END) MerrberGE_'3.5 x 1.75 x 18ga 33 ksi Girl' h#GE=0.316 SIDE WALL GRT BRACING LxG=119-in LyG= 12-in Lt.= 119-io END WALL GIRT BRACING UGE= 594n LyGE= 12-in LtGE=59-in END CLOSET MA1M END t Lpgj LOADS LOAD OIFORMIOAD MOMENT LC1 PECI = 1458 Ib NA NA LC3 PEC3=2881b wEc3=75•plf MEC3=51b•ft LC4 PErA=984 lb wEC4=56•pff MEC4=4lb•ft MEMBER SIZES INTERACTION END CLOSET ABOVE HEADER MemtwE-c='3.63 x 16 x 18ga 33 ksi Colrxm' kkc=0.332 END CLOSET BEHND JAMB MernberEwC='3.63 x 1.5 x 18go 33 ksi C umn' WVEM-0.382 END CLOSET ABOVE HEADER BRACING LxEC=gin LyEC-Sin LIEC=9-in END CLOSET BEHIND JAMB BRACING LxE-113-in LyE=45-in LtE=45-in NUMBER OF COLUMNS USED FOR BVD WALL CLOSETS CdWrfNW bKEWC= 1 KMI ER SIZES INTERACTION END CLOSET ABOVE HEADER Member ft_ '3.63 x 1.5 x 189a 33 ksi Cdwm' Int'k=0.000 P44124a 9'4eave.xmcd A7 7/2812017 DS' STUD SPACING ung= 16-in STUDLOADS UNIFORMLOAD CANT SDE WALL STUD IN MIO ZONE wsw=21.0 Msw=255YO-ft SDE WALL STUD IN ENDZONE wswd,,= 25•pif M = 313lb•ft MEMBER SIZES INTERACTION SIDE WALL STUD Member$w_'3.625 x 2 x 20ga 33 ksl Stud Irdsw=0-543 SIDE WALL STUB BRACING Lxsw=120-m Lysw=40-in Ltsw-40-in FOUNDATION INFORW4TION INTERIOR COLUMN REACTIONS GRAVITY Pdw t*,j, =2116 lb UPLIFT P„P iM=3171b EXTERIOR COLUMN REACTIONS GRAVITY Pte,,aery= 1058 Ib UPLIFT Pw w=321{b ALLOWABLE BEARING PRESSURE Bearkiftssm= 1500•psf SLAB THICKNESS Slab=5.5-in PAD WIDTH Pack_'na'-in PAD DEPTH P,*= 'na'•in P44124a 8'4eave.xmcd A8 712812017 TRACHTE BUILDING SYSTEMS, INC. PROJECT CALCULATIONS CUSTOMER := 'Steve Scoville' PREPARED—BY ='Michael L.Prod►aska' LOCATION := 'Queensbury,NY' REVIEWED_BY PLAN—NUMBER := "P44124' BUILDING :_ 'A&B_8'-4'eave' CODEBODY ='2015 IBC with 2016 New York Supplement' BUILDING DESMPT1011 BAYWIDTH bay:= 10ft PURLIN BRIDGING PBrid9fng;= *no' ROOF PITCH R� ;= 0� BUILDING HEIGHT h R' := 8ft +4in ROOF MATERIAL Roo(;=•SS BULDING WIDTH wig-= 30ft PURLIN SPACING p :_ 5ft ROOF ANGLE 6 =1.19 ft BULDING LENGTH 6n0:= 21Cft INT.PARTITION PANEL yes. ROOF TYPE Type:_ 'Lean-to" FLOOR TO FLOOR law - Oft INT.LATERAL BRIDGING Brklge:= 'no' RISK CATEGORY useGrow= .r Use'f orl' FOUNDATION SLOPE F ime= 0% MANLOAD semp LOAD GROUND SNOW LOAD PQ := ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE SNOW EXPOSURE CATEGORY Em := .0 BUILDING FRAM SYSTEM BFS ='Light Frame Wall w/Shear Panels' SNOW IMPORTANCE FACTOR IS=0.8 SEISMIC SITE CLASS Sbdass- 'D' THERMAL FACTOR Cj 1.2 SNRT PERIOD SPECTIAL ACC. SS= 0.234 SNOW EXPOSURE Exp := 'Partin' 1 SECOND PERIOD SPECTRAL ACC. S, =0.061 ROOF LIVE LOAD 4 _ 200 FLAT ROOF SNOW LOAD Pf =40-psf SPECTRAL RESPONSE ACC. SOS=0.25 UNBALANCE SNOW LOAD p =40-pd SPECTRAL RESPONCE ACC. SD1 =0.13 SNOW LOAD USED N DESIGN PS=40-pS# RESPONSE FATOR Response=6.5 RAN SURCHARGE RainSumharge=&pst SEISMIC DESIGN CATEGORY Seisr*w-•g• WIND LOAD SEISMIC RESPONSE COFFICIENT Cs =0.04 WIND VELOCITY V,*:= 105mph V,d=81-mph WIND EXPOSURE CATEGORY E."='C' EDGE STRIP WIDTH a=3 ft DEAD LOAD CQM MENTS AND CLADDING I'k#*d 2L ROOF DEAD LOAD DR=2-psf ENDWALL GRT FEG=25.psf PARTITION DEAD LOAD D'=10 SDEWALL GIRT FSG=24-pd ADDITIONAL LONG.DEAD LOAD DL=01W PURLIN Fp.%=—23.ps( ADDITIONAL TRANS,DEAD LOAD Dr=&W I#AM VAND FORCCElWKW SASE SH ENt LSO"MI)IM TwWSVER9 WALL (Suom and Pressure) Fw= 171%psf SBSM IC VL,= 1958 b V7s=93 ib ROOF FR=8-Pd WIND VL,,,= 1349 b VT,=5631b P44124ab 8.4eave.xrnod 61 7/2&2017 ANC90R WORIAATION EDGE DISTANCE EdgeDistarce:—3 CONCRETE STRENGTH Concrete:=2500 (ON:= .65 Table 2-ESR-2526 oOVs:= .6 Table 3-ESR-2526 Oc:_ .65 Table 3-ESR-2526 4,_.375:=0.375in do :=0.5in nominal anchor diameter(table 1 ESR 2528) het.375 1.42fiin hef 52.5= 1.652n t6 3.5:=2.5021n effective embedment(table 2 ESR 2526) cac_375:=3.25in ca4.525:=3in cac.5_3.5:=4in critical edge distance(table 1 ESR 2526) vw:=1.0 modifcaton factor for cracW and uncraked concrete(tabel 2 ESR 2526) kc:=17 effectiveness factor forcracked concrete(table 2 ESR 2526) Np:=Okip characteristic pukM strength,cracked concrete(table 2 ESR 25M 6-,375:= 1.426'm le-.5-2z:=1.6521n 4 S 3.5:=2.50n load bearing length of anchor (table 3 ESR 2526) 1`�,_37S= 10.3idp NW—5 =16AIp steel M"h in tension(table 2 ESR 2526) Vsa 375:=4.825 Vsa_.5:=7•9Wp sleet strergh in shear(table 3 ESR 2526) Cow Anchor nc 1 number of bolts at cokrnn cat_c 2.75m distance between bolls tom edge 2 st c:=Oin distance between bots along edge 1 cat c:=2.75in distance of boas tam edge 1 s2_c:=Olin distance between bolls along edge 2 kc:=Oin dsWm from resukaot tension load b centroid of anchors in tension eir_c-(fin distance from sutant shear load b centroid of anchors in shear odor Anchor %:=2 number of bolls at collum cal-e:=2.75in distance between bolls tom edge 2 site (lin distance between bolts along edge 1 cat a:= 105rn distance of bolts from edge 1 s2_e=5rn distance between bolts along edge 2 ka:=Oin distance from msukant tension load to centroid of and*rs in tension k,:=Oin distance from ufttshearload b centroid of anchors in shear Iriberior Mawr r; 1 number of bolls at column ca1_i:=100in distance between bots iom edge 2 st_i Oin distance between bolts Song edge 1 %2_i:=1001n distance of bolts tom edge 1 s2_i:=Oin distance between boles along edge 2 ew;=Dn distance from resultant tension load b centroid of anchors in tension ki:=Gin distance from suttant shear load to centroid of anchors in shear l4124ab V4eave.xrnod B2 7/28/2017 ? py1 ANCHOR FORCE SLWRY SHEAR UPLIFT WIND LONGITUDINAL1INTERIOR Vi1=71b Nd=2291b WIND 1 LONGITUDINAL/EXTERIOR V,,.,=64 b N.0= 141 lb WIND/TRANSVERSE/INTERIOR V,,,a=38 ib N„t=175lb WIND/TRANSVERSE I EXTERIOR V,,t= 188 b N,.=244 b SBSMC I LONGITUDINA L I INTERDR V j=59b Ns_-961b SEISMIC/LONGITUDINAL I EXTERIOR Vw= 591b N�d=26 lb SEISMIC/TRANSVERSE/INTERIOR Vsg= 12b Na_-244 ib SEISMIC ITRANSVERSE/EXTERIOR Vo=59 lb No_-731b ULTIMATE LOADS FOR ANC1 ICN S Tension prderM Tension(EAerior) Shear(Interior) Shear(E.*fiDr) Tmoor i=940.83 lb TensionX=2247.78Ib Shear,=940.83 b ShearX=2247.78 lb Bolt IMerat*m Check Appied Uplift i Tension+Applied Shear I Shear<12 L Vilu&w Transverse ktmiorArtchors Wild Aneho Lw=025 Void Andwi*=0.23 Simric Anchor;g=0.06 Siesmic Andar;g=0.01 EderiorAnchom Wind Anda�*-0.091 VVhd Anchor,,..=0.19 Siew4c ke"eAe=0.04 Siewric kd",_,=0.03 CormerAnchors Wind An&a,w=0.13 Vend Anchor,,t=0.13 Siewn c Andwc d=0 Siesadc Andxx,, a=0 LENGTH OF ANCHOR Irterior Lmoi-'26W Omerior L&V%= -L5!n' DW&-TER OF ANCHOR Interior Diameter,_`318 b' Exterior DiarneWX-'318 in' P44124ab 8'4esw.xrncd 83 7128/2017 PANEL CHECK PANEL CAPACITY Val=53•pIf LONGITUDINAL SHEAR PANEL REQUIRED PaWLen^ =36,95ft LONGITUDNALSHEAR PANEL Paned= 210ft TRANSVERSE SHEAR PANEL REQUIRED Pyr= 10.63ft TRANSVERSE SHEAR PANEL ParrelT=30 ft LONGITUDINAL SHEAR WALL Ply =•ck' OF PANEL CHECK IS'OIC NO STRAP BRACES REQUIRED TRANSVERSE SHEAR WALL Pwe#C�T= .ok. FOR LATERAL FORCE RESIST ING SYSTEM BUT STRAPS MAY BE REQUIRED FOR ANCHORING} JTRAP BRACES IIF RBQUIREDI LONGITUDINAL &rdpsL = 0 TRANSVERSE stqwr=0 AlbwaWe Tension in Shap Ta=2470.06 b GAUGE OF STRAP Gage= 16 STRAP WIDTH w$=2.b L°^9bdnal SSM* Brace =39.81-deg Tran nemeS'hWAn* BraceovIeT=39.81-deg . ,,/ Longftudnal Tension on Mw(VL.,VL.,) 7L=On) Trame + meTensw on Shap TT:= T='ok',0, max(VTa,VT.) 8taoe�T TT=0 b. COMPRESSION V4 VT, M EMBER OR — OR V,, VT, height Uplift I/T rocer -rte. V I I Bro bayP.P,,. (Note:Compression member to be desoied sepera6*see add o—d calculations. Compression memeber needed oriy when StraM >09 P44124ab gaeWe.xmca Ea 7i2SM1 7 INR1T VALUES PURUN BRIDGING SPACING PimmBridge3pwe=60 DEPTH OF PURLN webp:=7 HEIGHT OF HORIZONTAL BRACING ieight=4.46 ft JAMB SUPPORT StubPoslJ:='no' WIDTH OF INTERIOR COLUMN webs:=3.5 CORNER COLUMN UNBRAC ED LENGTH(y 6 9 Cbram=2.99 ft SIDE WALL COLUMN webs:=3.5 CdumnNumberSW=2 SDEWALL GIRT webG=webs Gi ftn bw. I END WALL COLUMN webE=3.5 CofumoNumberEW=2 ENDWALL GRT webGE webE EGirtNtxnber=1 END CLOSET COLUMN(JAMB) webF:=3.5 ColurmNurnber = 1 (Use either 3.5 or 5.5 bf he widh d Side Wag, END CLOSET COLUMN(IDR) webuc:=3.5 Cokx mNumberEc= i End Wag orEnd ClosetCokmns) STUB POST HEADER(L) webH:=9 5.5',9',10'or 17 Mem:= 1 STUB POST HEADER(S) webHS=5.5 W.9',10'or17 MembersHs:=1 LOAD COMBIKA.TIONS LC1 =D+MAX(S,L1 EQUATION 16.10 LC2=D+MAX(.75S,.75Lr) EQUATION 16-11 LC3=D+MAX(.6K.7E) EQUATION 16-12 LC4=D+..45W+".75S,.75L4 EQUATION 16-13 LC5=D+..525E+.75S EQUATION 16-14 LC6=.6D+MAX(.6W,.7E) EQUATION 16-15 EQUATION 16.16 Pum PURLIN LOADS UNIFORM LOAD ENDREACTION mm 1� LCI wp, ml =2129tf Rp„f„1 = 1058 b MRxii i1 = 26451)-ft LC4 Wp,,,*A = 1" Plkdm -898 b Mp,64 =2245 b-ft LC6 wo,"=-620 Rft" -—311 ib Mpu,,6_—778 bA LC6 wp„,,6,=— -pff Rpwktw=—369b Rp wk b=—321 Ib MM,6._—1064 lb-ft PURUN MemberpR=`7 x 16ga,50ksi Cee Fortin- kdm=0.879 L„pR= 118.54n LM= 118.54n LFR= 118.5in LypR 1By= 118.5in Lipp „v= 118.5-in STUB POST HEADERS STUB POST HEADER REACTION MOMENT LCI Rm = 1058 b MH1 = 5290Ib-ft LC4 RH4= 8981b MHµ-4491 lb-ft LC5 RH6=—311 Ib MW=—155516-ft MEMBER SIZES INTERACTIONEBF THH STUB POST HEADERS MemberH='9 x 32 x 14ga 50 ksi Stub Header W44=0.915 HeaderLergth= 10 ft STUB POST HEADER BRACING LxH= 1Min LyH= Min UH= 120�b SMALL STUB POST HEADERS Memberm='5.5 x 32 x 189a 33 ksi Stub Header WNS=0.902 SHLength - 5 ft SMALL STUB POST HEADER BRACING IxHs=60-in LyHS=60-in LtHg=60-in P44124ab 8'4eaw xrncd B5 7/28/2017 - INi1�R COLUMNS INTERIOR COLUMN LOADS AXIAL MOMENT LC4 Pm = 2116 lb M11 =0 LC3 Pq= 3721b Mp=0 LC4 PN= 1816 b Ma= 188.091b-ft (MDment due to 5 psf horimntaf load] LC5 N= 1692 ib Mj5= 188.09lb-ft MEMBER SIZES INTERACTION INTERIOR COLUMN Mmtw,='3.63 x 2 x 169x,50 ksi InUxIor Cok m' Iny=0.751 INTERIOR COLUMN BRACING Lx,= 101-in Lyi= 12-in L. = 101-in JAUN JAMB LOSS AXIAL LOAD MQMENT LC1 PJllbl= 1058 lb NA LC3 PU,,p3,=264 b M jwW,= 154 b•ft LC3 PU,63b= 1431b NA LC4 P jw&=966 b M,biriiM= 116ft)-ft L` Pjw w=8751b NA JAMB UNIFORM LOAD swo„b= 133•ptf wEyymb= 76-plf JAMB APPLIED MOMENT JambMonwd= 154 b-ft EWJarrbMomed=881b-ft JAMB AXIAL LOAD PD1 =1058 b JAMB MOMENT CAPACITY Wwrftw=971 b-ft JAMB AXIAL CAPACITY Po„w=5691 Ib JAMB CHECK JarrbCheck='oK EWJant)Check='ok' MEMBER SIZES END WALL HEADER MOMENT CAPACTIY EWheaderm,B0*=2922 lb-ft END WALL HEADERAPP'LIEDMOMENT EWhederm,,,tw= 2645 Ib-ft LARGE END WALL HEADER CHECK EWImder dwxkl6='I6in_EW Header 0.K' EWheader -`22in_EW Header O.K' SIDE WALL COLUMNS SDE WAIL LOADS AXIAL SIDE WALL MOMENT LCI PSM = 10581b Msw=Ob•ft LC3 PSW3= 264b LC4 PSW4=9661b MEMBER SIZES INTERA-00N SDE WALL COLUMN Membersw='3.63 x 1.5 x 18ga 33 ksi Coham' Irby„=0.366 SDE WALL COLUMN BRACING Lxs- 1013-in LyS=36-in LIS=36-in P44124ab 8'4ewexncd 86 7/28!2017 " ENMD Wl Att COLUMNS END WALL LOADS AXIAL LOAD UNIFORM LOAD MOMENT LCI PEW1 = 1058 m NA NA LC3 PEW3= 264 0) wm=53-p1f MEQ=5281b-ft LC4 PEW4=966lb wEW4=39-P1f MEM=39616-ft MEMBER SIZES INTERACTION END WALL COLUMN MwiwEw= '3.63 x 1.5 x 189a 33 ksi Cokxm' IntEw=0.838 END WALL COLUMN BRACING LxE= 101-in LyE=41-in UE=41-in GRTS GRT LOAM U FQRIM__L0AD END RI;AC7)DN MOMENT SDE WALL GRT IN MID ZONE wGS=44•pif RGS=2181b MGS=5461b•ft SDE WALL GRT IN END ZONE wGs,_52'pff RGse=2606 MG%=649bft GRT IN MIDZONE wGE=52•pff RGE=258 lb MGE= 161 ib-ft GRT IN END ZONE WGEe=p pff RGEe=314lb MGEe= 1961b-ft !MEMBER SIZES INTERACTION SIDE WALL GRT(M D) MemberGS='3.5 x 1.75 x 18ga 33 ksi Gkf IntGS=0.961 END WALL GIRT(END) MemberGE='3.5 x 1.75 x 18ga 33 ksi Girt' WGE=0.290 SDE WALL GRT BRACING LxG= 119-in LyG= 124n LIG= 1194n END WALL GIRT BRACING Lxm=59-in LyGE= 124n LIGE=59-in ENDCLOSET COWIN END CLOSET LQADS AXIAL,LQAD UNIFORM LOAD MOMENT LCI PECI= 1058` ib NA NA LC3 PEM=264 lb WEC3=75•Pif MEW=5t�-ft LC4 PEG=9661b wEcA=56-pd MECA=41b-ft K M@ER SIZES INTERACTION END CLOSET ABOVE HEADER MemberEC='3.63 x 1.5 x 189a 33 ksi Cokrmn' krIL-C=0.332 END CLOSET BEHIND JAMB MemberEwC='3.63 x 1.5 x 18ga 33 ksi Cdurrm' WEWC=0.361 END CLOSET ABOVE HEADER BRACING Lyr-c=Sin LyEC= gin UEC=gin ENDCLOSET BEHIND JAMB BRACING LxE= 101-in LyE=41-in UE=41-in NUMBER OF COLUMNS USED FOR END WALL CLOSETS Cok mNumberEWC= I MEMBER SIZES IbMCTION END CLOSET ABOVE HEADER Mernberg,='3.63 x 1.5 x 18ga 33 ksi Column' Int&=0.000 P44124ae &4eaW.xmod B7 7128/2017 $ STUDSPACING StuC>pacin9=16-in STUD LOADS UNIFORM LQAD MOMENT SIDE WALL STUD IN MID ZONE wsw_21-Pft Msw=208b-ft SIDE WALL STUD IN END ZONE wsmde=251)tf M%*= 256 b•ft !ui WER SIZES INTERACTION SIDE WALL STUD Members_'3.625 x 2 x 20ga 33 ksi She WSW=0.444 SIDE WALL STUB BRACING USW= 108-in Ly$w=36-in USW=36-in FOUNDATION INFORMATION INTERIOR COLUMN REACTIONS GRAVITY Pdm,tab,=2116b UPLIFT Pup it=304b EXTERIOR COLUMN REACTIONS GRAVITY Pte„o*ft= 1058 b UPLIFT P pct=281 b ALLOWABLE BEARING PRESSURE Bexkgftmn- 1500•psf SLAB THICMESS Slab= 5,5-in PAD WIDTH Ply=•r•.b PAD DEPTH Pad[)='na'•in P44124eb 8'48wm.xmcd B8 7282017 cc-00C 66%- zz THE Special SOIL COMPACTION TEST REPORT Inspector, LLC .otry anu special Inspections PROJECT: Scoville INSPECTION CATEGORY: Soils/Fill MATERIAL TYPE: Slab subgrade fill PROJECT#: 347 FIELD TECHNICIAN: DWR DATE TESTED: 11/8/2017 REPORT NUMBER: 347-E1 WEATHER: DESCRIPTION OF TESTING SERVICES/COMMENTS Subgrade compaction tested for fill below slabs SAMPLE ID: SA#1 TESTING STANDARDS. ASTM D1556/D4944 MAX. DRY DENSITY: 126.4 DENSITY STANDARD: ASTM D1557 MOD PROCT Test Number Location Description %Compaction of Max. Dry Recommendation Density 1 Area of Slab A 95.9 2 Area of Slab A 96.2 3 Area of Slab B 95.1 4 Area of Slab B 97.3 Comments 1. Compaction testing conducted for slab subgrade fill 2. Compaction accomplished with multiple passes of 10-ton roller 3. r THE Special MOISTURE-DENSITY Inspector, LLC RELATIONSHIP TEST REPORT PROJECT: Scoville Self Storage INSPECTION CATEGORY: Soils/Fill SAMPLE LOCATION: Center of Slab PROJECT#: 347 DATE SAMPLED: 11/7/2017 DATE TESTED: 11/7/2017 LAB TECHNICIAN: DWR REPORT NUMBER: 347-DEN1 SUPPLIER: Friedman Bank Run Sand MATERIAL USE: Mat Slab Subgrade/Fill DESCRIPTION OF TESTING SERVICES/COMMENTS Sand fill tested for maximum dry density for use in compaction testing SAMPLE ID: SA#1 DENSITY STANDARD: ASTM D1557-MOD PROCT MAX.DRY DENSITY: 126.4 OPTIMUM MOISTURE: 10.4% MOISTURE - DENSITY CURVE PLOT 126.5 126.0 125.5 V a z 125.0 0 o 124.5 124.0 123.5 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 %MOISTURE Comments 1. 2. 3. THE Special SIEVE ANALYSIS TEST REPOIT" ' Inspector, LLC L�nsiructiori nesting incl Special Inspections PROJECT: Scoville INSPECTION CATEGORY: Soils/Fill SAMPLE LOCATION: Sand Fill PROJECT#: 347 DATE SAMPLED: 11/7/2017 DATE TESTED: 11/7/2017 FIELD TECHNICIAN: DWR REPORT NUMBER: 347-SA#1 SUPPLIER: N/A MATERIAL USE: Subgrade Fill DESCRIPTION OF TESTING SERVICES/COMMENTS Sample of fill subgrade during placement SAMPLE ID: SA#1 TESTING STANDARD: ASTM C136 Sieve Size % Passing 2" 100.0 1 1/2" ill 96.6 3/4" 93.6 5/8" 1/2" 87.0 3/8" 83.8 No. 4 79.3 No. 8 75.2 No. 10 No. 16 72.0 No. 30 65.8 No. 40 57.2 No. 50 39.9 No. 100 17.4 No. 200 11.0 Minus 200 Comments: 1. 2. 3. CONSTRUCTION TECHNOLOGY 4 William Street,Ballston Lake,New York 12019 Phone:(518)399-1848 Fax:(518)399-1913 CLIENT: EVERTS AVENUE SELF STORAGE REPORT NUMBER: 1 PAGE#: 1 106 EVERTS AVENUE INSPECTION DATE: 11/09/17 QUEENSBURY,NEW YORK 12804 OUR FILE NUMBER: 129.000 INSPECTOR&TEST SET: BOB BEHAN #6 ATT'N: MR.DON SCOVILLE AMBIENT WEATHER: 20's:CLEAR PROJECT: EVERTS AVENUE SELF STORAGE:QUEENSBURY,NEW YORK OUR FILE LOCATION: 179031 CONCRETE FIELD INSPECTION & COMPRESSION TEST RESULTS PLACEMENT LOCATION OF LOAD# 1 : BUILDING B:SLAB ON GRADE:PROCEEDING EAST-WEST PLACEMENT LOCATION OF LOAD# 2: BUILDING B:SLAB ON GRADE:PROCEEDING EAST-WEST PLACEMENT LOCATION OF LOAD# 3: BUILDING B:SLAB ON GRADE:PROCEEDING EAST-WEST DELIVERED LOAD NUMBER: 1 2 3 TRUCK NUMBER/TICKET NUMBER: 4905/ 823443 4598 / 823444 4585 / 823445 YARDAGE DELIVERED/SUBTOTAL: 11.00/ 11.00 11.00 / 22.00 11.00 / 33.00 TIME CONIC. BATCHED/ARRIVED: 7.01/ 7.13 7.10 / 7.25 7.40 / 7.50 TIME PLACEMENT BEGAN/ENDED: 7.20/ 7.31 7.28 / 7.43 7.52 / 8.02 CONCRETE AGE(HOURS) (SPEC: MAX: 1.50) 0.50 0.55 0.37 SLUMP ON ARRIVAL (INCHES) 6.00 5.75 5.75 WATER ADDED ONSITE(GALLONS): WATER ADDED AT DISCRETION OF: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: PLACEMENT SLUMP(INCH) (SPEC: - 5.00) 6.001 5.751 5.75 1 ENTRAINED AIR (%VOL) (SPEC: 4.00- 7.00) 5.80 UNIT WEIGHT (PCF) (SPEC: ) 135.86 CONCRETE TEMP. (F) (SPEC: 45 - 90) 62 62 63 NUMBER OF TEST SPECIMEN CAST 6 LAB CYLINDER CONTROL NUMBERS 179031- 179036 DISCREPANCIES&REMARKS: 1:SLUMP NOTED UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 CONCRETE SUPPLIER: JOINTA-GALUSHA,LLC. CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM:C39 DESIGN STRENGTH&FORMULA: 4000 P.S.I.(7a 28 DAYS UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: 11/10/17 CEMENT: LBS. CYLINDER TEST TEST AGE ULTIMATE UNIT CEMENT: LBS. NUMBER DATE DAYS APPLIED LOAD P.S.I. WATER: GAL. COARSE AGGREGATE#1: LBS. 179031 11/16/17 7 38,800 3090 COARSE AGGREGATE#2: LBS. 179032 11/16/17 7 40,500 3220 COARSE AGGREGATE#3: LBS. 179033 12/07/17 28 53,650 4270 FINE AGGREGATE: LBS. 179034 12/07/17 28 54,300 4320 ADMIXTURE#1: OZS. 179035 12/07/17 28 55,450 4410 ADMIXTURE#2: OZS. 179036 SPARE ADMIXTURE#3: OZS. AIR ENTRAINING AGENT: OZS. REPORT DISTRIBUTION: 1:FILE 5: 2:SUPPLIER 6: 3: 7: 4: 8: RESPECTFULLY SUBMITTED, CONSTRUCTION TECHNOLOGY TOM JOSLIN,S.E.T. (NICET) MANAGER TECHNICAL SVCS. CONSTRUCTION TECHNOLOGY 4 William Street,Ballston Lake,New York 12019 Phone:(518)399-1848 Fax:(518)399-1913 CLIENT: EVERTS AVENUE SELF STORAGE REPORT NUMBER: 1 PAGE#:2 106 EVERTS AVENUE INSPECTION DATE: 11/09/17 QUEENSBURY,NEW YORK 12804 OUR FILE NUMBER: 129.000 INSPECTOR&TEST SET: BOB BEHAN #6 ATT'N: MR.DON SCOVILLE AMBIENT WEATHER: 20's:CLEAR PROJECT: EVERTS AVENUE SELF STORAGE:QUEENSBURY,NEW YORK OUR FILE LOCATION: 179037 CONCRETE FIELD INSPECTION & COMPRESSION TEST RESULTS PLACEMENT LOCATION OF LOAD# 4: BUILDING B:SLAB ON GRADE:PROCEEDING EAST-WEST PLACEMENT LOCATION OF LOAD# 5: BUILDING B:SLAB ON GRADE:PROCEEDING EAST-WEST DELIVERED LOAD NUMBER: 4 5 TRUCK NUMBER/TICKET NUMBER: 4902/ 823446 4598 / 823447 YARDAGE DELIVERED/SUBTOTAL: 11.00/ 44.00 11.00 / 55.00 TIME CONC. BATCHED/ARRIVED: 7.43/ 7.54 8.10 / 8.21 TIME PLACEMENT BEGAN/ENDED: 8.01/ 8.26 8.25 / 8.41 CONCRETE AGE(HOURS) (SPEC: MAX: 1.50) 0.72 0.52 SLUMP ON ARRIVAL (INCHES) 6.25 6.50 WATER ADDED ONSITE(GALLONS): WATER ADDED AT DISCRETION OF: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: PLACEMENT SLUMP(INCH) (SPEC: - 5.00) 6.251 6.501 ENTRAINED AIR (%VOL) (SPEC: 4.00- 7.00) 6.10 UNIT WEIGHT (PCF) (SPEC: - ) 135.37 CONCRETE TEMP. (F) (SPEC: 45 - 90) 63 63 NUMBER OF TEST SPECIMEN CAST 6 LAB CYLINDER CONTROL NUMBER 179037 - 179042 DISCREPANCIES&REMARKS: 1:SLUMP NOTED UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 CONCRETE SUPPLIER: JOINTA-GALUSHA,LLC. CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM:C39 DESIGN STRENGTH&FORMULA: 4000 P.S.I.@ 28 DAYS UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: 11/10/17 CEMENT: LBS. CYLINDER TEST TEST AGE ULTIMATE UNIT CEMENT: LBS. NUMBER DATE DAYS APPLIED LOAD P.S.I. WATER: GAL. COARSE AGGREGATE#1: LBS. 179037 11/16/17 7 33,300 2650 COARSE AGGREGATE#2: LBS. 179038 11/16/17 7 35,200 2800 COARSE AGGREGATE#3: LBS. 179039 12/07/17 28 50,900 4050 FINE AGGREGATE: LBS. 179040 12/07/17 28 51,700 4120 ADMIXTURE#1: OZS. 179041 12/07/17 28 51,050 4060 ADMIXTURE#2: OZS. 179042 SPARE ADMIXTURE#3: OZS. AIR ENTRAINING AGENT: OZS. REPORT DISTRIBUTION: 1:FILE 5: 2:SUPPLIER 6: 3: 7: 4: 8: RESPECTFULLY SUBMITTED, CONSTRUCTION TECHNOLOGY TOM JOSLIN,S.E.T. (NICET) MANAGER TECHNICAL SVCS. CONSTRUCTION TECHNOLOGY 4 William Street,Ballston Lake,New York 12019 Phone:(518)399-1848 Fax:(518)399-1913 CLIENT: EVERTS AVENUE SELF STORAGE REPORT NUMBER: 2 PAGE* 1 106 EVERTS AVENUE INSPECTION DATE: 11/17/17 QUEENSBURY,NEW YORK 12804 OUR FILE NUMBER: 129.000 INSPECTOR&TEST SET: BOB BEHAN #6 ATT'N: MR.DON SCOVILLE AMBIENT WEATHER: 30's:CLOUDY PROJECT: EVERTS AVENUE SELF STORAGE:QUEENSBURY,NEW YORK OUR FILE LOCATION: 179337 CONCRETE FIELD INSPECTION & COMPRESSION TEST RESULTS PLACEMENT LOCATION OF LOAD# 1 : BUILDING A:SLAB ON GRADE:PROCEEDING EAST-WEST PLACEMENT LOCATION OF LOAD# 2! BUILDING A:SLAB ON GRADE:PROCEEDING EAST-WEST PLACEMENT LOCATION OF LOAD# 3: BUILDING A:SLAB ON GRADE:PROCEEDING EAST-WEST DELIVERED LOAD NUMBER: 1 2 3 TRUCK NUMBER/TICKET NUMBER: 4565/ 823601 4904 / 823602 4906 / 823603 YARDAGE DELIVERED/SUBTOTAL: 11.00/ 11.00 11.00 / 22.00 11.00 / 33.00 TIME CONC. BATCHED/ARRIVED: 7.13/ 7.23 7.15 / 7.30 7.40 / 8.52 TIME PLACEMENT BEGAN/ENDED: 7.26/ 7.41 7.34 / 7.51 7.57 / 8.12 CONCRETE AGE(HOURS) (SPEC: MAX: 1.50) 0.47 0.60 0.53 SLUMP ON ARRIVAL (INCHES) 5.50 5.25 5.50 WATER ADDED ONSITE(GALLONS): WATER ADDED AT DISCRETION OF: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: PLACEMENT SLUMP(INCH) (SPEC: - 5.00) 5.501 5.251 5.50 1 ENTRAINED AIR (%VOL) (SPEC: 4.00- 7.00) 5.90 UNIT WEIGHT (PCF) (SPEC: ) 141.28 CONCRETE TEMP. (F) (SPEC', 45 - 90) 71 72 71 NUMBER OF TEST SPECIMEN CAST 6 LAB CYLINDER CONTROL NUMBER 179337- 179342 DISCREPANCIES&REMARKS: 1:SLUMP NOTED UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 CONCRETE SUPPLIER: JOINTA-GALUSHA,LLC. CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM:C39 DESIGN STRENGTH&FORMULA: 4000 P.S.I.@a 28 DAYS UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: 11/20/17 CEMENT: LBS. CYLINDER TEST TEST AGE ULTIMATE UNIT CEMENT: LBS. NUMBER DATE DAYS APPLIED LOAD P.S.I. WATER: GAL. COARSE AGGREGATE#1: LBS. 179337 11/24/17 7 49,500 3940 COARSE AGGREGATE#2: LBS. 179338 11/24/17 7 51,100 4070 COARSE AGGREGATE#3: LBS. 179339 12/15/17 28 62,650 4990 FINE AGGREGATE: LBS. 179340 12/15/17 28 60,100 4790 ADMIXTURE#1: OZS. 179341 12/15/17 28 62,400 4970 ADMIXTURE#2: OZS. 179342 SPARE ADMIXTURE#3: OZS. AIR ENTRAINING AGENT: OZS. REPORT DISTRIBUTION: 1:FILE 5: 2:SUPPLIER 6: 3: 7: 4: 8: RESPECTFULLY SUBMITTED, CONSTRUCTION TECHNOLOGY _'7-�" TOM JOSLIN,S.E.T. (NICET) MANAGER TECHNICAL SVCS. CONSTRUCTION TECHNOLOGY 4 William Street,Ballston Lake,New York 12019 Phone:(518)399-1848 Fax:(518)399-1913 CLIENT: EVERTS AVENUE SELF STORAGE REPORT NUMBER: 2 PAGE#:2 106 EVERTS AVENUE INSPECTION DATE: 11/17/17 QUEENSBURY,NEW YORK 12804 OUR FILE NUMBER: 129.000 INSPECTOR&TEST SET: BOB BEHAN #6 ATT'N: MR.DON SCOVILLE AMBIENT WEATHER: 30's:CLOUDY PROJECT: EVERTS AVENUE SELF STORAGE:QUEENSBURY,NEW YORK OUR FILE LOCATION: 179343 CONCRETE FIELD INSPECTION & COMPRESSION TEST RESULTS PLACEMENT LOCATION OF LOAD# 4: BUILDING A:SLAB ON GRADE:PROCEEDING EAST-WEST PLACEMENT LOCATION OF LOAD# 5: BUILDING A:SLAB ON GRADE:PROCEEDING EAST-WEST DELIVERED LOAD NUMBER: 4 5 TRUCK NUMBER/TICKET NUMBER: 4902/ 823604 4565 / 823605 YARDAGE DELIVERED/SUBTOTAL: 11.00/ 44.00 11.00 / 55.00 TIME CONC. BATCHED/ARRIVED: 7.58/ 8.06 8.31 / 8.45 TIME PLACEMENT BEGAN/ENDED: 8.10/ 8.29 8.49 / 9.05 CONCRETE AGE(HOURS) (SPEC: MAX: 1.50) 0.52 0.57 SLUMP ON ARRIVAL (INCHES) 5.75 6.00 WATER ADDED ONSITE(GALLONS): WATER ADDED AT DISCRETION OF: SLUMP OF CONCRETE INTO PUMP: IF APPLICABLE: PLACEMENT SLUMP(INCH) (SPEC: - 5.00) 5.751 6.001 ENTRAINED AIR (%VOL) (SPEC: 4.00- 7.00) 6.20 UNIT WEIGHT (PCF) (SPEC: ) 138.17 CONCRETE TEMP. (F) (SPEC. 45 - 90) 71 71 NUMBER OF TEST SPECIMEN CAST 6 LAB CYLINDER CONTROL NUMBERS 179343 - 179348 DISCREPANCIES&REMARKS: 1:SLUMP NOTED UNLESS NOTED ALL TESTING IAW: ASTM: C31, C138, C143, C172, C173, C231, C470, C567, C617, C1064 CONCRETE SUPPLIER: JOINTA-GALUSHA,LLC. CONCRETE TEST CYLINDER COMPRESSIVE RESULTS PER: ASTM:C39 DESIGN STRENGTH&FORMULA: 4000 P.S.I.@ 28 DAYS UNLESS OTHERWISE NOTED ALL CYLINDERS RECEIVED: 11/20/17 CEMENT: LBS. CYLINDER TEST TEST AGE ULTIMATE UNIT CEMENT: LBS. NUMBER DATE DAYS APPLIED LOAD P.S.I. WATER: GAL. COARSE AGGREGATE#1: LBS. 179343 11/24/17 7 36,950 2940 COARSE AGGREGATE#2: LBS. 179344 11/24/17 7 38,400 3060 COARSE AGGREGATE#3: LBS. 179345 12/15/17 28 52,900 4210 FINE AGGREGATE: LBS. 179346 12/15/17 28 51,550 4100 ADMIXTURE#1: OZS. 179347 12/15/17 28 52,100 4150 ADMIXTURE#2: OZS. 179348 SPARE ADMIXTURE#3: OZS. AIR ENTRAINING AGENT: OZS. REPORT DISTRIBUTION: 1:FILE 5: 2:SUPPLIER 6: 3: 7: 4: 8: RESPECTFULLY SUBMITTED, CONSTRUCTION TECHNOLOGY '-7-.1$ ----1 TOM JOSLIN,S.E.T. (NICET) MANAGER TECHNICAL SVCS. VISION Engineering �v` I C � mcy G2a R _ ova 4 .. tr .4,.. H�s .f § .0 t% `'S r August 2, 2018 Nib �- 41 r . Town of Queensbury TOWN OF QUEl'.=NS8URY Planning and Zoning Department „— 'LANNI ' OFFICE 742 Bay Road Queensbury, NY 12804 ATTN: Mr. Bruce Frank, Code Enforcement Officer RE: Scoville Self-Storage Facility—Everts Ave, Queensbury NY 12804 Site Certification VISION Engineering, LLC performed periodic construction observation and coordinated with the Owner throughout construction regarding approved site plan compliance for the above project. As you know the project is ongoing as only two of four storage buildings have been constructed. At this time, due to financial:constraints, the Owner hopes to construct the remaining two buildings either later this year or next year depending on how fast existing units are occupied. However, the site work specified in plans prepared by our office and approved by the Town of Queensbury is nearly complete. At this time we have deemed site work to meet the intent of and to be in general conformance with approved plans and specifications, with exception of the following; = There are sections of fence specified on the site plans that have not been installed. The Owner is considering minor changes to the configuration and/or limits of fence remaining which primarily were imposed by DEC permit conditions to provide permanent protection of wetland adjacent areas. Once the Owner has decided how they want to proceed and appropriate approvals for such changes have been obtained we will notify the Town of their intentions. - An additional down-cast pole light was installed along the entrance drive to only illuminate the security key pad area which allows patrons to enter the facility and operate the automatic gate at night. Once construction commences to finish the project we will continue to monitor activity and plan to provide the Town with a final as-built site plan depicting any changes to the project. Also, while the DEC SWPPP permit will remain open until project completion and site disturbances no longer exist, our office will temporarily suspend SWPPP inspections since the site is currently stabilized. If you have any questions or require any additional information, please do not hesitate to contact me at your earliest convenience. Respectfully submitted, Daniel W: Ryan, P.E. 20€ Glen Street Suite 5 Glens Fails, NY 12801 a P: 518-792-9264 a s:518-792-9282 bnrv.visionenginee=inglle.com