CC-0018-2018 TOWN OF QUEENSBURY 742 Bay Road, Queensbury, NY 12804-5904 (518) 761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: CC-0018-2018Date Issued: Monday, January 14, 2019 This is to certify that work requested to be done as shown by Permit Number CC-0018-2018 has been completed. 288.16-1-1 Tax Map Number: 1424 State Rte 9 Location: R. Genovese & Assoc., Inc., Lake George Northway LLC Owner: Permits Today Applicant: This structure may be occupied as a: Commercial Interior Alteration 5,813 sq. ft. Tenant: Michael Kors By Order of Town Board TOWN OF QUEENSBURY The Outlets at Lake George East, Space 13 Issuance of this Certificate of Occupancy DOES NOT relieve the property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building & Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development- Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: CC-0018-2018 Tax Map No: 288.16-1-1 Permission is hereby granted to: Permits Today For property located at: 1424 State Rte 9 In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: R.Genovese&Assoc.,Inc. Business Office-Alteration $275,000.00 Owner Address: 350 Landi CT Total Value $275,000.00 Wycoff,NJ 07481 Contractor or Builder's Name/Address Electrical Inspection Agency Plans&Specifications Commercial Interior Alteration 5,813 sq.ft. Tenant: Michael Kors The Outlets at Lake George East, Space 13 $ 1,743.90 PERMIT FEE PAID -THIS PERMIT EXPIRES: Wednesday, January 23,2019 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town Quee ury; 4 Tu 23,2018 SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement , Office Use Only ADDITION/ALTERATION PERMIT Permit#: APPLICATION Permit Fee:$ lg,,7g3. Q Town of Qucensbury 742 Bay Road,Queensbury,NY 12804 Invoice#: W`a P:518-761-8256 www.gueensbury.net Project Location: VAIA \X, Tax Map ID#: Subdivision Name: G . Scott Daves CONTACT INFORMATION: c/o Permits Today, LLC 140 S. Lake Ave., STE 323 • Applicant, Name(s): hG-�s .r j o ��, ;��"v,��; Pasadena, CA 91101-4710 Mailing Address,C/S/Z: o So \-�\caz- YT F1 QP_ Cell Phone: Land Line: Email: 0-0� C.Q N'v's • Primary Owner(s): Name(s): Mailing Address, C/S/Z: :35o v,� 1 Cro\, z S y cog v-- Cell Cell Phone:�_) land Line: ( ?-.o\ Email: • Contractor(s): FE 6. Business Name: FmL--L2--� In Contact Name(s): 19 Mailing Address, C/S/Z: Cell Phone: Land Line: (--) T67IN OF Q?.11MENSBURY Email: • Architect(s)/Engineer(s): Business Name: C.Z �H Contact Name(s): Mailing Address, C/S/Z: i5O �`T , 0,00 Cell Phone:_) Land Line: ( �-�Z ) (-PA3 C2Sc�)Z Email: c7XA0`<'�,c�11� e C3 :,,rch�}Cc��.:C✓ CSM Contact Person for Building&Code Compliance: Sca-m 1� S Cell Phone: ( --) Land Line: &Z.G ) 5V S 2-'T,3 Email: -n Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017 1 PROJECT INFORMATION: TYPE: Commercial Residential WORK CLASS: _Single-Family _Two-Family —Multi-Family(#of units ) _Townhouse ,Business Office Retail _Industrial/Warehouse _Garage(#of cars ) Other(describe ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: 531 2nd floor: 2nd floor: 31 floor: 3rd floor: 4th floor: 4th floor: Total square feet: Total square feet: 5`al ADDITIONAL PROJECT INFORMATION: cx7 1. Estimated Cost of Construction: $ 25©C)O 2. If Commercial project, what is the proposed use: i` ��� 3. Source of Heat(circle one): oGa-asOil Propane Solar Other Fireplaces need a separate Fuel Burning Appliances&Chimney Application 4. Are there any structures not shown on the plot plan? YES Explain: 5. Are there any easements on the property? YES NO 6. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? b. Is this a corner lot? YES NO c. Will the grade be changed as a result of the construction? YES NO d. What is the water source? UBLI PRIVATE WELL e. Is the parcel o EWE r a PRIVATE SEPTIC system? Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017 DECLARATION: 1. 1 acknowledge that no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. Ifthework is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. 1 certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. 1 acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. 1 also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: APPROVED By Jason Scheurich at 1:36 pm, Jan 11, 2018 SIGNATURE: DATE: Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised February 2017 INSPECTION WORKSHEET (BINS-005150-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0018-2018Case Module:Permit Inspection Date:07/13/2018Inspection Status:Partial Pass Inspector:John O'BrienInspection Type:Commercial Final Inspection Job Address:1424 State Rte 9Parcel Number:288.16-1-1 Lake George, NY 12845 Contact TypeCompany NameName Primary OwnerR. Genovese & Assoc., Inc.\[R. Genovese & Assoc., Inc.\] ArchitectC3 Arch\[C3 Arch\] , Property OwnerLake George Northway LLC\[Lake George Northway LLC\] , Granted PermissionJA Carpentry Inc.\[JA Carpentry Inc.\] , Electrical ContractorStaley Incorporated\[Staley Incorporated\] , ContractorJA Carpentry Inc.\[JA Carpentry Inc.\] , ApplicantPermits Today\[Permits Today\] , Checklist ItemPassedComments Plumbing Vent Through Roof/Roof completeYES Doors 36 inch wLever Hand Panic Hardware, if reqYES- Install remaining door hardware. Exits At Grade Or Platform 36 (w) x 44 (l)YES Floor Bathroom Watertight Other Floors OkayYES- Complete store flooring. Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES Gas Furnace Shut OffYES ¾ Hour Corridor Doors & ClosersYES- Verify existing rear exit corridor door is self-closing and latches. Elevator Operation and Signage Shaft SealedNO H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsYES-Install 18 inch vertical grab bars in each bathroom Approved Handicapped Bath/Parking Lot SignageYES-Install Handicapped Bathroom Signage for each bathroom. Approved 7/12/18 -Also install handicapped signage and bench for handicapped dressing room. - Signs need to be on wall latch side of door 60 inches from floor to center of sign. Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Universal Symbol of Access displayed - on all H/CYES signs Handicapped Service Counters 34 inchYES Final Electrical / Flex Gas Piping BondedYES7/12/18 - Verify basement furnace is bonded due to csst flex gas piping. Water Fountain or CoolerYES Bldg Access All Sides 20ft Drivable SurfaceYES Jul 13, 2018Page (1) INSPECTION WORKSHEET (BINS-005150-2018) Checklist ItemPassedComments Engineer or Architect ApprovalNO7/12/18 - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. OK to Issue Temporary C/OYES7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room.Approved - Sign needs to be on wall latch side of door 60 inches from floor to center of sign.Approved - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping.Approved -Complete Fire Marshal's Items -Electrical main panels need their covers installed.Approved Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. Jul 13, 2018Page (2) INSPECTION WORKSHEET (BINS-005150-2018) Checklist ItemPassedComments OK to Issue C/ONO7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room. - Sign needs to be on wall latch side of door 60 inches from floor to center of sign. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping. -Complete Fire Marshal's Items -Electrical main panels need their covers installed. Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. O'Brien, John (Inspector) Jul 13, 2018Page (3) INSPECTION WORKSHEET (BINS-005098-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0018-2018Case Module:Permit Inspection Date:07/12/2018Inspection Status:Failed Inspector:John O'BrienInspection Type:Commercial Final Inspection Job Address:1424 State Rte 9Parcel Number:288.16-1-1 Lake George, NY 12845 Contact TypeCompany NameName ArchitectC3 Arch, Granted PermissionJA Carpentry Inc., Electrical ContractorStaley Incorporated, Property OwnerLake George Northway LLC, Primary OwnerR. Genovese & Assoc., Inc., ContractorJA Carpentry Inc., ApplicantPermits Today, Checklist ItemPassedComments Plumbing Vent Through Roof/Roof completeYES Doors 36 inch wLever Hand Panic Hardware, if reqYES- Install remaining door hardware. Exits At Grade Or Platform 36 (w) x 44 (l)YES Floor Bathroom Watertight Other Floors OkayYES- Complete store flooring. Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES Gas Furnace Shut OffYES ¾ Hour Corridor Doors & ClosersYES- Verify existing rear exit corridor door is self-closing and latches. Elevator Operation and Signage Shaft SealedNO-Fire Marshal Item H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsYES-Install 18 inch vertical grab bars in each bathroom Approved Handicapped Bath/Parking Lot SignageNO-Install Handicapped Bathroom Signage for each bathroom. Approved 7/12/18 -Also install handicapped signage and bench for handicapped dressing room. - Signs need to be on wall latch side of door 60 inches from floor to center of sign. Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Universal Symbol of Access displayed - on all H/CYES signs Handicapped Service Counters 34 inchYES Final Electrical / Flex Gas Piping BondedNO7/12/18 - Verify basement furnace is bonded due to csst flex gas piping. Water Fountain or CoolerYES Bldg Access All Sides 20ft Drivable SurfaceYES Jul 12, 2018Page (2) INSPECTION WORKSHEET (BINS-005098-2018) Checklist ItemPassedComments Engineer or Architect ApprovalNO7/12/18 - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. OK to Issue Temporary C/ONO7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room. - Sign needs to be on wall latch side of door 60 inches from floor to center of sign. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping. -Complete Fire Marshal's Items -Electrical main panels need their covers installed. Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. OK to Issue C/ONO7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room. - Sign needs to be on wall latch side of door 60 inches from floor to center of sign. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping. -Complete Fire Marshal's Items -Electrical main panels need their covers installed. Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. O'Brien, John (Inspector) Jul 12, 2018Page (3) INSPECTION WORKSHEET (BINS-004939-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0018-2018Case Module:Permit Inspection Date:07/09/2018Inspection Status:Failed Inspector:John O'BrienInspection Type:Commercial Final Inspection Job Address:1424 State Rte 9Parcel Number:288.16-1-1 Lake George, NY 12845 Contact TypeCompany NameName ContractorJA Carpentry Inc.\[JA Carpentry Inc.\] , Electrical ContractorStaley Incorporated\[Staley Incorporated\] , Primary OwnerR. Genovese & Assoc., Inc.\[R. Genovese & Assoc., Inc.\] ArchitectC3 Arch\[C3 Arch\] , Property OwnerLake George Northway LLC\[Lake George Northway LLC\] , Granted PermissionJA Carpentry Inc.\[JA Carpentry Inc.\] , ApplicantPermits Today\[Permits Today\] , Checklist ItemPassedComments Plumbing Vent Through Roof/Roof completeYES Doors 36 inch wLever Hand Panic Hardware, if reqNO- Install remaining door hardware. Exits At Grade Or Platform 36 (w) x 44 (l)YES Floor Bathroom Watertight Other Floors OkayYES- Complete store flooring. Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES Gas Furnace Shut OffYES ¾ Hour Corridor Doors & ClosersNO- Verify existing rear exit corridor door is self-closing and latches. Elevator Operation and Signage Shaft SealedNO-Fire Marshal Item H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsNO-Install 18 inch vertical grab bars in each bathroom Handicapped Bath/Parking Lot SignageNO-Install Handicapped Bathroom Signage for each bathroom. Also install handicapped signage and bench for handicapped dressing room. - Signs need to be on wall latch side of door 60 inches from floor to center of sign. Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Universal Symbol of Access displayed - on all H/CNO signs Handicapped Service Counters 34 inchYES Jul 09, 2018Page (3) INSPECTION WORKSHEET (BINS-004939-2018) Checklist ItemPassedComments Final Electrical / Flex Gas Piping BondedNO- Verify basement furnace is bonded Water Fountain or CoolerYES Bldg Access All Sides 20ft Drivable SurfaceYES Engineer or Architect ApprovalNO- Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. OK to Issue Temporary C/ONO Jul 09, 2018Page (4) INSPECTION WORKSHEET (BINS-004939-2018) Checklist ItemPassedComments OK to Issue C/ONO7/5/18 Final Inspection Not Approved - Complete securing 2 ft x 2 ft ceiling light fixtures with two wires to structural framing above. Please leave enough ceiling tile out in order to inspect lighting. - Exposed new front window header and jack studs as discussed. - Verify basement furnace is bonded - Install Handicapped Bathroom Signage for each bathroom. Also install handicapped signage and bench for handicapped dressing room. - Install 18 inch vertical grab bars in each bathroom. - Install remaining door hardware. - Complete Fire Marshal's Items. - Complete store flooring. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 7/9/18 Final Inspection Not Approved - Verify basement furnace is bonded - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Install Handicapped Bathroom Signage for each bathroom. Also install handicapped signage and bench for handicapped dressing room. - Signs need to be on wall latch side of door 60 inches from floor to center of sign. -Install 18 inch vertical grab bars in each bathroom. - Verify existing rear exit corridor door is self-closing and latches. - Install remaining door hardware. - Fire Marshal Item O'Brien, John (Inspector) Jul 09, 2018Page (5) INSPECTION WORKSHEET (BINS-004835-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0018-2018Case Module:Permit Inspection Date:07/05/2018Inspection Status:Failed Inspector:John O'BrienInspection Type:Commercial Final Inspection Job Address:1424 State Rte 9Parcel Number:288.16-1-1 Lake George, NY 12845 Contact TypeCompany NameName ContractorJA Carpentry Inc.\[JA Carpentry Inc.\] , Granted PermissionJA Carpentry Inc.\[JA Carpentry Inc.\] , Primary OwnerR. Genovese & Assoc., Inc.\[R. Genovese & Assoc., Inc.\] Electrical ContractorStaley Incorporated\[Staley Incorporated\] , ArchitectC3 Arch\[C3 Arch\] , ApplicantPermits Today\[Permits Today\] , Property OwnerLake George Northway LLC\[Lake George Northway LLC\] , Checklist ItemPassedComments Plumbing Vent Through Roof/Roof completeYES Ext Finish /Grade Complete/6 in 10ft or EquivalentYES Doors 36 inch wLever Hand Panic Hardware, if reqNO- Install remaining door hardware. Exits At Grade Or Platform 36 (w) x 44 (l)YES Floor Bathroom Watertight Other Floors OkayNO- Complete store flooring. Relief Valve ,Heat Trap/Water Temp 110 deg or lessYES Gas Furnace Shut OffYES ¾ Hour Corridor Doors & ClosersNO- Verify existing rear exit corridor door is self-closing and latches. Elevator Operation and Signage Shaft SealedNO-Fire Marshal Item H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsNO-Install 18 inch vertical grab bars in each bathroom Handicapped Bath/Parking Lot SignageNO-Install Handicapped Bathroom Signage for each bathroom. Also install handicapped signage and bench for handicapped dressing room. Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Universal Symbol of Access displayed - on all H/CNO signs Public Toilet Room Handicapped AccessibleYESExisting Handicapped Service Counters 34 inchYES Final Electrical / Flex Gas Piping BondedNO- Verify basement furnace is bonded Bldg Num or Tenant Address on Bld or DriveNO Water Fountain or CoolerYES Bldg Access All Sides 20ft Drivable SurfaceYES Engineer or Architect ApprovalNO Jul 05, 2018Page (1) INSPECTION WORKSHEET (BINS-004835-2018) Checklist ItemPassedComments - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. OK to Issue Temporary C/ONO OK to Issue C/ONO7/5/18 Final Inspection Not Approved - Complete securing 2 ft x 2 ft ceiling light fixtures with two wires to structural framing above. Please leave enough ceiling tile out in order to inspect lighting. - Exposed new front window header and jack studs as discussed. - Verify basement furnace is bonded - Install Handicapped Bathroom Signage for each bathroom. Also install handicapped signage and bench for handicapped dressing room. - Install 18 inch vertical grab bars in each bathroom. - Install remaining door hardware. - Complete Fire Marshal's Items. - Complete store flooring. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. O'Brien, John (Inspector) Jul 05, 2018Page (2) INSPECTION WORKSHEET (BINS-000343-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal CC-0018-2018Permit Case Number:Case Module: Mon Jan 14, 2019Passed Inspection Date:Inspection Status: John O'BrienCommercial Final Inspection Inspector:Inspection Type: 1424 State Rte 9288.16-1-1 Job Address:Parcel Number: Lake George, NY 12845 Contact TypeCompany NameName ContractorJA Carpentry Inc. Electrical ContractorStaley Incorporated ArchitectC3 Arch Property OwnerLake George Northway LLC ApplicantPermits Today Primary OwnerR. Genovese & Assoc., Inc. Granted PermissionJA Carpentry Inc. Checklist ItemPassedComments Doors 36 inch wLever Hand Panic Hardware, ifYES- Install remaining door hardware. req Floor Bathroom Watertight Other Floors OkayYES- Complete store flooring. ¾ Hour Corridor Doors & ClosersYES- Verify existing rear exit corridor door is self-closing and latches. H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsYES-Install 18 inch vertical grab bars in each bathroom Approved Jan 14, 2019Page (1) INSPECTION WORKSHEET (BINS-000343-2019) Checklist ItemPassedComments Handicapped Bath/Parking Lot SignageYES-Install Handicapped Bathroom Signage for each bathroom. Approved 7/12/18 -Also install handicapped signage and bench for handicapped dressing room. - Signs need to be on wall latch side of door 60 inches from floor to center of sign. Final Electrical / Flex Gas Piping BondedYES7/12/18 - Verify basement furnace is bonded due to csst flex gas piping. Engineer or Architect ApprovalYES7/12/18 - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 1/14/19 Final Inspection Approved - Ok to Issue CO! - Received Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. Jan 14, 2019Page (2) INSPECTION WORKSHEET (BINS-000343-2019) Checklist ItemPassedComments OK to Issue Temporary C/OYES7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room.Approved - Sign needs to be on wall latch side of door 60 inches from floor to center of sign.Approved - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping.Approved -Complete Fire Marshal's Items -Electrical main panels need their covers installed.Approved Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. Jan 14, 2019Page (3) INSPECTION WORKSHEET (BINS-000343-2019) Checklist ItemPassedComments OK to Issue C/OYES7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room. - Sign needs to be on wall latch side of door 60 inches from floor to center of sign. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping. -Complete Fire Marshal's Items -Electrical main panels need their covers installed. Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 12/27/18 Final Inspection Not Approved Remaining Item: - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 1/9/19 Final Inspection Not Approved Remaining Item: - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 1/14/19 Final Inspection Approved - Ok to Issue CO! - Received Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. O'Brien, John (Inspector) Jan 14, 2019Page (4) INSPECTION WORKSHEET (BINS-000221-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal CC-0018-2018Permit Case Number:Case Module: Wed Jan 9, 2019Partial Pass Inspection Date:Inspection Status: John O'BrienCommercial Final Inspection Inspector:Inspection Type: 1424 State Rte 9288.16-1-1 Job Address:Parcel Number: Lake George, NY 12845 Contact TypeCompany NameName ArchitectC3 Arch Primary OwnerR. Genovese & Assoc., Inc. ApplicantPermits Today ContractorJA Carpentry Inc. Granted PermissionJA Carpentry Inc. Electrical ContractorStaley Incorporated Property OwnerLake George Northway LLC Checklist ItemPassedComments Doors 36 inch wLever Hand Panic Hardware, ifYES- Install remaining door hardware. req Floor Bathroom Watertight Other Floors OkayYES- Complete store flooring. ¾ Hour Corridor Doors & ClosersYES- Verify existing rear exit corridor door is self-closing and latches. H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsYES-Install 18 inch vertical grab bars in each bathroom Approved Jan 09, 2019Page (1) INSPECTION WORKSHEET (BINS-000221-2019) Checklist ItemPassedComments Handicapped Bath/Parking Lot SignageYES-Install Handicapped Bathroom Signage for each bathroom. Approved 7/12/18 -Also install handicapped signage and bench for handicapped dressing room. - Signs need to be on wall latch side of door 60 inches from floor to center of sign. Final Electrical / Flex Gas Piping BondedYES7/12/18 - Verify basement furnace is bonded due to csst flex gas piping. Engineer or Architect ApprovalNO7/12/18 - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. Jan 09, 2019Page (2) INSPECTION WORKSHEET (BINS-000221-2019) Checklist ItemPassedComments OK to Issue Temporary C/OYES7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room.Approved - Sign needs to be on wall latch side of door 60 inches from floor to center of sign.Approved - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping.Approved -Complete Fire Marshal's Items -Electrical main panels need their covers installed.Approved Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. Jan 09, 2019Page (3) INSPECTION WORKSHEET (BINS-000221-2019) Checklist ItemPassedComments OK to Issue C/ONO7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room. - Sign needs to be on wall latch side of door 60 inches from floor to center of sign. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping. -Complete Fire Marshal's Items -Electrical main panels need their covers installed. Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 12/27/18 Final Inspection Not Approved Remaining Item: - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 1/9/19 Final Inspection Not Approved Remaining Item: - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. O'Brien, John (Inspector) Jan 09, 2019Page (4) INSPECTION WORKSHEET (BINS-009027-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal CC-0018-2018Permit Case Number:Case Module: Thu Dec 27, 2018Partial Pass Inspection Date:Inspection Status: John O'BrienCommercial Final Inspection Inspector:Inspection Type: 1424 State Rte 9288.16-1-1 Job Address:Parcel Number: Lake George, NY 12845 Contact TypeCompany NameName Granted PermissionJA Carpentry Inc. ApplicantPermits Today Property OwnerLake George Northway LLC ArchitectC3 Arch Primary OwnerR. Genovese & Assoc., Inc. Electrical ContractorStaley Incorporated ContractorJA Carpentry Inc. Checklist ItemPassedComments Doors 36 inch wLever Hand Panic Hardware, ifYES- Install remaining door hardware. req Floor Bathroom Watertight Other Floors OkayYES- Complete store flooring. ¾ Hour Corridor Doors & ClosersYES- Verify existing rear exit corridor door is self-closing and latches. H/C Bathroom Grab Bars /Sinks/Toilets/MirrorsYES-Install 18 inch vertical grab bars in each bathroom Approved Dec 27, 2018Page (1) INSPECTION WORKSHEET (BINS-009027-2018) Checklist ItemPassedComments Handicapped Bath/Parking Lot SignageYES-Install Handicapped Bathroom Signage for each bathroom. Approved 7/12/18 -Also install handicapped signage and bench for handicapped dressing room. - Signs need to be on wall latch side of door 60 inches from floor to center of sign. Final Electrical / Flex Gas Piping BondedYES7/12/18 - Verify basement furnace is bonded due to csst flex gas piping. Engineer or Architect ApprovalNO7/12/18 - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. Dec 27, 2018Page (2) INSPECTION WORKSHEET (BINS-009027-2018) Checklist ItemPassedComments OK to Issue Temporary C/OYES7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room.Approved - Sign needs to be on wall latch side of door 60 inches from floor to center of sign.Approved - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping.Approved -Complete Fire Marshal's Items -Electrical main panels need their covers installed.Approved Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. Dec 27, 2018Page (3) INSPECTION WORKSHEET (BINS-009027-2018) Checklist ItemPassedComments OK to Issue C/ONO7/12/18 Final Inspection Not Approved -Install handicapped signage for handicapped dressing room. - Sign needs to be on wall latch side of door 60 inches from floor to center of sign. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. -Provide Air Balancing Report -Verify furnaces are bonded due to csst flex gas piping. -Complete Fire Marshal's Items -Electrical main panels need their covers installed. Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. 7/13/18 Final Inspection Partial Approval Ok to issue Temporary CO! Temporary CO Condition: - Decision on elevator. The elevator is out of order until a decision is rendered. - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. 12/27/18 Final Inspection Not Approved Remaining Item: - Provide Approval Letter from the engineer (Mark Huffnagle) stating that all lighting for the Michael Kors interior space has been installed in accordance with the approved 2015 COMcheck Interior Lighting Compliance Report. O'Brien, John (Inspector) Dec 27, 2018Page (4) INSPECTION WORKSHEET (FM-008991-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal CC-0018-2018Permit Case Number:Case Module: Fri Dec 21, 2018Passed Inspection Date:Inspection Status: Gary StillmanOCC-Inspections Inspector:Inspection Type: 1424 State Rte 9288.16-1-1 Job Address:Parcel Number: Lake George, NY 12845 Contact TypeCompany NameName Property OwnerLake George Northway LLC ArchitectC3 Arch ContractorJA Carpentry Inc. Primary OwnerR. Genovese & Assoc., Inc. ApplicantPermits Today Granted PermissionJA Carpentry Inc. Electrical ContractorStaley Incorporated Checklist ItemPassedComments Fire MarshalYESPaul Jannuzzi Exit AccessYES Exit EnclosureYES Exit DischargeYES Locks and LatchesYESAdd proper door exit hardware basement & first floor rear Dec 21, 2018Page (1) INSPECTION WORKSHEET (FM-008991-2018) Checklist ItemPassedComments Sign: NormalYES Sign: BackupYES Main Aisle WidthYES Secondary Aisle WidthYES Fire Extinguisher HungYESHang all fire extinguishers 7/9/18 Hang (6) fire extinguishers as discussed 7/12/18 HANG FIRE EXTINGUISHER IN BASEMENT SOUTH DOOR 7/3/18 FIRE EXTINGUISHER HUNG IB BASEMENT -OK Inspection of ExtinguisherYES7/12/18 OK Truss ID SignageYESReturn to verify 7/12/18 ok Emergency Lighting InteriorYES7/9/18 Fire Marshal to witness test Exit / Emergency lights both floors 7/12/18 FIRE MARSHAL WITNESS TEST OK Emergency Lighting ExteriorYESOn plaza Clearance to ElectricalYES Electrical Wiring Enclosed/LabeledYESClose up all electrical 7/12/18 ok Combustibles in Equipment RoomsYES Dec 21, 2018Page (2) INSPECTION WORKSHEET (FM-008991-2018) Checklist ItemPassedComments F.D. SignageYES StorageYESK Interior FinishesYESREPLACE ALL CEILING TILES 7/13/18 OK-PASSED CO DetectorsYESAdd CO DETECTION TO BASEMENT AND MAIN FLOOR, SHALL BE PART OF FIRE ALARM SYSTEM 7/12/18 added \[3\] AS PART OF FIRE ALARM SYSTEM Clearance to Sprinkler/CeilingYES Elevator Semi AnnualYESInspection required including QEI 7/12/18 NEED TO RESOLVE ELEVATOR ISSUES- DO NOT USE ELEVATOR 12/21/18 NEW LIFT INSTALLATION COMPLETED, RECEIVED INSPECTION (QEI) REPORT FROM CAPITAL DISTRICT ELEVATOR DATED 12/20/18 FIRE ALARM AnnualYESProvide as built plans and spec sheets for devices, NFPA INSPECTION AND COMPLETION REPORT 7/9/18 Fire Marshal to witness test fire alarm with contractor. Provide NFPA inspection and completion 7/12/18 Fire Marshal witness test ok- NEED AS BUILT PLANS SHOWING CO DETECTION, STROBES NEED TO BE REPROGRAMMED TO STAY ON ON SILENCE 7/13/18 STROBES REPROGRAMMING DONE TODAY BY MAHONEY ALARM, (STILL NEED AS BUILT PLANS) 7/13/18 RECEIVED AS BUILT PLANS FROM MAHONEY ALARM-PASSED HVAC ShutdownYES7/12/18 verified Dec 21, 2018Page (3) INSPECTION WORKSHEET (FM-008991-2018) Checklist ItemPassedComments Sprinkler System AnnualYESPROVIDE NFPA 13 LETTER from sprinkler contractor 7/12/18 STILL NEED NFPA 13 LETTER 7/13/2018RECEIVED NFPA 13 LETTER DATED 7/12/18 FROM ABSOLUTE FIRE PROTECTION LLC Knox Box: installed/checkedYESProvide Key for Knox box 7/12/18 RECEIVED DOOR KEY & FIRE ALARM PANEL KEY, PLUS BASEMENT Occupancy CycleYESM Stillman, Gary (Inspector) Dec 21, 2018Page (4) .A A COMcheck Software Version 4.0.7.2 Review Interior Lighting Compliance Ce Project Information Energy Code: 90.1 (2013) Standard C, Project Title: Michael Kors-Outlets at Lake George _ $ Project Type: Alteration �� 06 d Construction Site: Owner/Agent: Designer/Contra SOF S1��� 1424 Hwy 9 Michael Kors M Engineering Space 13 11 W 72nd St. 750 Brookesdge I1 15 ) Lake George, NY 12845 New York, NY 10036 Westerville, OH 614-839-4639 i JAN 19 2018 TOW QUEENS.,-3URY Allowed Interior LightingPower EFVL� ��� � ®�' R;.� . ;I" LfyIJITY[DEVELC)j:,/)EN,i Area Category Floor Area Allowed Allowed a lf (ft2) Watts/ft2 (B X C) 1-Sales Area(Retail:Sales Area) 3249 1.44 4679 Allowance:Furniture,clothing,cosmetics highlighting/Fix.ID:T1 3200(a) 1.40 4480(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:SD 49(a) 1.40 69(b) 2-Storage(Common Space Types:Storage­1000 sq.ft.) 1961 0.63 1235 3-Corridor(Common Space Types:Corridor/Transition<8 ft wide) 231 0.66 152 4-Fitting Rooms(Retail:Dressing/Fitting Room) 189 0.71 134 5-Restroom(Common Space Types:Restrooms) 112 0.98 110 6-Manager(Common Space Types:Office-Enclosed) 71 1.11 79 Supplemental Allowed Watts(null)= 326 Total Allowed Watts= 11264 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less. (c)Supplemental watts must be associated with retail merchandise highlighting fixtures. Proposed Interior Lighting Power A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Sales Area(Retail:Sales Area 3249 sq.ft.) LED 7:G1:2x2:LED Other Fixture Unit 25W: 1 53 25 1325 Track lighting 1:T1:Current Limiter: Wattage based on current limiting device capacity 0 0 7440 7440 Track lighting 1:T3:Current Limiter: Wattage based on current limiting device capacity 0 0 360 Exempt Exemption:Retail Display Window LED 7 copy 1:S4:Strip:LED Linear 15W: 1 16 15 Exempt Exemption:Advertising/Directional Signage LED 7 copy 2:SD:Strip:LED Linear 15W: 1 26 4 104 Storage(Common Space Types:Storage>=1000 sq.ft. 1961 sq.ft.) LED 6 copy 1:F1:4 Foot Strip:Other: 1 31 57 1767 Corridor(Common Space Types:Corridor/Transition<8 ft wide 231 sq.ft.) LED 6:F1:4 Foot Strip:Other: 1 4 57 228 REVIEWED FOR ENERGY CODE COMPLIANCE Project Title: Michael Kors-Outlets at Lake G rt date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\( 288.16-1-1 CC-0018-2018 Page 1 of 12 Michael Kors 1424 State Route 9, Space 13 Comm. Alterations 5813 s.f. a t A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Fitting Rooms(Retail:Dressing/Fitting Room 189 sq ft1 LED 7 copy 1:G1:2x2:LED Other Fixture Unit 25W: 1 6 25 150 Restroom (Common Space Types:Restrooms 112 sa ft) Incandescent 1:EX:Existing fan/light: Incandescent 10OW: 1 2 100 200 Manager(Common Space Types:Office-Enclosed 71 sq ft) LED 7 copy 2:G1:2x2:LED Other Fixture Unit 25W: 1 2 25 50 Total Proposed Watts= 11264 supplementalInterior Lighting : Passes using retail merchandise highlighting Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2013)Standard requirements in COMcheck Version 4.0.7.2 Review and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name Title Signature Date Project Title: Michael Kors-Outlets at Lake George Report date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\08 Energy Code\1743137 CL.cck Page 2 of 12 f 1 COMcheck Software Version 4.0.7.2 Review Interior Lighting Compliance Certificate Project Information Energy Code: 90.1 (2013)Standard Project Title: Michael Kors-Outlets at Lake George Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 1424 Hwy 9 Michael Kors M Engineering Space 13 11 W 72nd St. 750 Brookesdge Blvd. Lake George, NY 12845 New York, NY 10036 Westerville, OH 43081 614-839-4639 Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Sales Area(Retail:Sales Area) 3249 1.44 4679 Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:T1 3200(a) 1.40 4480(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix. ID:SD 49(a) 1.40 69(b) 2-Storage(Common Space Types:Storage—1000 sq.ft.) 1961 0.63 1235 3-Corridor(Common Space Types:Corridor/Transition<8 ft wide) 231 0.66 152 4-Fitting Rooms(Retail:Dressing/Fitting Room) 189 0.71 134 5-Restroom(Common Space Types:Restrooms) 112 0.98 110 6-Manager(Common Space Types:Office-Enclosed) 71 1.11 79 Supplemental Allowed Watts(null)= 326 Total Allowed Watts= 11264 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. (b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less. (c)Supplemental watts must be associated with retail merchandise highlighting fixtures. Proposed Interior Lighting Power A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Sales Area(Retail�Sales Area 3249 sq.ft.) LED 7:G1:2x2:LED Other Fixture Unit 25W: 1 53 25 1325 Track lighting 1:T1:Current Limiter: Wattage based on current limiting device capacity 0 0 7440 7440 Track lighting 1:T3:Current Limiter: Wattage based on current limiting device capacity 0 0 360 Exempt Exemption:Retail Display Window LED 7 copy 1:S4:Strip:LED Linear 15W: 1 16 15 Exempt Exemption:Advertising/Directional Signage LED 7 copy 2:SD:Strip:LED Linear 15W: 1 26 4 104 Storage(Common Space Types:Storage>=1000 sq.ft. 1961 sq.ft.) LED 6 copy 1:F1:4 Foot Strip:Other: 1 31 57 1767 Corridor(_Common Space Types:Corridor/Transition<8 ft wide 231 sq.ft.) LED 6:F1:4 Foot Strip:Other: 1 4 57 228 Project Title: Michael Kors-Outlets at Lake George Report date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\08 Energy Code\1743137 CL.cck Page 1 of 6 A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Fitting Rooms(Retail:Dressing/Fitting Room 189 s"A LED 7 copy 1:G1:2x2:LED Other Fixture Unit 25W: 1 6 25 150 Restroom(Common Space Types:Restrooms 112 sq.ft 1 Incandescent 1:EX:Existing fan/light: Incandescent 10OW: 1 2 100 200 Manager(Common Space Ty_pes:Office-Enclosed 71 sq.ft) LED 7 copy 2:G1:2x2:LED Other Fixture Unit 25W: 1 2 25 50 Total Proposed Watts= 11264 ,interior Lighting : Passes using retail merchandise highlighting supplemental watts. Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2013) Standard requirements in COMcheck Version 4.0.7.2 Review and to comply with any applicable mandatory requirements listed int4e4nspctlor Checklist. QCI t L a� L 'j,ii1 Name-Title ignatur Date Project Title: Michael Kors-Outlets at Lake George Report date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\08 Energy Code\1743137 CL.cck Page 2 of 6 COMcheck Software Version 4.0.7.2 Review Inspection Checklist Energy Code: 90.1 (2013) Standard Requirements: 98.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 8.4.1.1, calculations provide all information ❑Does Not 8.4.1.2, with which compliance can be 8.7 determined for the electrical systems ❑Not Observable [PR6]2 and equipment and document where ❑Not Applicable exceptions are claimed. Feeder ,connectors sized in accordance with approved plans and branch circuits sized for maximum drop of 3%. 4.2.2, Plans, specifications, and/or ❑Complies Requirement will be met. 9.4.3, 9.7 calculations provide all information ❑Does Not [PR4]1 with which compliance can be ❑Not Observable,Location on plans/spec: E200, E201 AND COMCHECK FORMS determined for the interior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Michael Kors-Outlets at Lake George Report date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\08 Energy Code\1743137 CL.cck Page 3 of 6 Section # Rough-in Electrical Inspection Complies? Comments/Assumptions & Req.ID 8.4.2 At least 50%of all 125 volt 15-and ❑Complies Exception: Space type is not private office, open office, or [EL10]2 20-Amp receptacles are controlled by ❑Does Not computer classroom. an automatic control device. []Not Observable ❑Not Applicable 9.4.1.1 Automatic control requirements ❑Complies Requirement will be met. [ELl]z prescribed in Table 9.6.1,for the ❑Does Not appropriate space type, are installed. �Location on plans/spec: E200 & E201 Mandatory lighting controls (labeled ❑Not Observable; as'REQ') and optional choice controls ❑Not Applicable (labeled as'ADD1' and 'ADD2')are implemented. 9.4.1.1 Independent lighting controls installed ❑Complies Requirement will be met. [EL2]z per approved lighting plans and all ❑Does Not manual controls readily accessible and: Location on plans/spec: E200 visible to occupants. ;❑Not Observable ❑Not Applicable 9.4.1.2 Parking garage lighting is equipped ❑Complies Exception: Requirement does not apply. [ELll]z with required lighting controls and ❑Does Not daylight transition zone lighting. ❑Not Observable ❑Not Applicable 9.4.1.1f Daylight areas under skylights and ;❑Complies ',Exception: Requirement does not apply. [EL13]1 roof monitors that have more than !'❑Does Not ;150 W combined input power for ;general lighting are controlled by ;❑Not Observable photocontrols. ❑Not Applicable 9.4.1.3 ;Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 .specific uses installed per approved ❑Does Not ;lighting plans. Location on plans/spec: E200 ❑Not Observable ❑Not Applicable 9.6.2 ,Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not ;approved lighting plans and isLocation on plans/spec: E200 & E201 ,automatically controlled and ❑Not Observable iseparated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Michael Kors-Outlets at Lake George Report date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\08 Energy Code\1743137 CL.cck Page 4 of 6 Section # Final Inspection Complies? Comments/Assumptions & Req.ID 8.7.1 Furnished as-built drawings for ❑Complies Requirement will be met. [F116]3 electric power systems within 30 days ❑Does Not of system acceptance. ❑Not Observable ❑Not Applicable 8.7.2 Furnished O&M instructions for ❑Complies :Requirement will be met. [F117]3 systems and equipment to the ❑Does Not building owner or designated ;❑Not Observable representative. ❑Not Applicable 9.2.2.3 Interior installed lamp and fixture ;❑Complies ;See the Interior Lighting fixture schedule for values. [F]18]1 lighting power is consistent with what I❑Does Not is shown on the approved lighting plans, demonstrating proposed watts ❑Not Observable are less than or equal to allowed ❑Not Applicable watts. Additional Comments/Assumptions: 111 High Impact(Tier 1) 2 1 Medium Impact(Tier 2) 3 1 Low Impact(Tier 3) Project Title: Michael Kors-Outlets at Lake George Report date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\08 Energy Code\1743137 CL.cck Page 5 of 6 y ► r .^ Project Title: Michael Kors-Outlets at Lake George Report date: 01/12/18 Data filename: P:\1743xxx\1743137\06Design\08 Energy Code\1743137 CL.cck Page 6 of 6 FIRE MARSHAL'S OFFICE Town of Queensbury 742 Bay Road, Queensbury, NY 12804 "Home of Natural Beauty ... A Good Place to Live " PLAN REVIEW Michael Kors Outlet 1424 State Route 9, #13 CC-000018-2018 1/22/2018 I have reviewed the submitted drawings for the above project, and offer the following comments: 1) Fire extinguisher locations to be discussed. 2) Locks / latches shall comply with 2015 IFC. Existing exterior doors are compliant. 3) CO detection is required. Note: can't be a smoke/CO combo unit unless part of a fire alarm system. 4) Exit/Emergency light plan appears adequate; a function test will be required prior to CO. 5) Provide NFPA 13 letter from sprinkler contactor. 6) Provide fire alarm plans including spec sheets for all new devices. Fire Marshal's office to witness a function test prior to CO. 7) Provide a key for the Plaza Knox Box. 8) Provide specs for new elevator if installed, current QEI inspections will be 4r uired for existing or new elevator. De uty Fire 1Vlarshal Gary K. Stillman 742 Bay Road Queensbury NY 12804 518 761 8205 garys@queensbury.net Fire Marshal 's Office • Phone: 518-761-8206 Fax: 518-745-4437 firemarshal@queensbunt.net • zvzvzv.queensbury net MA ADTEK Enterprises.. LLC P.O.Box 16144,Albany,IVY 12212 Phone:(518)218-0497 PROJECT PROJECT NAME:, NUMBER: " �, ,wI DATE �. :ADDRESS. F-),V, PAGE NUMBER: TOTAL PAGES: AIR MOVING EQUIPMENT TEST SHEET SYSTEIrfl („ �EQUIPMENT LOCATON AREA SERVICED Ia k �P EQUIPMENT ENT MANUFACTURER MODEL SERIAL NUMBER SPECIFIED ACTUAL SPECIFIED ACTUAL TOTAL IV1vr P s TOTAL CFM-OUTLET " R/A CFIM a w LZ O/A CFIM I L TOTAL STATIC PRESSURE '—' INLET PRESSURE NS NS DISCHARGE PRESSURE NS u „ m•_ � NS FAQ[RPM r 4 ; MOTOR MANUFACTURER ,W MOTOR HP/BHP � o PHASE 141 VOLTAGE '�. N AMPERAGE 461 MOTOR RPM 4 MOTOR SERVICE FACTOR ka STARTER HEATER ELEMENTS k MOTOR SHEAVE&NO.GROOVES I FAN SHEAVE&CIO.GROOVES BELTS 4, r, r, r MA ADTEK Enterprises, LLC P.O.Box 16144,Albany,NY 12212 Phone:(518)21B-049T PROJECT PROJECT(NAME: NUMBER: DATE: ADDRESS: PACE NUIMABER, TOTAL PAGES: AIR MOVING EQUIPMENT' EST SHEET SYSTEM �, .—A, — EQUIPMENT LO ATCNN AREA SERVICED EQUIPMENT MANUFACTURER MODEL : r SERIAL NUMBER SPECIFIED ACTUAL SPECIFIED ACTUAL TOTAL CFM-FAINTOTAL CFiMIi-OUTLET R/A CFMI D/A CFMI TOTAL STATIC PRESSURE INLET PRESSURE N5 PAS DISCHARGE PRESSURE CIS s U5 I'FAN RPM MOTOR MANUFACTURER .. MOTOR HP/BHP mb.. PHASE ,. VOLTAGE AMPERAGE �P MOTOR RPMqf MC+TC7R SERVICE FACTOR STARTER HEATER ELEMENTS rMrIIICBTC)R SHEAVE&NO GROOVES FAIN SHEAVE&NO.GROOVES BELTS Remarks! MA ADTEK Enterprises, LLC P.O.Box 16144,Albany,ICY 12212 Phone:(518)218-04 i PROJECT NAME: PROJECT!NUMBER: CRATE,. ADDRESS. PAGE NUMBER TOTAL PAGES: AIR DISTRIBUTION TEST SHEET TERMINAL TERMINAL NUMBER TYPE NUMBER DESIGN TEST-FPM or CFM FINAL TYPE SIZE Ak FPM CFM TEST 1 TEST 2 TEST 3 FPM CFM w I W Y, ^ ^ G,r,� r y r q M � . a Remarks: Enterprises, LLC P.O.Box 16144,Albany,NY 12212 Phone.,(518)218-0497 PROJECT NAME: PROJECT NUMBER: 'DATE; ADDRESS- PAGE NUMBER: TOTAL PAGES. AIR DISTRIBILITIM TEST SHEET TERMINAL R' �? NUMBER TERMINAL DESIGN TEST-FPM or CFM FINAL NUMBER TYPE 7 SIZE Ak FPM I CFM TEST 1 TEST 2 TEST 3 FPMVM CFM r N, mra "+q,, X.� R � 7 m w � amp �. ti w wo „ w „ nt w w f 1"4 1 '� � "° „ ram ^mvhY ipib"'' :n N u „ x m m °r Remmoarks ^-' d h„,G,;.: �,iG ~•r exf' ',fir` �- � �_ A A ADTEK Enterprises, LLC P.O.Box 16144,Albany,NY 12212 Phone,(518)218-0497 PROJECT NAME:. PROJECT NUMBER: DATE: ADDRESS: [PAGE NUMBER, pe" TOTAL PAGES: III DISTRIBUTION TEST SHEET NUMBER ROOM NUMBER TERMINAL DESIGN TEST-FPM or CFM FINAL TERMINAL TYPE SIZE Ak FPM CFM TEST 1 TEST 2 TEST 3 FPM CFM s o z i r u R V Y1 m i i Remarks: MJL ADT'EK Enterprises, LLC P.O.Box 16144,Albany,NY 1.2212 Phone:(518)218-0493 �PROJECTNAME: PROJECT NUMBER: DATE: ADDRESS: PAGE NUMBER: TOTAL PAGES: DUCT'TRAVERSE TEST FORM LOCATON CONDITiICIIw15 REQUIRED FIRST TEST FI'NALTEST Zone/Branch Building Floor&Column Dint Sze Effect Velocity CFM Velocity CFM Velocity CFM Area FPM FPM FPM r "r♦ r^�im a' a�'rx, ly I „ flh j'M � 4 k � yy ✓ �'§+n d J 46 is Remarks: