Loading...
4.03 4.3 WATERJapping Fees—New Schedule—5-21-18 RESOLUTION ADOPTING NEW TAPPING FEE SCHEDULE FOR TOWN WATER DEPARTMENT RESOLUTION NO.: ,2018 INTRODUCED BY: WHO MOVED FOR ITS ADOPTION SECONDED BY: WHEREAS, the Town of Queensbury previously established tapping fees to cover the cost of Town ownership and installation of water services and meters installed for residents and businesses receiving Town water service, and WHEREAS, by Resolution No.: 87,2014, the Queensbury Town Board adopted a new tapping fee schedule, and WHEREAS, due to the increasing level of difficulty in performing long service taps, the Town Water Superintendent has recommended an addition to its tapping fee schedule to provide for an"XX open cut long" to recover restoration costs associated with open-cutting of roads in order to install service lines, and also, as a result of an analysis of raw costs and cost summaries related to tap installs, the Water Superintendent further recommends adjustment to other tapping fees, NOW, THEREFORE, BE IT RESOLVED, that the Queensbury Town Board hereby authorizes and directs adoption of the Water Department's new tapping fee schedule as follows: Tap Size Present Fee With Proposed Fee With Meter Present Meter Proposed Meter Meter Charge Charge 3/4" short $920 $1175 $315 $375 '/4"long $1450 $2275 $315 $375 3/4" open cut long $3275 1" short $1125 $1450 $465 $575 I"long $1650 $2600 $465 $575 1" open cut long $3600 1 1/" short $1555 $1750 $780 $805 11/ "long $2255 $3950 $780 $805 1 '/ " open cut long $4950 2" short $2060 $2850 $1000 $1,050 2"long $2960 $4450 $1000 $1,050 2" open cut long $5450 [The above fees do not include any rock excavation, services that extend more than 60' or for rental of dewatering equipment. The cost for any such excavation, additional piping and/or dewatering equipment will be added to the applicable fee.] and BE IT FURTHER, RESOLVED, that this new tapping fee schedule shall take effect immediately, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor, Water Superintendent and/or Town Budget Officer to take such other and further action as may be necessary to effectuate the terms of this Resolution. Duly adopted this 21St day of May, 2018 by the following vote: AYES NOES ABSENT: RESOLUTION ADOPTING NEW TAPPING FEE SCHEDULE FOR TOWN WATER DEPARTMENT RESOLUTION NO.: 87,2014 INTRODUCED BY: Mr.Anthony Metivier WHO MOVED FOR ITS ADOPTION SECONDED BY: Mr. Brian Clements WHEREAS, the Town of Queensbury previously established tapping fees to cover the cost of Town ownership and installation of water services and meters installed for residents and businesses receiving Town water service, and WHEREAS, the Town Water Superintendent informed the Town Board that as a result of an increase in material and labor costs, he recommends that the Town Board increase its tapping fees to reflect such price increases, and NOW, THEREFORE, BE IT RESOLVED, that the Queensbury Town Board hereby authorizes and directs adoption of the Water Department's new tapping fee schedule as follows: Tap Size Present Fee With Proposed Fee With Present Meter Proposed Meter Meter Meter Charge Charge 3/4" short $770 $920 $250 $315 3/4" long $1,230 $1,450 $250 $315 1" short $910 $1,125 $385 $465 1" long $1,380 $1,650 $385 $465 1 '/2" short $1,150 $1,555 $550 $780 1 '/2 " long $1,800 $2,255 $550 $780 2" short $1,575 $2,060 $675 $1,000 2" long $2,200 $2,960 $675 $1,000 [The above fees do not include any rock excavation. The cost for any such excavation will be added to the applicable fee.] and BE IT FURTHER, RESOLVED,that this new tapping fee schedule shall take effect immediately, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor, Water Superintendent and/or Town Budget Officer to take such other and further action as may be necessary to effectuate the terms of this Resolution. Duly adopted this 10th day of March,2014 by the following vote: AYES : Mr. VanNess, Mr. Strough,Mr. Metivier, Mr. Clements,Mr. Irish NOES : None ABSENT: None