Loading...
RC-0333-2018 Alhi,/ TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building& Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-0333-2018 Date Issued: Wednesday, October 17, 2018 This is to certify that work requested to be done as shown by Permit Number RC-0333-2018 has been completed. Tax Map Number: 308.12-1-44 Location: 20 WOODEN LN Owner: Michaels Group Homes, LLC Applicant: Michaels Group Homes, LLC This structure may be occupied as a: Single Family Dwelling 1916 s.f. Garage 493 s.f. By Order of Town Board Laric, Lot 19 TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the (- 4.4P 41 ,gt- property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY `Y '''' 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 s Community Development-Building & Codes (518) 761-8256 BUILDING PERMIT Permit Number: RC-0333-2018 Tax Map No: 308.12-1-44 Permission is hereby granted to: Michaels Group Homes,LLC For property located at: 20 WOODEN LN In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Michaels Group Homes,LLC Single Family-New $240,000.00 Owner Address: 1 Marions Way Total Value $240,000.00 Mechanicville,NY 12118 Contractor or Builder's Name/Address Electrical Inspection Agency Michaels Group Homes,LLC 1 Marions Way Mechanicville,NY 12118 • Plans&Specifications Single Family Dwelling 1916 s.f. Garage 493 s.f. Laric,Lot 19 $ 1,599.80 PERMIT FEE PAID -THIS PERMIT EXPIRES: Friday, June 14,2019 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before t expiration d 3 t. Dated at the Town .£Que- `+ury; 4 T �r..:��, une 14,2018 SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement \ pp �p� p gyp Ui71ce use Un,i/( //�� 2 �,[/ 1 ' '�� y.l PRINCIPLE STRUCTURE PERMIT Permit#: RC 'V 3J�'����E..I I 4_G�7,ZP-er��, e `�ir $ 'J 9. kG APPuicAiRTown of Queensbury I11 LL �J � V� 742 ay; Road,Queensbury,NY 12804 P:518-761-8256 wwiv.queensburv.net JUN 0 8 o� jvoice_# 0 Project Location: 2-CD OF Q EEG SBURY i"aU1LTiNG&COOE ._. __— r Tax Map ID #: 3U� � i � / ` IE 4 Subdivision Name: `r *TOWN BD.RESOLUTION 86-2013: $850 recreation fee for new dwelling units: single family,duplexes/two-family, multiple family, apartments, condominiums,townhouses, and/or manufactured & modular homes, but not mobile homes. This Is In addition to the permit fee(s). CONTACT INFORMATION: • • Applicant: Name(s): 1-4tcMt Qi = Mailing Address, C/S/Z: I I`A zic)1,1.5 WA$`f, 2 Cell Phone: ( 51'2) ) 8gq . kg:1�1 l Land Line: ( S ) sa.` ct -St i Email: .3p.„L)1,1,;�^� e M1 >► -tS ew _s7.wM • Primary Owner(s): Name(s): Mailing Address, C/S/Z: Cell Phone: ( ) Land Line: ( Email: • Contract,urf s): Business Name: SP+N1= cs Contact Name(s): Mailing Address, C/S/Z: Cell Phone: ( ) Land Line: ( ) Email: • Arcchitect(s)/Fngineer(s): Business Name: V-eA11-1 , F e Contact Name(s): Mailing Address, C/S/Z: Cell Phone: ( ) tarn. 24O . Land Line: ( ) Email: v_r-L3Fc-► 1 -- izrz Contact Person for Building & Code Compliance: "Tc-Thl'-r ts'e.J Leo Cell Phone: ( ) '651.3144 Land Line: ( ) Email: i tc, e MtC..441*-- SC,iszok...P. Cc- Town of Queensbury Building&Code Enforcement Principle Structure Application Revised February 2017 a 4 PROJECT INFORMATION: TYPE: Commercial ?4 R;=•3ideri[[ial WORK CLASS: X Single-Family Two-Family Multi-Family(#of ) Townhouse Business Office Retail Hotel/Motel Industrial/Warehouse Garage(#ofcars ) Other(describe ) STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1sT floor: 4:1 S.4 4 1T floor: 4' 1 4 2"d floor: 9 3 Z 4 2nd floor: 3rd floor: • Total square feet: 49 3 Eh 4th floor: Total square feet: te. ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 2_Ito, U o �' 2. Proposed use of the building: u►LY Tz �17c�tC 3. If Commercial or Industrial, indicate the name of the business: 4. Source of Heat (circle one): Oil Propane Solar Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application, one per appliance) 5. Are there any structures not shown on the plot plan? YES NO Explain: 6. Are there any easements on the property? YES NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? , Z b. Is this a corner lot? YES NO c. Will the grade be changed as a result of the construction? YES NO d. What is the water source? PUBLI PRIVATE WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? 's'-'P's'L Town of Queensbury Building&Code Enforcement Principle Structure Appication Revised February 20T DECLARATION: 1. I acknowledge that no construction shall commence prior to issuance of a valid building permit and work will be completed within a 12 month period. 2. If the work is not completed by the 1 year expiration date the permit may be renewed: subject to fees and department approval. 3. I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. • • I have read and agree to the above: PRINT NAME: 4 (c A� CAb SIGNATURE: /%i DATE: C / • Town of Queensbury Building&Code Enforcement Principle Structure Application Revised February 2017 Town of`(Queensbury Thomas R. Van Ness Highway Superintendent Highway Home (518) 745-0929 Department 742 Bay Road-Queensbury,NY 12801 David Dwell Phone: (518) 761-8211 Deputy Highway Superintendent Fax: (518) 745-4466 Home(518) 743-0938 DRIVEWAY PERMIT DATE: 'SI 7'0I1e APPLICANT NAME: M11GH( S Ci P , t.t-C. TELEPHONE NO.: 31c2z. .b311 ADDRESS TO BE INSPECTED: Zoe � `1- 1-Ai.t RETURN ADDRESS: 1 N1Ce-koNS W1t' 1v►s k1ANlCi1 U t h1Y 'Z11Q, Applicant must show exact location and width of driveway(s) to be connected to the highway by placing stakes at the specified location. • The Superintendent of Highways of the Town of Queensbury has reviewed this application.The following action has been taken: STEP 1: ( ) Preliminary Approval NEED: () Slight swale () Deep swale ( ) Level with the road ( ) Level with the top of the paved wing Size culvert pipe to be used (if necessary) ( ) 12" ( ) 15" ( ) 18" ( ) 24" ( ) 36„ Preliminary inspection completed by: Date: Approval by Highway Supt: (or) Deputy Supt: Upon completion, please resubmit this approved permit for a final approval. STEP 2: ( ) Final Approval ( ) Rejected Date: Thomas R. Van Ness, Highway Superintendent David Duel!, Deputy Highway Superintendent Y C/` � �..4 SEPTIC DISPOSAL PERMIT APPLICATION Office Use Only 742 Bay Read,Queensbury,NY 12804 Town oF(Zca»6ur, P:518-761-8256 www.ciueensbury.net Permit#: Tax Map ID#: Permit Fee:$ ; Invoice#: Project Location: 7C \ACCAz:octs Septic Variance? Yes No Primary Owner(s) tdAckf ,s t i. r Mailing Address 't tip atys 1t4t-f ),,I t��t, -� ts� 12- % Phone & Email 5\53 c -fri e mi DNA-EL C1 Q 3 cc%-4 Installer/Builder - —psy �, �ct Mailing Address ly:5t=1,-A r N,Y 1 Z? ci Phone & Email ,']4-1,`=t-W7 Engineer l�bc,c1c, iVC , 'P c.• Mailing Address 1st q-2A> WY 12.4- p4 Phone & Email 51S . 7 4-5 Contact Person for Building&Code Compliance: l 5- -`r L C Z C Phone: 51a•Sc"l •��44 RESIDENCE INFORMATION: �� Year Built #of bedrooms X gallons per bedroom =total daily flow Garbage Grinder Yes �i' 1980 or older Installed? (circle one) Spa or Hot Tub Yes to 1981-1991 Installed? (circle one) 1992-Present 3 j l p 3 3� PARCEL INFORMATION: Topography X Flat Rolling Steep Slope %Slope Soil Nature X Sand Loam Clay Other Groundwater At what depth? ,U( Bedrock/Impervious material At what depth? AIM Domestic Water Supply Municipal _Well (if well,water supply from any septic system absorption is_ft.) Percolation Test Rate: per minute per inch (test to be completed by licensed engineer/architect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: Tank size (}o'6 gallons(min.size 1,000 gallons,add 250 gallons for each garbage cylinder or spa/hot tub System Absorption field with#2 stone Total length 1 rn ft.; Each Trench 5 a ft. Seepage Pit with#3 stone How many: ;Size: Alternative System Bed or other type: Holding Tank System Total required capacity? ;tank size ;#of tanks NOTES: 1.Alarm system&associated electrical work must be inspected by a Town approved electrical inspection agency; 2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file—no exceptions. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void. I have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. / I PRINT NAME: j � � G-d 5 G DATE: / _ J SIGNATURE: �'/ DATE: Town of Queensbury Building&Code Enforcement Revised February 2017 ti A 20 Wooden Ln HVAC Load Calculations • for The Michaels Group -re TT. - fi m g IDEN 1 A A HvAcLo.... ryjS Prepared By: Nick Abrunza Appolo Heating 868 Burdeck St Schenectady Ny 12306 Thursday,June 07,2018 Rhvac is an ACCA approved Manual J and Manual D computer program. Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. J 6 i 110 '12.hyab,-.:.130itiential&Light pi:010400a!"yel.,:.cf.p4OS. ": j-,,:,.::: ;= :'=:F'' = r' : -"- -::- 1 -::-':7• 'pite Siift*atp Development Inc f. App*:iip-atitto Inc: :T---, : :-: ', -:::-,_,.:1-,--..i':::"::-- .. :i- -i-s: _ t ,. .-.. ' ' =.- 20 Wooden Ln -: . ; ; -E - ' Pae Project Report :,. G enetarPr*CtInfornietibrt i.! Project Title: 20 Wooden Ln '.c. i Designed By: The Michaels Group Project Date: Wednesday, June 06, 2018 i Client Name: The Michaels Group ., f Company Name: Appolo Heating ' Company Representative: Nick Abrunza Company Address: 868 Burdeck St Company City: Schenectady Ny 12306 i i DreSign Data.- -:-:=,-.1:',,i_ -;.:-g:;: -_,- ..,„'..-,7.,..'f',:: :;-.:T-,-,:kj,-,:-:.,',„-:,::'--:::.',:,,:,,c.;,:j,:-;'f,.::::,':.;::,,,: ,_:::-::::?, ,, :.,:,-:--,•::'' ::,._ c,:..7-,_,-,,,--if L-7-;:.:q:::,,,:,•:-L:=I :=...'i,-,-.,,:`::.,=::;'±.=' ;': Reference City: Schenectady, New York Building Orientation: Front door faces Northwest 1 Daily Temperature Range: Medium Latitude: 42 Degrees 4 .- Elevation: 378 ft. Altitude Factor: 0.986 5 Outdoor Outdoor Outdoor Indoor Indoor Grains Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference Winter: 1 0.31 n/a n/a 70 n/a Summer: 87 72 49% 50% 75 30 1 5 ,Cheek.Figorest1:;'''''... -- ;':"-.--.:::',::',-;---:,.-":-:_,i._':- -,e,:l: .-s:--,:::: ,,,:: ,....:.' -,,-,-,i:1 .. ._::_ _.,:: .;:: , : .-.:r,1 f: ;-.;:f11::- Total Building Supply CFM: 1,104 CFM Per Square ft.: 0.372 Square ft. of Room Area: 2,966 Square ft. Per Ton: 1,313 5 1 Volume(ft3): 24,741 ik K .BUildinglOadS::::: -..-:',..:,?: 1---.. ,'.';,-_:::-::','..„•-:..,,--,:-:::-.-.:":- -:.,----.,.::---,:-,--'''f-!:---:: :: :-: •;:-: ,-.--„;-';--;:;-,'-.- '-',--i-1::',--..'-'1.:-.:::;,-. ',_::::,,-,---,' ::-..---2„::':::!.-_ .f':- -,-. Total Heating Required Including Ventilation Air: 55,350 Btuh 55.350 MBH q Total Sensible Gain: 23,964 Btuh 88 % i Total Latent Gain: 3,141 Btuh 12 "Yo Total Cooling Required Including Ventilation Air: 27,105 Btuh 2.26 Tons (Based On Sensible+ Latent) 1\lote-si :.;::: :.-:',::;::::,::,: „-,--:,,:::_ ,,,-„":.:. E-L '':'...,:,.i::', :•'; -11- ^--..'* ' L=-- ...ii:•:!:::. '' '' -'T'r'; 7.;,'.: „ Rhvac is an ACCA approved Manual J and Manual D computer program. q Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. q All computed results are estimates as building use and weather may vary. i Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at your design conditions. :I ) 1 f. i i i i r, !3, C:\Users\nicka\Documents\Elite Software\Rhvac 9 Projects\20 Wooden Ln.rh9 Thursday, June 07,2018, 8:18 AM Fpi' 0 • i =Rhvac.^-:Residential&:Light_Commercial HUAG,Loads;:r _'. :--: -,,- .:1-,, - Elite Software Development,Inc ?AAippolo Heating Inc 20 Woo'den Ln , , :Schenectady,NY :12306 - ._. . - -. : : 3age-3 E Miscellaneous Report System I Outdoor=: :_ Outdoor _Outdoor -.°: Indoor Indoor Grain`s-: _Input Data: = Dry Bulb-_m :Wet Bulb Rel Hum Rel,Hum; :: -Dry Bulb Difference:, Winter: 1 0.31 80% n/a 70 n/a i Summer: 87 72 49% 50% 75 29.96 1 t Duct Sizing tnputs -. : - Main Trunk Runouts s Calculate: Yes Yes 1 Use Schedule: Yes Yes Roughness Factor: 0.00300 0.01000 Pressure Drop: 0.1000 in.wg./100 ft. 0.1000 in.wg./100 ft. j` Minimum Velocity: 650 ft./min 450 ft./min t Maximum Velocity: 900 ft./min 750 ft./min e Minimum Height: 0 in. 0 in. e Maximum Height: 0 in. 0 in. li :Outside=Air-Data: -: _�. ` . Winter Summer Infiltration Specified: 0.410 AC/hr 0.210 AC/hr 169 CFM 87 CFM Infiltration Actual: 0.410 AC/hr 0.210 AC/hr Above Grade Volume: X 24,741 Cu.ft. X 24,741 Cu.ft. 10,144 Cu.ft./hr 5,196 Cu.ft./hr r X 0.0167 X 0.0167 5 Total Building Infiltration: 169 CFM 87 CFM . Total Building Ventilation: 0 CFM 0 CFM ---System 1 Li Infiltration &Ventilation Sensible Gain Multiplier: 13.02 = (1.10 X 0.986 X 12.00 Summer Temp. Difference) Infiltration &Ventilation Latent Gain Multiplier: 20.09 = (0.68 X 0.986 X 29.96 Grains Difference) Infiltration &Ventilation Sensible Loss Multiplier: 74.87 = (1.10 X 0.986 X 69.00 Winter Temp. Difference) Winter Infiltration Specified: 0.410 AC/hr(169 CFM), Construction:Average Summer Infiltration Specified: 0.210 AC/hr(87 CFM), Construction:Average t 1 t E i 5 El 1 i 9 8 1 i Q pug C:\Users\nicka\Documents\Elite Software\Rhvac 9 Projects\20 Wooden Ln.rh9 Thursday, June 07, 2018, 8:18 AM i . 4 Rhvac'Residential_&:LightCommercial;HVAC Loads_:': - _ Elite_SoHware=eevelopment; nc. N ppoIo Heating Inc 20 Wooden Ln 1 ,. Schenectady,NY=12306 :._ :_P_age`4 Load Preview Report - Min Min Sys Sys Sys Netft.' Sen Lat Net Sen Htg Clg Htg Clg Act Duct Scope To /Tor Area Gain Gair Gain Loss CFM CFM CFM CFM CFM Size Building 226 1,313 2,966 23,964 3,141 27,105 55,350 729 1,104 729 1,104 1,104 1 + System 1 226 1,313 2,966 23,964 3,141 27,105 55,350 729 1,104 729 1,104 1,104 12x16 g. ' Zone 1 2,966 23,964 3,141 27,105 55,350 729 1,104 729 1,104 1,104 12x16 1-Basement 986 2,288 530 2,818 13,725 181 105 181 .105: 105 1-6 t 2-Dining 108 1,569 131 1,700 3,965 52 72 52 • 72; 72 1-5 t 3 3-Great Room 337 2,068 192 2,260 6,649 88 95 88 - 95 95 1-6 k' 4-Kitchen 185 1,103 74 1,177 2,589 34, 51 34 .... 51: 51 1-4 4 5-Mud Room 58 1,157 66 1,223 1,910 25 53 25 53 53 1-4 !i 6-Powder Room 30 583 9 592 398 5 27 5 . . 27 27 1-4 1 7-Foyer 111 950 94 1,044 2,520 33 44 33 . • 44. 44' 1-4 8-Office 186 1,980 128 2,108 4,112 54 91 54 ' •91 91 1-6 9-Master Bath 125 1,631 93 1,724 3,033 40 75 40 . 75. 75 1-5 10-Master Bedroom 221 2,974 825 3,799 4,649 61 137 61 .137, 137 2-5 '` 11-WIC 55 489 0 489 522 7 23 7 23, 23 1-4 12-Balh 1 68 875 25 900 1,151 15 40 15 .40: 40 1-4 13-Loft/Stairs 90 647 0 647 852 11 30 11 '• 30' 30 1-4 e 14-Bedroom 2 166 2,191 458 2,649 3,571 47 101 47 101; 101 1-6 i 15-Laundry 73 1,013 58 . 1,071 1,851 24 47 24 " •47, 47 1-4 16-Bedroom 3 166 2,444 458 2,902 3,853 5i 113 51 113 113 2-4 } C k Li l 3 Gd L U V F S li j i N r i. i 1. a I.'', 8µK f. k 1 11 C:\Users\nicka\Documents\Elite Software\Rhvac 9 Projects120 Wooden Ln.rh9 Thursday, June 07, 2018, 8:18 AM 't • • t Rhvac-Residential&:Light CemmetdialHVAC Loads ' _a Elite•Software:Development,Inca t . r ppolo.Heating Inc _20 Wooden"Ln: Schenectady,NY..1230.6.: . _.. - . .,,..' , _ - ,,i:--'..: Page:5' . t [Duct Size Preview • x Room or Source Minimurr) Maximurr Rough Desig SP Duct Duct Htg Clg Act. Duct i Duct Name Velocity Velocity Factor L/10 Loss Velocity Lengtl Flow Flow Flow Size System 1 Supply Runouts Zone 1 1 r 1 � 1-Basement Built-In 450 750 0.01 0.1 537.1 181 Pi05 105 1-6 1 2-Dining Built-In 450 750 0.01 0.1 530.3 52EY_,_ 2 72 1-5 1 3-Great Room Built-In 450 750 0.01 0.1 485.4 88Yh9g 95 1-6 4-Kitchen Built-In- 450 750 0.01 0.1 582.7 341 1i 51 1-4 il 5-Mud Room Built-In 450 750 0.01 0.1 611 25 Ram 53 1-4 6-Powder Room Built-In 450 750 0.01 0.1 307.6 5 go- 1 27 1-4 i 7-Foyer Built-In 450 750 0.01 0.1 501.7 3 3 EMJA 44 1-4 1 " 8-Office Built-In 450 750 0.01 0.1 464.6 54�:�i-i�911 ti- 91 1-6 a rw_A i~ 9-Master Bath Built-In 450 750 0.01 0.1 551.3 40I-. `75 75 1-5 I i 10 Master Bedroom Built In 450 750 0.01 0.1 502.6 61 ?037 137 2-5 4 11-WIC Built-In 450 750 0.01 0.1 258.2 7kt= �,3 23 1--4 i4= i 12-Bath 1 Built-In 450 750 0.01 0.1 462.1 15 1,74 40 1-4 13-Loft/Stairs Built-In 450 750 0.01 0.1 341.7 11 n. 30 1--4 f _1 14-Bedroom 2 Built-In 450 750 0.01 0.1 514.3 470 R„` 1j1 101 1-6 15-Laundry Built-In 450 750 0.01 0.1 534.8 241 .714 1 47 1-4 16-Bedroom 3 Built-In 450 750 0.01 0.1 645.4 .51 - i 113 2-4ri Other Ducts in System I r � �t Supply Main Trunk Built-In 650 900 0.003 0.1 828.2 729r"=%j ftl 1,104 1 2 x 1 c I'• Summary System 1 Heating Flow: 729 f Cooling Flow: 1104 t A ]ii 5 R i L } 4 fi P P a C 1 ii k 3 I d i i 3 C:\Users\nicka\Documents\Elite Software\Rhvac 9 Projects120 Wooden Ln.rh9 Thursday, June 07, 2018, 8:18 AM • si Rhvac,-:Residential&..Light_Commercial_..,..,.,,_..-..Dads _ ',;`< y_-`�' '- ;. -_. - Elite'Software::Development;-Inc.: `1ppolo Heating Inc :_ 20 Wooden Ln_ Schenectady,NY 12306 Page 6= Total Building Summary Loads Component - - - :;,, " ,-,,'Area ` Sen _ Cat Seh Total. 4 .:Description ._ '. .` r'- =: - � - _ Quan ^ -_ _Loss..:',=:' 'Gain.' =- Gain . Gain- i Pella Vinyl: Glazing-Pella Vinyl, u-value 0.31, SHGC 0.28 239 5,113 0 3,092 3,092 a Pella Slider: Door-Slider 40.8 845 0 282 282 k Fire Rated: Door-Fire Rated 20.4 394 0 131 131 Front Door TMG: Door-TMG Entry U-Value 0.19 20.4 267 0 89 89 12C-0bm: Wall-Frame, R-13 insulation in 2 x 4 stud 1029.6 8,170 0 1,065 1,065 cavity, no board insulation, brick finish, metal studs 12F-0sw: Wall-Frame, R-21 insulation in 2 x 6 stud 2031.7 9,112 0 1,623 1,623 cavity, no board insulation, siding finish,wood studs rt 16B-38: Roof/Ceiling-Under Attic with Insulation on Attic 965.3 1,733 0 1,179 1,179 Floor(also use for Knee Walls and Partition Ceilings), Vented Attic, No Radiant Barrier, Dark Asphalt Shingles or Dark Metal,Tar and Gravel or s Membrane, R-38 insulation j • 21A-24: Floor-Basement, Concrete slab, any thickness, 2 986 1,701 0 0 0 r or more feet below grade, no insulation below floor, any floor cover, shortest side of floor slab is 24'wide 19A-Ocp: Floor-Over enclosed crawl space, No insulation 1626.2 12,435 0 2,164 2,164 on exposed walls, sealed or vented space, passive, no floor insulation, carpet or hardwood x 19A-0tp: Floor-Over enclosed crawl space, No insulation 353.6 2,922 0 509 509 on exposed walls, sealed or vented space, passive, no floor insulation, tile or vinyl Subtotals for structure: 42,692 0 10,134 10,134 People: 4 1,400 1,600 3,000 t Equipment: 0 0 0 3 Lighting: 3170 10,810 10,810 Ductwork: 0 0 0 0 Infiltration: Winter CFM: 169, Summer CFM: 87 12,658 1,741 1,128 2,869 I Ventilation: Winter CFM: 0, Summer CFM: 0 0 0 0 0 AED Excursion: __ _______ _-__ 0 0 292 292 Total Building Load Totals: 55,350 3,141 23,964 27,105 F i ,Check'Figures - -. . . , - . = . : . Total Building Supply CFM: 1,104 CFM Per Square ft.: 0.372 i Square ft. of Room Area: 2,966 Square ft. Per Ton: 1,313 =, Volume(ft3): 24,741 4 Buildin. ..Loads .:K' - Total Heating Required including Ventilation Air: 55,350 Btuh 55.350 MBH 4 Total Sensible Gain: 23,964 Btuh 88 % il Total Latent Gain: 3,141 Btuh 12 % Total Cooling Required Including Ventilation Air: 27,105 Btuh 2.26 Tons (Based On Sensible+ Latent) 1 Nofes, Rhvac is an ACCA approved Manual J and Manual D computer program. f Calculations are performed per ACCA Manual J 8th Edition,Version 2, and ACCA Manual D. All computed results are estimates as building use and weather may vary. a Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at 1 your design conditions. t i t k c i i C:\Users\nicka\Documents\Elite Software\Rhvac 9 Projects\20 Wooden Ln.rh9 Thursday, June 07, 2018, 8:18 AM il r i ;Rhvac Residential&Light Gommercio..,,„,,goads _ Elite Sbttwaie Deyeloprrient,Iti F ,_;Ai-polo Heating Inc; 11. - 20 Wooden Ln Schenectady,NY 1"2306 Rage:-24 or System 1 Room Load Summary Htg-, ivlm Run Run Cig- Gig Min Act Room ,. Area -Sens Htg Duct Duct Sens Lat CIg -Sys, NoNariie ;SF Btuh,_ _. CFM Size Vel Btuh- ;_ B tuh _ "`GFM_ . GFM._' ---Zone 1--- - 1 Basement 986 13,725 181 1-6 537 2,288 530 105 105 - 2 Dining 108 3,965 52 1-5 530 1,569 131 72 72 3 Great Room 337 6,649 88 1-6 485 2,068 192 95 95 4 Kitchen 185 2,589 34 1-4 583 1,103 74 51 51 5 Mud Room 58 1,910 25 1-4 611 1,157 66 53 53 6 Powder Room 30 398 5 1-4 308 583 9 27 27 f 7 Foyer 111 2,520 33 1-4 502 950 94 44 44 t 8 Office 186 4,112 ° 54 1-6 465 1,980 128 91 91 9 Master Bath 125 3,033 40 1-5 551 1,631 93 75 75 10 Master Bedroom 221 4,649 61 2-5 503 2,974 825 137 137 3 11 WIC 55 522 7 1-4 258 489 . 0 23 23 12 Bath 1 68 1,151 15 1-4 462 875 25 40 40 13 Loft/Stairs 90 852 11 1-4 342 647 0 30 30 r< 14 Bedroom 2 166 3,571 47 1-6 514 2,191 458 101 101 15 Laundry 73 1,851 24 1-4 535 1,013 58 47 47 16 Bedroom 3 166 3,853 51 2-4 645 2,444 458 113 113 System 1 total 2,966 55,350 729 23,964 3,141 1,104 1,104 i System 1 Main Trunk Size: 12x16 in. Velocity: 828 ft./min Loss per 100 ft.: 0.101 in.wg 6 Coolirig System Symiiiary _ : Coolin SensibJe1Latent - - Se nsible - Latent = Total 9 z =Tons Split Bfuh=. :. • Btuh -:;Btuo Net Required: 2.26 88%/12% 23,964 3,141 27,105 Actual: 2.77 75%/25% 24,900 8,300 33,200 Equipment Data. :.,,, , r.. ; = . _. . : -. .. . _ Heating System Cooling System Type: Natural Gas Furnace Standard Air Conditioner Model: ML195UH070XP36B-* 13ACXN036-230-** Indoor Model: C35-36B+TDR+TXV Brand: MERIT 90 LENNOX E Description: Natural Gas or Propane Furnace Efficiency: 95 AFUE 13 SEER Sound: 0 0 Capacity: 64,000 Btuh 33,200 Btuh g Sensible Capacity: n/a 24,900 Btuh Latent Capacity: n/a 8,300 Btuh li AHRI Reference No.: n/a 8267077 I , 9 E t _t. S i F 1 E C:\Users\nicka\Documents\Elite Software\Rhvac 9 Projects120 Wooden Ln.rh9 Thursday, June 07, 2018, 8:18 AM REScheck Software Version 4.6.2 . rittil Compliance Certificate O� NE�ii Project The Kimball - ,�� p RUp Ya Energy Code: 2015 IECC CO 4- w Location: Warren County, New York ` Construction Type: Single-family Project Type: New Construction c, �+ Z Conditioned Floor Area: 1,916 ft2 `AAs 2�, g.� • ,c�3 .$ Glazing Area 13% ©0 �' Climate Zone: 6 (8499 HDD) IT SS\ ' Permit Date: 29 May, 2018 Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 20 Wooden Lane Michaels Group Homes, LLC Queensbury, NY 12804 1 Marions Way Mechanicviile, NY 12118 Compliance: Passes using UA trade-off Compliance: 1.0%Better Than Code Maximum UA: 296 Your UA: 293 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R_Value R-Value U-Factor UA Perimeter Foundation Wall: Solid Concrete or Masonry 1,247 0.0 19.0 0.039 47 Wall height: 7.6' Depth below grade: 6.6' Insulation depth: 7.6' 2x 6030 Sliding Windows:Vinyl Frame:Double Pane with Low-E 36 0.300 11 lx Std. Basement Window:Vinyl Frame:Double Pane with Low-E 2 0.300 1 1st Floor Walls:Wood Frame, 24" o .c. 1,305 21.0 0.0 0.056 62 Foyer#1: Solid 21 0.170 4 2x Home Office(0):Vinyl Frame:Double Pane with Low-E 36 0.300 11 lx Stair(AC):Vinyl Frame:Double Pane with Low-E 4 0.300 1 2x Great Room (E): Vinyl Frame:Double Pane with Low-E 29 0.300 9 lx Great Room (R):Vinyl Frame:Double Pane with Low-E 27 0.300 8 2x Dining (C):Vinyl Frame:Double Pane with Low-E 21 0.300 6 #7 Breakfast: Glass 40 0.300 12 lx Mud (AC):Vinyl Frame:Double Pane with Low-E 4 0.300 1 Mud#20: Solid 19 0.170 3 2nd Floor Walls:Wood Frame, 24" o.c. 1,016 21.0 0.0 0.056 51 2x Bed #3 (AT):Vinyl Frame:Double Pane with Low-E 32 0.300 10 Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 1 of10 Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter lx Master Bed (G):Vinyl Frame:Double Pane with Low-E 32 0.300 10 lx Master Bath (Q):Vinyl Frame:Double Pane with Low-E • 12 0.300 4 lx Master Bath (AC):Vinyl Frame:Double Pane with Low-E 4 • 0.300 1 lx Main Bath (AC):Vinyl Frame:Double Pane with Low-E 4 0.300 1 lx Bed#2 (AT):Vinyl Frame:Double Pane with Low-E 16 '0.300 5 lx Laundry(AS):Vinyl Frame:Double Pane with Low-E 10 0.300 3 Ceiling: Raised or Energy Truss 1,111 38.0 0.0 0.025 28 Floor Above Garage:All-Wood Joist/Truss:Over Unconditioned Space 115 30.0 0.0 0.033 4 Laundry Floor Above Porch:All-Wood Joist/Truss:Over Outside Air 14 30.0 0.0 0.033 0 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in REScheck Version 4.6.2 and to comply with the mandatory requirements sted in th REScheck Inspection Checklist. Ai Ili- r y. Name-Title Signatur Date 4 Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 2 of10 REScheck Software Version 4.6.2 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions &Req.ID 103.1, Construction drawings and i❑Complies 103.2 documentation demonstrate i❑Does Not [PR1]1 energy code compliance for the building envelope.Thermal • ❑Not Observable envelope represented on Not Applicable construction documents. 103.1, Construction drawings and Complies 103.2, documentation demonstrate Does Not 403.7 energy code compliance for [PR3]1 lighting and mechanical systems. ;❑Not Observable Systems serving multiple ;❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, 'Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr j❑Does Not [PR2]2 on loads calculated per ACCA Cooling: Cooling: Manual J or other methods ❑Not Observable Btu/hr Btu/hr ❑Not Applicable approved by the code official. pp Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 3 of10 v • Section Plans Verified Field Verified # Foundation Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1 Conditioned basement wall R- . R- ;❑Complies :See the Envelope Assemblies [FO4]'- insulation R-value.Where interior R_ R- ❑Does Not table for values. insulation is used,verification may need to occur during ❑Not Observable j Insulation Inspection. Not ❑Not Applicable required in warm-humid locations, in Climate Zone 3. 303.2 'Conditioned basement wall lEComplies [FOSP- insulation installed per . y❑Does Not manufacturer's instructions. : ., - :-' ❑Not Observable _ - ❑Not Applicable 402.2.9 'Conditioned basement wall ft ft ;❑Complies See the Envelope Assemblies [FO6]1 insulation depth of burial or ;❑Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable r 303.2.1 A protective covering is installed : i❑Complies , [FO11]2 to protect exposed exterior i❑Does Not insulation and extends a .-_ minimum of 6 in. below grade. ❑Not Observable ' ❑Not Applicable 403.9 Snow-and ice-melting system ❑Complies [FO12]2 controls installed. InDoes Not lam( ;❑Not Observable ❑Not Applicable Additional Comments/Assumptions: • • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 4 of10 y v Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions &Req.ID 402.1.1, Door U-factor. U- U- ❑Complies ISee the Envelope Assemblies 402.3.4 ❑Does Not table for values. [ty9 ❑Not Observable ' ❑Not Applicable 402.1.1, 'Glazing U-factor(area-weighted U- U- `❑Complies 'See the Envelope Assemblies 402.3.1, average). El Does Not table for values. 402.3.3, 402.3.6, ❑Not Observable 402.5 ❑Not Applicable [FR2]1 :J 303.1.3 U-factors of fenestration products ,- 1 = ; ,i❑Complies [FR4]l are determined in accordance :l'',., `. .t'::; I❑Does Not `J with the NFRC test procedure or ;taken from the default table. • ;❑Not Observable ' • 1-' - 3❑Not Applicable 402.4.1.1 Air barrier and thermal barrier w. IDComplies [FR23]1 installed per manufacturer's ; _ ❑Does Not instructions. • j❑Not Observable - ,❑Not Applicable 402.4.3 Fenestration that is not site built , ;❑Complies [FR20]1 is listed and labeled as meeting • ;❑Does Not AAMA/WDMA/CSA 101/I.S.2/A440 ' or has infiltration rates per NFRC ❑Not Observable 400 that do not exceed code ;❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ;❑Complies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate <_2.0 cfm • leakage at 75 Pa. ❑Not Observable :Not Applicable 403.2.1 Supply and return ducts in attics ,❑Complies [FR12]1 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >= , ' R-6 where<3 inches.Supply and' ❑Not Observable return ducts in other portions of i❑Not Applicable the building insulated >= R-6 for diameter>=3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as , ❑Complies [FR15]3 ducts or plenums. I❑Does Not 1F4' ;❑Not Observable ❑Not Applicable 403.4 'HVAC piping conveying fluids R- R- ❑Complies [FR17]2 above 105°F or chilled fluids ❑Does Not below 55°F are insulated to>_R- 3 ❑Not Observable ❑Not Applicable 403.4.1 Protection of insulation on HVAC i ,❑Complies [FR24]1 piping. ❑Does Not i ;❑Not Observable ' I❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R- ❑Complies [FR18]2 .>_R-3. ❑Does Not ❑Not Observable i❑Not Applicable 403.6 Automatic or gravity dampers are, IDComplies [FR19]2 installed on all outdoor air i❑Does Not intakes and exhausts. , , +❑Not Observable ENot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 5 of10 Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 6 of10 S 1 Section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled ;❑Complies [IN13]2 or the installed R-values Does Not provided. I❑Not Observable ' ❑Not Applicable 402.1.1, ;Floor insulation R-value. R- ' R- ,❑Complies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood I❑Does Not table for values. [IN1]1 ❑ Steel r❑ Steel j❑Not Observable J ❑Not Applicable 303.2, Floor insulation installed per ;❑Complies 402.2.7 manufacturer's instructions and - • ;❑Does Not [IN2]1 in substantial contact with the ,gi 'underside of the subfloor, or floor I❑Not Observable framing cavity insulation is in ;❑Not Applicable contact with the top side of sheathing, or continuous - : insulation is installed on the ! underside of floor framing and • : extends from the bottom to the top of all perimeter floor framing ! - members. 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood -❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ;❑Not Observable ' [IN3]1 exterior,the exterior insulation J requirement applies(FR10). El Steel •EI Steel ❑Not Applicable 303.2 Wall insulation is installed per I❑Complies • [IN4]1 manufacturer's instructions. {❑Does Not ❑Not Observable i❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) { 3 Low Impact(Tier 3) Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & RegiD 402.1.1, Ceiling insulation R-value. R- R- :❑Complies ,See the Envelope Assemblies 402.2.1, 1 ,❑ Wood ,❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel :❑ Steel ONot Observable 402.2.6 [FI1]1 Not Applicable . 303.1.1.1, ,Ceiling insulation installed per '.;;, ?: "❑Complies 303.2 manufacturer's instructions. ; :' R,-<.4 h;;° + ❑Does Not [Fl2]1 Blown insulation marked every -- t. "` ' a '.' ' ,:::*:-. ;❑Not Observable 300 ft . "'. . ' .e= i❑Not Applicable 402.2.3 Vented attics with air permeable ''r".= -:' �'`,;❑Complies [FI22]2 insulation include baffle adjacent _ ;:_- 1❑Does Not ' to soffit and eave vents that *' extends over insulation. i❑Not Observable ' , r;'' i❑Not Applicable 402.2.4 Attic access hatch and door R- R- :❑Complies [FI3]1 insulation R-value of the 3111Does Not adjacent assembly. ❑Not Observable ❑Not Applicable • 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [FI17]'- ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ;❑Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 i0Complies [F14]'' cfm/100 ft2 across the system or ft2 ft2 ❑Does Not - <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in 3 [Not Observable tests,verification may need to ❑Not Applicable occurduring Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 .❑Complies [FI27]'- determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a '❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a ' pressure differential of 0.1 inch w.g.across the entire'system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated 10Complies [FI24]'' by manufacturer at<=2%of ;❑Does Not design air flow. , ❑Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies [FI9]2 installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to ❑Not Observable code specifications. ;❑Not Applicable 403.1.2 Heat pump thermostat installed ;DComplies [FI10]2 on heat pumps. - 11=IDoes Not ❑Not Observable ❑Not Applicable 403.5.1 Circulating service hot water I❑Complies ' [FI11]2 systems have automatic or i,❑Does Not accessible manual controls. ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) • Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 8 of10 a Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID 403.6.1 ;All mechanical ventilation system I❑Complies [FI2512 'fans not part of tested and listed ;❑Does Not ;HVAC equipment meet efficacy and air flow limits. ❑Not Observable ❑Not Applicable 403.2 ;Hot water boilers supplying heat • - ❑Complies [F126]2 'through one-or two-pipe heating ❑Does Not systems have outdoor setback i control to lower boiler water j '❑Not Observable temperature based on outdoor I❑Not Applicable temperature. i 403.5.1.1 Heated water circulation systems • I❑Complies [FI28]2 'have a circulation pump.The i❑Does Not ,system return pipe is a dedicated !, ;return pipe or a cold water supply', ' '" ❑Not Observable i❑Not A licable pipe. Gravity and thermos- pp syphon circulation systems are • . ' not present. Controls for i ` circulating hot water system pumps start the pump with signal, for hot water demand within the ;occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ;❑Complies [F129]2 comply with IEEE 515.1 or UL ❑Does Not 515. Controls automatically I adjust the energy input to the ❑Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies [FI30]2 have recirculation pumps that ;❑Does Not pump water from a heated water supply pipe back to the heated ❑Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls f that manage operation of the pump and limit the temperature of the water entering the cold water piping to 104°F. i 403.5.4 Drain water heat recovery units ❑Complies [F131]2 tested in accordance with CSA DDoes Not B55.1. Potable water-side pressure loss of drain water heat [Not Observable recovery units< 3 psi for DNot Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units<2 psi for individual units connected to three or more showers. 404.1 75%of lamps in permanent EComplies [Fie fixtures or 75%of permanent ;❑Does Not fixtures have high efficacy lamps. 'Does not apply to low-voltage ❑Not Observable lighting. ❑Not Applicable 404.1.1 'Fuel gas lighting systems have ;❑Complies [F123]3 no continuous pilot light. ;EIDoes Not -6; IDNot Observable ` ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) . Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 9 of10 s Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions &Req.ID 401.3 Compliance certificate posted. ;❑Complies [FI7]2 ;❑Does Not ❑Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ;❑Complies [FI18]3 mechanical and water heating R❑Does Not systems have been provided. ['Not Observable ❑Not Applicable Additional Comments/Assumptions: • • 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: The Kimball Report date: 05/30/18 Data filename: F:\Share\Design\Res-Check\Burnt Ridge\20 Wooden Lane.rck Page 10 of10 20r‘4 15 IECC Energy Efficiency Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 30.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.30 Door 0.30 Heating&Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments Dated:April 10, 2003 A ' Last Revised:January 4, 2014 By: Van Dusen & Stoves \\\\. ----1-7 216 E Filed: March 3, 2014, P/at C-349 3601 , S 464.8°' ------- co...------- c _------- .-------- ,...---------- ------- -00 a , to Lo \----- co • 3 10 1.. to Crl -.1 LOT 19\ 83745.3 Sq. Fee 1.92 Ato s 23 9 -4 al 1 rn 2 f7-1 0 c; i' •`-- 1-17<- --- . --I (I/ 1 ---r-- II \ . \\ • _ q Fri 73 cli. sV tu • i •xl 1 --t 5---- ' a 0 n — > ,.. „ , cr) 6 t5.'s , 0z; 329.38' N 25°48'45" W \ . A / J. ..A.+-- 308.12-1-44 RC-0333-2018 C' 2 V]ck---,cle,1 j.4,-.1 Michaels Group Homes, LLC 20 Wooden Lane, Lot 19 SFD 2409 s.f., Garage 493 s.f. NACE ENGINEERING, P.C. 169 Haviland Road, Queensbury, NY 12804 Phone-518-745-4400 Fax -518-792-8511 October 11, 2018 Job #46257 New York State Dept. of Health 77 Mohican Street Glens Falls, NY 12801 RE: Burnt Ridge Subdivision Phase 2 - Queensbury(T), Warren County Lot #19 Septic System—20 Wooden Lane Gentlemen: This letter is to inform you that we inspected the completed septic system for the house at 20 Wooden Lane (Lot#19) in the Burnt Ridge Subdivision on 9/13/2018. The septic system as installed was for a 3-bedroom house and consisted of a 1,000 gallon septic tank and 150 lineal feet of absorption trench constructed with stone and perforated pipe. The system conforms to the requirements of the approved subdivision design drawings. Please call me if you have any questions or concerns. Sincerely, Thomas R. Center Jr., PE SI cc: Dave Hatin, Town of Queensbury Eric Wilson, The Michaels Group , 11 201� -too DNG&�ao-5 AS BUILT