Staff Notes AV 3-2011 Bhatti Town of Queensbury Zoning Board of Appeals Community Development Department Staff Notes Area Variance No.: 3-2011 Project Applicant: Sam Bhatti dba Econo Lodge Project Location: 543 Aviation Road Meeting Date: January 19, 2011 Description of Proposed Project: Applicant requests approval after the fact for the construction of a 120 square foot canopy at main office location. Relief Required:  Travel Corridor relief-Request for 38.4 feet or 51% relief from the 75 foot Travel Corridor setback requirement for the CI zone as per §179-3.  Front Setback relief-Request for 38.4 feet or 51% relief from the 75 foot Front setback requirement for the CI zone as per §179-3.  FAR relief-Request for an additional 120 square feet for a total FAR of 42.90% from a previously existing FAR of 42.78%.  Relief for the expansion of a non-conforming structure as per §179-13-010. Criteria for considering an Area Variance according to Chapter 267 of Town Law: In making a determination, the board shall consider: 1. Whether an undesirable change will be produced in the character of the neighborhood or a detriment to nearby properties will be created by the granting of this area variance. Minorimpacts to the neighborhood may be anticipated. 2. Whether the benefit sought by the applicant can be achieved by some method, feasible for the applicant to pursue, other than an area variance. The nature of the variance and lot limitations appears to preclude a feasible method for the applicant to pursue other than an area variance. 3. request for 38.4 feet or 51% relief from the 75 Whether the requested area variance is substantial. The foot Travel Corridor setback requirement for the CI zone as per §179-3 appears moderate relative to the ordinance. Further, the request for 38.4 feet or 51% relief from the 75 foot Front setback requirement for the CI zone as per §179-3 appears moderate relative to the ordinance. Additionally, the request for an additional 120 square feet for a total FAR of 42.90% from a previously existing FAR of 42.78% appears moderate relative to the ordinance.relief for the expansion of a non- Finally, the conforming structure as per §179-13-010 must be approved by this board. 4. Whether the proposed variance will have an adverse effect or impact on the physical or environmental conditions in the neighborhood or district. Minor impacts on the physical and environmental conditions of the neighborhood may be anticipated. Criteria continued 5. Whether the alleged difficulty was self created . The difficulty may be considered self created. Parcel History (construction/site plan/variance, etc.): AV 85-2002 Setback, parking, buffer zone, density, frontage Approved 11/20/02 SP 12-04 Mod #1 Parking, grading, lighting & landscaping modification Approved 6/05 SP 12-04 Mod #2 Stormwater, grading, parking & site improvement modifications Approved 2/28/06 BP 03-965: 16,200 S.F. Hotel S.P. 12-04 Site plan modification Approved 3/24/09 Staff comments: The applicant is under a stop work order for the construction of the canopy that is before the board tonight. There is some concern from the Fire Marshal’s office with regards to the height of the structure, please see attached comments. SEQR Status: Type II-no further review needed C:\Documents and Settings\keitho\Desktop\Daily Files\2011 Staff Notes\Zoning\January 19\AV 3-2011 Bhatti.doc Zoning Board of Appeals Community Development Department Staff Notes