Loading...
RC-0381-2018 TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: RC-0381-2018 Date Issued: Tuesday, October 2, 2018 This is to certify that work requested to be done as shown by Permit Number RC-03 81-2018 has been completed. Tax Map Number: 295.15-2-16 Location: 39 JOHN CLENDON RD Owner: FOOTHILLS BUILDERS, LLC Applicant: FOOTHILLS BUILDERS, LLC This structure may be occupied as a: Single Family Dwelling w/gas FP 1422 s.f. Garage 528 s.f. By Order of Town Board Lot 19 TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve the (- 444.0 4 )0t- property owner of the responsibility for compliance with Site Plan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. { TOWN OF QUEENSBURY r . lrfik ,, f 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 ----, Community Development-Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: RC-0381-2018 Tax Map No: 295.15-2-16 Permission is hereby granted to: FOOTHILLS BUILDERS,LLC For property located at: 39 JOHN CLENDON RD In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: FOOTHILLS BUILDERS,LLC Single Family-New $150,000.00 Owner Address: 9 Mountainside DR Total Value $150,000.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency FOOTHILLS BUILDERS,LLC 9 Mountainside DR Queensbury,NY 12804 Plans&Specifications Single Family Dwelling w/gas FP 1422 s.f. Garage 528 s.f. Lot 19 $ 726.60 PERMIT FEE PAID-THIS PERMIT EXPIRES: Saturday, June 29,2019 (If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration d.te.) Dated at the Town uee ury; 4Fri a i4 .e 9,2018 SIGNED BY: for the Town of Queensbury. Director of Building&Code Enforcement Office Use Only PRINCIPLE STRUCTURE PERMIT permit#: - t — 201 Permit Fee: APPLICATION $ 2� or *Rec. Fee:$ 742 Bay Road.Queensbury, NV 12804 P 518-761-8256 ; : _ ;.t`r Invoice#: 351-1 Project Location: 39 Jo f or C Lt & 0 g.D Tax Map #: 215 . Subdivision Name: 3-6 i CCFN Oo (� TOWN BD.RESOLUTION 86-2013 6850 recreation fee for new dwelling units single family:dupl:exesItwo-family, multiplefamily, apartments.condominiums townhouses,and`or manufactured modular homes but not mobiSe homes. This is in addition to the permit fee(s). CONTACT INFORMATION: a Applicant: Name(s): ? o t0 TN I Lc_S 3 u.i L..1] EKS `5()E Liu c.-t Mailing Address, C/S/Z: q /no u TA e,S /0 bk I v- & sr -j NlY i2.ro Cell Ph.: f ( Si ) -7 t t- i t 33 nn Land Lino: I (StT ) 196-35-24 Ceti.) Email: Foa ti{ILtS3utLC>ERSNILI C—injt_. C. 'n • Primary Owner(s): Name(s): SAmE AS A PPLi C ANT Mailing Address, CIS/Z: Cell Ph.: ( ) Land Line: Email: 1 It E n v fi l� • Contractor(s): JUN 2 0 2018 iilfr- Name(s): S Ain AS A P P Li C A NI- o _ t�v�'�!OF QUEENSSUR Mailing Address, CIS/Z: � R1 rrr nrn ., ., Cell Ph.: ( ) Land Line: ( CODES Email: • Architect(s)/Engineer(s): Name(s): R►� t`Zy A , PE Lv l S i at-) £r f G 1 N E- K i N C- ) Mailing Address, C/S/Z: 2.00 Cri-Gt-. 5 i Sr-ir re- 549 IJ LcPs FAu N'1 12-TO I Cell Ph.: ( ) Land Line: I (S-t ? ) 79 Z -- 9 2.(e`f Email: )(L2-1 i1r-►0 V 15ioiJ ENG. emfl i /. Contact Person for Building & Code Compliance: SoE i✓i;Lt L i Cell Ph.: ( (S"tI ) `I� i- 1`�33 Line: i (sr1 ) 1 gr<,-3S2o Email: Foo oTtr.zs t . Li)e St1`f@CY-rnAi.-, coiv, Tan Ruildina R,Code Fnfnrrpmant Prinrinlp Strurturp RPvicPd March 7O1R PROJECT INFORMATION: TYPE: Commercial t< Residential WORK CLASS: K Single-Family Two-Family _Multi-Family(#of ) • Townhouse Business Office Retail Hotel/Motel _Industrial)Warehouse Garage(#ofcars ) Other(describe STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: 1'Tfloor: l 4 Z2- 1 floor: S'�2 2nd floor: 2nd floor: 3rd floor: Total square feet: C2-g Basement(habitable space): Total square feet: • ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction:$ C r D 1 0-0 0 2. Proposed use of the building: lTIL T I A Z 3. If Commercial or Industrial,indicate the name of the business: 4. Source of Heat(circle one): Gas Oil Propane Solar Other: (Fireplaces need a separate Fuel Burning Appliances&Chimney Application,one per appliance) 5. Are there any structures not shown on the plot plan? YES Explain: 6. Are there any easements on the property? YES (b 7. SITE INFORMATION: a.What is the dimensions or acreage o the parcel? L , ( A e-/z-e'S b. Is this a corner lot? YES c.Will the grade be changed as a re a construction? YES ON d.What is the water source? L PRIVATE WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? jr 12-I V rl T f Toth Ruik1in2&CM Enf irremant Prinrinlc Strur nra Rovicoti Marrh MIR DECLARATION: I. l acknowledge that no construction shall commence priorto issuance of a valid building perm and work will be completed within a 12 month period. 2. If the work is not completed by the 1year expiration date the permit may be renewed, subject to fees and department approve I. 3. I certify that the application, plans and supporting materials are a t rue and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed i, or my agents, will obtain a certificate of occupancy. 5. 1 understand that lie are required to provide an as-bui tt survey by a licensed land surveyor of all newly constructed facilities priorto issuance ofa certificate of occupancy. I have read and agree to the above: PRINT NAME: I-6SCP R LI:u 9 SIGNATURE: DATE; r ( 18111 • ToO Building&Code Enforcement PrinrinW Stnu7ura Ravicad Myrrh 77YIR Office Use Only FUEL BURNING APPLIANCE & Permit#: CHIMNEY APPLICATION Permit Fee:$ Invoice#: 42 Bsy Road, Queensbury, NY 2804 P: 518-761-8256 r) Project Location: 3 ck 1 3-6 r J- 'a Tax Map ID: Room of Install: Q--I'LJEA7 Planned Install Date: S" **ONE APPLICATI ON PER APPLIANCE** CONTACT INFORMATION: • Applicant: •Name(s): T H1L- s 'g+.kkueQS L.LC a°c LEU Mailing Address, CISJZ: '1 ' i81NS/DC 7)f-- Que. 1J'f J2go '1 Cell Ph.: 1 (S Ig ) 1R1- 33 Land Line:(( c,g ) 1% -3S20 (a -u) Email: I^o aTK l t -s Pli;.ti(4)C S i-1 1 (3C—rrt tU L CO PA • Primary Owner(s): Name(s): S'R rn-E fi-g APO-I c R N Mailing Address, C/S/Z: Cell Ph.: ( ) Land Line: ( ) Email: • lnstallertBuilder: Name(s): S ij ryN A 5 99~-1 cn Mailing Address, CISIZ: Cell Ph.: ( ) Land Line: ( ) Email: Contact Person for Building &Code Compliance: "31)0 LE(k C- I Cell Ph.: ( ( T r ) 1cl 1 - 1' 33 Lend Line: j_(5-1 S ) 116 - 35-2 Ccet L-) Email: r--telt"',-e - Fbo T t G-rr Town of Ou_enseury Eui;con^&Code Enforcement FUEL BURNING APPLIANCE INFORMATION: TYPE OF DEVICE: Stove X Fireplace Insert _Fireplace EN) Hl i� rno rc,N Mob-Z >.�v'A3‘FF3n� TI H- bTL.UX _Fuel Fired Equipment(Garage Only,13"clearance per IMC 304 3) Fireplace, factory built** "Manufacturers Name: Model#: SOURCE OF HEAT: Wood Coal Pellet Gas --) CHIMNEY INFORMATION: _Masonry: block brick stone • Flue: tie (stJe 12 size,ninches Material*: double-wall triple-wa II jnsulated (*Manufacturer's r-i m = Model#: ADDITIONAL INFORMATION: I. Two inspections are required. A rough-in nspection,prior to installation and a final inspection,after installation. 2 Manufacturer's installation manual must be available at the time of inspection. 3 Masonry fireplaces &chimneys require plans to be submitted. 4 Twenty-four (24)hour notification b required for nspections. Peciaration:Construction/installation must conform to NYS Fire Prevention&Building Code and/or manufacturer requirements.The applicant or owner agrees to comply with all applicable laws,ordinances,regulations and all conditions that are part ofthese requirements and also will allow the inspector to enter the premises to perform the required inspections. I have read and agree to the above: PRINTNAIVIE: 305E?H Lev�l — SIGNATURE: O `/� IDATE: 6I/8 t Fuel Burning Appliance&Chimney Application ti, r .,, 2, SEPTIC DISPOSAL PERMIT APPLICATI ON Office use On ` - - 7-L Bay Road.Queensbury,NY 1_x04 P 518-76 W56 _ . ..m Perna=: Tax Map ID#: Permit I ee S ., .oil.:: Pro'ect Location: ' cl 'So H w C c.Lrw b k i-, Q' :Septic ,_anance? Y i,;_. Prirr ary Owner(s) I F0 p i 1-1 t LLS ;3�i 1 L C g S LL-C (so€' Le LA <--1) ` Mailing Address ICI mbLA- ,TA1NSIOC ig. Que1 t,,s814A-1 Nj 12$0: l Phone & Email IC,sts)- t--(933 /0101%'3S2c EoOTHi1-1-SF31AILbEPSN`1 e46-mAlL, D Installer/Builder &A,.t\e AS APPLtCANit' Mailing Address — Phone & Email Engineer Torte t., tr ftP- • Mailing Address j(p1 1-1AvlL.Aivr, PC (, 1A.E-FiQS6ut.g -j Ny 12.g•0 `f Phone& Email C5_=1011(0-2._S-7 S 1.1,6:1•11-6P,3G) @YRIloo,C,®r''i___�w��-� - -r Contact Person for Building&Code C,8:,mpiiancc:S6e- LE Q-C( Plltic)n : (.51011I _ 1933 RESIDENCE NFORMATION: t!Sl 01`� 2 0 Year Built # of bedrooms X gallons per bedroom = totaidaily flow Garbage Grinder Yes 1980 or olden Installed? {circle one) 9$9-D91 a -.. ___ Spa or Hot Tub Yes Noo Installed? {circle one) �3 =Prase nt _ I �� 3 ' �.. , PARCEL NFORMATION: Topography f DC Flat Rolling Steep Slope %Slope Soil Nature n,Sand Loam Clay __Other Groundwater At what depth? N(A Bedrock/lrnpery bus material [At what depth? fir Domestic Water Supply Municipal _Well 3fwell,water supply from any septic system absorption is_ft.) Percolation Test IRate: (- c per minute per inch{test to be completed by licensed engneer/arcitect) PROPOSED SYSTEM FOR NEW CONSTRUCTION: Tank size '(006 gallons{min.size 1000 ga llons,add 250 ga lions for each garbage cylinder or spa/hot tub System Absorption field with#2 stone iTotal length / CO ft.;EachTrench S-v ft. Seepage Pitwith#3 stone How many: -Size: Alternative System Bed or other type: HoldingTank System ?Total required capacity?? -tank size ;# of tanks NOTES:'Alarm system&associated electrica Mork must be inspected by a Town approved electrical inspection agency;2.We will no longer allow systems to be covered until such time as an as-built plan is received and approved. The installed system must match the septic layout on file-no exceptions. Declaration:Any permit or approval granted which is based upon or is granted in reliance upon any material representation or failure to make a material fact or circumstance known by or on behalf of an applicant,shall be void.l have read the regulations and agree to abide by these and all requirements of the Town of Queensbury Sanitary Sewage Disposal Ordinance. PRINT NAME: O'OS t-P A Le Lt. 4 DATE: C lirlik ,......„(A......„\:: SIGNATURE:___61:14Viii\----.._______ DATE: j Y Torn of Oueensbur,,B.,•d:: . .Code Enforcement e._ a,..... 2017 y - 4 Town of Queensbury Thomas R.Van Ness Highway Department Highway Superintendent 742 Bay Road,Queensbury,NY 12804 Home:518-745-0929 Phone:518-761-8211 Fax:518-745-4466 David Duel! Deputy Highway Superintendent Home:518-745-0938 DRIVEWAY PERMIT Date: 6 1 �t' r Applicant Name: Foo 3 H1LtS t3 LA.tLC)E12--S &SO6- Le u� {J Telephone No.: CS'1079 i-(q 33 /( CI %-3c2 O Address to be Inspected: 39 TO &i ev• L Cg-iv 0 6 f-N I 1' Return Address: 9 me u N if i N S iDE Z QUAi Er,S$t,('y ttt (Z$C` Applicant must show exact location and width of driveway(s)to be connected to the highway by placing stakes at the specified location. The Superintendent of Highways of the Town of Queensbury has reviewed this application. The following action has been taken: STEP 1: ( ) Preliminary approval NEED ( ) Slight Swale ( ) Deep Swale ( ) Level with the road ( ) Level with the top of the paved wing Size culvert pipe to be used(if necessary) ( ) 12" ( ) 15" ( ) 18" ( )24" ( )36" Preliminary inspection completed by: Date: Approval by Highway Supt.: or Deputy Supt.: Upon completion please resubmit this approval permit for a final approval. STEP 2: ( ) Final Approval ( ) Rejected Date: Thomas R.Van Ness, Highway Superintendent David Duell, Deputy Highway Superintendent Town of Queensbury Building&Code Enforcement Principal Structure Application Revised February 2017 INSPECTION WORKSHEET (007041-2018) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number: Inspection Date: Inspector: Case Module: Inspection Status: Inspection Type: RC-0381-2018 10/02/2018 Charles Dyer Permit Passed Residential Final Inspection Job Address:Parcel Number:39 JOHN CLENDON RD Queensbury, NY 12804 295.15-2-16 Contact Type Company Name Name Primary Owner FOOTHILLS BUILDERS, LLC [FOOTHILLS BUILDERS, LLC] Contractor FOOTHILLS BUILDERS, LLC [FOOTHILLS BUILDERS, LLC] Applicant FOOTHILLS BUILDERS, LLC [FOOTHILLS BUILDERS, LLC] Granted Permission FOOTHILLS BUILDERS, LLC [FOOTHILLS BUILDERS, LLC] Checklist Item Passed Comments General Comments NO 4 inch Building Number Address visible from road NO Chimney Height / B Vent / Direct Vent Location YES Chimney Rain Cap Installed NO Fresh Air Intake YES Fresh air supply 3' from grade YES 3" Plumbing Vent through roof minimum 18 inch YES Outside Spigots have Air Gap YES Roof Complete / Exterior Finish Complete YES Platform at all exterior doors YES Handrail 4 or more risers YES Guards at stairs,decks,patios 30" + above grade NO Guard at stairwell at 34" or more YES Window guards req:<2' above floor/6' above grade - quick release installed YES Guard at deck, porches 36" or more NO Handrail Termination at Newell Post or Wall YES Interior/Exterior Railings 34 to 38 YES Wood deck: 2'+ from grade dia bracing required - H/C ramp compliant NO Oct 02, 2018 Page (1) INSPECTION WORKSHEET (007041-2018) Checklist Item Passed Comments 4+ Deck Joist Ledger Connections-24" From Ends NO Deck Ledger-Bolted per Code NO Grade away from foundation 6 with 10 feet YES 6 clearance to sill plate YES Gas Shut-off Exposed & Regulator (18) Above Grade YES Interior privacy/trim/doors/main entrance 36 YES Bathroom / Kitchen Watertight YES Low flow toilet 1.3 gal/flushing cycle - showerhead/faucet YES Smoke Detectors: Carbon Monoxide YES Smoke Detectors 3' from Kitchens & Baths R314 YES Every level, Every bedroom YES Outside every bedroom area YES Inter Connected YES Battery backup: _____YES Attic Access 22 x 30 minimum YES Attic Access Insulation = Attic R- Value YES Attic Access Gasketed YES Bathroom Fans, if no window YES Plumbing fixtures YES Backflow Preventors where required YES Foundation insulation to floor YES Energy Sticker on Elec. Panel:R-Val. & Heating Sys YES All Hot Water Systems: R-3 YES Duct work sealed properly YES Intake Openings YES Blower Door Test Certification YES HRV or ERV Installed per Bedroom Requirements YES Floor truss, draft stop- fin base 1,000 sq. ft.NO Emergency egress below grade YES Oct 02, 2018 Page (2) INSPECTION WORKSHEET (007041-2018) Checklist Item Passed Comments Furnace shut-off w/in 30 ft. or w/in line of site YES Oil Furnace Shut-Off at Entrance to Furnace Area YES Furnace Hot Water Heater operating YES Relief Valve ,Heat Trap/Water Temp 110 deg or less YES 1/2" Gypsum or House Wall and Gable YES 5/8" Type X with Living Space Above YES 20 Minute Fire Door/Self-Closing Hardware YES Seals on Garage Doors, esp. Wood YES Basement stairs closed rise greater than 4 inches YES Basement Egress: 5s.f. window w/sill or Bilco door YES Garage Floor Pitched YES Gas Log In Sealed or Glass Enclosure YES Fin Elect; Energy Saving Light Bulbs 50 Percent YES Final Survey Plot Plan YES Arc Fault Breaker Habitable Spaces YES As Built Septic System YES Site Plan / Variance required NO Flood Plain Certification, if required NO Fuel Tanks above flood plain elevation NO Buried Fuel Tanks anchored in flood zone NO Truss ID Signage Installed at Electrical Meter YES OK to Issue Temporary C/O NO OK to Issue C/O YES Need to verify hydro at 4" main line Will recheck 10/2/18 Verified 10/2/18 Oct 02, 2018 Page (3) Dyer, Charles (Inspector) Compliance Certificate • Project Foothills Builders Energy Code: 2015 IECC Location: Glens Falls, New York Construction Type: Single-family Project Type: New Construction TECIEUVE0 Conditioned Floor Area: 1,422 ft2 JUN 2 0 2018 Glazing Area 11% Climate Zone: 6 (7635 HDD) TOWN OF QUEENS BURY Permit Date: I BUILDING&.CODES Permit Number: Construction Site: Owner/Agent: Designer/Contractor: 39 John Clendon Dr VISION Engineering, LLC Lot 19 206 Glens Street Queensbury, NY 12804 Suite 56 Glens Falls, NY 12801 vv,i I�KiSte_�..�� ���._, ..... � ' s Compliance: 0.4%Better Than Code Maximum UA: 232 Your UA: 231 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies ,S u u R-M lle - •oar, UA< .. Ceiling 1: Flat Ceiling or Scissor Truss 1,422 38.0 0.0 0.030 43 Wall 1:Wood Frame, 16" o.c. 1,566 21.0 0.0 0.057 79 Window 1:Vinyl/Fiberglass Frame:Double Pane with Low-E 102 0.290 30 Door 1: Solid 18 0.140 3 Door 2: Glass 40 0.290 12 Door 3: Solid 20 0.200 4 Basement Wall 1: Solid Concrete or Masonry 1,357 0.0 19.0 0.038 51 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 2:Vinyl/Fiberglass Frame:Double Pane 9 0.400 4 Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 295.15-2-16 RC-0381-2018 Foothills Builders 39 John Clendon Roa d, Lot 19 SFD w/gas FP 1422 s.f., Gar. 528 s.f. Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES - Page 1 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck 3 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed ing has been designed to meet the 2015 IECC re uirements in REScheck ersion 4.6.4 and to comply with the mandatory re rei"e 4nts listed in the REScheck Inspection Checkli t. Name-Titlei signature ante / (or NE(z • A * #3 tu • Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES- Page 2 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck 4 T 7 r". REScheck Software Version 8 ■ Inspection Checklist p ::Energy Code: 2015 IECC Requirements:,0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. ectl" ( : %%' flans Verified .Field yeirified I Pre lnspectiori/Plans Review l ae . Value r Co plles? Comments/Asisur pt¢ons.. &.Re=t ID. _' . :: a'. 103.1, :Construction drawings and "--w'=.:'. ;s,'?;;❑Complies 103.2 documentation demonstrate 'ir - 'AEI Not [PR1]1 i energy code compliance for the ...:\A.:;,t w ❑Not Observable building envelope.Thermal =4', `,;,. ., .,z❑Not Applicable :envelope represented on ; :-,,4 : ; construction documents. =' = '{ , 103.1, :Construction drawings and ,:;p, ''" ,;:f T• ❑Complies 103.2, documentation demonstrate i," >' =❑Does Not `403.7 =energy code compliance for ,<:;�_: ❑Not Observable [PR3P :lighting and mechanical systems. is:::%::•,, ,' :Systems serving multiple ,, ❑Not Applicable dwelling units must demonstrate "` '<', :compliance with the IECC • ,"°" "' :Commercial Provisions. `? 302.1,:=`:,:ii Heating and cooling equipment is: Heating: Heating: ;❑Complies 403:7-- >i sized per ACCA Manual S based i Btu/hr : Btu/hr :❑Does Not [0;112-]?'`;;; on loads calculated per ACCA : Cooling: Cooling: ,❑Not Observable ,:fit: ' Manual J or other methods : Btu/hr ; Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: • 11;High Impact(Tier 1) "2, Medium Impact(Tier 2) 3`: Low Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES - Page 3 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck S,ecti ors ;. Plans Verified 'Field Verified.; ' Foundation lns +ettlr� •Co piles'? mments/Assuript'onys E&.:RetgJt3 ,:.. VIt€e 1Tlue .- 402.1.1 :Conditioned basement wall ` R- R- ;❑Complies See the Envelope Assemblies [F04]1 insulation R-value.Where interior I R_ R- 3 ;table for values. =❑Does Not insulation is used,verification may need to occur during ;❑Not Observable Insulation Inspection. Not ❑Not Applicable required in warm-humid locations i • in Climate Zone 3. 303.2 :Conditioned basement wall <❑Complies [F05]1 insulation installed per `❑Does Not ;manufacturer's instructions. ?:><;- ❑Not Observable • • •"" ;❑Not Applicable 402.2.9 :Conditioned basement wall ft _ ft - ;❑Complies See the Envelope Assemblies [F06]1 insulation depth of burial or ❑Does Not table for values. j distance from top of wall. • ❑Not Observable • ❑Not Applicable •303.2: :;,A protective covering is installed '❑Complies [FOIl]?,Z" zto protect exposed exterior ." ❑Does Not " s: insulation and extends a ,..,-,=s'i= ;" ' „ ❑Not Observable minimum of 6 in. below grade. ;.... :<--❑Not Applicable 403'.9-; Snow-and ice-melting system lEComplies [FOi"2:] controls installed. <❑ r'° -;(�, `,Y� `<: ` Does Not r ❑NOt Observable ` ` i❑Not Applicable • Additional Comments/Assumptions: i lHigh Impact(Tier 1) '2 IMedium Impact(Tier 2) 1:3' Low Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES- Page 4 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck -Eal• lerifiiec] Field Verrfaecl -: Framing 1Rough-in l sg,: -,,,. Valli i pi° s C anrasee�tslAs , , ,,rb s "6e Req.iD Value 402.1.1, Door U-factor. V U- ' U- s❑Complies See the Envelope Assemblies 402.3.4 ;❑Does Not table for values. [FR1]1 • • ❑Nat Observable ❑Not Applicable 402.1.1, :Glazing U-factor(area-weighted : U- U- ❑Complies See the Envelope Assemblies 402.3.1, i average). • ;❑Does Not table for values. • 402.3.3, ; 402.3.6, ❑Not Observable 402.5 i ;❑Not Applicable [FR2]1 • • • 303.1.3 :U-factors of fenestration products> ❑Complies [FR4]1 are determined in accordance ;,;,;" " z"'' ❑Does Not with the NFRC test procedure or -4. , :taken from the default table. _N=, ,., ,r❑Not Observable :,;- . ?.. ❑Not Applicable • 402.4.1.1 :Air barrier and thermal barrier ;;:,>.;" ;,:;: •.-,,;,,,❑Complies [FR23]1 ;installed per manufacturers ❑Does Not :,i instructions. ' ;y❑Not Observable `` ENot Applicable 402.4.3 Fenestration that is not site built `' w,, ❑Complies [FR20]1 is listed and labeled as meeting = ~r�` ;- , .,-:;>❑Does Not 4. , AAMA/WDMA/CSA 101/I.5.2/A440, :', <=,:; <, `'a ,' `>`q❑Not Observable :or has infiltration rates per NFRC E?: , 400 that do not exceed code ='' , :1- ;❑Not Applicable :limits. :E: 402:4:5 'IC-rated recessed lighting fixtures; ::• a<`,:` Complies [FR1612`]-" sealed at housing/interior finish t ❑Does Not and labeled to indicate <_2.0 cfm a¢, '; V ❑Not Observable (leakage at 75 Pa. '-',.'''a.'';• `: ',: • • ❑Not Applicable ❑Comlies 403.2.1 :Supply and return ducts in attics p g.";y_„ '�;r,��. : p [FR12]1 :insulated >= R-8 where duct is ,' ' 3❑Does Not >= 3 inches in diameter and >= j`..'❑Not Observable R-6 where< 3 inches.Supply and 4' ;return ducts in other portions of '"'- '+ '` ;`_<._r< ❑Not Applicable the building insulated >= R-6 for :diameter>= 3 inches and R-4.2 F;r>'`� :for< 3 inches in diameter. I .403.3'.-3.5:,i Building cavities are not used as ' • M ,}," ❑Complies FR15 3 'ducts or plenums. ''. '`"� , "aF>>� `❑Does Not [ 1. ri p ' ._� v : `_0)-:.. t • rr ` 'x ❑Not Observable -... ", °�' , ❑ '. Not Applicable . 403.4 HVAC piping conveying fluids : R- 1 R- iC1Complies [FR171 : -" above 105°F or chilled fluids i❑Does Not ,; s.;.,..,_;,,. below 55 °F are insulated to >_R 3 ;❑Not Observable • ❑Not Applicable 403.4.1 :Protection of insulation on HVAC '-'.ar:" °1, E..❑Complies [FR24]1 :piping. ' `_ ❑Does Not „,„›,-F< " i❑Not Observable _ „ �•j: • `'` ❑Not Applicable 40„3,5.:3; `<:� Hot water pipes are insulated to : R- ; R ❑Complies [FR1.8] - '"=?R 3. '_ ❑Does Not ; ' ❑Not Observable ❑Not Applicable --,4,'' 403:n Automatic or gravity dampers are;, :.•• ;; ❑Complies [FR19"]?:'`' :installed on all outdoor air ❑Does Not ;intakes and exhausts. £: 3❑Not Observable ;~ �»;;' --Not Applicable ljHigh Impact(Tier 1) ,2';:.. Medium Impact(Tier 2) -3 iLow Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES - Page 5 of 10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES - Page 6 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck e€3 `e! ttert`:`Plans�ler�rfa F� ins�sl�ti�srs l�s���t,®n - f Cr�rr��stses? GcstnealetslAsSsarailatlor�s; 6€.RegJD Value i1 l a installed insulation is labeled ', :❑Complies 3 [lN13]?, or the installed R-values -❑Does Not provided. ',❑Not Observable• • ❑Not Applicable 402.1.1, `Wall insulation R-value. If this is a R- R- `❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least V2 of the '❑ Wood • ❑ Wood 3❑Does Not {table for values. 402.2.E wall insulation on the wall ❑ Mass ;❑ Mass ❑Not Observable [IN311 exterior,the exterior insulation requirement applies(FR10). ❑ Steel ID Steel ❑Not Applicable • • 3 • 03.2 :Wall insulation is installed per ``.%;.• ❑Complies [IN4]1 manufacturer's instructions. i``;:. ; ❑Does Not • ❑Not Observable • ;❑Not Applicable Additional Comments/Assumptions: • • 1 ;High Impact(Tier 1) 2- Medium Impact(Tier 2) .:3. Low Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES- Page 7 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck •Sectian;_ :_ . fits VerifiedFrei Verified ; 't' 4:. :::. Final knspectio AProvaslons hale . Cot es?jali <" ' omnientsmAssumptions & eq 11 ,, , " Value. 402.1.1, Ceiling insulation R-value. ` R- : R- ❑Complies See the Envelope Assemblies 402.2.1, i ❑ Wood i❑ Wood i❑Does Not table for values. 402.2.2, i ❑ Steel I❑ Steel 11=INot Observable 402.2.E [FI1]1 ❑Not Applicable • • 303.1.1.1, :Ceiling insulation installed per '''_" >, >>q❑Complies 303.2 `manufacturer's instructions. h<s'-9 :: ` ~;• Does Not [F1211 Blown insulation marked every µ`<; ❑ 300 ft2. ;❑Not Observable '•-_ '❑Not Applicable '402.2.3> ;Vented attics with air permeable ❑Complies F122]2` ";'_;insulation include baffle adjacent '":,',` ❑Does Not s ' '• _- . to soffit and eave vents that " j extends over insulation. '' ❑Not Observable ❑Not Applicable 402.2.4 :Attic access hatch and door : R- R- i❑Complies [FI3]1 insulation R-value of the i❑Does Not adjacent assembly. • ❑Not Observable • ❑Not Applicable 402.4.1.2 :Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [FI17]1 ;ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.2.3 ;Duct tightness test result of<=4 : cfm/100 5. - cfm/100 ❑Complies [FI4]1 :cfm/100 ft2 across the system or ' ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ❑Not Observable tests,verification may need to ❑Not Applicable `occur during Framing Inspection. 403.3.2 :Ducts are pressure tested to cfm/100 cfm/100 iDComplies [FI27]1 :determine air leakage with ; ft2 ft2 iDDoes Not either: Rough-in test:Total leakage measured with a _ Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g.across the system including :the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total ° - leakage measured with a pressure differential of 0.1 inch i = w.g. across the entire system :including the manufacturer's air handler enclosure. 403,3.2.1 'Air handler leakage designated ❑Complies [F124]1 by manufacturer at<=2%of ? ❑Does Not :design airflow. ❑Not Observable • ❑Not Applicable 4031:1 Programmable thermostats " • '❑Complies [Fi9]2 " installed for control of primary �❑Does Not heating and cooling systems and ,. =y°r'" ❑Not Observable ;initially set by manufacturer to £; u :<<="a:3 code specifications. • ❑Not Applicable 403::, - Heat pump thermostat installed • . ❑Complies [Fi10]2 .on heat pumps. - -❑Does Not ❑Not Observable ' ="❑Not Applicable > 403:5',1 ::;Circulating service hot water =�:::r::�„.::: -.,-.- : : v--�:.>. h❑Complies [F111]2 , .;" f systems have automatic or ;_ . ❑Does Not `, ''` '`=accessible manual controls. ' ' ' ;❑Not Observable . .r.� _;.. e;;_...;:. ❑Not Applicable > ' 1 !High Impact(Tier 1) 1:,2•.lMedium Impact(Tier 2) 3: Low Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES - Page 8 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck �,Sectior • Plaits'4�ea'lfieci Field$!anti # Final inspection Provisions complies? , Comnrnents/Assurnptaons e:Re EE), value '`Valcie 403.6 1 All mechanical ventilation system '' %~,-;',.'` ;,' ` ' `❑Complies [FI25] ;fans not part of tested and listed .,... y❑p - HVAC equipment meet efficacy ; -: :i oes Not and airflow limits. ❑Not Observable • ❑Not Applicable 403,2 Hot water boilers supplying heat mm ❑Complies [FI26]? • ""through one-or two-pipe heating • ❑ `' Does Not ;systems have outdoor setback ' - [ ' " , s;.;.= ;:-k • []Not Observable •";control to lower boiler water ', ,",,, ' " temperature based on outdoor ❑Not Applicable temperature. «"_ 403:5s1 1 ;Heated water circulation - , ;rc,,,,; ;;;";.1;" " ❑Com lies systemsp [F128]``--,: , '!'',3 ',have a circulation pump.The ❑Does Not ,)system return pipe is a dedicated t ,,. ; w?-- , ,.* .. ❑Not Observable ',return pipe or a cold water supply pipe. Gravity and thermos ,,,' ';, ,!•❑Not Applicable syphon circulation systems are not present.Controls for circulating hot water system pumps start the pump with signal ••• - " " :for hot water demand within the "~<,: occupancy. Controls • automatically turn off the pump ;when water is in circulation loop :TY `t is at set-point temperature and ' ,;, ., ... ; :;: ;, ?:'- ",,':,,,,,,:-,'„I no demand for hot water exists. 403.5.1.2 Electric heat trace systems :, ;;,<,w-,;,,,., " •• • '❑Complies (F12912 comply with IEEE 515.1 or UL y.;;,, • -]:▪ , ❑Does Not 515. Controls automatically ' r,- •'•'• `a'F i ❑Not Observable adjust the energy input to the - -,'_<y ;:,�,,;3.`f;;.;, heat tracing to maintain the • ❑Not Applicable ."' desired water temperature in the €,;'.>;: :>" ." " y""' ' piping. ":,'°,, ❑Com lies 4fl3"S.2 Water distribution systems that ` '. • - ;,,w; p [F130]2" ., have recirculation pumps that (',,; "'' ' • :,r, `::'" .".u, ❑Does Not pump water from a heated water .r<<;E,', supply pipe back to the heated =` ;,;.;,, ,, ':,, =❑Not Observable water source through a cold , %:'• > ' ❑Not Applicable water supply pipe have a ,,,; r r . demand recirculation water is • •• , •system. Pumps have controls i:: i>r ; ?., '' " that manage operation of the 1-.: ,- "'.�,:,.:,, ,i .. >;. •x pump and limit the temperature i_. :ter::, ;x; , of the water entering the cold l: �e='':' water piping to 104°F. } 403.5.4" Drain water heat recovery units ' :,:: • ❑Complies •[F13112 .,, tested in accordance with CSA ,❑Does Not B55.1. Potable water-side <; -:-: • l `°'�' - • ❑Not Observable ;, pressure loss of drain water heat y -.•'`;.'F recovery= units< 3 psi for ? '.._, ❑Not Applicable . individual units connected to one Y:• :_ .' -,1 or two showers. Potable water- " ~'side pressure loss of drain water SKy,- heat recovery units< 2 psi for individual units connected to ;c:::: <three or more showers. ' 14t.">` 4. :j°: ° 7; -, .z , - ,❑Com lies 404.1 • !75%of lamps in permanent p [FI6]1 fixtures or 75%of permanent ';'' 'i❑Does Not ;fixtures have high efficacy lamps.`•"`` ` . Does not apply to low-voltage ',',.4 ❑Not Observable lighting. w>:. z,,.•" 10Not Applicable .G '' `❑Complies 404 I V': ,'Fuel gas lighting systems have ;_: ';. ``] 3 [F►23]3 no< continuous pilot light. il r'' ='=- ❑Does Not :;�. F' ❑Not Observable ' °} ` ❑Not Applicable 1 !High Impact(Tier 1) ,•2,,IMedium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES - Page 9 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck , CtiQtl 4 Plans Verified Foeld 1Teeifi d':;, ,:• ='` Final inspectk n Pravisions" C i�spl�es? coit�rrserttslAsou options & litegilD ' wile Value 402.3:' Compliance certificate posted. ❑Complies [F17 ❑Does Not�?�"� � ❑Not Observable DNot Applicable 3033 _=Manufacturer manuals for " DComplies [F118P3 ' ,, mechanical and water heating • ❑Does Not x.?systems have been provided. ••,: ..: ❑Not Observable E ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) :,2 Medium Impact(Tier 2) '3 Low Impact(Tier 3) Project Title: Foothills Builders Report date: 06/19/18 Data filename: C:\Users\DWR Desktop\Dropbox\VISION Engineering, LLC\Active Projects VE\1345 - DES- Page 10 of10 FHB 38 John Clendon Dr Lot 19\1345 Rescheck.rck a a ,p �X 2 V i 0 - i i Eff e lit= LL1; Na SUB ` Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Window 0.29 Door 0.29 r a. ynnSn t"^ . gyp• * -t z< �.'.Y.w ,�d�,.. .. aLv:3w+.�� . =.a.e Heating System: Cooling System: Water Heater: Name: Date: Comments • . K - - Manual S Compliance iance Report Job: 39 JOHN CLENDON DR pDate: Jun 22,2018 Entire House By: Plan: 1345 FOOTHILL BUILDERS QUEENSBURY,NY 12804 Project Information For: JOE, FOOTHILL BUILDERS QUEENSBURY, NY 12804 . . Cooling Equipment Design Conditions Outdoor design DB: 85.0°F Sensible gain: 18590 Btuh Entering coil DB: 75.3°F Outdoor design WB: 71.0°F Latent gain: 4687 Btuh Entering coil WB: 62.6°F Indoor design DB: 75.0°F Total gain: 23277 Btuh Indoor RH: 50% Estimated airflow: 805 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: York Model: TCHD30S41S3+HD36A3XH1+TM8X060Al2MP11+S1-1TVM4G1 Actual airflow: 933 cfm Sensible capacity: 0 Btuh 0% of load Latent capacity: 0 Btuh 0% of load Total capacity: 0 Btuh 0% of load SHR: 0% Heating Equipment Design Conditions Outdoor design DB: -4.0°F Heat loss: 82706 Btuh Entering coil DB: 65.4°F Indoor design DB: 68.0°F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas furnace Manufacturer: York Model: TM9X080B12MP11 Actual airflow: 933 cfm Output capacity: 76000 Btuh 92% of load Temp. rise: 50 °F JUN 25 2O8 TORN OF QUEENSBURY Meets are all requirements of ACCA Manual S. SUILQIND&CODES 2018-Jun-22 14:54:46 . wrightsoft® Right-Suitee Universal 2017 17.0.16 RSU25116 Page 1 /ICCA ...ngeworthy\Documents\York\39 JOHN CLENDON DR.rup Calc=MJ7 Front Door faces: N �. Residential Plans Examiner Review Form Form ACCIko for HVAC System Design (Loads, Equipment, Ducts) 15Mar09 ArCon:KonivCairadasofAmeriza QUEENSBURY Header Information Contractor: FOOTHILL BUILDERS REQUIRED ATTACHMENTS ATTACHED Manual J1 Form(and supporting worksheets): Yes No Mechanical license: or MJ1AE Form*(and supporting worksheets): Yes ❑ No ❑ OEM performance data(heating,cooling,blower): Yes ❑ No ❑ Building plan#: 1345 Manual D Friction Rate Worksheet: Yes 0 No D Duct distribution sketch: Yes (] No D Home address(Street or Lot#,Block,Subdivision): , Entire House HVAC LOAD CALCULATION (IRC M1401.3) Design Conditions Building Construction Information Winter Design Conditions Building Outdoor temperature: -4 °F Orientation: Front Door faces North Indoor temperature: 68 °F North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 82706 Btuh Number of bedrooms: 3 Conditioned floor area: 4256 ft2 Summer Design Conditions Number of occupants: 0 Outdoor temperature: 85 °F Indoor temperature: 75 °F Windows Roof Grains difference: 27 gr/Ib©50% RH Eave overhang depth: 0 ft Sensible heat gain: 20656 Btuh Internal shade: none Eave Latent heatgain: Blinds,drapes,etc. 5207 Btuh Depth Window Total heat gain: 25864 Btuh Number of skylights: 0 HVAC EQUIPMENT SELECTION (IRC M1401.3) Heating Equipment Data Cooling Equipment Data Blower Data Equipment tye: Gas furnace Equipment type: SplitAC Heating cfm: 933 umace,Hea pump,Boiler,etc. it onditioner,Heat pump,etc. Cooling cfm: 933 Model: York Model: York Static pressure: 0 in H2O TM9X080B12MP11 TCHD30S41S3 Fan•s rated extemal static pressure for design airflow Heating output capacity:. 7600 Btuh Total cooling capacity: 0 Btuh Heat pumps-capacity at winter design outdoorconditions Sensible cooling capacity: 0 Btuh Aux.heating output capacity: 0 Btuh Latent cooling capacity: 0 Btuh HVAC DUCT DISTRIBUTION SYSTEM DESIGN (IRC M1601.1) Design airflow: 933 cfm Longest supply duct: 0 ft Duct Materials Used Equipment design ESP: 0 in H2O Longest return duct: 0 ft Trunk duct: Total device pressure losses: 0 in H2O Total effective length(TEL): 0 ft Available static pressure(ASP): 0 in H2O Friction rate: 0 in/100ft Branch duct: Sheet metal Friction Rate=ASP+(TELx 10 ) I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name:' , Contractor's signature: Date: Reserved for County,Town Municipality or Authority having jurisdiction use. "Home qualifies for MJ1AE Form based on Abridged Edition Checklist 41- wrightsoft® Right-Suites Universal 2017 17.0.16 RSU25116 t �! 'Summary Summar Job: 39 JOHN CLENDON DR y' Date: Jun 22,2018 Entire House By: FOOTHILL BUILDERS Plan: 1345 QUEENSBURY,NY 12804 Pro'ect Information For: JOE, FOOTHILL BUILDERS QUEENSBURY, NY 12804 Notes: • Desi• n Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 °F Outside db 85 °F Inside db 68 °F Inside db 75 °F Design TD 72 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr./lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 77806 Btuh Structure 17724 Btuh Ducts 4900 Btuh Ducts 867 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh (none) Humidification 0 Btuh Bl (none) 0 Btuh Piping 0 Btuh Equipment load 82706 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 16731 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Average Fireplaces - 0 Structure 4687 Btuh Ducts 0 Btuh Central vent (0 cfm) 0 Btuh Heating Cooling (none) Area(ft2) 4256 4256 Equipment latent load 4687 Btuh Volume(ft') 38304 38304 Air changes/hour 0.70 0.40 Equipment total load 21418 Btuh Equiv.AVF (cfm) 447 255 Req. total capacity at 0.70 SHR 2.0 ton Heating Equipment Summary Cooling Equipment Summary Make York Make York Trade YORK Trade HORIZONTAL DISCHARGE Model TM9X080B12MP11 Cond TCHD30S41S3 AHRI ref 2008691 Coil HD36A3XH1+TM8X060Al2MP11+S1-1TVM4G1 AHRI ref 3743063 Efficiency 95.5 AFUE Efficiency 12.5 EER, 14 SEER Heating input 80000 Btuh Sensible cooling 19600 Btuh Heating output 76000 Btuh Latent cooling 8400 Btuh Temperature rise 74 °F Total cooling 28000 Btuh Actual air flow 933 cfm Actual air flow 933 cfm Air flow factor 0.011 cfm/Btuh Air flow factor 0.050 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.80 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. t Wr- 11tSOft® 2018-Jun-2214:54:46 At`— g Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACCK ...ngeworthy\Documents\York\39 JOHN CLENDON DR.rup Caic=MJ7 Front Door faces: N Right-J®Worksheet Job: 39 JOHN CLENDON DR ` Entire House Date: Jun 22,2018 By: FOOTHILL BUILDERS Plan: 1345 QUEENSBURY,NY 12804 MANUAL J:7th Ed. 1 Name of room Entire House Room2 Room3 Room4 2 Length of exposed wall 522.0 ft 174.0 ft 17.0 ft 15.0 ft 3 Room dimensions 1.0 x 1422 ft 5.0 x 12.0 ft 1.0 x 74.0 ft 4 Ceilings Condit.Option 9.0 ft d 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft*) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft*) Htg Clg 5 Gross a 12E3 5.4 1.0 4698 **** **** 1566 **** **** 153 **** **** 135 **** **** Exposed b 0 0 Hill **** **** ill 111 **** **** !WI! **** **** IIIIII **** **** walls and c 0 0 IIIIII **** **** mill **** **** Iilif! **** **** Him **** **** partitions d 0 0 IIIIII **** **** I I I I I I **** **** IIIIII **** **** II III I **** **** e 0 0 IIIIII **** **** I I I I I I **** **** Iillll **** **** I I I I I I **** **** f 0 0 "II **** **** 111111 **** **** I11111 **** **** 111111 **** **** 6 Windows and a 3A0 39.7 ** 160 6348 **** 0 0 **** 10 397 **** 0 0 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 55 **** 1045 0 **** 0 0 **** 0 0 **** 0 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 60 **** 4080 0 **** 0 10 **** 680 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 45 **** 1530 0 **** 0 0 **** 0 0 **** 0 Holz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 1OD0 33.1 6.3 84 2782 526 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 4454 24052 4543 1566 8456 1597 143 772 146 135 729 138 exposed b 0 0 111111 0 0 IIIIII 0 0 HMI 0 0 IIIIII 0 0 walls and c 0 0 111111 0 0 IIIIII 0 0 IIIIII 0 0 IIIIII 0 0 partitions d 0 0 111111 0 0 III111 0 0 IIIIII 0 0 111111 0 0 e 0 0 Min 0 0 IIIIII 0 0 IIIIII 0 0 I I I111 0 0 f 0 0 Mill I I11 0 0 min 0 0 IIIIII 0 0 I I1111 0 0 10 Ceilings a 16G0 2.4 1.1 2844 6757 3191 1422 3379 1595 60 143 67 74 176 83 b 0 0 111111 0 0 null 0 0 IIIIII 0 0 111111 0 0 C 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0 d 0 0 111111 0 0 IIIIII 0 0 IIIIII 0 0 IIIIII 0 0 e 0 0 111111 0 0 IIIIII 0 0 IIIIII 0 0 IIIIII 0 0 f 0 0 111111 0 0 IIIIII 0 0 111111 0 0 IIIIII 0 0 11 Floors a 1910 1.7 0 1412 2440 0 0 0 0 0 0 0 0 0 0 (Note:room b 1910 1.7 0 20 35 0 10 17 0 0 0 0 0 0 0 perimeter c 0 0 IIIIII 0 0 IIIIII 0 0 IIIIII 0 0 IIIIII 0 0 is displ. d 0 0 Iwo 0 0 111111 0 0 111111 0 0 IIIIII 0 0 for slab e 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0 floors) f 0 0 111111 0 0 111111 0 0 nnn 0 0 IIIIII 0 0 12 Infiltration a 145 11.5 244 35393 2809 0 0 0 10 1451 115 0 0 0 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 77806 **** **** 11852 **** **** 2762 **** **** 905 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 4900 **** 6% 746 **** 6% 174 **** 6% 57 **** 15 Total loss=13+14 **** 82706 **** **** 12599 **** **** 2935 **** **** 962 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 17724 **** **** 3193 **** **** 1008 **** **** 221 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 867 5% **** 156 5% **** 49 5% **** 11 19 Total RSH gain=(17+18)*PLF 1.00 **** 18590 1.00 **** 3349 1.00 **** 1058 1.00 **** 232 20 Air required(cfm) 933 933 142 168 33 53 11 12 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. .` wr- htsoftm 2018-Jun-2214:54:46 9 Right-Suite®Universal 2017 17.0.16 RSU25116 Page 1 ACdA ...ngeworthy\Documents\York\39 JOHN CLENDON DR.rup Calc=MJ7 Front Door faces: N Right-J®Worksheet Job: 39 JOHN CLENDON DR a J + Entire House Date: Jun 22,2018 By: FOOTHILL BUILDERS Pan: 1345 QUEENSBURY,NY 12804 MANUAL J:7th Ed. 1 Name of room Room5 Room6 Room7 Room8 2 Length of exposed wall 9.0 ft 0 ft 15.0 ft 52.0 ft 3 Room dimensions 9.0 x 4.0 ft 5.0 x 6.0 ft 15.0 x 12.0 ft 1.0 x 594.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Gig (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg 5 Gross a 12E3 5.4 1.0 81 **** **** 0 *It** **** 135 **** **** 468 **** **** Exposed b 0 0 1,i i I l **** **** 111111 **** **** I I I I n **** **** IIIIII **** **** walls and c 0 0 111111 **** **** 111111 **** **** 111111 **** **** IIIIII **** **** partitions d 0 0 IIIIII **** **** IIIIII **** **** I I I I I I **** **** IIIIII **** **** e 0 0 III!!! **** **** I I I II 1 **** **** nnn **** **** IIIIII **** **** f 0 0 111111 **** **** IIIIII **** **** IIIIII **** **** I I I I I I **** **** 6 Windows and a 3A0 39.7 ** 0 0 **** 0 0 **** 30 1190 **** 40 1587 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** • d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 0 **** 0 0 **** 0 30 **** 570 10 **** 190 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 0 **** 0 0 **** 0 30 **** 1020 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 10D0 33.1 6.3 0 0 0 0 0 0 0 0 0 84 2782 526 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 81 437 83 0 0 0 105 567 107 344 1858 351 exposed b 0 0 nnn 0 0 111111 0 0 111111 0 0 111111 0 0 walls and c 0 0 111111 0 0 IIIIII 0 0 win 0 0 IIIIII 0 0 partitions d 0 0 Win 0 0 111111 0 0 111111 0 0 111111 0 0 e 0 0 nnn 0 0 IIIIII 0 0 111111 0 0 111111 0 0 f 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0 10 Ceilings a 16G0 2.4 1.1 36 86 40 30 71 34 180 428 202 594 1411 666 b 0 0 HMI 0 0 111111 0 0 111111 0 0 111111 0 0 c 0 0 HMI 0 0 111111 0 0 111111 0 0 111111 0 0 d 0 0 HMI I I11 0 0 111111 0 0 111111 0 0 111111 0 0 e 0 0 In111 0 0 111111 0 0 111111 0 0 111111 0 0 f 0 0 Inn! 0 0 111111 0 0 111111 0 0 111111 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 1910 1.7 0 0 0 0 0 0 0 0 0 0 4 7 0 perimeter c 0 0 IIIIII 0 0 111111 0 0 111111 0 0 IIIIII 0 0 is displ. d 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0 for slab e 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0 floors) f 0 0 IIIIII 0 0 111111 0 0 111111 0 0 111111 0 0 12 Infiltration a 145 11.5 0 0 0 0 0 0 30 4352 345 124 17987 1428 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 523 **** **** 71 **** **** 6536 **** **** 25631 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 33 **** 6% 4 **** 6% 412 **** 6% 1614 **** 15 Total loss=13+14 **** 556 **** **** 76 **** **** 6948 **** **** 27246 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 123 **** **** 34 **** **** 1224 **** **** 4180 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 6 5% **** 2 5% **** 60 5% **** 204 19 Total RSH gain=(17+18)*PLF 1.00 **** 129 1.00 **** 35 1.00 **** 1284 1.00 **** 4385 20 Air required(cfm) 6 6 1 2 78 64 307 220 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wrlghtSOft® Right-Suite®Universal 2017 17.0.16 RSU25116 2018-Jun-22 14:54:46Page 2 ACct ...ngeworthy\Documents\York\39 JOHN CLENDON DR.rup Calc=MJ7 Front Door faces: N Right-J®Worksheet Job: 39 JOHN CLENDON DR Date: Jun 22,2018 Entire House By: FOOTHILL BUILDERS Plan: 1345 QUEENSBURY,NY 12804 • MANUAL J:7th Ed. 1 Name of room Room9 Room10 Room11 Room12 2 Length of exposed wall 26.0 ft 5.0 ft 35.0 ft 0 ft 3 Room dimensions 1.0 x 160.0 ft 10.0 x 5.0 ft 1.0 x 202.0 ft 4.0 x 9.0 ft 4 Ceilings Condit.Option 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) Area Load(Btuh) EXPOSURE NO. Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Clg (ft2) Htg Gig 5 Gross a 12E3 _5.4 1.0 234 **** **** 45 **** **** 315 **** **** 0 **** **** Exposed b 0 0 IIIIII **** **** !nu I **** **** win **** **** IIIIII **** **** walls and c 0 0 IIIIII **** **** IIIIII **** **** Him **** **** 111111 **** **** partitions d 0 0 IIIIII **** **** llllll **** **** Him **** **** Ill NI **** **** e 0 0 111111 **** **** IIIIII **** **** mill **** **** IIIIII **** **** f 0 0 IIIIII **** **** llllll **** **** ll1111 **** **** !Ili ll **** **** 6 Windows and a 3A0 39.7 ** 15 595 **** 0 0 **** 15 595 **** 0 0 **** glass doors b 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** Heating c 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** d 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** e 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** f 0 ** 0 0 **** 0 0 **** 0 0 **** 0 0 **** 7 Windows and North 19.0 15 **** 285 0 **** 0 0 **** 0 0 **** 0 glass doors NE/NW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Cooling E/W 68.0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 SE/SW 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 South 34.0 0 **** 0 0 **** 0 15 **** 510 0 **** 0 Horz 0 0 **** 0 0 **** 0 0 **** 0 0 **** 0 8 Other doors a 10D0 33.1 6.3 0 0 0 0 0 0 0 0 0 0 0 0 b 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9 Net a 12E3 5.4 1.0 219 1183 223 45 243 46 300 1620 306 0 0 0 exposed b 0 0 llllll 0 0 111111 0 0 111111 0 0 111111 0 0 walls and c 0 0 !MN 0 0 111111 0 0 111111 0 0 111111 0 0 partitions d 0 0 111111 0 0 llllll 0 0 111111 0 0 111111 0 0 e 0 0 llllll 0 0 111111 0 0 111111 0 0 111111 0 0 f 0 0 111111 0 0 111111 0 0 111111 0 0 111111 0 0 10 Ceilings a 16G0 2.4 1.1 160 380 180 50 119 56 202 480 227 36 86 40 b 0 0 min 0 0 111111 0 0 111111 0 0 111111 0 0 c 0 0 111111 0 0 1 1 1 111 0 0 111111 0 0 111111 0 0 e 0 0 null 0 0 111111 0 0 111111 0 0 111111 0 0 e 0 0 lulu 0 0 111111 0 0 111111 0 0 111111 0 0 f 0 0 will 0 0 111111 0 0 111111 0 0 111111 0 0 11 Floors a 1910 1.7 0 0 0 0 0 0 0 0 0 0 0 0 0 (Note:room b 1910 1.7 0 0 0 0 0 0 0 6 10 0 0 0 0 perimeter c 0 0 llllll 0 0 111111 0 0 111111 0 0 111111 0 0 is displ. d 0 0 llllll 0 0 111111 0 0 111111 0 0 111111 0 0 for slab e 0 0 Him 0 0 111111 0 0 111111 0 0 111111 0 0 floors) f 0 0 llllll 0 0 111111 0 0 111111 0 0 111111 0 0 12 Infiltration a 145 11.5 15 2176 173 0 0 0 15 2176 173 0 0 0 Ventilation 0 0 0 0 0 0 0 0 13 Subtotal loss=6+8..+11+12 **** 4334 **** **** 362 **** **** 4881 **** **** 86 **** Less external heating **** 0 **** **** 0 **** **** 0 **** **** 0 **** Less transfer **** 0 **** **** 0 **** **** 0 **** **** 0 **** Heating redistribution **** 0 **** **** 0 **** **** 0 **** **** 0 **** 14 Duct loss 6% 273 **** 6% 23 **** 6% 307 **** 6% 5 **** 15 Total loss=13+14 **** 4607 **** **** 385 **** **** 5189 **** **** 91 **** 16 Int.gains: People @ 300 0 **** 0 0 **** 0 0 **** 0 0 **** 0 Appl. @ 1200 0 **** 0 0 **** 0 0 **** 0 0 **** 0 17 Subtot RSH gain=7+8..+12+16 **** **** 861 **** **** 102 **** **** 1215 **** **** 40 Less external cooling **** **** 0 **** **** 0 **** **** 0 **** **** 0 Less transfer **** **** 0 **** **** 0 **** **** 0 **** **** 0 Cooling redistribution **** **** 0 **** **** 0 **** **** 0 **** **** 0 18 Duct gain 5% **** 42 5% **** 5 5% **** 59 5% **** 2 19 Total RSH gain=(17+18)*PLF 1.00 **** 903 1.00 **** 107 1.00 **** 1275 1.00 **** 42 20 Air required(cfm) 52 45 4 5 59 64 1 2 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wri htsoft* 2018-Jun-22 14:54:46 9 Right-Suite®Universal 2017 17.0.16 RSU25116 • Page 3 C. als ...ngeworthy\Documents\York\39 JOHN CLENDON DR.rup Cale=MJ7 Front Door faces: N Right-J®Worksheet Job: 39 JOHN CLENDON DR • Entire House Date: Jun 22,2018 By: FOOTHILL BUILDERS Plan: 1345 QUEENSBURY,NY 12804 MANUAL J:7th Ed. 1 Name of room Room13 2 Length of exposed wall 174.0 ft 3 Room dimensions 1.0 x 1412 ft 4 Ceilings Condit.Option 9.0 ft heat/cool TYPE OF CST HTM Area Load(Btuh) Area Area Area EXPOSURE NO. Htg Clg (ft2) Htg Clg Htg Clg Htg Clg Htg Clg 5 Gross a 12E3 5.4 1.0 1566 **** **** **** **** **** **** **** **** Exposed b 0 0 illiII **** .**** **** **** **** **** **** **** walls and c 0 0 HMI **** **** **** **** **** **** **** **** partitions d 0 0 IIIIII **** **** **** **** **** **** **** **** e 0 0 IIIIII **** **** **** **** **** **** **** **** f 0 0 win **** **** **** **** **** **** **** **** 6 Windows and a 3A0 39.7 ** 50 1984 **** **** **** **** glass doors b 0 ** 0 0 **** **** **** **** Heating c 0 ** 0 0 **** **** **** **** d 0 ** 0 0 **** **** **** **** e 0 ** 0 0 **** **** **** **** f 0 ** 0 0 **** **** **** **** 7 Windows and North 19.0 0 **** 0 **** **** **** glass doors NE/NW 0 0 **** 0 **** **** **** Cooling E/W 68.0 50 **** 3400 **** **** **** SE/SW 0 0 **** 0 **** **** **** South 34.0 0 **** 0 **** **** **** Horz 0 0 **** 0 **** **** **** 8 Other doors a 10D0 33.1 6.3 0 0 0 b 0 0 0 0 0 c 0 0 0 0 0 9 Net a 12E3 5.4 1.0 1516 8186 1546 exposed b 0 0 mill 0 0 walls and c 0 0 mill 0 0 partitions d 0 0 will 0 0 e 0 0 IIIiil 0 0 f 0 0 will 0 0 10 Ceilings a 16G0 2.4 1.1 0 0 0 b 0 0 dill! 0 0 c 0 0 will 0 0 e 0 0 will 0 0 e 0 0 iiiiii 0 0 f 0 0 will 0 0 11 Floors a 1910 1.7 0 1412 2440 0 (Note:room b 1910 1.7 0 0 0 0 perimeter c 0 0 iiiiil 0 0 is displ. d 0 0 iiiiii 0 0 for slab e 0 0 lulu 0 0 floors) f 0 0 liii!! 0 0 12 Infiltration a 145 11.5 50 7253 576 Ventilation 0 0 13 Subtotal loss=6+8..+11+12 **** 19863 **** **** **** **** **** **** **** Less external heating **** 0 **** **** **** **** **** **** **** Less transfer **** 0 **** **** **** **** **** **** **** Heating redistribution **** 0 **** **** **** **** **** **** **** 14 Duct loss 6% 1251 **** **** **** **** 15 Total loss=13+14 **** 21114 **** **** **** **** **** **** **** 16 Int.gains: People© 300 0 **** 0 **** **** **** Appl. @ 1200 0 **** 0 **** **** **** 17 Subtot RSH gain=7+8..+12+16 **** **** 5522 **** **** **** **** **** **** Less external cooling **** **** 0 **** **** **** **** **** **** Less transfer **** **** 0 **** **** **** **** **** **** Cooling redistribution **** **** 0 **** **** **** **** **** **** 18 Duct gain 5% **** 270 **** **** **** 19 Total RSH gain=(17+18)*PLF 1.00 **** 5792 **** **** **** 20 Air required(cfm) 238 291 Calculations approved by ACCA to meet all requirements of Manual J 7th Ed. wrightSOft® Right-Suite®Universal 2017 17.0.16 RSU25116 2018-Jun-22 14:54:46Page 4 ACC ...ngeworthy\Documents\York\39 JOHN CLENDON DR.rup Calc=MJ7 Front Door faces: N *j':::•1:. , . i gi..s • : 1{,; 4� r o EXHAUST SYSTEMS N • am:-:, exi li, •. TABLE M1507.3.3(1) R CONTINUOUS WHOLE-HOUSE MECHANICAL VENTILATION SYSTEM AIRFLOW RATE REQUIREMENTS 1,' ,11 1, DWELLING UNIT NUMBER OF BEDROOMS � _q FLOOR AREA 0-1 2-3 4-5 6-7 .s'r r • (square feet) — VA: Airflow in CFM `_•b 1 :.. <1,500 30 45 60 75 90 : ;'t f`. +`=:? 1,5017 3,000 45 . 60 75 90 105— '°` ,'?`% 3,001-4,500 60' 75 90 r" 0 s:,.,. 105 120 1N3;;'.:-. 4,501-6,000 75 90 105 120 135 ' `' 6,001—7,500 90 105 . 120 135 150 •:'• >7,500 105 120 135 150 ��,� ��,; 165 :zz.,.,T .-. 1• For SI: 1 square foot=0.0929 m2,1 cubic foot per minute=0.0004719 m3/s. t3 ;:`t.: ;{ TABLE M1507.3.3(2) "l:aigi'l INTERMITTENT WHOLE-HOUSE MECHANICAL VENTILATION RATE FACTORSa7 b . 'a :.'il;�s, RUN-TIME PERCENTAGE IN EACH 4-HOUR ',AMU:, `:; 25% 33% 50% 66% 75% : s: =-� ': SEGMENT 1 ' ,;,;r, Factors 4 3 2 1.5 1.3 • jF ,6Yi7,. it:, , a. For ventilation system run time values between those given,the factors are permitted to be determined by interpolation. :�h1 ra>t�i.' , ` b.Extrapolation beyond the table is prohibited. IF . . •',ice Irq�` TABLE M1507.4 "'4R 's M1507 4 Local exhaust rates. Local exhaust systems shall MINIMUM REQUIRED LOCAL EXHAUST RATES F• be designed to have the capacity to exhaust the minimum air ONE-AND TWO-FAMILY DWELLINGS:.`: ,�,5-, ` flow rate determined in accordance with Table-M1507.4. AREA TO BE ;:1 • 's= �'tr EXHAUST RATES 1..! •r,1 ..13- .;, EXHAUSTED n 14 u;-7 f;g„ Kitchens 100 cfm intermittent or 25 cfin,co •;'_:. lv_ Bathrooms-Toilet Mechanical exhaust capacity,p55 .fir 1 t.q . Rooms intermittent or 20 cfm continuoiN tAl ;,°`t 3"lis For SI: 1 cubic foot per minute=0.0004719 m3/s. -'1f l,..a fi=r 1� sep f-4- = 60 r, j c i �p �r 5©�0 •`4 `t thip.- `:a.' y 1• j;.E '--.Yet ''F_,I,_. fk4 . 6'1 ,,kin i,', VII "lilt,[ 4144(1,1,'=7' a .-Fa # % - i:' ' i'_ � it r- - .. is. 1:P i.:Y s4:: , t a r"'2,4 ."•>. A.. 2015 INTERNATIONp , ` 155 MAX ; HEAT RECOVERY VENTILATOR 4 ENGINEERING DATA LIFEBREHTH° THERMALLY CONDUCTIVE,PATENTED DEFROST ALUMINUM CORE Recirculating damper defrost system. The counter-flow heat recovery core transfers heat between the two airstreams.It is easily removed for cleaning or service. CASE Twenty gauge prepainted galvanized steel for superior corrosion resistance.Insulated to MOTORS AND BLOWERS prevent exterior condensation.Drain connections 2-1/2 in.(12 mm)0D.Balancing ports Each airstream has one centrifugal blower driven by a common PSC motor,with multiple are located on door. fan speed operations. ELECTRONICS FILTERS The DXPLO2 control included with the unit can be wall mounted in a central location of Washable air filters in exhaust and supply air streams. the home.3 wire 20 gauge(win.)100 ft length(max.). MOUNTING Four threaded inserts at corners of the cabinet designed to accept the"s"hooks and WARRANTY hanging straps supplied with the unit. Units carry a lifetime warranty on the HRV core and a S year replacement parts warranty. OPTIONAL ACCESSORIES: Techrille Weather Hood 99-EAG4 Terminator Wireless 20/40/60 99-18S 9-EA 99 EAG5 Fitting Min Timer o 99-EAG699-186 99-TM4 99 DET02�i l 99-187 99-EAGB 99-TMS 99-TMS 4._sj \?- LIFEBREATH CONTROL OPTIONS TIMER OPTIONS 99-DET01-Lifebreath 20/40/60 Minute Timer FEATURES 99-DXPLD2 99-BCD2 99-BC03 99-13E04 Initiates high speed Ventilation for ZD,40 or 60 ✓ minutes.3 wire connection. 5 speed fan operation on each mode 99-DET02 2 speed fan operation(Low/High) V ✓ Wireless Lifebreath 20/40/60 Minute Timer ✓ Initiates high speed Ventilation for 20,40 or 60 Continuous low speed fan operation minutes.Wirelessly connects to main control for Humidity control through adjustable Dehumidistat ✓ ✓ ✓ ease of installation.40'approximate range. Excusive to Lifebreath. Large digital LCD screen ✓ 99-RX02-Wireless Lifebreath Repeater LED status indicator lights V ✓ V Extends range of 99-DET02 Wireless Timers.Plugs into 120V power outlet.Wirelessly connects to Continuous Ventilation ✓ ✓ main control and 99-DET02.Install at halfway point between timer and main wall control if timer Continuous Recirculation ✓ V is out of range. 20 ON/40 OFF , \°sts 10 0N/50 OFF V •4; - 20 ON/40 Recirculation ✓ V' (bko 'G `* i o 20/40/60 min.High speed override button ✓ 99-DXPLO2 99 DETD2 Compatible with 99-DET02 Wireless Timer ✓ ✓ ✓ ✓ 3 wire connection I V V V L IFEBREIITHz II Indoor Air Systems 155MAX(01-01-18) www.lifebreath.com - 155 MAX HEAT RECOVERY VENTILATOR .* PERFORMANCE (HVI CERTIFIED) r LIFEBRERTIf as O.1(25) 0.2(50) 0.3(75) 0.4(100) 0.5(125) 0.6(150) 0.7(175) ELECTRICAL SPECIFICATIONS IN.W.G.(PA) CFM(Us) CFM(Us) CFM(Us) CFM(Us) CFM(Us) CFM(Us) CFM(L/s) VAC @ 60Hz 115 Net Supply Airflow 184(87) 163(77) 146(69) 132(62) 115(54) 92(43) 60(28) Watts/Low Speed 66 Gross Supply Airflow 188(87) 166(78) 149(70) 134(63) 117(55) 94(44) 61(29) Watts I High Speed 118 • Gross Exhaust Airflow 239(113) 228(101) 212(100) 193(91) 172(81) 150(71) 126(60) Amp Rating 1.4 Sensible Effectiveness(ASE) 32°F(0°C) 84% 180 WEIGHT: @ 59 CFM(28 Us) 71 LBS(32 KG) Sensible Efficiency(SRE) 32°F(0°C) 75% 160 SHIPPING WEIGHT: @ 59 CFM(28 Us) 140 73 LBS(33 KG) Sensible Efficiency(SRE) 32°F(0°C) 75% @ 64 CFM(30 Us) 3 120 Sensible Efficiency(SRE) -13°F(-25°C) 72% NOTE: Ho 64 CFM(30 Us) a Front clearance of 25 in.(635 mm)is 80 recommended for servicing unit.All ducts use 6 in.(152 mm)round collars.Balancing N; 9001SO c��IIIL9,I6o dampers are located in all air streams. ® GS o- -- �ro�s CERTIFIED mum 1 I I I I i I 1 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 Static Pressure(in w.g.) DIMENSIONS FRONT VIEW TOP VIEW Filter ir 1 14 3/4In.(375 mm)' Recirculating f Defrost !� !� —i I I I I Damper .� — , A • • .4 NIlli Blower Removable Heat IN Motor E Stale air to outside Recovery ifti Care . i• Fresh air from outside ==_=- ®� Stale air from inside 1 .,,_ yFresh air to inside _+ilik O - 6 in.(152 mm) I' — 33 518 in.(354 mm) I • o v Round Collars Date: WARRANTY Contractor: Units carry a lifetime warranty Tag: on the HRV core and a S year replacement parts warranty. Project Qty: Supplier: Quote#: All units conform to CSAand ULstandards Engineer: .1 Control: Submitted By: LIFEBRERTH° Indoor Air Systems Timer: Timer Qty: 155MAX(01-Q1-18) www.lifebreath.com MAP REFERENCE: "LEUCI - JOHN CLENDON ROAD SUBDIVISION" BY: VAN DUSEN & STEVES LAND SURVEYORS AND NACE ENGINNERING, P.C. DATE: MARCH 15, 2016 LAST REVISED: JUNE 12, 2017 FILED: JULY 12, 2017 PLAT D-13 INSTRUMENT NO. 2017-3000063 E N 6l1y6.g3 0� / R325 .0 LBB .Z Lo o Q m � V 3 N " 42.G' d O V L4 / .94.4' I O LOT 18 LOT 20 N �/ y 0 a LOT 19 46194.3 Sq. Feet 1.1 Acres I 30'N CU A A JUN202018 0 .00 N 83°29_40• w SUI or UEENSBURY CO�SB.S PERMIT EkQj,P I HAVE PERSONALLY MEASURED THE DISTANCE ERTY 295.15-2-16 RC-0381-2018 PROP SED STHERU URE SNN TO THE Foothills Builders ( )39 John Clendon Road, Lot 19 Si N NATURE SFD w/gas FP 1422 s.f., Gar. 528 s.f. DAT Dater June CO, 2018 Dus vNAUTHORIgD ALTERATION OR SURVEYORS S A SURVEY Map of a Plot Plan made for Scale 1'=40' NAP VIOLATION OF A LICENSED LAND SURVEYORS SEAL IS A NOLATION OF SECTION 7200,SUB-DIVISION{OF THE NEW YORK STATE EDUCATION LAW.' S 'ONLY COPIES FROM THE ORIGINAL OF SURVEYORS SURVEY NARKED NTH AN ORIGINAL OF THE LAND SURVEYORS SEAL SHALL BE CONSIDERED TG BE VALID TRUE COPIES.' 'CERTIFICATIONS NDICARED HEREON THAT Foothills Builder s THIS SURVEY WAS PREPARED IN ACCORDANCE NTH THE LanONEXISTING CODE OF PRACTICE FOR LAND SURVEYORS ADOPTED BY AL d Survey ors W10 "SURVVEEYD M SAID CERTFICA71ONS SHALYORK STATE ASSOCIATION OF RIJN L TO THE PERSON FOR VMON THE SURVEY IS PREPARED,AND ON HIS BEHALF TO THE TITLE COMPANY.GOVERNMENTAL HE 1 1 169 Haviland Road ueensbur New York 12804 AGENCY AND LENDING INSTTUITION LISTED HEREON,AND Town of Queensbur y, Warren County, New York Q y, TO THE ASSIGNEES OF THE LENDING INSTITUTION.- FOOTHILLS (518) 792-8474 New Yor k Lie. No. 50135 NO. DATE DESCRIPTION DWG. NO. 09094-19 NORTH EAST BUILDING PERFORMANCE ADVISORS Serving the Capital District, Saratoga and Adirondack Regions Sept 29, 2018 7 Rocky Ridge, Warrensburg, NY 12885 Foothill Builders LLC 9 Mountainside Drive Queensbury, NY 12804 RE: Blower Door Test for NYS Building Code, Town of Queensbury Mr. Joseph Leuci: After inspection of the New 1 Story Home at 39 John Clendon Rd, Queensbury, New York and completion of a Blower Door Test consistent with the practice of depressurization to 50 Pascal in a winter condition with the exterior windows and doors shut and the interior doors to all the rooms open, my observations are as follows:  This home tested passed the current New York State Building Code for Air Changes per Hour @ 50 Pascal of less than or equal to 3 ACH/50 (for Homes permitted after st November 1, 2016). The tested number is 2.96 ACH/50 Pascal.  The total volume of conditioned space at 39 John Clendon Rd. is 24445.8 cubic feet taking into consideration all conditioned space in the home. The cubic feet per minute @ 50 Pascal was 1208 CFM/50. The height correction factor for New York State is 19 for a one story building, as such the tested home @ 39 John Clendon Rd. has the natural rate of air exchange of 0.16 air changes per hour/natural or 64 cfm natural infiltration credit based on the blower door test.  In the latest (2013) version of ASHRAE 62.2, high-performance homes need to be ventilated at 7.5 cfm per bedroom + 1, plus 3 cfm per 100 square feet. That means for 3+1 bedrooms it would need 1422 sq ft/100 times 3 cfm= 43 cfm + 30 cfm or 73 cfm. It would also be advantageous to use the bathroom and kitchen fans to help control humidity and improve indoor air quality.  My credentials are as follows:  BPI Certified Building Analyst  BPI Certified Envelope Specialist  BPI Certified Heating Professional  If you have any questions regarding my findings please feel free to contact me. Sincerely, Jack Towne 1.888.472.2774 7 Rocky Ridge Road 4A Vatrano Drive Warrensburg, NY 12885 Albany, NY 12205 Phone (518)623.7016 Phone (518)350.2941 Fax (518)623.7015 Fax (518)694.0102 NACE ENGINEERING, P.C. 169 Haviland Road, Queensbury,NY 12804 Phone-518-745-4400 Fax -518-792-8511 October 3, 2018 Job#46265 Dave Hatin Town of Queensbury Building Department Bay Road Queensbury,NY 12804 RE: Leuci John Clendon Road Subdivision - Queensbury(T) Lot# 19 Septic System Dear Dave: This letter is to inform you that we inspected the completed septic system for the house at Lot #19 in the Leuci John Clendon Road Subdivision on September 19, 2018. The septic system as installed was for a three-bedroom house and consisted of a 1,000 gallon septic tank and 150 lineal feet of absorption trench constructed with stone and perforated pipe. The septic system conforms to the requirements of the approved subdivision design drawings. Please call me if you have any questions or concerns. Since , AS BUILT Thomas R. Center Jr., PE OCTTECE W-7E. ni 92 /ft] Ot0 11j)