SOLAR-0490-2018
TOWN OF QUEENSBURY
742 Bay Road, Queensbury, NY 12804-5904 (518) 761-8201
Community Development - Building & Codes (518) 761-8256
CERTIFICATE OF COMPLIANCE
Permit Number: SOLAR-0490-2018Date Issued: Monday, January 14, 2019
This is to certify that work requested to be done as shown by Permit Number
SOLAR-0490-2018
has been completed.
296.12-1-8
Tax Map Number:
4 BAYBERRY CT
Location:
WILLIAM GEHRING
Owner:
Solar Liberty Energy Systems Inc
Applicant:
This structure may be occupied as a: Solar Panel Installation
By Order of Town Board
TOWN OF QUEENSBURY
Issuance of this Certificate of Compliance DOES NOT relieve the
property owner of the responsibility for compliance with Site Plan,
Variance, or other issues and conditions as a result of approvals by the
Director of Building & Code Enforcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
t. q
742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201
'- —�'s Community Development-Building&Codes (518) 761-8256
BUILDING PERMIT
Permit Number: SOLAR-0490-2018
Tax Map No: 296.12-1-8
Permission is hereby granted to: Solar Liberty Energy Systems Inc
For property located at: 4 BAYBERRY CT
In the Town of Queensbury,to construct or place at the above location in accordance with application together
with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform
Building Codes and the Queensbury Zoning Ordinance
Type of Construction
Owner Name: WILLIAM GEHRING Solar Panel-Residential $14,000.00
Owner Address: 4 Bayberry TER Total Value $14,000.00
Queensbury,NY 12804
Contractor or Builder's Name/Address Electrical Inspection Agency
Solar Liberty Energy Systems Inc
6500 Sheridan DR, Suite 120
Buffalo,NY 14221
Plans&Specifications
Solar Panel Installation
$ 75.00 PERMIT FEE PAID -THIS PERMIT EXPIRES: Saturday,August 3,2019
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before he expirati+ da .)
Dated at the To of Qu sb 1 4 i i°,/August 3,2018
SIGNED BY: for the Town of Queensbury.
Director of Building&Code Enforcement
Office Use Only
Permit#: 5 L,' a.—oe-00, - zcv5
_ : Fee:$ "4r."
742 Bay Road,Queensbury,NY 12804 invoice#: '
P:518-761-8256 www.queensbury.net
. SOLAR PANEL PERMIT APPLICATION
�
• Property Owner(s): 911
Wiliam Gehring
JUL 0 2018
Name(s): 1
DEW � b
Mailing Address, C/S/Z: 4 Bayberry Court Queensbury, NY 12804
Cell Phone:_( ) 518 744 1 505 Land Line: _( �)� 7°ij - -436Ur {
Email: wgehring@yahoo.com
Project Address: 4 Bayberry Court Queensbury, NY 12804
Section Block Lot:
Existing Use: ® Single Family ❑ 2-4 Family 0 Commercial 0 Other:
• Solar Contractor:
Business Name: Solar Liberty Energy Systems, Inc.
Contact Name: Kelli Wilson
Mailing Address, C/S/Z: 6500 Sheridan Drive Suite 120 Buffalo, NY 14221
Cell Phone: ( ) 716 634 3780 Land Line:_(
Email: kelli.wilson@solarliberty.com
• Electrical Contractor:
Business Name:
Contact Name:
Mailing Address, C/S/Z:
Cell Phone: _( ) Land Line: ( ) .
Email:
Contact Person for Building & Code Compliance:
Cell Phone: ( ) Land Line: (
Email:
•
Solar Panel Application Revised December 2017
Estimated cost of construction: $ 14,000
Total System Capacity Rating (sum of all panels):
Solar PV System: 5.232 kW DC
Select System Configuration:
►,! Supply side connection with micro inverters
❑ Supply side connection with DC optimizers
❑ Supply side connection with string inverter
❑ Load side connection with DC optimizers
❑ Load side connection with micro inverters
❑ Load side connection with string inverter
Please sign below to affirm that all answers are correct and that you have met all the
conditions and requirements to submit a unified solar permit.
William Gehring 23,2018)" Jul 23,2018
(Ju
Homeowner's Signature Date
(--)f
7/2.3 (
Solar Co. Representative Signature Date
Solar Panel Application Revised December 2017
Finger Lakes Engineering, PC LL<
jan1.14ES\; 2536 State Route 21 ` .. 4
� � . ` -- Canandaigua, NY 14424
hen* phone (585) 396-3438
Anthony Yannotti, PE fax (585) 394-3867
July 20, 2018 Sheet 1 of 1
R1057
Mr. Michael Prinzi
Senior Project Manager, Solar Liberty
6500 Sheridan Drive Suite 120
Buffalo,NY 14221
RE: William Gehring, 4 Bayberry Court, Queensbury,NY 12804
Dear Mike,
Per your request we conducted a Preliminary Structural Condition Assessment that
included an on-site visit on 7/12/18, an observational examination of the existing roof
structure, and a review of any drawings, blueprints, or sketches that were available.
PV solar panels are proposed for the roof of an attached garage as summarized below.
The panels are mounted on rails which are attached to the roof with an anchored deck
base system installed per manufacturer's specifications and recommendations.
I found that the roof structure, as noted on Site Plan PV-S1, can satisfactorily withstand
the additional loads as proposed and will also meet the applicable standards included in
the NYS 2017 Supplement, ASCE 7-10, and 2015 IRC.
My analysis indicates that the areas of the existing roof, where the additional weight is to
be located, and only as it applies to Solar Liberty specified equipment and their tributary
areas, are capable of supporting a total load of at least 60 psf.
In 2007 the roof was replaced, was a"tear off', and a single layer of asphalt shingle
roofing was added to the existing plywood sheathing.
The maximum existing total load on these areas of the roof is estimated to be 52 psf
(DL=9, LL=43)leaving an available capacity of at least 8 psf. The average weight of the
proposed solar panels and framework is less than 4 psf.
Therefore, the roof framing in these areas will not be overstressed by the installation of
the solar panels and framework. � ® NEg,
p �.� . ,q 0
Thank you for the opportunity to be of service co�,�a 7/zo 18`l% '�.�c'
cc
Sincerely, n V0/W44A/g 9)4.W-et- rp
f 0830
Anthony R Yannotti
if?CfiE3StC311°'
FingerLakesEngineering.com 1-800-255-8779
TOWN OF QUEENSBURY
BUILDING DEPARTMENT
Based on our limited examination,compliance
FILE COPY with our comments shall lot be construed as
tilt plans ana s ecitications; are in
-
compliance with the
-Z
N PV SYSTEM SUMMARY New York State, Building Codes at
General Notes
OF
TOTAL STC DC SYSTEM SIZE 5.232 kW THE INSTALLATION SYSTEM SHALL BE I PV
N
ACCORDANCE WITH THE MOST
RECENT NATIONAL ELECTRIC
SOLAR MODULE MODEL SUNPOWER AC LEGEND AND BUILDING CODES AND
STANDARDS,AS AMENDED BY
SOLAR MODULE STC DC RATING 327 W JURISDICTION
UNSHADED SOLAR MODULE
SOLAR MODULE INFO 61.3"x 41.2"x 1.8",45.5lbs SHADED SOLAR MODULE
MIXED ORIENTATION
SOLAR MODULE COUNT 16 SOLAR MODULE
....................................... STRING SIZE 8Mx2S INV INVERTER
RACKING SYSTEM SUNPOWER INVISIMOUNT EZM EASY TO READ METER
*4 AC COMBINER BOX
PITCH OF ARRAY 9:12 El
UM UTILITY METER
INVERTER MODEL INTEGRATED MICROINVERTERS MAIN MAIN BREAKER PANEL
ELECTRICAL TRENCH ELECTRICAL STAMP AREA
ARRAY AZIMUTH 180*
VENTING AND PATHWAYS
EAVE HEIGHT 8'
V
GROUND ACCESS AREA THIS INFORMATION IS CONFIDENTIAL AND
PROPRIETARY TO SOLAR LIBERTY ENERGY S
INTERCONNECTION VOLTAGE 240V/1(P
............ YSTEMS.INC PLEASE DO NOT SHARE THIS WITH
ANYONE UNLESS THERE IS AWRITTEN APPROVAL
N -I UVVN E E- I--I --- FROM SOLAR LIBERTY
OF ittl
PV SYSTEM OVERVIEW
BUILDING & C P
Scale:N.T.S.
_r O
Reviewed BY:
0 10 SrA Pba WIWI*
No. R-W-A— Date
SOLARLIBERTY''
THE FUTURE Of ENERGY INVERENDE-
6500 Sheridan Drive
Suite 120
Buffalo,NY 14221
866-80-RENEW
PV Installation
Professional
296.12-1-8 SOLAR-0490-2018
Gehring, William ft*d NWo GN Ad*M
4 Bayberry Ct Gehring Residence
4 Bayberry Court
Solar Panel Installation Queensbury,NY 12804
date 4 Choftd&I
im CP
06/15/2018 06/15/2018
sd. Shd
AS NOTM PV-Sl
General Notes
Array Details
Panel Manufacturer:
Sunpower E20-327-C-AC
Panel Model:327W
(2)#16 AWG TWISTED PAIR Panel Count: 16
(2)#8 AWG THHN Array Layout:8M x 2S
(1)#8 AWG NEUT.
(2)#10 AWG THWN-2, (1)#8 AWG CU GND
(1)#10 AWG CU GND (1)3/4"EMT COND. 120/240V
(1)3/4"EMT COND. 1�/3W SERVICE Inverter Details
(TP) I SunPower EnergyLink
ENTRANCE
Monitoring System O
JUNCTION BOX TO SPLICE SUNPOWER-- Inverter Model: Built In
SUPPLIED WIRES TO FIELD WIRING. L _��� y� >< X Qty: 16
1 2 8 15AI Account#35914-33101 Peak Output Power: 320 W
Nominal Output Current: 1.33 A
I Meter#OH936470
Ira �— / O Line-to-Line Voltage:240V/1
v/ System Rating
GFDI 1511
—` OUTLET o o-- Peak Output Power:5.12 kVA
• • • Nominal Output Current:21.3A
I • • • Al r I Line-to-Line Voltage:240V/1�
O1 2 8
2QA
= I D o~
2QA INSTALL PV BREAKER This document is proprietary
to Solar Liberty Energy
I � AT FARTHEST POSITION OPPOSITE Systems, Inc. Do not copy or
I \
• • •I L1 L2 TO MAIN BREAKER redistribute without prior' I consent from Solar Liberty
` � • • •t LJ - � Energy Systems.
d y
CENTRAL JUNCTION BOX ) n
(4)#10 AWG THWN-2 100A/240V oA
(1)#10 AWG CU GND SUBPANEL. C
(1)3/4"EMT COND. ) 1 2 Modules Added o�/o1J1s
Notes I LABELED: ° C (� I
0 Array I - 16 x Sunpower AC 327W Solar Panels,Arranged in 2 "DO NOT o Preliminary Drawnng 0N13/18
Strings of 8 Modules, w/ Built-In Micro Inverter. ADD LOADS." No. Revision/Issue Date
0 Revenue grade EZ Read Meter for cumulative PV energy production. MBJ S®IAR�IBERTY`
Current Transformer THE FUTURE OF ENERGY INDEPENDENCE
O3 Utility owned and installed bi-directional energy meter. MDP SUPPLY-SIDE 6500 Sheridan Drive
tY 9Y Suite 120
SUNPOWER AC PV MODULE SYSTEM DOES NOT REQUIRE A 200A/240V 89L TAP Buffalo, NY 14221
GEC PER THEIR INSTALLATION MANUAL. Generator Disconnect Project Nome and Address
Switch Gehring Residence
4 Bayberry Court
Queensbury, NY 12804
—A] CkSAW y
Ty
-T8/13/2018I t/13/20181
ter.l
As Ha�o PV-S 1
� �;Sep. 17. 2018 1 :40PM MDIA No. P. 3/18
�.�lr _ `/•✓.�-/•✓.✓✓�/ -/•✓. •�•✓•✓�✓:✓:�%:•\.%:��1:\•.%:.\•.%i�`��i:✓:�:✓=:-�%`��1��:/:\• tel: `,`\,�`\�`:\••'•. •.�`.::`. ..... - _ `.:
Al MIDDLEINSPECTION AGENCY INC.
DEPARTMENT A.RTM NT ZN P CTI N •.,
''�' <<{,
��that the electrical wiring to the electrical equipment listed below has been examined and is approved as V ;
g\ being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date ?'
noted below and is issued subject to the following conditions.
�.� Owner: William Gehringr '
Date: 08/28/2018
( Occupant Solar PV System Location- 0
4 Bayberry Court j
Occupancy' Queensbury, Warren
Single Family Dwg. a ran Co. NY
,t Applicant: '
;; Solar Liberty Energy System
(�) 6500 Sheridan Drive .- .".• . •
•
a
Suite 120 . •• :.. .. . . _ . i j
L Buffalo NY 14221 . •
Joseph A.Holmes • ••• • - • -;)
?i• No. 141542105124EL •`'\ - • - - - - -• -- - • . . L<
:<< Equipment: <<J�
�;-
16-Solar Modules; 16-Micro Invertefs; 1 =`Summing Pane1;~"1 -Back Fed-Breaker' •- ?
;\ •->,
:• j;
..._.._.._..-._ .. CCU
.(`r1
C�)
(a�
%� This certificate applies to the electrical wiring to the electrical equipment listed immediately null and void. This certificate applies only to the use,occupancy and
above and the installation inspected as of the above noted date based on a visual ownership as Indicated herein. Upon a change In the use,occupancy or ownership ?J\
'-j inspection. No warranty is expressed or implied as to the mechanical safety.effi- of the property indicated above,this certificate shall be immediately null and void. Y j
ally p cieney Or fitness of the equipment for articular purpose. This certificate shall In the event that this certificate becomes invalid based upon the above conditions,
.%
\• be valid for a period of one year from the above noted date. Should the electrical this certificate may be revalidated upon reinspection by Middle Department
(C) system to which this certificate applies be altered In any way.Including but not limit. Inspection Agency,Inc. An application for Inspection must be submitted to Middle i))
(A ed to,the introduction of additional electrical equipment and/or the replacement of Department Inspection Agency, Inc.to initiate the inspection and revalidation ((•
;; any of the components installed as of the above noted date,this certificate shall be process. A fee will be charged for this service.
<=. :v'--.4•;\r ,,,'/ '1. ;w,c ;;•r>,k ,c,r.-'4, \ •' �-.i ;=% r.• ',.• /; is . :. '..::.:4•".\:':',;-, ;;./ ; ri.
G-its,_,: : :%:✓,: : : : :`!:' ,:*•,,Lv: '`✓=`i' ,:`1:k✓,:L✓,•:i-J:✓:,✓,• -�:• ar:\✓:\t�:iJ =::,-=!:•L,!�=!�2?: =:=::,'!i-,•••-`---tS=,-/i\E!-,--\-.:�:,-.L\-, ✓-•=7-'
-&•42_.- o490 _ rLQ,Io
s; .I i yLi i LET in 1
L mil/ ---•.-..w__. . i Ii I I 1
I I i SEP 18 2018 j(,�1 i