Loading...
BINS-003621-2019 0617209INSPECTION WORKSHEET (BINS-003621-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0480-2018 Case Module:Permit Inspection Date:Mon Jun 17, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Foundation Job Address:Parcel Number:11 Beacon Hollow DR Queensbury, NY 12804 297.13-1-39 Contact Type Company Name Name Engineer Rucinski-Hall Architecture Primary Owner HAYES CONSTRUCTION GROUP, LLC Granted Permission HAYES CONSTRUCTION GROUP, LLC Contractor HAYES CONSTRUCTION GROUP, LLC Applicant HAYES CONSTRUCTION GROUP, LLC Checklist Item Passed Comments Building Inspector Notes NO 1/17/19 Dampproofing Approved 5/3/19 Backfill and Dampproofing Not Approved Remaining Items: - Waterproofing must be applied to top of footing and foundation wall to grade due to the mottling(high ground water mark) at 41" below grade. - Foundation Perimeter Drain to daylight in rear of property must be Installed due to mottling at 41". 6/17/19 Waterproofing, Perimeter Drain and Backfill Partial Approval. - Provide letter from Waterproofing Contractor certifying waterproofing Installed in accordance with manufacturer's installation requirements. Jun 17, 2019 Page (1) INSPECTION WORKSHEET (BINS-003621-2019) Checklist Item Passed Comments Footings YES With 2 rows # 4 continuous wet sticking verticals every 40" o/c 1/4/19 1/7/19 interior footing with two #5 rebar Piers NO Monolithic Slab NO Reinforcement in Place NO Foundation / Wallpour YES 1/7/19 rear frost wall with one #5horizontal rebar 1/14/19 foundation walls with 2 rows # 4 continuous Reinforcement in Place NO Foundation Dampproofing NO 1/17/19 Dampproofing Approved 5/3/19 Backfill and Dampproofing Not Approved Remaining Items: - Waterproofing must be applied to top of footing and foundation wall to grade due to the mottling(high ground water mark) at 41" below grade. - Foundation Perimeter Drain to daylight in rear of property must be Installed due to mottling at 41". Foundation Waterproofing NO 6/17/19 Waterproofing, Perimeter Drain and Backfill Partial Approval. - Provide letter from Waterproofing Contractor certifying waterproofing Installed in accordance with manufacturer's installation requirements. Jun 17, 2019 Page (2) INSPECTION WORKSHEET (BINS-003621-2019) Checklist Item Passed Comments Footing Drain Daylight or Sump YES 5/3/19 Backfill and Dampproofing Not Approved Remaining Items: - Waterproofing must be applied to top of footing and foundation wall to grade due to the mottling(high ground water mark) at 41" below grade. - Foundation Perimeter Drain to daylight in rear of property must be Installed due to mottling at 41". 6/17/19 Waterproofing, Perimeter Drain and Backfill Partial Approval. - Provide letter from Waterproofing Contractor certifying waterproofing Installed in accordance with manufacturer's installation requirements. DAYLIGHTED! Footing Drain Stone - 12 inch width YES 5/3/19 Backfill and Dampproofing Not Approved Remaining Items: - Waterproofing must be applied to top of footing and foundation wall to grade due to the mottling(high ground water mark) at 41" below grade. - Foundation Perimeter Drain to daylight in rear of property must be Installed due to mottling at 41". 6/17/19 Waterproofing, Perimeter Drain and Backfill Partial Approval. - Provide letter from Waterproofing Contractor certifying waterproofing Installed in accordance with manufacturer's installation requirements. Footing Drain Stone - 6 inches above footing YES 5/3/19 Backfill and Dampproofing Not Approved Remaining Items: - Waterproofing must be applied to top of footing and foundation wall to grade due to the mottling(high ground water mark) at 41" below grade. - Foundation Perimeter Drain to daylight in rear of property must be Installed due to mottling at 41". 6/17/19 Waterproofing, Perimeter Drain and Backfill Partial Approval. - Provide letter from Waterproofing Contractor certifying waterproofing Installed in accordance with manufacturer's installation requirements. Footing Drain stone - 6 mil poly NO Jun 17, 2019 Page (3) INSPECTION WORKSHEET (BINS-003621-2019) Checklist Item Passed Comments Backfill Approval NO 5/3/19 Backfill and Dampproofing Not Approved Remaining Items: - Waterproofing must be applied to top of footing and foundation wall to grade due to the mottling(high ground water mark) at 41" below grade. - Foundation Perimeter Drain to daylight in rear of property must be Installed due to mottling at 41". 6/17/19 Waterproofing, Perimeter Drain and Backfill Partial Approval. - Provide letter from Waterproofing Contractor certifying waterproofing Installed in accordance with manufacturer's installation requirements. Plumbing Under Slab NO PVC / Cast / Copper NO Foundation Insulation Interior / Exterior NO Rough Grade 6 inch drop within 10 ft.NO Poly Under Slab NO Jun 17, 2019 Page (4) O'Brien, John (Inspector)