2011-130 TOWN OF QUEENSBURY
F4 ray
742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201
Community Development-Building& Codes (518) 761-8256
CERTIFICATE OF COMPLIANCE
Permit Number: P20110130 Date Issued: Friday, May 13, 2011
This is to certify that work requested to be done as shown by Permit Number P20110130
has been completed.
Tax Map Number: 523400-309-009-0002-001-000-0000
Location: 200 LUZERNE Rd
Owner: HOMESTEAD VILLAGE L P
Applicant: HOMESTEAD VILLAGE L P
This structure may be occupied as a:
Septic Alteration Commercial
By Order of Town Board
TOWN OF QUEENSBURY
Issuance of this Certificate of Compliance DOES NOT relieve the
property owner of the responsibility for compliance with Site Plan,
Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement
Planning Board or Zoning Board of Appeals.
TOWN OF QUEENSBURY
` 742 Bay Road,Queensbury,NY 12804-5902 (518)761-8201
Community Development-Building&Codes (518) 761-8256
BUILDING PERMIT
Permit Number: P20110130 Application Number: A20110130
Tax Map No: 523400-309-009-0002-001-000-0000
Permission is hereby granted to: HOMESTEAD VILLAGE L P
For property located at. 200 LUZERNE Rd
in the Town of Queensbury,to construct or place
at the above location in accordance with application together with plot plans and other information hereto filed
and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning
Ordinance. Type of Construction Value
Owner Address: HOMESTEAD VILLAGE L P
Septic Alteration Commercial
4294 ROUTE 5
CALEDONIA,NY 14423 Total value
Contractor or Builder's Name/Address Electrical Inspection Agency
Plans&Specifications
2011-130
45 &46 Windsong Drive
$75.00 PERMIT FEE PAID-THIS PERMIT EXPIRES: Friday, April 20, 2012
(If a longer period is required,an application for an extension must be made to the code Enforcement Officer
of the Town of Queensbury before the expiration date.)
Dated at the Tos sro eens ,j *{/e ' ay,April 20, 2011
ivy (-
SIGNED BY for the Town of Queensbury.
Director of Building&Code Enforcement
4x,-t_ CommunityDevelopment Office
4,.17.4.5 p
— Town of Queensbury • 742 Bay Road • Queensbury, New York •12804
Office Use Only �J f
TAX MAP NO. 4, ,
3� ! 7 Z—� PERMIT NO. 1 11 ��LJ PERMIT FEE 7_,f..„.__.
f es
APPROVALS: ZONING TOWN CLERK
APPLICATION FOR SEPTIC DISPOSAL SYSTEM PERMIT: A PERMIT MUST BE OBTAINED
BEFOR WORK BEGINS. APPLICATION IS SUBJECT TO REVIEW EFORE ISSUANCE 0 A VALID ERMIT.
OWNER:_ i QA?) (/1 ( A INSTALLER: Q /t! / % _I c_(—
ADDRESS:
ADDRESS: � /J9 R) ADDRESS: Z -3 22-
PHONE NOS._7_9 2. 2_ /a PHONE NOS. 7 94-0 p ro
LOCATION OF INSTALLATION:.1 J 74- go 1L1 ,j,),'�,/Q -7)D (V
•
RESIDENCE INFORMATION:
YEAR BUILT NO.OF X COMPUTATION 7`—'�
BEDROOMS (Gallons per bedroom) = TOTAL DAILY FLOW
GARBAGE GRIND R
1980 or older X 150 = INSTALLED?___ _u
1981 -1991 X 130 = SPA OR HOT TUB r y
1992-present X 110 = INSTALLED?
PARCEL INFORMATION:
✓ TOPOGRAPHY: FLAT ROLLING STEEP SLOPE %SLOPE
✓ SOIL NATURE: SAND`' LOAMCLAY OTHER
✓ GROUNDWATER: AT WHAT DEPTH?
✓ BEDROCK/IMPERVIOUS MATERIAL: AT WHAT DEPTH?
✓ DOMESTIC WATER SUPLY: MUNICIPAL_ WELL (If well:water supply from any septic system absorption is: ft)
✓ PERCOLATION TEST: RATE IS PER MIINUTE PER INCH[mpi) (Test to be completed by a licensed professional
engineer or architect)
PROPOSED SYSTEM FOR NEW CONSTRUCTION: All individual sewage disposal systems must be designed by a licensed professional engineer or
architect(unless installed in a Planning Board approved subdivision).
(Z)
TANK SIZE: t 0 ' J GALLON (MIN. SIZE IS 1,000 GAL.)Add 250 gallons to the size of the septic tank for each garbage grinder,
spa or whirlpool tub.
SYSTEM TYPE:
,,.ABSORPTION FIELD(WITH NO. 2 STONE) Total length a ft. Each trench .2 X s`3
❑ SEEPAGE PIT(S) (WITH NO, 3 STONE) How many? Size?
0 ALTERNATIVE SYSTEM Bed or other type?
❑ HOLDING TANK SYSTEM Total required capacity? Tank size? Number of tanks?
NOTE: ALARM SYSTEM AND ASSOCIATED ELECTRICAL WORK MUST BE INSPECTED BY A TOWN APPROVED ELECTRICAL
INSPECTION AGENCY. PLEASE REVIEW LIST PROVIDED.
For your protection, please note that pursuant to Section 136-29 of the Code of the Town of Queensbury, any permit or approval
granted which is based upon or is granted in reliance upon any material misrepresentation or failure to make a material fact or
circumstance known by or on behalf of an applicant, shall be void.
I have read the -.utations wit respect to this application and agree to
-• a: by thes-'ata.4;II req ents of the Town of ueensbury QUESTIONS? CALL 761-8256 OR EMAIL
San'ary Se :ge spas dinance. codesqueensbury.net
VISIT OUR WEBSI
tgnature of P rson Responsible ate 34/ TE FOR MORE INFORMATION
www.queensbury.net
R _
Septic Inspection Report
Office No. (518)761-8256 Date Ins on
Queensbury Building&Code Enforcement Arrive: •ID a ��, _ D-. : Wk. a 'ffl
742 Bay Rd., Queensbury, NY 12804 Inspector's Initials: � _.
NAME: \ 1 E IT NO.: 1 t -
-30
LOCATION: �-I,�5' i 1 �C� -PECT ON: �
RECHECK:
Comments and/or diagram
Soil Type: Sand/ Loam/Clay
Type of Water: Municipal/Well Water
Waterline separation distance ft.
Well separation distance ft.
Other wells: _ ft.
Well Casing Length 50'+/- Y N N/A
[150'to well required if NO]
Absorption Field: Total length ft.
Length of each trench ft.
Depth of trenches ft.
Size of Stone
Seepage Pits: Number
Size: x
Stone Size:
Piping Size Type
Building to tank
Tank to Distribution Box
Distribution Box to Field/ Pit
Opening Sealed: Y N
End Cap Y N
Inlet/Outlet Pipes&Baffles Y,.�..,,N
Manholes 12"or less below grade Y N
[provide extension collar if Yes] Y N
Location/Separations
Foundation to tank ft.
Foundation to absorption ft.
Separation of Pits ft.
-= = '•-r Plot Plan Y N
Engineer Report a . As-Built _ Y N
- u- - - -nce Contract Y N
provided
Location of System on Property:
Front r Left Side Right Side Middle Front Middle Rear
Use S s:
Approved
Partial Approved and needs to be re-inspected, please call the Building&Codes Office
Disapproved
L:\Pam Whiting\2010\Building Codes Forms\Inspectlon Forms\Septic Inspection ReportS3 29 10.doc
,Ti
IIIIIIIIIIII
ENVIRONMENTAL DESIGN
PARTNERSHIP,LLP
May 11, 2011
Queensbury Building& Code Enforcement
742 Bay Road
Queensbury,NY 12804
Via email johno@queensbury.net
Attn: John O'Brien
Re: Homestead Village Mobile Home Park
Lot 45 &46 Windsong
Dear John:
On April 27, 2011 our office inspected the above referenced Homestead Village Mobile Home
Park lots. The purpose of this visit was to observe the installation of the new septic system
designed by EDP dated April 8, 2011.
Based on my review of the plans and observation of the installation it is my opinion that the
system was installed substantially in compliance with the intent of the design plans.
Please contact me should you have any questions regarding this system.
Sincerely,
671:rfOGAZ
James E. Mitchell, P.E.
900 Route 146,Clifton Park, New York 12065 phone(518)371-7621 -fax(518)371-9540
Septic Inspection ReportAF
/
Office No. (518) 761-8256 Date Invection req ed: Z4' l
Queensbury Building &Code Enforcement Arrive: ,-tom pro l7 a,• pm
742 Bay Rd., Queensbury, NY 12804 Inspector's Initiap
NAME: I1° LIi — P/MIT NO.: ZC2// ^ 13/0
LOCATION: -[ rj- �-{(eG A - c{Scr J C'' ► i�SPECT ON: `-V2—7//l
RECHECK: l `
Comments and/or diagram
Soil Typ; .i•11roam / Clay
Type of Water: ' %.•1/ Well Water
Wate •- separation distance ft.
Well separation distance ft.
Other wells: ft.
Well Casing Length 50' + / - Y N N/A
Absorption Field: Total length ft.
Length of each trench .
Depth of trenches Z ft.
Size of Stone
Seepage Pits: Number
Size: x
Stone Size:
Piping Size Type
Building to tank 4" j
Tank to Distribution Box 1-4'` 1-1
Distribution Box to Field/ Pit / bQ g_-3 -VD 1Jsyci_39.-
Opening Sealed: Qr_N
End Cap
Inlet/Outlet Pipes &Baffles ,Y Y— N
Location/ Separations
• Foundation to tank _ _tJ) ft.
Nle} Eetipetati9n to absorption ` .
Separation of Pits
Conforms as per Plot Plan /_ft;/
�'�
Engineer Report and As-Built
Location of System on Property:
Front Re. Left Side Right Side Middle Front Middle Rear
-t Us- t. .
Approved
Partial Approved and needs to be re-inspected, please call the Building &Codes Office
Disapproved
Last revised 06/18/07 L:\Building&Codes Forms-OLD\Building&Codes\Inspection Forms\Septic Inspection Report.doc
TOPSOIL FOR SETTLING
1 I I1 1111 I I --
-I I I II 111- —IIII— -I I I I=I I I I-1 I II I I I—II I ITERRATEX NO. 2 NONWOVEN
z a_ -I I EARTH IIII —IIII- EARTH -III 1=)III_ CONSTRUCTION FABRIC OR
IF UNTREATED BUILDING PAPER
BACKFILL =IIII—I BACKFILL =IIII OR STRAW
�p N
I I I I I I� � I I I I I I I I I I—IIII- III—III 1=
TOP OF AGGREGATE IIII-1 — 4" PVC MIN.
TO BE WITHIN OO ?0 OO O
6"-12" OF SURFACE 8 O RAKE ANY PERFORATION JOINT
2 SMEARED
U TRENCH
N z O WALLS
Oo 00 67
MI ov
24" 4 CRUSHED STONE OR
GROUNDWATER BEDROCK WASHED GRAVEL
MN OR IMPERVIOUS LAYER 3/4" TO 1y2"
CROSS SECTIONAL VIEW LONGITUDINAL VIEW
TERRATEX NO. 2 NONWOVEN CONSTRUCTION FABRIC
UNTREATED BUILDING PAPER OR PERMEABLE
GEOTEXTILE OR 4" LAYER OF STRAW
=III 1= I
_1111�Ir IIII— 1=III'
=IIII=
11 =1 I ►=1 I I I=
67 C�7 a!7 � O 7 o 0
O O 2" MIN. p
FLOW -L. PROVDE CAPS
0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 o o 0 o ON LINE ENDS
O7 (�
p O
SLOPE PIPE Y6" -Y32" PER FT,
SPACING OF ABSORPTION TRENCH 6' O.C.
TRENCH BOTTOM TO BE NEAR
LEVEL AND RAKED
TRENCH PROFILE
10_� ABSORPTION TRENCH DETAIL
NOT TO SCALE
GRADE
FINISH GRADE
I I II I I I= I—) � I( N
SEAL ASPHALTIC _IIII-
INLET
" MIN.
" OR 3
FB
-LDG.. SEWER AFA�
ZZE
SANITARY =
TEE~ - Go
I z 4" MIN.
ALL JOINTS BELOW -/FULL w
LIQUID LEVEL TO BE BITUMINOUS I�
WATERTIGHT AND COAT
Q o
LEAKAGE TESTED
PRIOR TO BACKFILLING KOP 300M CD I BAFFLE WITH
OR EQUAL J i 4"X18' MIN.
MAY NOT BE
REQUIRED
SECTION VIEW
NOTE:
ASPHALTIC INLET INVERT IS 3" ABOVE
(2" MIN.)
SEAL
I
I I
INLET -� H
O it O
THE SLOPE OF THE INLET PIPE
BETWEEN THE RESIDENTIAL UNIT AND i BAFFLE NOTE:
THE SEPTIC TANK TO BE %4" PER FT. MAY NOT BE BAFFLE NOT REQUIRED FOR
REQUIRED TANKS LESS THAN 10 FT. LENGTH
PLAN VIEW
HEAVY DUTY MANHOLE FRAME
AND COVER BY CAMPBELL OR EQUAL
=IIII= EXTENSION
2MHIEGRADE RING
PER
FORT MILLER OR EQUAL
(AS REQUIRED)
OUTLET
WATER TIGHT JOINT (TYP.)
PARGE W/NON-SHRINK GROtJT
INSIDE & OUT
�- SANITARY TEE
EEEI
6" TO 12" LAYER
PEA GRAVEL OR
CRUSHED STONE
BEDDING LAYER
24" I.D. TAPERED
/ PLUG (TYP.)
THE SLOPE OF THE OUTLET PIPE
BETWEEN THE SEPTIC TANK AND THE
DISTRIBUTION BOX TO BE %4" PER FT.
m
OUTLET -�
T
4NK SIZE
MIN. LIQUID DEPTH "A"
TANK DIMENSIONS "B"X"C"
"0"
"1"
vv i.nv�
HEIGHT
000 GAL,
5'-0"
4'-3" x 8'-2"
5'-6"
5'-9"
6'-8"
SEPTIC TANK
NOT TO SCALE
(HEAVY DUTY SEPTIC TANK)
FORT MILLER OR EQUAL
2 DISTRIBUTION BOX
INSPECTION REQUIREMENTS:
ENGINEER OF RECORD TO INSPECT TRENCHES PRIOR TO BACKFILLING.
NOTE
1) BASEMAP INFORMATION OBTAINED FROM PUBLICALLY AVAILABLE
RESOURCES AND DOES NOT REPRESENT AN ACTUAL FIELD
INSTRUMENT SURVEY.
LEGEND:EXISTING SANITARY STRUCTURES INCLUDING
.:, observed, or believe I saw evidem, OT,SEPTIC TANK AND SEEPAGE DEVICES (EXCLUDING
O.H.U.L. DENOTES OVERHEAD UTILITY LINES 3 ick pEl Q rias et, THE SEPTIC TANK FOR LOT 45, WHICH WILL
n ;.,,,es w.,s S trues ' DI'�.0a •� �•� REMAIN ACTIVE
U. P. DENOTES UTILITY POLE ' ' N� ) ARE TO BE CRUSHED IN PLACE
W. S. DENOTES WATER SHUTOFFn ISO repre nt that I have AND FILLED WITH NATIVE MATERIAL.
, �� Bance t �rth on the iag � ..
I W tD TE
FIIF (��PV
LOT 71
LOT 72
PROPOSED 1,000 GALLON SEP77C TANK
(SEE DETAIL - SHEET 2)
TREE
TREE
PROPOSED 4" PVC
-- SCH 40 AT 2X MIN. —
I
PROPOSED 4" PVC SDR -35
(GISKET D BELL) AT 1X MIN.
EXISTING
MOBILE
HOME
LOT 73
N C)R TH
TREE
EXISTING 1,000 ` l
GALLON SEPTIC TANK
(TO BE REMAIN & BE
USED FOR LOT 45)
PROPOSED 4" PVC SDR -35
(GASKETED BELL) AT 19 MIN.
PROPOSED
DISTRIBU77ON BOX #2
7z (SEE DETAIL - SHEET 2)
TRE
TREE
TRE I
3 1 1 1 1
BEDIROOM
I
TREE
I I I I I
J_ 1 1
CONTRACTOR MUST I CONFIRM LOCATION OF
EXISTING WATER SERVICE PRIOR TO
COMMENCEMENT OF CONSTRUCTION AND
MAINTAIN A MINIM M 10 FT. SEPARATION
BETWEEN THE EXISTING WATER SERVICE AND
PROPOSED SANIjjTTARY SEWER LATERALS
d
LOT 46
PARKING
AREA
TOWN OF QU
BUILDING & C
Reviewed Bya
Date:
TREE
EXISTING
MOBILE
HOME
3
BEDROOM
UNIT
LOT 45
PARKING
AREA
W. S.
I
U U
o�
m, Wtia
vWi mm�
3 fop
�2 WIND ONG
TREE
REMOVE TREES
AS NECESSARY
TREE
�I
PARKING
AREA
LOT 44
TREE
CONTRACTOR MUST CONFIRM LOCATION OF EXISTING
WATER SERVICE PRIOR TO COMMENCEMENT OF
CONSTRUCTION AND MAINTAIN A MINIMUM 10 FT.
SEPARATION BETWEEN THE EXISTING WATER SERVICES
AND PROPOSED SANITARY SEWER LATERALS
DRIVE
1A LPROPOSED ABSORPTION FIELD
v l 5 LINES AT 50 FT. EACH (SPACED 6' ON CENTER)
TO SERVICE BOTH LOTS 45 & 46
(SEE DETAIL - SHEET 2)
NOTE:
MOBILE HOME UNITS TO BE PLACED WITH A MINIMUM 10 FT. HORIZONTAL SEPARATION.
THE LOCATION OF THE WATER SERVICE MUST BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION
TO CONFIRM PROPER SEPARATION DISTANCE FROM TILE FIELD (MINIMUM 10 FEET)
HOMESTEAD VILLAGE
TOWN OF QUEENSBUR Y WARREN COUNTY, NEW YORK
SCALE: 1 " = 20' APRIL 8, 2011
ENVIRONMENTAL DESIGN PARTNERSHIP, LLP
900 ROUTE 146 CLIFTON PARK, N.Y. 12065 (518) 371-7621
ENGINEERING LANDSCAPE ARCHITECTURE LAND SURVEYING
JAMES E. MITCHELL P. E. 53,337
BORING AND PERCOLATION TEST:
ASSUMED CONDITION BASED ON SITE EVALUATION
0-5' MEDIUM FINE SAND
NO WATER OR MOTTLING
PERCOLATION RATE APPROXIMATELY ONE MINUTE
NOTE: SOIL CONDITIONS TO BE CONFIRMED BY P.E. PRIOR TO BACKFILLING SYSTEM.
SEPTIC DESIGN:
APPLICATION RATE = 1.2 GAL./SF/DAY
LOT 45
3 BEDROOMS AT 100 GALLONS/BEDROOM
=300 GALLONS
LOT 46
3 BEDROOMS AT 100 GALLONS/BEDROOM
=300 GALLONS
TOTAL
6 BEDROOMS AT 100 GALLONS/BEDROOM
600 GALLONS
USE (2) 1,000 GALLON PRECAST SEPTIC TANKS
USE 5 LINES AT 50 FT. EACH (SPACED 6 FT. ON—CENTER)
CONSTRUCTION NOTES,
1) CONSTRUCTION OF ABSORPTION FACILITIES SHALL NOT OCCUR WHEN THE GROUND IS FROZEN OR
THE SOIL MOISTURE CONTENT IS HIGH. IF A FRAGMENT OF SOIL FROM APPROXIMATELY NINE INCHES
BELOW THE SURFACE CAN EASILY BE ROLLED INTO A RIBBON INSTEAD OF CRUMBLING, THE
MOISTURE CONTENT /S TOO HIGH FOR CONSTRUCTION PURPOSES. OBVIOUSLY, SOME SILT OR CLAY
MUST BE PRESENT FOR A RIBBON TO BE FORMED.
2) TRENCH LOCATIONS AND DEPTHS SHOULD BE MARKED BY STAKES BEFORE TRENCHES ARE
EXCAVATED. THE NATURAL SURFACE SHALL NOT BE SIGNIFICANTLY DISTURBED. IF THE SITE /S
REGRADED OR SIMILARLY DISTURBED, THE SOIL SHALL BE ALLOWED TOSTABILIZE (I.E., SETTLE
NATURALLY FOR A PERIOD OF AT LEAST SIX MONTHS, INCLUDING AT LEAST ONE FREEZE -THAW
CYCLE) AND NEW PERCOLATION AND DEEP HOLE TESTS CONDUCTED. HEAVY EQUIPMENT USE /N THE
DESIGNATED ABSORPTION SYSTEM AREA SHOULD BE MINIMIZED TO PREVENT SOIL PERMEABILITY
REDUCTION DUE TO COMPACTION PLUS POSSIBLE TRENCH CAVE-IN AND DISTRIBUTION PIPE
MI SAL I GNMEN T/BREAKA GE.
3) AFTER A FINAL GRADE CHECK, TRENCH EXCAVATION MAY BEGIN. TRENCH DEPTH SHALL BE AS
SHALLOW AS POSSIBLE, BUT NOT LESS THAN 18 INCHES. TRENCHES SHALL BE EXCAVATED TO
DESIGN DEPTH WITH BOTTOMS PRACTICALLY LEVEL. .
4) FOLLOWING EXCAVATION, THE TRENCH BOTTOMS SHOULD BE GRADED BY HAND. THE BOTTOMS OF
THE TRENCHES SHOULD BE CHECKED BY A TRANSIT, ENGINEER'S LEVEL, OR CARPENTER'S LEVEL TO
ASSURE THAT EACH IS PRACTICALLY LEVEL. TRENCH BOTTOMS AND SIDEWALLS SHOULD BE
IMMEDIATELY RAKED AFTER FINAL GRADING AND AT LEAST SIX INCHES OF AGGREGATE PLACED /N
THE TRENCHES.
5) GRAVITY DISTRIBUTOR PIPE SHALL BE CAREFULLY INSTALLED AT A SLOPE OF %6 TO %32 INCH PER
FOOT. PRESSURE OR DOSED DISTRIBUTOR PIPE SHALL BE INSTALLED LEVEL. GRADES SHALL BE
DETERMINED BY AN ENGINEER'S LEVEL, TRANSIT OR CARPENTER'S LEVEL. AN EASY METHOD OF
MEASURING THE 116 INCH PER FOOT SLOPE FOR DISTRIBUTOR PIPE 1S TO TAPE A %4 INCH BLOCK TO
ONE END OF A STRAIGHT FOUR FOOT BOARD. BY PLACING THE BLOCKED END WITH THE BLOCK
FACING DOWN ON THE DOWNSTREAM TOP OF THE DISTRIBUTOR PIPE, A CARPENTER'S LEVEL CAN BE
USED TO DETERMINE THE X16 INCH PER FOOT SLOPE. A %a INCH BLOCK SIMILARLY USED WOULD
RESULT IN A %32 INCH PER FOOT SLOPE. ANOTHER METHOD USED TO ESTABLISH THE GRADE OF
DISTRIBUTOR PIPE /S BY BATTER BOARDS, AGGREGATE SHALL BE INSTALLED /N THE TRENCHES TO
A DEPTH OF AT LEAST TWO INCHES ABOVE THE TOP OF THE DISTRIBUTOR PIPES. ADDITIONAL
AGGREGATE MAY BE REQUIRED TO BRING THE TOP OF THE AGGREGATE TO WITHIN SIX TO 12 INCHES
OF FINAL GRADE.
6) AFTER THE UPPER AGGREGATE IS PLACED IN THE TRENCHES, THE GEOTEXTILE, UNTREATED BUILDING
PAPER, HAY OR STRAW IS TO BE IMMEDIATELY INSTALLED ON THE AGGREGATE AND THE TRENCH
BACKFILLED WITH EXCAVATED SOIL. IF THE TRENCHES CANNOT BE IMMEDIATELY BACKFILLED, THE
TRENCHES SHOULD BE TEMPORARILY COVERED WITH AN IMPERVIOUS MATERIAL, SUCH AS TREATED
BUILDING PAPER TO PREVENT SIDEWALL COLLAPSE AND SILTATION INTO THE AGGREGATE.
7) THE EARTH BACKFILL IS TO BE MOUNDED SLIGHTLY ABOVE THE ORIGINAL GROUND LEVEL (I.E., NOT
COMPACTED) TO ALLOW FOR SETTLING. FOLLOWING SETTLEMENT, THE ENTIRE AREA SHOULD BE
GRADED WITHOUT THE USE OF HEAVY EQUIPMENT AND SEEDED WITH GRASS. HEAVY EQUIPMENT
SHALL NOT ENTER THE ABSORPTION FACILITY AREA OR THE PROPOSED EXPANSION AREA AFTER THE
SUBSURFACE SEWAGE TREATMENT SYSTEM HAS BEEN CONSTRUCTED.
8) A MINIMUM HORIZONTAL SEPARATION OF 10 FEET SHOULD EXIST BETWEEN THE HOUSE SEWER AND
ANY WATERLINE. WHERE LINES MUST CROSS, THE WATER SER'.110E LINE SHALL BE AT LEAST 12
INCHES ABOVE THE HOUSE SEWER. IF A WATER LINE MUST PASS BELOW THE HOUSE SEWER, THE
VERTICAL SEPARATION MUST BE AT LEAST 18 INCHES.
9) ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE EXCLUDED FROM THE
SYSTEM. WATER SOFTENER, WATER RECHARGE AND BACKWASH WASTES NORMALLY ARE NOT TO BE
DISCHARGED TO THE SYSTEM UNLESS A SEPARATE SUBSURFACE DISCHARGE TO AN AREA 250 FEET
FROM WELLS OR WATER COURSES IS UNAVAILABLE.
SHEET 1 OF 2
SEPTIC DESIGN PREPARED FOR
LOT 45 AND 46 WIND SONG DRIVE
HOMESTEAD VILLAGE
TOWN OF QUEENSBURY WARREN COUNTY, NEW YORK
SCALE: 1 " = 20' APRIL 8, 2011
ENVIRONMENTAL DESIGN PARTNERSHIP, LLP
900 ROUTE 146 CLIFTON PARK, N.Y. 12065 (518) 371-7621
ENGINEERING LANDSCAPE ARCHITECTURE LAND SURVEYING
JAMES E. Ml TCHELL P. E. 53, 337
NO TE:
I. PIPE JOINTS TO BE SEALED WITH
ASPHALTIC MATERIALS OR EQUIVALENT.
12" MIN
REMOVABLE
COVER -7
2. INVERT ELEVATIONS OF ALL
OUTLET PIPES MUST BE EQUAL.
J. THE SLOPE OF OUTLET PIPES
BETWEEN THE DISTRIBUTION BOX
AND THE DISTRIBUTOR LATERALS
SHOULD BE I/8" PER FOOT.'
BAFFLE
,
INVERT
INLET
2"MIN
EL EV.
00
00
Oo
OUTLET CONTRACTOR TO USE SPEED LEVELERS
AS SUPPLIED
_
BY FORT MILLER TO
•
EQUALIZE FLOW.
2.,- 5'
'
SHEET 2 OF 2
a -
-
SANI TAR Y DETAILS FOR
12 MIN
CLEAN SAND OR
PEA GRAVEL
LOT 45 AND 46
WINDSONG DRIVE
2 DISTRIBUTION BOX
INSPECTION REQUIREMENTS:
ENGINEER OF RECORD TO INSPECT TRENCHES PRIOR TO BACKFILLING.
NOTE
1) BASEMAP INFORMATION OBTAINED FROM PUBLICALLY AVAILABLE
RESOURCES AND DOES NOT REPRESENT AN ACTUAL FIELD
INSTRUMENT SURVEY.
LEGEND:EXISTING SANITARY STRUCTURES INCLUDING
.:, observed, or believe I saw evidem, OT,SEPTIC TANK AND SEEPAGE DEVICES (EXCLUDING
O.H.U.L. DENOTES OVERHEAD UTILITY LINES 3 ick pEl Q rias et, THE SEPTIC TANK FOR LOT 45, WHICH WILL
n ;.,,,es w.,s S trues ' DI'�.0a •� �•� REMAIN ACTIVE
U. P. DENOTES UTILITY POLE ' ' N� ) ARE TO BE CRUSHED IN PLACE
W. S. DENOTES WATER SHUTOFFn ISO repre nt that I have AND FILLED WITH NATIVE MATERIAL.
, �� Bance t �rth on the iag � ..
I W tD TE
FIIF (��PV
LOT 71
LOT 72
PROPOSED 1,000 GALLON SEP77C TANK
(SEE DETAIL - SHEET 2)
TREE
TREE
PROPOSED 4" PVC
-- SCH 40 AT 2X MIN. —
I
PROPOSED 4" PVC SDR -35
(GISKET D BELL) AT 1X MIN.
EXISTING
MOBILE
HOME
LOT 73
N C)R TH
TREE
EXISTING 1,000 ` l
GALLON SEPTIC TANK
(TO BE REMAIN & BE
USED FOR LOT 45)
PROPOSED 4" PVC SDR -35
(GASKETED BELL) AT 19 MIN.
PROPOSED
DISTRIBU77ON BOX #2
7z (SEE DETAIL - SHEET 2)
TRE
TREE
TRE I
3 1 1 1 1
BEDIROOM
I
TREE
I I I I I
J_ 1 1
CONTRACTOR MUST I CONFIRM LOCATION OF
EXISTING WATER SERVICE PRIOR TO
COMMENCEMENT OF CONSTRUCTION AND
MAINTAIN A MINIM M 10 FT. SEPARATION
BETWEEN THE EXISTING WATER SERVICE AND
PROPOSED SANIjjTTARY SEWER LATERALS
d
LOT 46
PARKING
AREA
TOWN OF QU
BUILDING & C
Reviewed Bya
Date:
TREE
EXISTING
MOBILE
HOME
3
BEDROOM
UNIT
LOT 45
PARKING
AREA
W. S.
I
U U
o�
m, Wtia
vWi mm�
3 fop
�2 WIND ONG
TREE
REMOVE TREES
AS NECESSARY
TREE
�I
PARKING
AREA
LOT 44
TREE
CONTRACTOR MUST CONFIRM LOCATION OF EXISTING
WATER SERVICE PRIOR TO COMMENCEMENT OF
CONSTRUCTION AND MAINTAIN A MINIMUM 10 FT.
SEPARATION BETWEEN THE EXISTING WATER SERVICES
AND PROPOSED SANITARY SEWER LATERALS
DRIVE
1A LPROPOSED ABSORPTION FIELD
v l 5 LINES AT 50 FT. EACH (SPACED 6' ON CENTER)
TO SERVICE BOTH LOTS 45 & 46
(SEE DETAIL - SHEET 2)
NOTE:
MOBILE HOME UNITS TO BE PLACED WITH A MINIMUM 10 FT. HORIZONTAL SEPARATION.
THE LOCATION OF THE WATER SERVICE MUST BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION
TO CONFIRM PROPER SEPARATION DISTANCE FROM TILE FIELD (MINIMUM 10 FEET)
HOMESTEAD VILLAGE
TOWN OF QUEENSBUR Y WARREN COUNTY, NEW YORK
SCALE: 1 " = 20' APRIL 8, 2011
ENVIRONMENTAL DESIGN PARTNERSHIP, LLP
900 ROUTE 146 CLIFTON PARK, N.Y. 12065 (518) 371-7621
ENGINEERING LANDSCAPE ARCHITECTURE LAND SURVEYING
JAMES E. MITCHELL P. E. 53,337
BORING AND PERCOLATION TEST:
ASSUMED CONDITION BASED ON SITE EVALUATION
0-5' MEDIUM FINE SAND
NO WATER OR MOTTLING
PERCOLATION RATE APPROXIMATELY ONE MINUTE
NOTE: SOIL CONDITIONS TO BE CONFIRMED BY P.E. PRIOR TO BACKFILLING SYSTEM.
SEPTIC DESIGN:
APPLICATION RATE = 1.2 GAL./SF/DAY
LOT 45
3 BEDROOMS AT 100 GALLONS/BEDROOM
=300 GALLONS
LOT 46
3 BEDROOMS AT 100 GALLONS/BEDROOM
=300 GALLONS
TOTAL
6 BEDROOMS AT 100 GALLONS/BEDROOM
600 GALLONS
USE (2) 1,000 GALLON PRECAST SEPTIC TANKS
USE 5 LINES AT 50 FT. EACH (SPACED 6 FT. ON—CENTER)
CONSTRUCTION NOTES,
1) CONSTRUCTION OF ABSORPTION FACILITIES SHALL NOT OCCUR WHEN THE GROUND IS FROZEN OR
THE SOIL MOISTURE CONTENT IS HIGH. IF A FRAGMENT OF SOIL FROM APPROXIMATELY NINE INCHES
BELOW THE SURFACE CAN EASILY BE ROLLED INTO A RIBBON INSTEAD OF CRUMBLING, THE
MOISTURE CONTENT /S TOO HIGH FOR CONSTRUCTION PURPOSES. OBVIOUSLY, SOME SILT OR CLAY
MUST BE PRESENT FOR A RIBBON TO BE FORMED.
2) TRENCH LOCATIONS AND DEPTHS SHOULD BE MARKED BY STAKES BEFORE TRENCHES ARE
EXCAVATED. THE NATURAL SURFACE SHALL NOT BE SIGNIFICANTLY DISTURBED. IF THE SITE /S
REGRADED OR SIMILARLY DISTURBED, THE SOIL SHALL BE ALLOWED TOSTABILIZE (I.E., SETTLE
NATURALLY FOR A PERIOD OF AT LEAST SIX MONTHS, INCLUDING AT LEAST ONE FREEZE -THAW
CYCLE) AND NEW PERCOLATION AND DEEP HOLE TESTS CONDUCTED. HEAVY EQUIPMENT USE /N THE
DESIGNATED ABSORPTION SYSTEM AREA SHOULD BE MINIMIZED TO PREVENT SOIL PERMEABILITY
REDUCTION DUE TO COMPACTION PLUS POSSIBLE TRENCH CAVE-IN AND DISTRIBUTION PIPE
MI SAL I GNMEN T/BREAKA GE.
3) AFTER A FINAL GRADE CHECK, TRENCH EXCAVATION MAY BEGIN. TRENCH DEPTH SHALL BE AS
SHALLOW AS POSSIBLE, BUT NOT LESS THAN 18 INCHES. TRENCHES SHALL BE EXCAVATED TO
DESIGN DEPTH WITH BOTTOMS PRACTICALLY LEVEL. .
4) FOLLOWING EXCAVATION, THE TRENCH BOTTOMS SHOULD BE GRADED BY HAND. THE BOTTOMS OF
THE TRENCHES SHOULD BE CHECKED BY A TRANSIT, ENGINEER'S LEVEL, OR CARPENTER'S LEVEL TO
ASSURE THAT EACH IS PRACTICALLY LEVEL. TRENCH BOTTOMS AND SIDEWALLS SHOULD BE
IMMEDIATELY RAKED AFTER FINAL GRADING AND AT LEAST SIX INCHES OF AGGREGATE PLACED /N
THE TRENCHES.
5) GRAVITY DISTRIBUTOR PIPE SHALL BE CAREFULLY INSTALLED AT A SLOPE OF %6 TO %32 INCH PER
FOOT. PRESSURE OR DOSED DISTRIBUTOR PIPE SHALL BE INSTALLED LEVEL. GRADES SHALL BE
DETERMINED BY AN ENGINEER'S LEVEL, TRANSIT OR CARPENTER'S LEVEL. AN EASY METHOD OF
MEASURING THE 116 INCH PER FOOT SLOPE FOR DISTRIBUTOR PIPE 1S TO TAPE A %4 INCH BLOCK TO
ONE END OF A STRAIGHT FOUR FOOT BOARD. BY PLACING THE BLOCKED END WITH THE BLOCK
FACING DOWN ON THE DOWNSTREAM TOP OF THE DISTRIBUTOR PIPE, A CARPENTER'S LEVEL CAN BE
USED TO DETERMINE THE X16 INCH PER FOOT SLOPE. A %a INCH BLOCK SIMILARLY USED WOULD
RESULT IN A %32 INCH PER FOOT SLOPE. ANOTHER METHOD USED TO ESTABLISH THE GRADE OF
DISTRIBUTOR PIPE /S BY BATTER BOARDS, AGGREGATE SHALL BE INSTALLED /N THE TRENCHES TO
A DEPTH OF AT LEAST TWO INCHES ABOVE THE TOP OF THE DISTRIBUTOR PIPES. ADDITIONAL
AGGREGATE MAY BE REQUIRED TO BRING THE TOP OF THE AGGREGATE TO WITHIN SIX TO 12 INCHES
OF FINAL GRADE.
6) AFTER THE UPPER AGGREGATE IS PLACED IN THE TRENCHES, THE GEOTEXTILE, UNTREATED BUILDING
PAPER, HAY OR STRAW IS TO BE IMMEDIATELY INSTALLED ON THE AGGREGATE AND THE TRENCH
BACKFILLED WITH EXCAVATED SOIL. IF THE TRENCHES CANNOT BE IMMEDIATELY BACKFILLED, THE
TRENCHES SHOULD BE TEMPORARILY COVERED WITH AN IMPERVIOUS MATERIAL, SUCH AS TREATED
BUILDING PAPER TO PREVENT SIDEWALL COLLAPSE AND SILTATION INTO THE AGGREGATE.
7) THE EARTH BACKFILL IS TO BE MOUNDED SLIGHTLY ABOVE THE ORIGINAL GROUND LEVEL (I.E., NOT
COMPACTED) TO ALLOW FOR SETTLING. FOLLOWING SETTLEMENT, THE ENTIRE AREA SHOULD BE
GRADED WITHOUT THE USE OF HEAVY EQUIPMENT AND SEEDED WITH GRASS. HEAVY EQUIPMENT
SHALL NOT ENTER THE ABSORPTION FACILITY AREA OR THE PROPOSED EXPANSION AREA AFTER THE
SUBSURFACE SEWAGE TREATMENT SYSTEM HAS BEEN CONSTRUCTED.
8) A MINIMUM HORIZONTAL SEPARATION OF 10 FEET SHOULD EXIST BETWEEN THE HOUSE SEWER AND
ANY WATERLINE. WHERE LINES MUST CROSS, THE WATER SER'.110E LINE SHALL BE AT LEAST 12
INCHES ABOVE THE HOUSE SEWER. IF A WATER LINE MUST PASS BELOW THE HOUSE SEWER, THE
VERTICAL SEPARATION MUST BE AT LEAST 18 INCHES.
9) ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE EXCLUDED FROM THE
SYSTEM. WATER SOFTENER, WATER RECHARGE AND BACKWASH WASTES NORMALLY ARE NOT TO BE
DISCHARGED TO THE SYSTEM UNLESS A SEPARATE SUBSURFACE DISCHARGE TO AN AREA 250 FEET
FROM WELLS OR WATER COURSES IS UNAVAILABLE.
SHEET 1 OF 2
SEPTIC DESIGN PREPARED FOR
LOT 45 AND 46 WIND SONG DRIVE
HOMESTEAD VILLAGE
TOWN OF QUEENSBURY WARREN COUNTY, NEW YORK
SCALE: 1 " = 20' APRIL 8, 2011
ENVIRONMENTAL DESIGN PARTNERSHIP, LLP
900 ROUTE 146 CLIFTON PARK, N.Y. 12065 (518) 371-7621
ENGINEERING LANDSCAPE ARCHITECTURE LAND SURVEYING
JAMES E. Ml TCHELL P. E. 53, 337
INSPECTION REQUIREMENTS:
ENGINEER OF RECORD TO INSPECT TRENCHES PRIOR TO BACKFILLING.
NO E.
1) BASEMAP INFORMATION OBTAINED FROM PUBLICALLY AVAILABLE
RESOURCES AND DOES NOT REPRESENT AN ACTUAL FIELD
INSTRUMENT SURVEY.
EXISTING SANITARY STRUCTURES INCLUDI
have seen or observed,or believe I saw evidence ASEPTIC,TANK AND SEEPAGE DEVICES (EX
INES P
O.N.U.L. DENOTES OVERHEAD UTILITY LTHE S TIC TANK FOR LOT 45, WHICH W
U.P. DENOTES UTILITY POLE �� � �'"SUCK nS hOUS°S,WeI1S,trees,fences,etc., Fr
W.S. DENOTES WATER SHUTOFF I, REMAI ACTIVE) ARE TO BE CRUSHED IN
�i`,MFi fi thi'do Llmen ISO repre t that I have AND FELLED WITH NATIVE MATERIAL.
ally asnred d' 'ance t fcrth on the iagram."
I�?r_
SIG ' 6EjiG�d��TUR
LOT 71 LOT 72
LOT 73
PROPOSED 1,000 GALLON SEPTIC TANK
(SEE DETAIL — SHEET 2) -
\.\
GALLON
G
GALLON SEEPT"IC TANK
TREE - �/�\ (TO BE REMAIN BE
USED FOR LOT 455)
i PROPOSED 4"PVC
SCN 40 AT 29> MIN. PROPOSED 4'PVC SDR-35
_ (GASKETED BELL) AT IX MIN.
PROPOSED 4"PVC SDR-35 PROPOSED
Q (G ISKETED BELL) AT I%MIN. DISTRIBUTION BOX,¢2
J (SEE DETAIL — SHEET
i
_ "s tLE /� FxrsnNc
HOME
J I MOIAF
77z
f
1
rREF
EXISTIT
BEDROOM �) I I I I BEDRCOM �t i,�' HOMe
r .-`UNIT-'` \.I/.'<I� I I ..�VNJ,T TREE
y I I I i I
TREE ( REMOVE TREES LC
AS NECESSARY
LOT 46dGf
TREE LOT 45 _
TREE
I TREE
V \� PARKING \1 I r PA
P.
�grgp I AREA I ,It%` AREAO TREE PARKING
^ Ip 9 TREE ( -_ \,.� AREA
TREE (1
I
W.S. W.S.
W
v <
CONTRACTOR MUST CONFIRM LOCATION OF as I °4 s I o.. CONTRACTOR MUST
EXISTING WATER SERVICE PRIOR TO maw w'w w WATER SERVICE PRIO
COMMENCEMENT OF CONSTRUCTIONAND rcl o3a m ��� CONSTRUCTION AND
MAINTAIN A MINIMUM 10 FT. SEPARATION �� qo ¢)oda SEPARATION BETWEEN
�- a AND PROPOSED SANT
BETWEEN THE EXIST G WATER SERVICE AND �I o00 3`(do0
PROPOSED SANT ARY SEWER LATERALS Qin
j o WIND ONO j o2a DRI VE
p V V2
,..OWN OF QUE
BUILDING& U D .
B PROPOSED ABSORPTION FIELD
Reviewed
�d .n 5 LINES AT 50 FT. EACH (SPACED 6' ON CENTEF
Date: TO SERVICE BOTH LOTS 45 & 46
(SEE DETAIL — SHEET 2)
N OTE:
MOBILE HOME UNITS TO BE PLACED WITH A MINIMUM 10 FT. HORIZONTAL SEPARATION.
THE LOCATION OF THE WATER SERVICE MUST BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRU(
TO CONFIRM PROPER SEPARATION DISTANCE FROM TILE FIELD (MINIMUM 10 FEET)