Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Revised Information for November 14, 2018 Review; Submission for Subdivision of lot 1
169 Haviland Road Queensbury, NY 12804 Hutchins Engineering Phone: (518)745-0307 Fax: (518) 745-0308 October 15, 2018 Zoning Board of Appeals Town of Queensbury 742 Bay Road Queensbury NY 12804 Re: Area Variance for Tra-Tom Development—Subdivision of Lot 1 in Barringer Heights Dear Zoning Board of Appeals Members: This office represents Tra-Tom Development with respect to their revised subdivision of lot 1 in the Barringer Heights Subdivision located on the north end of Richmond Hill Drive. During the original subdivision discussions during the final stage of Sub 4-2003, it was determined that the section of lot 1 on the west side of the subdivision road would be deed restricted for no further subdivision but the portion of lot 1 on the east side of the road could be considered for further subdivision after installation of the stormwater drainage system and re-evaluation of the soils on the east side of lot 1. The subdivision stormwater infrastructure has been completed since the fall of 2007. The request before you is to subdivide Lot 1 into 3 new residential lots on the east side of the subdivision road and a large deed restricted lot on the west side of the subdivision road. The 3 new residential lots are proposed to be 1.01 acres, 1.04 acres, and 1.2 acres respectively with the remaining lot to be 25.78 acres. We are requesting a variance for the new residential lots less than 2 acres in an MDR zone. We have reevaluated the soils for each of the proposed lots and have designed the wastewater systems and the basements accordingly. The proposed area of disturbance will require several feet of fill to raise the lots above the existing subdivision road and for the installation of the basements and wastewater systems. On behalf of owner/applicant Tra-Tom Development, we look forward to discussing this project at one of the November Zoning Board of Appeals meetings. Please contact me if you have any questions or if you require additional information. Best Regards, Thomas Center Jr., P.E. Cc: Mr. Thomas Farone Mr. Lapper, Esq., Bartlett Pontiff Stewart & Rhodes G Thomas Hutchins. P E thutchins@hutchinsengineering com Area Variance [ZBA approved: September 21 2016] General Information Tax Parcel ID Number: 308.7-1-48 Zoning District: MDR Detailed Description of Project [include current& proposed use]: Current Use: RESID.LOT ON EAST SIDE OF RD&DEED RESTRICTED PORTION ON WEST SIDE Proposed Use: SUBDIVIDE INTO 3 NEW RESIDENTIAL LOTS AND A DEED RESTRICTED LOT Location of Project: N.PORTION OF BARRINGER HEIGHTS SUBDIVISION ON RICHMOND HILL DRIVE Applicant Name: TRA TOM DEVELOPMENT Mailing Address 677 NYS ROUTE 9 I Home Phone City, State,Zip GANSEVOORT,NY 12831 Work Phone Cell Phone E-Mail: FAX No. Agent's Name: HUTCHINS ENGR&VAN DUSEN Mailing Address 169 HAVILAND RD Home Phone &STEVES SURYEORS City, State,Zip QUEENSBURY,NY 12801 Work Phone Cell Phone 5187962515 E-mail TCENTER360YAHOO.COM FAX No. Owner's Name SAME AS APPLICANT Mailing Address Home Phone City, State, Zip Work Phone Cell Phone E-mail FAX No. Page 1 Area Variance [ZBA approved: September 21 20161 Site Development Data Area/Type Existing sq.ft. Proposed Total sq.ft. Additions . ft. A. Building footprint B. Detached Garage C. Accessory Structure(s) D. Paved, gravel or other hard surfaced area E. Porches/Decks F. Other G. Total Non-Permeable [Add A-F] H. Parcel Area [43,560 sq. ft./acre] I. Percentage of Impermeable Area of Site [I=G/H] Setback Requirements Area Required Existing Proposed Front Yard [1] 30' 30' Front Yard[2] Shoreline 75' Side Yard [1] 25' 25' Side Yard [2] 25' 25' Rear Yard [1] 30' 30' Rear Yard [2] Travel Corridor Height [maximum] 40' 40'MAX Permeability 50% 50%MAX Number of parking spaces 2 2 Page 2 ZONING SUMMARY ZONE - MDR MINMIMUM LOT SIZE - 2 ACRES PER DWELLING W/O MUNICPALE WASTE WATER *VARIANCE REQUESTED FOR LESS THAN 2 ACRE LOTS FRONT SETBACK- 30' SIDE SETBACKS -25' REAR SETBACK- 30' AVERAGE LOT WIDTH- 100' MINIMUM BUILDING HEIGHT- 40' MINIMUM PERCENT PERMEABLE - 50% SUBDIVISION DENSITY CALCULATIONS ZONE - MDR (SR-lA FOR ORIGINAL SUBDIVISION) TOTAL AREA- 49.87 ACRES ROAD & STORMWATER EASEMENT AREA- 4.16 ACRES AREA OF FLAGGED WETLANDS - 4.3 ACRES USABLE DENSITY ACREAGE - 41.41 ACRES TOTAL NUMBER OF ALLOWABLE LOTS - 41.41 LOTS (SR-lA ORIGINAL ZONING) TOTAL NUMBER OF EXISTING LOTS -32 LOTS TOTAL NUMBER OF PROPOSED NEW LOTS - 3 LOTS TOTAL NUMBER OF LOTS - 35 LOTS EXISTING LOT SIZES - 0.46 ACRES TO 29.06 ACRES PROPOSED LOT SIZES (3 NEW LOTS) - 1.0191.04 & 1.2 ACRES Area Variance [ZBA approved: September 21 2016] Additional Protect Information 1. Will the proposal require a Septic Variance from the Town Board of Health? NO 2. If the parcel has previous approvals, list application number(s): SUB 4-2003 3. Does this project require coverage under the New York State Pollutant Discharge Elimination System(SPDES)Permit Program? ✓Yes/_No 4. Estimated project duration: Start Date: 9/2018 End Date: 12/2021 5. Estimated total cost of project: $800,000 6. Total area of land disturbance for project: 1.6 ACRES Floor Area Ratio Worksheet FLOOR AREA RATIO (FAR) -- The relationship of building size to lot size, derived by dividing the total building floor area by the lot size in square feet,yielding a percentage. Zoning District Symbol Floor Area Ratio [FAR] Waterfront Residential WR 0.22 Commercial Moderate/Commercial CM/Cl 0.3 Intensive A. The combined area of all square footage, as measure from exterior walls of all structures on the property, including all floors of the structures, garages, basements and attics with more than five (5) feet of ceiling height and covered porches. Building square footage does not include: Open deck, docks and that portion of covered docks extending over water and one storage shed of one hundred twenty (120) square feet or less. Any additional sheds will be included. (See"FLOOR AREA RATIO"). B. Commercial or industrial: the total area in square feet as measured from the exterior of the outside walls of a building or structure, and when applicable,the sum total of all floor areas of the principal and accessory buildings or structures on the project site. Parcel Area s . ft. Existing Floor Area s . ft. see above definition] Proposed Additional Floor Area s . ft. Proposed Total Floor Area s . ft. Total Allowable Floor Area (Area x see above table Page 3 Area Variance [ZBA approved: September 21 2016] Compliance with Zoning Ordinance Requesting relief from SECTION: 179-3-040-3(b).1A,3,&4 Need relief from the requirement(s)listed below which can not be met by the project as proposed. [Check all that apply] Y Setback ❑ Buffer Zone ❑Lot Width DOther LESS THAN 2 ACRE LOTS The following questions reflect the criteria for granting this type of variance. Please complete them; use additional sheets if needed. 1. Whether an undesirable change will be produced in the character of the neighborhood or a detriment to nearby property will be created by the granting of this area variance? N11 THE ORIGINAL SUBDIVISION APPROVAL INC LUDEA DEED RESTRICTION ONLY FOR THE WEST SIDE OF LOT 1. THE UNDERSTANDING WAS THAT THE DEVELOPER MAY CONSIDER FURTHER SUBDIVISION OF THE EAST SIDE OF LOT 1 AFTER SEVERAL YEARS AND REEVALUATION OF THE SOILS AFTER THE COMPLETION OF NEW DRAINAGE 2. Whether the benefit sought by the applicant can be achieved by some method, feasible for the applicant to pursue, other than an area variance? SUBDIVISIONNO,THE SUBDIVISION WAS DESI(;NED—A5 I A-CLMER E TOWN CQAE HiA...S_ SINCE BEEN REVISED TO MDR-2 ACRE MINIMUM LOT SIZE WITH ONSITE WASTEWATER. 3. Whether the requested area variance is substantial? RELATIONT14F REQUEST COULD RE CONSIDERED SUBSTANTIAL IN In THE NEW VIRDIVIChTnN ZONING f nnF.R111 IS CONSISTENT WITH PREVIOSULY APPROVED 4. Whether the proposed variance will have an adverse effect or impact on the physical or environmental conditions in the neighborhood or district? NO.THE PROPOSED SUBDIV1$IQI-QF THE EAST SIDE OF LQT 1 Wf[I..I E,.SIM[LA � IiE PREV10[1SI.YA�'1r'RCIY_I D SUBDIVISION. 5. Whether the alleged difficulty was self-created? US,THE ALLEGED DIFFICULTY COULD-BE DEEMED SELF-CREATED, Page 4 Area.Variance [ZBA approved: September 21 2016] Section 179-14-030—Application materials Application materials and site plan drawing is to include sufficient information for the Board to review and provide a decision. The applicant is to provide a site plan drawing(s)—a survey showing existing conditions,a proposed conditions map(see page 00 for specific criteria)and include any other attachments that address A-D as applicable to the proposed project. A. General Shown on Sheet# 1 Title,Name,Address of applicant&person responsible for preparation of drawing COVER 2 Deed X 3 North arrow,Tax Map ID, date prepared and scale minimum: 1 inch=40 feet J X 4 Boundaries of the roe lotted to scale, zoning boundary 291261-01-52 5 Principal structures, accessory structures with exterior dimensions 291261-01-53&S4 6 Site improvements incl. outdoor storage areas, driveways, parking areas,etc.: existing& 291261-01-53&S4 proposed 7 Setbacks for all structures and improvements: existing& 2roposed 291261-01-53 8 Elevations and floor plans of all proposed and affected structures NA B. Water& Sewer Shown on Sheet# 1 Project sewage disposal facilities, design details, construction details,flow rates, and number of bedrooms proposed 291261-01-S4 2 Water supply [i.e. well] & septic on adjoining lots with separation distances to existing or 291261-01-54 proposed on-site water su ly and septic 3 Separation distances for proposed sewage disposal system to well and water bodies 291261-01-54 4 Existing public or private water supply [well, lake, etc.]. Method of securing public or private water, location, designand construction of water supply includingdail water usa a 291261-01-54 5 Percolation test location and results 291261-01-53 C. Parking/Permeable Areas Shown on Sheet# 1 Number of spaces required for project including calculations and justification: existing& proposed 2 No. of existing parking spaces,number to be removed, number to maintain and type of surfacing material [e.g.,gravel,paved] 3 Provision for pedestrian and handicap access and parkin : existing&proposed 4 Design details of ingress, egress, loading areas and cutting: existing&proposed 5 Location and character of green areas [existing and proposed], modification to green area,buffer zone to remain undisturbed 6 Lighting, location and design of all existing and proposed outdoor lighting D. Additional Site Development and Miscellaneous Shown on Sheet# 1 On-site&adjacent watercourses, streams,rivers, lake and wetlands 2 Utility/energy distributions stem as,electric,solar,telephone]: existin & ro osed 3 Location, design and construction details of all existing and proposed site improvements including: drains, culverts,retaining walls, fences,fire&emerLency zones and hydrants, etc. 4 Square footage of bldg. area proposed for office, manufacturing,retail sales or other commercial activities: existing&proposed 5 Si na e: Location,size,type, design and setback: existing&proposed 6 Waiver Request: provide letter with application requesting any waivers: please reference specific items 7 Commercial /Industrial Development requires submission of Landscaping, Stormwater Management, Grading&Lighting Plans 8 Identification of Federal, State or County permits required for the project together with a record of application for all necessary permits Page 5 Area variance[ZBA approved: September 21 20161 Pre-Submission Conference Form/Section 179-9-040 1. Applicant Name: TRA TOM DEVELOPMENT-BARRINGER HEIGHTS LOT 1 SUBD. 2. Tax Map ID 308.7-1-48 Location: RICHMOND HILL DR 3. Zoning Classification MDR 4. Reason for Review: VARIANCE FOR NON CONFORMING RESIDENTIAL LOTS 5. Zoning Section#: 179-3-040-3(b).1A,3,&4 6. Pre-Submission Meeting Notes: Provided Outstanding; Please provide by Deed General Information complete Site Development Data Complete Setback Requirements,Complete Additional Project Information Complete FAR addressed k/� Compliance with Zoning Ordinance Checklist items addressed Environmental Form completed Signature Page completed �t-f UGC G f A ' 1 r 4D L-,.e CJ Lc4i,6Q.-6� �S f C c-t. U(h 0 -1 UL) v i r V Sc [V►S t �t CA► YJ(�J i '� C,C L OCR .l� tiIC L) l C /XAprLytAj f C� �-Y °�- Q't - SV+e•Y�!'sfr� con A, Staff Representative: Applicant/Agent: Date: Page 6 Area.Variance [ZBA approved: September 21 2016] This page includes the 1.) Authorization to Act as Agent Form: 2.) Engineering Fee Disclosure; 3.) Authorization for Site Visits;4.) Other Permit Responsibilities;5.)Official Meeting Disclosure and 6.)Agreement to provide documentation required. OWNER's AGENT FORM: Complete the following if the OWNER of the property is not the same as the applicant: Owner: TRA TOM DEVELOPMENT Designates: HUTCHINS ENGR&V.D.S. as Agent regarding the following: Variance ✓ Site Plan Subdivision ✓ For Tax Map No.:308.7-1-48 Deed Reference: Book Page Date OWNER SIGNATURE: DATE: , APPLICANT'S AGENT FORM: Complete the following if the APPLICANT is unable to attend the meeting or wishes to be represented by another party: Owner: TRA TOM DEVELOPEMNT Designates: HUTCHINS ENGR/VAN DUSEN&STEVES as Agent regarding the following: Variance ✓ Site Plan Subdivision / For Tax Map No.:308.7-1-48 Deed Reference: Book Page Date OWNER SIGNATURE: . DATE: 7 2. ENGINEERING FEE DISCLOSURE: Applications may be referred to the Town consulting engineer for review of septic design, storm drainage, etc. as determined by the Zoning or Planning Department. Fees for engineering review services will be charged directly to the applicant. Fees for engineering review will not exceed S 1,000 without notification to the applicant. AUTHORIZATION FOR SITE 'VISITS: By signing this page and submitting the application materials attached herein, the Owner,Applicant,and his/her/their agent(s)hereby authorize the Zoning Board or Planning Board and Town Staff to enter the subject properties for the purpose of reviewing the application submitted. 4. OTHER PERMIT RESPONSIBILITIES. Other permits may be required for construction or alteration activity subsequent to approval by the Zoning Board or Planning Board. It is the applicant's responsibility to obtain any additional permits. 5. OFFICIAL MEETING MINUTES DISCLOSURE: It is the practice of the Community Development Department to have a designated stenographer tape record the proceedings of meetings resulting from application,and minutes transcribed from those tapes constitutes the official record of all proceedings. 6.) AGREEMENT TO PROVIDE DOCUMENTATION REQUIRED: I,the undersigned, have thoroughly read and understand the instructions for submission and agree to the submission requirements, I acknowledge no construction activities shall be commenced prior to issuance of a valid permit. I certify that the application,plans and supporting materials are a true and complete statement/description of the existing conditions and the work proposed, and that all work will be performed in accordance with the approved plans and in conformance with local zoning regulations. I acknowledge that prior to occupying the facilities proposed,I or my agents, will obtain a certificate of occupancy as necessary. I also understand that I/we may be required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy I have read and agree to the ab V S e[Applicant] Print Name[Applicant] bale signed THOMAS CENTER 7/16/18 Signature[Agent] Print Name[Agent] Date signed Page 7 Short Environmental Assessment Form Part I -Project Information Instructions for Completing Part 1 -Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding,are subject to public review,and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item,please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency;attach additional pages as necessary to supplement any item. Part 1 -Project and Sponsor Information TRA TOM DEVELOPEMENT Name of Action or Project: BARRINGER HEIGHTS LOT 1 SUBDIVISION Project Location(describe,and attach a location map): NORTH EAST SIDE OF RICHMOND HILL DR Brief Description of Proposed Action: SUBDIVIDE THE EAST SIDE OF LOT 1 INTO 4 NEW RESIDENTIAL LOTS. Name of Applicant or Sponsor: Telephone: TRA TOM DEVELOPEMENT E-Mail: Address: 677 NYS RT 9 City/PO: State: Zip Code: GANSEVOORT NY 12831 1.Does the proposed action only involve the legislative adoption of a plan,local law,ordinance, NO YES administrative rule,or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If no, continue to question 2. 2. Does the proposed action require a permit,approval or funding from any other governmental Agency? NO YES If Yes, list agency(s)name and permit or approval: ❑ 3.a.Total acreage of the site of the proposed action? 29.06 acres b.Total acreage to be physically disturbed? 1.6 acres c.Total acreage(project site and any contiguous properties)owned or controlled by the applicant or project sponsor? 29.06 acres 4. Check all land uses that occur on, adjoining and near the proposed action. ❑Urban ❑Rural(non-agriculture) ❑Industrial [:]Commercial m Residential(suburban) ❑Forest ❑Agriculture ❑Aquatic ❑Other(specify): ❑Parkland Page 1 of 3 5. Is the proposed action, NO YES N/A a.A permitted use under the zoning regulations? EZI ❑ ❑ b. Consistent with the adopted comprehensive plan? ❑ Fv/1 ❑ 6. Is the proposed action consistent with the predominant character of the existing built or natural NO YES landscape? ❑ Z 7. Is the site of the proposed action located in,or does it adjoin, a state listed Critical Environmental Area? NO YES If Yes, identify:VMIAgaS GVE-S'pER1V 1? ❑ 8. a. Will the proposed action result in a substantial increase in traffic above present levels? NO YES ❑ ❑ b.Are public transportation service(s)available at or near the site of the proposed action? V/ ❑ c.Are any pedestrian accommodations or bicycle routes available on or near site of the proposed action? FVI ❑ 9.Does the proposed action meet or exceed the state energy code requirements? NO YES If the proposed action will exceed requirements,describe design features and technologies: 10. Will the proposed action connect to an existing public/private water supply? NO YES If No,describe method for providing potable water: ❑ ❑ 11. Will the proposed action connect to existing wastewater utilities? NO YES If No,describe method for providing wastewater treatment: ❑ ONSITE WASTEWATER SYSTEMS 12. a. Does the site contain a structure that is listed on either the State or National Register of Historic NO YES Places? V/ ❑ b. Is the proposed action located in an archeological sensitive area? ❑ ❑ 13. a. Does any portion of the site of the proposed action,or lands adjoining the proposed action,contain NO YES wetlands or other waterbodies regulated by a federal,state or local agency? ❑ Z b. Would the proposed action physically alter,or encroach into, any existing wetland or waterbody? ❑ ❑ If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: 14. Identify the typical habitat types that occur on,or are likely to be found on the project site. Check all that apply: ❑Shoreline ❑Forest ❑Agricultural/grasslands ❑Early mid-successional m Wetland ❑Urban m Suburban 15. Does the site of the proposed action contain any species of animal,or associated habitats, listed NO YES by the State or Federal government as threatened or endangered? ❑ ❑ 16. Is the project site located in the 100 year flood plain? NO YES 17. Will the proposed action create storm water discharge,either from point or non-point sources? NO YES If Yes, a.Will storm water discharges flow to adjacent properties? m NO EJYES ❑ Z b.Will storm water discharges be directed to established conveyance systems(runoff and storm drains)? If Yes,briefly describe: LZ]NO AYES Page 2 of 3 18. Does the proposed action include construction or other activities that result in the impoundment of NO YES water or other liquids(e.g.retention pond,waste lagoon,dam)? If Yes,explain purpose and size: ❑ ❑ 19. Has the site of the proposed action or an adjoining property been the location of an active or closed NO YES solid waste management facility? If Yes,describe: ❑ 20.Has the site of the proposed action or an adjoining property been the subject of remediation(ongoing or NO YES completed)for hazardous waste? If Yes,describe: Fv(] ❑ I AFFIRM THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Applicant/sponsor name: THOMAS CENTER,PE CHINS ENGINEERING Date: 10/15/18 Signature: PRINT FORM Page 3 of 3 Agency Use Only IIf applicable] Project: Date: Short Environmental Assessment Form Part 2 -Impact Assessment Part 2 is to be completed by the Lead Agency. Answer all of the following questions in Part 2 using the information contained in Part 1 and other materials submitted by the project sponsor or otherwise available to the reviewer. When answering the questions the reviewer should be guided by the concept"Have my responses been reasonable considering the scale and context of the proposed action?" No,or Moderate small to large impact impact may may occur occur 1. Will the proposed action create a material conflict with an adopted land use plan or zoning ❑ Elregulations? 2. Will the proposed action result in a change in the use or intensity of use of land? ❑ ❑ 3. Will the proposed action impair the character or quality of the existing community? ❑ ❑ 4. Will the proposed action have an impact on the environmental characteristics that caused the ❑ ❑ establishment of a Critical Environmental Area(CEA)? 5. Will the proposed action result in an adverse change in the existing level of traffic or ❑ ❑ affect existing infrastructure for mass transit,biking or walkway? 6. Will the proposed action cause an increase in the use of energy and it fails to incorporate ❑ ❑ reasonably available energy conservation or renewable energy opportunities? 7. Will the proposed action impact existing: ❑ ❑ a.public/private water supplies? b.public/private wastewater treatment utilities? 8. Will the proposed action impair the character or quality of important historic,archaeological, El El or aesthetic resources? 9. Will the proposed action result in an adverse change to natural resources(e.g., wetlands, ❑ ❑ waterbodies,groundwater, air quality,flora and fauna)? 10. Will the proposed action result in an increase in the potential for erosion,flooding or drainage ❑ ❑ problems? 11. Will the proposed action create a hazard to environmental resources or human health? PRINT FORM Pagel of 2 Age Use Only[Itapplicablel Project: Date: Short Environmental Assessment Form Part 3 Determination of Significance For every question in Part 2 that was answered"moderate to large impact may occur",or if there is a need to explain why a particular element of the proposed action may or will not result in a significant adverse environmental impact,please complete Part 3. Part 3 should,in sufficient detail,identify the impact,including any measures or design elements that have been included by the project sponsor to avoid or reduce impacts. Part 3 should also explain how the lead agency determined that the impact may or will not be significant.Each potential impact should be assessed considering its setting, probability of occurring,duration,irreversibility,geographic scope and magnitude. Also consider the potential for short- term,long-term and cumulative impacts. Check this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action may result in one or more potentially large or significant adverse impacts and an environmental impact statement is required. Check this box if you have determined,based on the information and analysis above,and any supporting documentation, that the proposed action will not result in any significant adverse environmental impacts. Name of Lead Agency Date Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer(if different from Responsible Officer) PRINT FORM Page 2 of 2 i WARREN COUNTY CLERK RECORDING COVER SHEET EMP. INITIALS_ INSTRUMENT 0 1 1 No, of PACES TYPE OF DOG. ADDTL. FEE Towfl r' ADDTL. NAMES +i A S� F+ Ali TRANSFER TAX AMT. �.�SyO C9)�1I UY MORTGAGE AMT.A A MORTGAGE TAX i * IANSFER TAX STAMP A MORTGAGE TAX STAMP ^' * A PW6 RECEIVED k a REAL ESTATE + FLAB 2 6 2001 0TRANSFER TAX A �WIREN COUNTY A is AAAAAA AAA,*AAA A*****AAA*AAAAAAA**A****A*AA******AAAAAA***AA*A*k*k***AA**kA**Ak**AA***** Ill eano fill In blanks below before submitting for recording. PANTY OF THE FIRST PART I}h� + ' PARTY OF THE SECOND PART RECORDED BY: p es _ /ll/ll/lull/l/ll/ll/ll/llllllll/l/llll EFTURN TO: 1� Ps - / RECORDING STAMP Oe2 C- �Ll CrC. +� l IU'IIY ILY. 01 FEB(2u :',i1 9: 10 Upon recording, this pnge becomes a part of the / document (».00) / 1 i i C!"F1kAFARONM-D1ANRAT1F&ni te rra Tom 101l.eo vo 'A N.Y.S p 0301••HLa Warranty Deed with Lion covenant, 2-92 TAX iro—ly a lot) $ ��ji� �fn�etttu�e Between THOMAS J.FARONE&SON,INC.a New York corporation with an address of 804 Route 9,Gansevoort,New York 12831 I TRA-TOM DEVELOPMENT,INC.a New York corporation with an address of 804 Route 9,Gansevoort,New York 12831 r.n ," �Vitnessethosrlolri'hy.'i+!ofly/s�r�,�mn,a�rrlw��r�..ax.iirt'�........................................ ....................................... oxavdew ,.�, ii tpeL'b./r". .,,r I ..//y�,,ore,../wn(oniy,.u.K6�d0urrr;/!y r.Sr�rr f/ry rj/d,�.anrdrrrl.r/i+.r,frrrly�mnl nnAwr�.av"na.ai�riy�'nl r�/dlr.:...rn/�.rrr. � nir»/6a%Rrrdn•nt nn,Ire:Vyra�mri.rJ/ SEE ATTACHED SCHEDULE"A" Excepting and reserving herefrom All that certain piece or parcel of land situate,lying and being in the Town of Queensbury,County of Warren and State of New York more particularly bounded and described as follows; BEGINNING at a point in the northerly bounds of Fox Farm Road at die southwest comer of lot 40 of the Indian Ridge PUD as shown on a map of the same,dated January 26,2000 and revised April 3,2000 running thence along the northerly bounds of said Fox Farm Road,the fallowing two courses and distances: (I)north 8 i degrees 19 minuses ant. 56 seconds west a distance of 47.25 feel;(2)thence running along a curve to the ItA,having a radius of 325.00 feet,a distance of 18S.86 feat;thence runt+.ing north 84 degrees 14 minutes and 58 seconds west a distance of 34,98 feel;thence rwutinb along the westerly northerly and easterly bounds of said lands ofthe grantor herein the following seven eoursei and distances: (1)north 27 degrees 20 minules and 00 seconds east a distance ar475,70 feet; (2)north 84 degrees 33 minutes and DO seconds west a distance of 171,60 feet; (3)north 05 degrees 25 minutes and 51 seconds cast a distance of 1420.30 feel; ` (4)north 04 degrees 40 minutes and 26 seconds east a distance of 637.45 feet; E (5)north 06 degrees 12 minutes and 46 seconds east a distance of 268.63 feel; j (6)south 84 degrees 44 minutes and 3.1 seconds east a dlstanee of 1619.18 feel; (7)south 07 degrees 48 minutes and 06 seconds west a dislanco or 1050.44 feel to ii puinl in the northerly bounds of Lot 24 in please III or said Indian Ridge PUD:thence running along the nordlwes(erty bounds of Phase III and the # northwesterly bounds 91'Phase 1 the following diittecn courses and distances: (1)south 74 degrees 06 minutes and 06 seconds west a distance of 170.29 feet; i (2)south 55 degrees 05 minutes and 52 seconds west a distance of inns feet; (3)south 29 degrees 45 minutes and 50 seconds west it distance of 202.45 feel; (4)south 22 degrees 33 minutes and 31 seconds west a distance of 190.90 feet; (5)south 45 degrees 23 minutes and 12 seconds west a distance of 63.65 feel; (6)south 60 degrees 40 minutes and 45 seconds west a distance of 76.05 feel; (7)sonlh 54 degrees 33 minutes and 56 seconds west a distance of 120.03 feel; (8)south 54 degrees 3D minutes and 57 seconds west a distance of 70.02 feel; (0)south 45 degrees 39 nrinttIts and 36 seconds west a ditlanea of 117.94 ice 1; (10)south 57 tlaglees 27 joinutes and 41 seconds west a distance of 116.05 feel; [I1)south 50 degrees 05 minutes and 02 seconth west a dislance of 128.49 foci; (I2)south 42 dcgrecs 51 sn(nutes and 23 seconds west a dislant'c of 154.87 feel; [13)south 41 degrees 33 ntinutcs and 37 seconds west a distance of 119.77 feel; (14)south 30 degrees 42 ntinmes and 16 seconds west a distnncc of 484,57 feet to the point and place of beginning, i containing 60.79 acres of ton to be The sama Inosc or leas. C.oradndng 12m1s previously conveyed to the Town of Queensbury The real property conv_ycd herein does not constitute all or substantially all of the corporation's assets. t i r t 1, i f 1` I k . s • C:INyFI,,If ARO.4h\R101ANIIRr1F Jc,d 1.7.Tom 10 73 00 uVd 'rest rher,rarN.,yp.nw,, .wore/mr,.M/Aw„J,�gg/cirAr�.�iN�drylrr/mia,ww/A w/�..«rw i ' s - Ta have and to hold di�e.,,_.v.e.,:E..,.�a/,mI•N��y-;w�i/».•e,Idstsl:;Gr„l.,ln;v�,.,lr:y,.r I And �ni/�,�•w�/.Z/w�frrn.».w��riny ..o- I First,•;r��cp.,y•w�.�..w✓�N.R.r ��y.�:��...:�. Second,. gyp,y,wQrkfwf r,.r,,t,.c'1/N:m r�r u���✓�,.,w third, // yfa rw.7/r•(�. 7,,wCA `, I w.w/.wJ'LM%Ayi,r�'.l�A•..mn.wrl.•nn6.•MrnMn/plfiw�A•bfyN.t/�I��F.d-a7nv�/�61'.,/'�7,...�q�o1,.;7M.r.„,.I..w./.,,f� ',vim,' Ni�wNINA�rL�+yr.r�/N.n/�I�l yMnr nM r�ww�v�lr��!/�AN✓�/Is,��ie yrd 1ir.— i m In Witness Whereof,641 rmarn. W IN rResliNce or 4-09w,. L.S. L.S. I L.S. Stale of New York —-` :ss.t County of Saratoga On this Qday October,ZOPQ,before me,a Notary Public In mid for tfte sald 5tatc, 4 personally appeared THOMAS L FARONE&.SUN,INC.personally known to me or proved to me on the basis ofsalisfaetory evidence to be lily Individual whore name is subserlbed to the within Instrument and acknowledged to me Clint he/she execuled tare same In his/her capacity,and that by his/her signature on the In.,truniont,tiro irrdlvldual or the person on behalf of which the Individual a cd,exeeutrd lire frrstr went. ti Notary Public --- -- JANETMcKEENBAIDES Norary Puhllo.Slala of Now York No•40473g3,Saratoga County Commission Expiros 11.3Q1t1Q3 SCHEDULE "A" r� .,r All that certain piece or parcel of land situate,lying and being in the Town of ,! Queensbury,County of Warren and the State of New York,more particularly bounded ' and described as follaws:It I-__.0 INN 1ING at a point in the easterly bounds of Fox Farm Romt in the northwest comer of lands conveyed to the People of the Slate of New York, by dead dated February 17,1967 and recorded in book 479 of deeds at page 32;thence running along the lands of Thomas J.Fnrone and Son Inc.the following eight courses and distances: (1)North 42 degrees,02 minutes and 30 seconds East,a distance of 143,54 feet; (2)Norih 84 degrees,14 minutes and 58 seconds West,a distance of 52.47 feel; (3)North 27 degrees,20 minutes and 00 seconds East,a distance of 475.70 feet; I (4)North 84 degrees,33 minutes and 00 seconds West,a distance of 171.60 feet; (5)North 05 degrees,25 minutes and 51 seconds East,a distance of 1420.30 feel; (6)Nortll 04 dogrccs,40 minutes and 26 seconds East,a distance of 637.45 feet; (7)North 06 degrees, 12 minutes and 46 seconds East,a distance of 268.63 feet; (8)South 84 degrees,44 minutes and 34 seconds East,a distance of 1629.18 feel to a �+ point in the westerly bounds of the lands of Queensbury Central School District;thence running along the bounds of Queensbury Central School District,the following four courses and distances: (i)South 07 degrees,43 minutes and 06 seconds West,a distance of 1050.44 feel; (2)South 83 degrees,33 minutes and 40 seconds East,a distance of 543.63 feet, (3)South 05 degrees,37 minutes and 09 seconds West,a distance of 1610.72 feet; (4)North 86 degrees,01 minutes and 10 seconds West,a distance of 508.97 feel to a point in the said westerly bounds of Queensbury Central School District and the easterly bounds of lands of J.Buckley Brian Jr.;thence running along the division line between Thomas J.Fnrone and Son Inc.and J.Buckley Brian Jr.,the following ten courses and distances: (1)North 29 degrees,36 minutes and 08 seconds West,a distance of 104,74 feet; (2)South 60 degrees,23 minutes and 52 seconds West,a distance of 104,83 feet; (3)along a curve to the right,having a radius of 625.00 feet,a distance of 514.73 feet; (4)North 72 degrees,24 minutes and 57 seconds West,a distance of 168.59 feet; (5)along a curve to the Icll,having a radius of 475,00 feet,a distance of 73.92 feet; (6)North 81 degrees, 19 minutes and 56 seconds West,a distance of48.01 feet; i (7)along a curve to the left,having a radius of 25.00 feet,a distance of 39.27 feet; (8)South 03 degrees,40 minutes and 04 seconds West,a distance of 75.00 feel; (9)North 81 degrees, 19 minutes and 56 seconds West,a distance of453.43 feet; (10)along a curve to the Ion,having a radius of 275.00 foal,a distance of 270,99 feel to a point in the northerly bounds of the lauds of the State of New York;thence westerly along said northerly bounds of the lands of the State of Nov York,North 65 degrees,10 minutes and 45 seconds West,a distance of 8,51 feet to the point and place of beginning, containing 119.73 acres of land to be the same more or less. Bearings given in the above description refer to magnetic North. SUBJECT to casements of record, EXCEPTING AND RESERVING from the above described parcel of land all property that has been conveyed to the Town of Queensbury for highway purposes. � THE 1OHf5 FIR61 P 0.8ox 4400 -N, 6S West Ave. , 5aralaga Springs,iiY 1t95!} i 1. i I.: I X Vee `/.� / �, ,uw � l s �.l '� "�'. ,r, x 4 ':°� ;xz,,.,, e-afi\ a d --'✓ may. �" ,,✓y, ><n a� �ts" ^fF.< wr K"` 1�`6�r,Eo. aa.. rHl«n✓=zo r r :✓ r /: `« rk.,�: .- z-;r'^:. 5'" ,az .✓-;"i t s 4214 £Ytt" T.�,< � •„s'y >�' ! t} n;S, ,\e et .ac JS W,�� '�` ", F/ �,✓ .z,<;/ � �-.,J .r;<,% `.v ,„a �\ ski:��s., -/�€ rs.,,' t 'S/�/x�/✓ E y,, „f i ,xS�?"�;. - 3 k ��\\\ y \t.,,. , ✓o zy Fk,D,x� 'ss'_ra' �/• =Jy %,I i.. �j � ,y,<�, r, k--,,,.,^�+-"°°m�"'s«", ,<� -``\ y^.!,�/ �,z` i �� -v,ski, ✓ J� § ,�'.r a.: � a'! rh„ � �� '�kY a� T .✓r.. / � �f,d -�\ ` •�;,-" Rx,. �•' r.�'g, z X 4^' d �»,e,' r 3� c ;. �f�£✓2,.'.� x f sue+«-�.... .�r �� '"�.� >� � ,z";��, RX f u UBDML�VISION M Aomoh' DIFICATION � j� ?/ .:.; � w�<��af➢t'„''=`^a^"�sC/v� 5�: #,: r v r �ram'.<-,.: ,z.;` i «, .n. �..` \,:;. > > .; ', `�' � yrdr sr:'yea\ �, ,w.7�� c;�'� ��,,,, x a ? kv �`: � r•<`Fu:,,, ,L' a s x 2 FOR O"UBDI�VZSZ.ON UAO%F LOT� 1 ,.,�* ;,., .� a t«x x �• •w is f .oF' 3 y„ F r/:, g�;"".•,,: E� � �z '�� .,,>M.. � /r :ram �'E:..\ k. x� - - s S">Sa sM f �< 3'.,. „«,s „3 � z.Ss.�C', E � �':. �• �4y:vs� ,a �" ,�, C, ,.,,,,..zf ,, ., ,,. � \, �.-'::- .,,. '. «. .,3 ,. .�. '� <a,,,,_ o,.: .., 'ems.._ ..;� zz4. ,�,... .._ `• KCxm`,: ...... fr.,,.<;� - -., .:,,.-. �.-�... ... .,. rxrfy ,,,.... <'.._ -ter...._.. .. _.-. .?� .c\\ ,w....:.. ....,E ,:;.. .. , ,f,..,:.: ��.... -':;,.. *. \q COVER SHEE ;a�.: � a+ `�.-,.� - y v, ...... \ 01 , F ,x.:rsG 5,4 � ^'FlY` / £aro � ,�.� � �-•?ASS 53_ v� ,F .. SITE LOCATION LOCATION MAP MmTCHMW'0%NDftW' HILLN IBM MILT%ff "U TOWNU" 'Mr "W16ENSO WIN WARREN COUffiNTY NIEW YORi'v" b"TATE 11111111111h go F finft am& dmb, T" MAP it 'M RZ 1 m4s' EILELNIMINAER"Irr SUONDDIVISICO)N mw-,= JUL ir 8 Ell 'aftow � W = � AW fim."Oft' RA WZNW`0h L 1`64'001)"TH SURVEYS ENGZNEERZNG PLANS - LAYOUT & UTZLZTYPLAN - GRADZNG & DRAZNAGE - S6- WASTEWATER TA L SHEET OWNER/APPLICANT Dig Safely,New York T TOM DEVELOPMENT INC c a n Engineering ®Cali Before You Dig THIS SET OF DRAWINGS IS ISSUED FOR THE CONSTRUCTION OF THE MAIN SHARED ROAD AND ASSOCIATED M Wait The Required Time GRADING & DRAINAGE & STORMWATER MANAGEMENT SYSTEMS. DETAILED ARCHITECTURAL LAYOUTS OF THE 6771 V YS ROUTE 9 G. Thomas Hutchins, P.E. ®Confirm Utility Response INDIVIDUAL RESIDENCES HAVE NOT BEEN COMPLETED. GRADING & STORMWATER MANAGEMENT SYSTEMS FOR ®Respect The Marks THE RESPECTIVE LOTS ARE CONCEPTUAL IN DESIGN AND ARE TYPICAL FOR THE FOOTPRINTS SHOWN. IT IS Ap,,c n (� pp�► 1 QQ �/ ®Dig with care c GAIVJEVOORT® NY 1�V�� 169 HAVILAND ROAD QUEENSBURY, NEW YORK 8®®'96Z'�I962 RESPONSIBILITY OF THE INDIVIDUAL HOMEOWNER/BUILDER TO OBTAIN THE NECESSARY APPROVALS AND Phone: 518 745-0307 Fax: 518 745-0308 www.digsafelynewyork.com PERMITS FOR THEIR RESPECTIVE DESIGNS. thutchins0hutchinsengineering.corn © 2000 Map Reference: O Subdivision Modification Subdivision Plan 0LL3K0i�jY W O Thomas Schiavone Dated: January 09, 2003 Last Revised: December o 17, 2009 By: Nace Engineering P.C. U o and Van Dusen & Steves Land O W Surveyors / hh h� 5Cc �. 3 f'o 9 h N O h r, �y 0 0 � j h �sr, Uj /P CO N LANDS I M s Oa°4 0„� ®F NIAGARA M OHAW Pp�rER N o N S 94.80, 256.77' �+ CO °j `��° S 08°43'00" W coI?po w ° ATI pN � co sj� AcF LOT 1-A 224.86' _ _ {� ,?�-11 Z 54214.6 Sq. Feet S 08°43100„ W 1.2 Acres 290.00' cov o o � 65.00' , v �y O ® 0 , LOT 1-B N Og 43 co rn 43847. Sq. Feet o - ,, co 1.01 Acres III T o LOT 1-C _ b ►� 45175.0 Sq. Feet .Q s. co °' 1.04 Acres a 50 , oo LOT 2 <7s 0224.86' CO ° 8 "J LOT 3 43 LOT 4 O or] 9"72 5� 225.00' o LOT 5 a o y LOT 6 O N 08°43100" E v LOT 7 4-1c � S 08°43100,, �y �� Q LOT 8 O 4-1 ku 448.92' ,6/cy ® LOT g 0 O o _ LOT 1-E N® 1,123,193. sq.ft. LOT 10 E--4H M 25.78 acres HILL co 3 ®R/ NOTE VC THE PORTION OF LOT#1 WEST OF THE PROPOSED o 0 SUBDIVISION ROAD IS TO BE DEED RESTRICTED o �` FROM ANY FURTHER SUBDIVISION N ° Z07` LOT 71 CO \ LOT 22 / LOT 23 a \ a w Mazo LOT 24 S 08°43' „ LOT 28 LOT � c� �o "- o / \ \ 175.00, LOT 27 LOT 12 I N � LOT o \ LOT 28 '�gi° N° wmseo�� ;� \ 100' SETBACK M 1 20 CID o ° ca N FROM WETLAND5 ca LO I LOT 32 LOT > _ _ — C 13 g3 S 17°2 6Q' — LOT 3 x4 r3 4a_ v:r J ""� 0 LOT 2 r o _ — _ -p``'" LOT74 € .° t ' LO 01 . ... co 278.64' co M N 06103'00" CQ 1-4 E 274.34, / N 07°0030 E / LOT 1,5 296.77' s� N 06°28'00" E 90.93' o O 05°41'00" 201.6>' i ` LOT >9 a� ;4 N 05°18'30" E Z 431.39, / LOT 18 LOT 17 LOT 16 N 05°26130" E W 0 105.74' "1 iJW � � ~- N 05°49'00" E 214.52' N 07°15'00,, E Z O TlL b 0 co CQ Date AUCU1S'C 15,2018 Scale 11-by - 1 SHEEr 1OF6 02080-LOT--�-SUB-TOTAL Map Reference: O Subdivision Modification Subdivision Plan OLL.�I�t05'T1t zo Thomas Schiavone Dated: January 09, 2003 CL Last Revised: December Q 17, 2009 W By: Nace Engineering P.C. U C) and Van Dusen & Ste.ves Land W Surveyors CC ti \ o 0 d z hh }�=25•� ��3g.27 C z O Ar 60, O �--a c a e , w yj O \ o ce ,� p Cr o p C QO. �+ oA, , `W Niagara L ands 0 f o MohaW 00 o kpowerCr p. S S 08�43 00 08'43'00„ W yy CO 2S6 �� \ 25 yv . . o • BE ZONED goo�< NO . w U T r, - _ 8 4 00„ �y INDIVIDUALDOEDSD FAN \._ - - 0 S IN F --_ gs r o � �N OD \ 9 S 08 43'00" ti .�. r� eQU�� oog000 o l 0� 190 - - g 3 o c+� LOT 1-A _ � .op 54214.E S Feet -_ j.F� � ay == f q W -- \ 1..2 Acre \ o: O \ , r - , b Q O .O„ 3 \ 08Q � r . . . . 4.3 a, . LOT `1-8 wv 43847.2 S Feet - 1.01 Acres o o a LOT 1-C 45175.0 Sq. Feet , \ J X. 1 1 1.04 Acres , aft, ,, J ` «a a T 2 CQ N 08°43'00,, E TTnn M ► 4 Zi M 0� � m --__M Z S, AOW46 M Cr M M I O PART OF LOT 1 1,123,193. sq.ft. b 25.78 acres i Cat D � NOTE THIS PORTION OF LOT#1 WEST OF THE 4 co SUBDIVISION ROAD IS DEED RESTRICTED "4 FROM ANY FURTHER SUBDIVISION LOT 21 Datw- FEBRUARY 22,2018 LOT 22 scale r-50' -- SFEET 2 OF 6 D-2284 DWG. NO. 02080-LOT-1-5UB 308. 7-1-48 cb - - - - - - - - - - - - - - S a8 r Map Reference: s o„ r Subdivision Modification ,OI,L,�IdOYN Subdivision Plan f Thomas Schiavone Dated: January 09, 2003 Last Revised: December ce 17, 2009 By Nace Engineering P.C. �e and Van Dusen & Steves Land Surveyors •iiciiicci �O 126) flop& °o,. Lands oR o o Niagara Mohawk p f ' o„ Older Corp, p S 0 °43 ,� �$'- $ QOn .4 S o43 W 00" �y i9�{..i' `' ;:: :•:•. cc) ice..........: 5, N W I D E O . . . C � � --�::;_;:;:;c;:�:;�;:;i;�.: �;•c•c•i•i•i•c•� 2::c�:;�::;:�'•i•:�:•i�c•c�i•i•i•c�i�.=:�: : - U ZONE TO g T IN IND RECORDED l 3o'REAR serMA S 0$°43'00, IVIDU .� cK W AL D EED S LOT 1-A 54214.6 Sq. Feet 1.2 Acres 30' S 0$° R 4 EAR 3 LOT 1-B S 0 0 0 ETMq C W K . . ..:......::..:�i�:�i�i�i::�c c�i�:�i�c�i�c�i�c�i�i�i�i�i�i�c�i�c .�.•.�. PT 43847.2 Sq. Feet . . . :::;::.... 1.07 Acres TIPQ W W 30'REAR S ETMAC m K . # 1 PT a: :o: : :•. . . . o _ :•,,. _ w o o o o :....,... : .•....:.. ..: : :.: : : : : : : : : . . . •: .•.•:•.•.•: Ov;i;:;:;:; ..:..�`: : . . . . . . . . . . . .. - •rill$° o LOT 1 C . .: :•:•:-.•r:-:-:•:•:•:-:•:.:-:-:-: :-:I 3 �n b 0 . . �' 45175.0 Sq. Feet r_,: :;.;.;.;.:.:.: . ::::: ; yc�T w o # 2 `° PT .i....... . co YCO 1 04 Acres N # 2 o TIP # 3 TP PT 4 h N 3 # 4 m 7� 30'FRONT h o 0 '9 �•60 , o sErMAc m 2'S0 N a LOT 2 CO 224.85' 30'FRONT' N M 0$°43'00 sETMACK PART OF LOT 1 1,123,193. sq.ft. 25.78 acres 225.00' N 08°4�33,0 E M NOTE M THIS PORTION OF LOT#1 WEST OF THE SUBDIVISION ROAD IS DEED RESTRICTED FROM ANY FURTHER SUBDIVISION M GRAPHIC SCALE 10 0 5 10 25 50 M--- ( IN FEET ) SUBDIVISIO POUT PLAN SCALE: 1"=50' - 22/34 SCALE: 1"=100' - 11/17 SITE SOILS DATA . TP-3: 7/5/2018 BY T. CENTER, P.E. ZONING SUMMA Y SUBDIVISION DENSITY CALCULATIONS 0-10" TOPSOIL DEEP HOLE TEST PITS: 10-27" LOAMY MEDIUM FINE SAND ZONE MDR (MODERATE DENSITY RESIDENTIAL) TP-1 : 7/5/2018 BY T CENTER P.E. QUEEN58URYZONING SR-lA(ORIGINAL T. ,APPROVAL) 27-90" FINE SAND MINIMUM LOT SIZE 2 ACRES PER DWELLING 0-14" TOPSOIL MOTTLING AT 24" (VARIANCE REQUESTED FOR LESS THAN 2 AC LOTS) TOTAL AREA 49.87-ACRES 14"-34" LOAMY MEDIUM FINE 'SAND MOIST-@ 60" FRONT SETBACK-30' ROAD&S/W EASEMENT AREA 4.16-ACRES 34-48" MEDIUM FINE SAND NO GROUNDWATER OBSERVED SIDE SETBACKS - 25' 48-70" FINE SAND REAR SETBACK-30' AREA OF FLAGGED WETLANDS 4.3 MOTTLING @ 23" TP-4 : 7/5/2018 BY T. CENTER, P.E. AVERAGE LOT WIDTH - 100' USABLE DENSITY ACREAGE 41.41 -ACRES MOIST @ 50" 0-17" TOPSOIL NO GROUNDWATER OBSERVED 17-38" LOAMY MEDIUM FINE SAND MAXIMUM BUILDING HEIGHT- 40` 38-72" FINE SAND MINIMUM PERCENT PERMEABLE 50% TOTAL NUMBER OF ALLOWABLE LOTS 41.41 -LOTS TP-2: 7/5/2018 BY T. CENTER, P.E. 72-93" MEDIUM COARSE SAND 0-7" TOPSOIL MOTTLING @ 28" TOTAL NUMBER OF EXISTING LOTS 32-LOTS 7-24" LOAMY MEDIUM FINE SAND MOIST @ 70",GROUNDWATER @ 90" TALC MAP # 308.7-1-48 TOTAL PROPOSED NUMBER OF NEW LOTS 3-LOTS 24-85" FINE SAND MOTTLING OBSERVED AT 18" ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED TOTAL NUMBER OF LOTS 35-LOTS PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW. MOIST @ 60" EXISTING LOT SIZES 0.46-29.06-ACRES NO GROUNDWATER OBSERVED PROPOSED LOT SIZES(4 NEW LOTS) 1.01, 1.04, 1.20-ACRES SITE E SOILS DATA PERCOLATION TEST: 1 REVISED FOR SUBDIVISION MODIFICATION 10/15/18 PT-1 @ TP#1: 7/5/2018 BY T.CENTER, PE 0 ISSUED FOR SUBDIVISION MODIFICATION 7/16/18 STABILIZED PERCOLATION RATE: 1 MINUTE 17 SECONDS N p, Revisions Date PER INCH AT 20" IN A 26" DEEP HOLE PT-2 @ TP#2: 7/5/2018 BY T.CENTER, PE SUBE)WI 10"' LA / J T 1 TI L I T / PLAN N STABILIZED PERCOLATION RATE: 1 MINUTE 12 SECONDS prepared for: PER INCH AT 12" IN A 18" DEEP HOLE TRA-TOM DEVELOPMENT Dig ® Safely. PT-3 @ TP#3: 7/5/2018 BY T.CENTER, PE RICHMOND HILL RIVE STABILIZED PERCOLATION RATE: 1 MINUTE 18 SECONDS TOWN Of QueenSbury, Warren County, NY New ®York PER INCH AT 18" IN A 24" DEEP HOLE flip c C ®Call Before You Dig THIS SET OF DRAWINGS IS ISSUED FOR THE CONSTRUCTION OF THE MAIN ROAD AND ASSOCIATED MAP REFERENCE ®wait The Required Time GRADING & DRAINAGE & STORMWATER MANAGEMENT SYSTEMS. DETAILED ARCHITECTURAL LAYOUTS Drawn: TRC Checked: GTH Scale: 1"=50' Date: 7/i 0/18 Confirm utility Response PT-4 @ TP#4: 7/5/2018 BY T.CENTER, PE "MAP OF A SURVEY FOR TRA—TOM ®Respect The Marks OF THE INDIVIDUAL RESIDENCES HAVE NOT BEEN COMPLETED. GRADING & STORMWATER169 Hdviland Road DEVELOPMENT" DATED 2/22/1$ BY VAN NY 12804 MANAGEMENT SYSTEMS FOR THE RESPECTIVE LOTS ARE CONCEPTUAL IN DESIGN AND ARE TYPICAL STABILIZED PERCOLATION RATE: 1 MINUTE 15 SECONDS Queensbury, 29♦26 d_®-1_S3 ®Dig with Care DUSEN & STEVES SURVEYORS, QUEENSBURY, ( �( 1 8 -9 2-79 2 FOR THE FOOTPRINTS SHOWN. IT IS RESPONSIBILITY OF THE INDIVIDUAL HOMEOWNERIBUILDER TO PER INCH AT 18" IN A 24" DEEP HOLE NY. (518) 745-0307 Phone www.digsafelynewyork.com OBTAIN THE NECESSARY APPROVALS AND PERMITS FOR THEIR RESPECTIVE DESIGNS. Htl$Cf'tit1S Englfl@L'PICtg 518 745-0308 Fax ,OId,�NO�.yY Ni Lands a9'ara Mohawk P f OWer Corp. O zs WI D E NO TyP SI L T CUT ENCE NE TO BE RE C I O N R I D N E D D I V I D U A L D EE n'P . ..._.....,.•.................•., :.:.-...- DS IC CLE -'- - - : .: : . . . . ARING LIMITS .-ems • soo i 9 m ESFR V E ® 9 8 t .' - ....,,, F P T d - �96 i 97 C 99 14 9 9 i ' . {- 'T r 1 50%RFSER�VE" _ P o' . I O 114 : := O . D . . . . . E I :.::::::::::::::::•:•:•:•:•:•:•:•:• :: :=: L , a PTINN ® ��}}. 100 f ®® 9g 97 99 ? e 41 TP N. GARA .•• doZ � � , f � � C c 41 GF a .zoo LOT 4C MIN. �- V•=1p ' r M --�_M �M`�__ M SITE PLAN SCALE: 1"=40' - 22134 SCALE: 1�,_80' - 11/17 INDIVIDUAL LOT GRADING GRAPHIC SCALE REUIMENTS 10 0 5 10 20 40 MINIMUM MIN. SEPTIC MIN. GARAGE BASEMENT BOTTOM OF ( IN FEET ) LOT NUMBER FLOOR FLOOR TRENCH ELEVATION ELEVATION ELEVATION lA 102 93 95 1B 102 93 95 1C 102 93 95 SITE CONSTRUCTION SEQUENCING INDIVIDUAL LOT CONSTRUCTION WASTEWATER SYSTEM STEP! EROSION & SEDIMENT CONTROL NOTES e TEMPORARY EROSION CONTROL MEASURES, INCLUDING SEDIMENT • INSTALL SEDIMENT CONTROL FENCING AT LOW POINTS AS BEFORE ANY CLEARING OR GRUBBING OF THE SITE IS INITIATED, AND CONTROL FENCE AND/OR MULCH, SHALL BE INSTALLED AND SHOWN ON PLANS. COMPONENT SCHEDULE DURING EARTHWORK PHASES, SEDIMENT CONTROL FENCE SHALL BE MAINTAINED FOR ANY TEMPORARY SOIL STOCKPILE AREAS THAT ARE TO - • CLEAR TREES AS NEEDED FOR PLACEMENT OF FILL MATERIAL, SITE PLAN INSTALLED AS SHOWN ON THE PLAN. BE LEFT FOR MORE THAN 24-HOURS. TAX MAP # 3®�.7-�-48 DRIVE, HOUSE & WASTEWATER SYSTEM CONSTRUCTION AND COMPONENT SIZING& MATERIAL SYMBOL °• AT THE CONCLUSION OF EACH DAYS WORK AND AFTER EVERY STORM DURING FINAL SITE GRADING, REMOVE ALL ACCUMULATED SEDIMENT,ASSOCIATED CUT & FILL SLOPES. ALTERATION OF THIS .DOCUMENT. EXCEPT BY A LICENSED SCARIFY SUBSOILS AND PERFORM SOIL RESTORATION TECHNIQUES OVER • GRUB AREA FOR HOUSE SITE, DRIVEWAY & ROUGH GRADE. EVENT, SEDIMENT CONTROL FENCE AND ANY .OTHER.EROSION CONTROL PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW. A HOUSE SEWER PIPE 4 SDR-35 OR SCH-40 PVC MEASURES SHALL BE INSPECTED FOR FAILURES OR SEDIMENT SPECIFIED AREAS. • INSTALL GRAVEL SUBBASE FOR DRIVEWAY. • CONSTRUCT HOUSE, UTILITIES WATER SUPPLY LINES AND 1250 GAL PRECAST CONCRETE ACCUMULATION. ANY FAILURE SHALL BE IMMEDIATELY CORRECTED. FOR GROUND CLEARING ACTIVITIES OCCURRING BETWEEN OCTOBER 15 & WASTEWATER SYSTEM. B SEPTIC TANK ALTERNATIVE SIZING PER a TEMPORARY RAPID GROWTH COVER CROPS FOR THE SEDIMENT CONTROL APRIL 15, IN WHICH VEGETATION CANNOT BE ESTABLISHED, EXPOSED WASTEWATER SYSTEM SIZING EARTHEN AREAS SHALL BE COVERED WITH EITHER A TARP COVER OR • FINE GRADE, TOPSOIL AND SEED LAWN AREAS, INSTALL SCHEDULE AREAS, SUCH AS ANNUAL RYEGRASS MAY BE USED FOR TEMPORARY LANDSCAPING; REMOVE SEDIMENT CONTROL FENCE AFTER SURFACE STABILIZATION DURING THE CONSTRUCTION PHASES, APPLY AT AN EXTRA HEAVY LAYER OF MULCH. EFFLUENT SEWER 1 REVISED FOR SUBDIVISION MODIFICATION 10/15/18 VEGETATION IS ESTABLISHED. C PIPE 4"SDR-35 OR SCH-40 PVC A RATE OF 35-LBS PER ACRE. ANY AREA OF REVEGETATION MUST EXHIBIT A SURVIVAL OF A MINIMUM • INSTALL FINAL DRIVEWAY SURFACE. OF 807. OF THE VEGETATION THROUGHOUT THE YEAR FOLLOWING 0 ISSUED FOR SUBDIVISION MODIFICATION 7/16/18 D DISTRIBUTION BOX (6)HOLE PRECAST CONCRETE ALL BARE EARTH AREAS SHALL BE SEEDED AND MULCHED WITHIN 14-DAYS OF COMPLETION OF WORK IN THE AREA. ONLY AREAS WHICH REVEGETATION. REVEGETATE AS NEEDED TO MEET THIS REQUIREMENT. No. Revisions Date (4)PIPE-IN-STONETRENCHES'p ACTIVELY UNDER CONSTRUCTION MAY REMAIN OPEN FOR MORE THAN THE CONTRACTOR SHALL CONDUCT AN INSPECTION OF THE SITE ON A [ PLAN E ABSORPTION FIELD 50'EACH-ALTERNATIVE SIZING 14-DAYS. ONCE CONSTRUCTION IS COMPLETED IN THESE AREAS, SEED DAILY BASIS TO COLLECT LITTER AND CONSTRUCTION DEBRIS AND SUBDIVISION GRADING DRAINAGE `!""LA PER WASTEWATER SYSTEM SIZING SCHEDULE AND MULCH SHALL BE INSTALLED. DISPOSE OF LEGALLY. prepared for. TRA-TOM DEVELOPMENT Dig MASafely, WASTEWATER SYSTEM SETACK"" SCHELE RICHMOND HILL DRIVE Newf n Warren n County, NY ® �, Town o Quee sbury, a e ou ty, THIS SET OF DRAWINGS IS ISSUED FOR THE CONSTRUCTION OF THE MAIN ROAD AND ASSOCIATED PROPERTY LINE BUILDING DRAINAGE DITCH WATERBODIES, Call Before You Dig ® MAP REFERENCE Wait The Required Time GRADING & DRAINAGE & STORMWATER MANAGEMENT SYSTEMS. DETAILED ARCHITECTURAL LAYOUTS WETLANDS Drawn: 1RC Checked:GTH Scale: 1"=40' Date: 7/10/18 ®confirm Utility Response OF THE INDIVIDUAL RESIDENCES HAVE NOT BEEN COMPLETED. GRADING & STORMWATER SEPTIC TANK 10' 10' 10' 50' EM Respect The Marks MANAGEMENT SYSTEMS FOR THE RESPECTIVE LOTS ARE CONCEPTUAL IN DESIGN AND ARE TYPICAL "MAP OF A SURVEY FOR TRA-TOMAh6 169 bur y, N Road R Dig with care s� ABSORP710N DEVELOPMENT" DATED 2122118, BY VAN Queensbury, NY 12804 00'962'79 G FOR THE FOOTPRINTS SHOWN. IT IS RESPONSIBILITY OF THE INDIVIDUAL HOMEOWNER/BUILDER TO FIELD 10' 20' 20' 100' DUSEN & STEVES SURVEYORS, QUEENSBURY, (518) 745-0307 Phone ����61-01- A www.digsafelynewyark.com OBTAIN THE NECESSARY APPROVALS AND PERMITS FOR THEIR RESPECTIVE DESIGNS. NY. Hutchins Engineering 51B 745-0308 Fox ,DIL�L�7�i�TY DISTURBANCE SUMMARY • LOT 1A 28,000 SF NZ agar L ana's o TF LOT 1 B 23,000 SF •-•'• a Mohawk PoCoro. werLOT 1C 22,000 SF --___ 0 F TOTAL DISTURBANCE 950 OS 25 �y TYP• O ID SZ = E LT ® ZO NO CUT FENCE 2.18 AC NETO B E R E C I O N R I CORDED E D D I V I D U A L �i DEED 7YP S ICgL C LEA'q ING ® LIMrT �• s :::::• :: ::::::. ...:::::::: ..•.-... sq o d r ♦ FR�F R S ABILIZATION I� ♦ g 8 -....., THE CONTRACTOR.SHALL INITIATE STABILIZATION MEASURES AS SOON AS t - �•ar _•�� PT ♦ - 9 �i ,� / F ""' 6 ® PRACTICABLE IN PORTIONS OF THE SITE WHERE ACTIVITIES HAVE ♦ 9? - 9e TEMPORARILY OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN 9s + s 14-DAYS. 9 1 l 5 0 o,o R • ES E STABILIZATION OF GRASS AREAS INCLUDES HYROSEEDING USING 1 P R E EE TALKIE/E R ON SLOPES OVER 1:5 OR SEEDING AND INSTALLING A i 0 0 + . : . . .'. : . : : :':':':': .' ':: ::::::::::::::::•:.::: : CONTINUOUS COVER OF STRAW MULCH WATERED INTO PLACE. ON SLOPES '7 D + r� INSTALL EROSION ACCORDANCE WITH E tol OVER 1:3 NS ALL EROS 0 CONTROL BLANKET IN G G 'g O - aor THE DETAILED EROSION CONTROL PLANS A IN ACCORDANCE WITH PT '4 a - G 9B 9s - � -- - MANUFACTURERS INSTRUCTIONS . ....:.:.::::::::.:::.:..:.:. ......... . zoa �/®� 1® TP �� 99 98 �, OIL RESTORATION NARRATIVE r .6 ♦ ' 50%RES VE MAP ��r ♦ # 3 ®o TP SOIL RESTORATION 7S A REQUIRED PRACTICE OVER PORTIONS OF THE SITE I'IAE� REFERENCE cos � O� � � ,� ♦ C WHERE THE NATIVE SOILS HAVE BEEN COMPACTED THROUGH EARTHWORK "MAP OF A SURVEY FOR TRA-TOM roo o�`o� /' ,� ® u. GgjZ 4 3 D E CONSTRUCTION AND WILL BE REVEGETATED IN ORDER TO RECOVER THE DEVELOPMENT" DATED 2122118, BY VAN ° $ ♦ GF ♦/ 4B ORIGINAL PROPERTIES AND POROSITY OF THE NATIVE SOILS. DUSEN & STEVES SURVEYORS, QUEENSBURY, / O2 ♦ A s AREAS WHICH WILL RECEIVE HEAVY CONSTRUCTION TRAFFIC FOR BUILDING NY Zoz ; Zoo CONSTRUCTION WILL BE OVER THE AREAS WHICH WILL BECOME ASPHALT c ° ® DRIVES AND LOADING AREAS, THEREFORE FULL SOIL RESTORATION IS NOT ° LOT 2 REQUIRED FOR THE SITE. � ♦ 9a+ s 'too Zo1 ' MIN. GA • FOR HSG A SOILS IN THE AREAS OF CUT OR FILL, AERATE SOILS WITH SOIL m G G� AERATOR MECHANICAL IMPLEMENT DURING FINAL GRADING, APPLY 6-INCHES 1 1' Y•=IO2 ®� OF TOPSOIL, SEED, FERTILIZE AND MULCH. 0 0 AREAS WHICH ARE TO RECEIVE SOIL RESTORATION ARE SPECIFIED ON THE + EROSION CONTROL PLAN. ° STANDARD SPECIFICATIONS FOR STABILIZED CONSTRUCTION NTICAL CONsr roo ENTRANCE RUCTION M— RAIVCE 99 s DEFINITION M A STABILIZED PAD OF AGGREGATE UNDERLAIN WITH GEOTEXPLE LOCATED WHERE TRAFFIC WILL (� (� pq ENTERING OR LEAVING A CONSTRUCTION SITE TO AND FROM A PUBLIC STREET OR ROAD. S /�, PURPOSE . V V■R. REQUIREMENTS ENTS M_�_ _-� �M ' TO REDUCE OR ELIMINATE THE TRACKING OF SEDIMENT ONTO PUBLIC RIGHTS OF WAY. • FOR RESIDENTIAL PROJECTS CUMULATIVELY DISTURBING MORE THAN 1-ACRE OF LAND, A BASIC APPLICATION M GATE SIZE: USED A MATRIX OF 1-4 INCH STONE STORMWATER POLLUTION PREVENTION PLAN MUST BE PREPARED, CONSISTING OF EROSION & SEDIMENT - THICKNESS: LESS THAN 6 INCHES CONTROLS AND A NOTICE OF INTENT (NOI) MUST BE SUBMITTED TO DEC PRIOR TO INITIATING'WORK. M - 12 FOOT MINIMUM, NOT LESS THAN FULL MOTH OF POINTS WHERE INGRESS-OR EGRESS OCCUR SITE �LAN 24 FO M IF THERE IS ONLY ONE ACCESS POINT TO THE SITE • AN MS4 SWPPP ACCEPTANCE FORM AND COPY OF THE NOI MUST BE SUBMITTED TO THE TOWN OF LA Y M-- - LENGTH: NOT LESS THAN 50 FEET QUEENSBURY MS4 ADMINISTRATOR FOR APPROVAL, SO THAT THE NOI CAN THEN BE SUBMITTED TO SCALE: 1"=40' - 22134 - GE07EXTILE: TO BE PLACED OVER THE ENTIRE AREA TO BE COVERED WITH AGGREGATE. FILTER CLO NYSDEC. SCALE: 1"=80' - 11117 NOT REQUIRED ON A SINGLE FAMILY RESIDENCE LOT. • THE CONTRACTOR UNDERTAKING SITE CONSTRUCTION OF THIS PROJECT MUST SIGN THE CERTIFICATION IN THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL.PREVENT TRACKING OF SEDIMENT ON THE SWPPP NARRATIVE REPORT AND BE FAMILIAR WITH ALL REQUIREMENTS OF THE SWPPP AND GRAD(/�iIC SCALE o PU OF WAY OR STREETS THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITION REQUIREMENTS OF THE NYS DEC SPDES GENERAL PERMIT FOR STORMWATER DISCHARGES FROM 10 0 5 10 20 40 n AGGREGATE ALL SEDIMENT SPILLED, DROPPED OR WASHED ONTO PUBLIC R.O.W.s MUST BE REMO IMMEDIATELY. WHEN NECESSARY, WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRAN CONSTRUCTION ACTIVITY - PERMIT NO. GP-0-15-002. x ONTO PUBLIC R.O.W.s. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WI • THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH THE TERMS OF THE NYSDEC SPDES GENERAL ( IN FEET j AGGREGATE, WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPING DEVICE. ALL SEDIMENT SHALL PERMIT FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITY - PERMIT NO. GP-0-15-002. A 36" FENCE POST PREVENTED FROM ENTERING STORM DRAINS, DITCHES OR WATERCOURSES. DRIVEN MINIMUM 16" STANDARD SPECIFICATIONS FOR SILT FENCE fl� » COPY OF THE GENERAL PERMIT IS FOUND IN THE SITE COPY OF THE SWPPP INSPECTION BINDER. EROSION & SEDIMENT CONTROL-NOTES INTO GROUND DEF-I 71ON :...:....::.:..... 6 MIN COURSE OF • PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL HAVE THE ENGINEER CONDUCT A TEMPORARY BARRIER OF GE07EXTILE FABRIC INSTALLED ON THE CONTOUR ACROSS A SLOPE • BEFORE ANY CLEARING OR GRUBBING OF THE SITE IS INITIATED, AND TO INTERCEPT SEDIMENT LADEN RUNOFF FROM SMALL DRAINAGE AREAS OF DISTURBED SOILS. :..:...:..........:.........:: ........ 2 STONE AN ASSESSMENT OF THE SITE AND CERTIFY IN AN INSPECTION REPORT THAT THE APPROPRIATE EROSION DURING EARTHWORK PHASES, SEDIMENT CONTROL FENCE SHALL BE PURPOSE HAVE BEEN ADEQ UATELY INSTALLED. FOLLOWING COMMENCEMENT OF SILT STOP EMBED IN ANDSEDIMENT CONTROLS HA - ............................ ........................................................... ........................,.................................. INSTALLED AS SHOWN ON THE PLAN. GROU ND 8 MIN.. TO REDUCE RUNOFF VELOCITY & TO EFFECT DEPOSITION OF TRANSPORTED. SEDIMENT LOAD. .......................................................:............................................................................................. HALL PREPARE IT INSPECTIONS S E ARE A REPORT AS THE ENGINEER SHALL MA KE WEEKLY SITE CONSTRUCTION, E G PPLICATION AT THE CONCLUSION OF EACH DAYS WORK AND AFTER EVERY STORM -"�'�`��•.�":`�:�_::Y�:�•��',:•• <.. - PLACED ON A 1 002. MAXIMUM ALLOWABLE SLOPE LENGTHS CONTRIBUTING RUNOFF TO THE FENCE LAC REQUIRED BY THE GP 0 5 Q TR a.s FENCE CONTROL EVENT SEDIMENT CONTROL E CE AND ANY OTHER EROSION CON Z SLO PE. z: 1 HAVE BEEN TEMPORARILY SUSPENDED AND ALL DISTURBED AREAS 8" - WHEN IL DISTURBANCE ACTIVITIES SO - MEASURES SHALL BE INSPECTED FOR FAILURES OR SEDIMENT _ .................. MEASURES �'.•.•.•.•.•.•:.•.•.•.�:.•.•.•.•.•.•:.•.•.•.•.•:.•.•.-.•.•:.•:.•.•.•.•.•.•:.•.•.•:•:.•.•.•:-.•.•:.•.•.•.•:.•. ... 1:2 SLOPE (50%) 25 F71:3 SLOPE (33%) 50 FT .................................................................................. MONTHLY. THE M PERFORMED 0 S4 ADMI ISTRATOR 1 INSPECTIONS SHALL BE N HAVE BEEN STABILIZED SITE INS E 8 PE 25% 75 FT1:5 SLOP OR LESS 100 FT E . 1:4 SLO E F RE SHALL BE IMMEDIATELY CORRECT D >ACCUMULATION. ANY FAILURE ( Tt N WILL - G T 4 ACRE PER 100 FREQUENCY OF SITE INSPEC 0 S LL BE REDUCED DUE TO MAXIMUM DRAINAGE AREA FOR OVERLAND FLOW SHALL NO EXCEED 1 C SHALL U NOTIFIED IN WRITING THAT THE Q TEMPORARY PI GROWTH COVER CROPS FOR THE SEDIMENT CONTROL /j ET OF FENCE WITH MAXIMUM PONDING DEPTH OF 1.5 FEEL A TMTI S BEING SUSPENDED. 1 A KFIL FEET CONSTRUCTION C E SOL B C L Y FOR TEMPORARY ERSPECTIVE AREAS SUCH ANNUAL RYEGRASS MAY BE USED E S C AS o P EROSION WILL OCCUR AS SHEET EROSION.• H T DOWN WITH PARTIAL PROJECT COMPLETION S HAVE BEEN S U EC IF SOIL DISIURBANCE C A T1VI77E TH APPLY AT _SURFACE STABILIZATION DURING E CONSTRUCTION PHASES • CONCENTRATED WATER FLOW SHALL NOT BE DIRECTED TO FENCE. STABILIZED - � ..................................... ........................................ .............................................................. INSPECTIONS MAY BE CEASED IF ALL DISTURBED AREAS HAVE BEEN AND ALL STOR WATER A RATE OF 35 LBS PER ACRE. 36 FENCE POST DESIGN CRITERIA "" ' ' "'"""'"""" """'"""' "' """ "' """""" """"""' ............................ ... ......... MANAGEMENT PRACTICES HAVE BEEN INSTALLED MTHIN THE PORTION OF THE PROJECT WHICH HAS BEEN ALL BARE EARTH AREAS SHALL BE SEEDED AND MULCHED WI THIN - ALL SILT FENCES SHALL BE PLACED AS CLOSE TO THE DISTURBED AREAS AS POSSIBLE, """""'"""""""""""""'""""""""""""" " Z W1774 A MINIMUM OF 10-FEET FROM 774E TOE OF A SLOPE. THE AREA BEYOND THE FENCE ? COMPLETED. THE MS4 ADMINISTRATOR SHALL BE NOTIFIED IN WRITING THAT THE CONSTRUCTION 7-DAYS OF COMPLETION OF WORK IN THE AREA. ONLY AREAS WHICH MUST BE UNDISTURBED OR STABILIZED.FOR MORE THAN SILT STOP EMBED IN EXISTING GROUND ACTIVITIES AND INSPECTIONS ARE BEING SUSPENDED. ACTIVELY UNDER CONSTRUCTION MAY REMAIN OPEN F o - SENSITIVE AREAS TO BE PROTECTED BY SILT FENCE MAYBE NEED TO BE REINFORCED BY w GROUND 8" MIN. • IF SOIL DISTURBANCES HAVE BEEN SHUT DOWN FOR 2-YEARS WITH PARTIAL PROJECT COMPLETION, A 7-DAYS. ONCE CONSTRUCTION IS COMPLETED IN THESE AREAS, SEED FLOW—_ USING HEAVY WIRE FENCING FOR ADDED SUPPORT. .............. .........:... - WHERE THE ENDS OF THE SILT FENCE COME TOGETHER, THE TWO ENDS SHALL BE AND MULCH SHALL BE INSTALLED. � \ OVERLAPPED, ROLLED TOGETHER AND STAPLED TO PREVENT SEDIMENT BYPASS AT THESE J`�D' MIN OR AS NEEDED NOT SHALL 8E FILED WITH NYSDEC ��' z �� • THE CONTRACTOR SHALL MAINTAIN A RECORD OF ALL INSPECTION REPORTS IN A SITE LOG BOOK,. TEMPORARY EROSION CONTROL MEASURES, INCLUDING SEDIMENT co- UNDISTURBED CONNECTIONS GROUND -� MAINTAINED ON S17E AND AVAILABLE TO THE PERMITTING AUTHORITY UPON REQUEST. CONTROL FENCE AND/OR MULCH, SHALL BE INSTALLED AND CONSTRUCTION SPECIFICA77ONS FOR INDIVIDUAL SITE CONDITIONS C N 1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE 77ES OR • AT COMPLETION OF CONSTRUCTION, THE CONTRACTOR AND ENGINEER SHALL PERFORM A FINAL MAINTAINED FOR ANY TEMPORARY SOIL STOCKPILE AREAS THAT ARE TO STAPLES POST SHALL BE STEEL EITHER "7- OR "U" TYPE OR HARDWOOD. INSPECTION TO CERTIFY THAT THE SITE HAS UNDERGONE FINAL STABILIZATION AND THAT ALL BE LEFT FOR MORE THAN 24-HOURS 2. FILTER CLOTH TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED STABILIZED CONSTRUCTION ENTRANCE DETAIL TEMPORARY EROSION AND SEDIMENTATION CONTROLS HAVE BEEN REMOVED. UPON CERTIFICATION OF • DURING FINAL SITE GRADING, REMOVE ALL ACCUMULATED SEDIMENT, EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE, 6" MAX. MESH NTS COMPLETION, A NOTICE OF TERMINATION (NOT) SHALL BE FILED WITH NYSDEC. SCARIFY SUBSOILS AND PERFORM SOIL RESTORATION TECHNIQUES OVER OPENING. • THE MS4 ACCEPTANCE STATEMENT ON THE NOT MUST BE SIGNED BY THE MS4 ADMINISTRATOR SO THAT SPECIFIED AREAS. 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE (2) 2"x2"x3' STAKES !-1/� MAP OVER-LAPPED BY 6-INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X, TAX v fl CJ # 30 .7-1-48 THE NOT CAN THEN BE SUBMITTED TO NYSDEC. • FOR GROUND CLEARING ACTIVITIES OCCURRING BETWEEN OCTOBER 15 & EACH BALE 3G' FENCE POST. 10' MIRAFI 10OX, STABILINKA T140N OR APPROVED EQUIVALENT. rVr • TEMPORARY EROSION CONTROL MEASURES, INCLUDING SEDIMENT CONTROL FENCE AND/OR MULCH, SHALL APRIL 15, IN WHICH VEGETATION CANNOT BE ESTABLISHED, EXPOSED O.C. MAX. DRIVEN IG• MIN 4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE OR APPROVED EQUIVALENT ALTERATION OF THIS DOCUMENT EXCEPT BY A LICENSED EARTHEN AREAS SHALL BE COVERED WITH EITHER A TARP COVER OR INTO GROUND 5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN BULGES" PROFESSIONAL ENGINEER IS A VIOLATION OF NYS EDUCATION LAW. BE INSTALLED AND MAINTAINED FOR ANY TEMPORARY SOIL STOCKPILE AREAS THAT ARE TO BE LEFT z DEVELOP IN THE SILT FENCE AN EXTRA HEAVY LAYER OF MULCH. SILT STOP EMBED FOR MORE THAN 7 DAYS. � IN GROUND 6' MIN. • ANY AREA OF REVEGETATION MUST EXHIBIT A SURVIVAL OF A MINIMUM - CONSTRUCTION SPECIFICATIONS • FOR GROUND CLEARING ACTIVITIES OCCURRING BETWEEN OCTOBER 15 & APRIL 15, IN WHICH VEGETA7ION BALED STRAW. INSTALL END OF 80% OF THE VEGETATION THROUGHOUT THE YEAR FOLLOWING `1'�low TO END TO LENGTH SHOWN 1. STONE SIZE - USE 1-4" STONE OR RECLAIMED OR RECYCLED CONCRETE EQUIVALENT. CANNOT BE ESTABLISHED, EXPOSED EARTHEN AREAS SHALL BE COVERED WITH EITHER A TARP COVER ---� REVEGETATION. REVEGETATE AS NEEDED TO MEET THIS REQUIREMENT. ON PLAN 2. LENGTH - NOT LESS THAN 50-FEET. OR AN EXTRA HEAVY LAYER OF MULCH. THE CONTRACTOR SHALL CONDUCT AN INSPECTION OF THE SITE ON A z UNDI5TURBED 3. THICKNESS - NOT LESS THAN 6-INCHES 1 REVISED SUBDIVISION MODIFICATION 10�15�18 • ANY AREA OF REVEGETATION MUST EXHIBIT A SURVIVAL OF A MINIMUM OF 80% OF THE VEGETATION GROUND 4. WIDTH 12-FOOT MINIMUM, 24-FOOT MINIMUM IF SINGLE ENTRANCE TO SITE. DAILY BASIS TO COLLECT LITTER AND CONSTRUCTION DEBRIS AND 0 ISSUED SUBDIVISION MODIFICATION 7/16/18 THROUGHOUT THE YEAR. FOLLOWING REVEGETATION. REVEGETATE AS .NEEDED TO MEET TI-ITS 5. GEOTEXTILE - WILL BE PLACED OVER 1T-IE ENTIRE AREA PRIOR TO PLACING OF REQUIREMENT DISPOSE OF LEGALLY. SECTION STONE. N o. Revisions Date • THE CONTRACTOR SHALL COMPLY WITH THE6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD NEW PORK GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL AS PUBLISHED BY THE EMPIRE STATE CHAPTER OF THE SOIL AND WATER CONSERVATION CONSTRUCTION ENTRANCES SHALL BE PIPED BENEATH THE ENTRANCE. IF PIPING IS A MOUNTABLE BERM WITH 1V 5H SLOPES WILL BE PERMITTED. SUBDIVISION EROSION CONTROL FLAN SEDIMENT CONTROL FENCE DETAIL IMPRACTICAL, SOCIETY. 7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL prepared for: NTS PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL TRA-TOM DEVELOPMENT SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED ONTO PUBLIC RIGHTS-OF-WA Dig ®ASafely MUST BE REMOVED IMMEDIATELY. RICHMOND FALL DRIVE ® 8.New WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH Town of Queensbury, Warren County, NY York® STONE AND WHICH DRAINS INTO AN APPROVED'SEDIMENT TRAPPING DEVICE. EM Cali Before You Dig THIS SET OF DRAWINGS IS ISSUED FOR THE CONSTRUCTION OF THE MAIN ROAD AND ASSOCIATED Wait The Required Time GRADING & DRAINAGE & STORMWATER MANAGEMENT SYSTEMS. DETAILED ARCHITECTURAL LAYOUTS 9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER EACH Drawn: TRC Checked: GTH Scale: 1"=40 Date: 7/10/18 Confirm utility Response RAIN EVENT. IM Respect The Marks OF THE INDIVIDUAL RESIDENCES HAVE NOT BEEN COMPLETED. GRADING & STORMWATER 169 HaV►land Road M Dig With Care MANAGEMENT.SYSTEMS FOR THE RESPECTIVE LOTS ARE CONCEPTUAL IN DESIGN AND ARE TYPICAL Queensbury, NY 12804 /f !f /f -9 2■79 2 FOR THE FOOTPRINTS SHOWN. IT IS RESPONSIBILITY OF THE INDIVIDUAL HOMEOWNERIBUILDER TO (518) 745-0307 Phone •���``��_®���"S www.digsafelynewyork.com OBTAIN THE NECESSARY APPROVALS AND PERMITS FOR THEIR RESPECTIVE DESIGNS. Hutchins i Erl neerift � g 518) 745-0308 Fax WASTEWATER SYSTEM DESIGN WASTEWATER SYSTEM DESIGN SYSTEM INSTALLATION NOTES 4-BEDROOM RESIDENCE 3-BEDROOM RESIDENCE CONSTRUCTION SHALL BE AS SHOWN ON THIS DRAWING AND IN ACCORDANCE MIN WATER SAVING FIXTURES WATER SAVING FIXTURES THE N.Y.S. DEPARTMENT OF HEALTH INDIVIDUAL HOUSEHOLD SYSTEMS AND ASTM F481 INSTALLATION OF THERMOPLASTIC PIPE AND CORRUGATED TUBING /N SEPTIC (1.6 GPF MAX. FLUSH, 3.0 GPM MAX. FAUCETS) (1.6 GPF_MAX. FLUSH, 3.0 GPM MAX. .FAUCETS) TANK LEACH FIELDS. DESIGN FLOW - 110 GPD/BEDROOM DESIGN FLOW - 110 GPD/BEDROOM AFTER EXCAVATION OF TRENCHES TO THE DEPTHS .REQUIRED, THE. WALLS AND SYSTEM DESIGN FLOW - 440 GPD SYSTEM DESIGN FLOW - 330 .GPD SEPTIC TANK - 1250 GALLON PRECAST CONCRETE SEPTIC TANK SEPTIC TANK - 1000 GALLON PRECAST CONCRETE SEPTIC TANK S OF EACH TRENCH SHALL BE CLEANED AND RAKED IN ORDER TO LOOSEN LEACH FIELD - STANDARD PIPE-IN-STONE TRENCHES LEACH FIELD STANDARD PIPE-IN-STONE TRENCHES SMEARED R ARED SECTIONS OF TRENCH. PLACEMENT OF WASHED CRUSHED STONE, PERFORATED PIPE AND FILTER FABRIC DESIGN PERCOLATION RATE IN NATIVE MATERIAL= 1-5 MIN/IN DESIGN PERCOLATION RATE IN NATIVE MATERIAL= 1-5 MIN/IN SHALL BE AS SHOWN, AND CARE SHALL BE EXERCISED TO AVOID INCLUSION OF ABSORPTION APPLICATION RATE = 1.2 GPD/SF ABSORPTION APPLICATION RATE = 1.2 GPD/SF FINE GRAINED SOILS AND WASTE MATERIAL IN THE PIPE. ABSORPTION TRENCH AREA REQUIRED = 367 SF ABSORPTION TRENCH AREA REQUIRED = 275 SF THE PIPE SHOULD BE LAID AT THE GRADES INDICATED, MAINTAINING STRAIGHT ABSORPTION TRENCH LENGTH REQUIRED = 184 LF ABSORPTION TRENCH LENGTH REQUIRED = 138 LF CONTINUOUS GRADES WITHOUT SAGS, HUMPS, SEPARATED JOINTS, OR OTHER INSTALL (4) TRENCHES AT 50' EACH, 200 LF TO BE PROVIDED INSTALL (3) TRENCHES AT 50' EACH, 150 LF TO BE PROVIDED UNSUITABLE CONDITIONS. ALL DISPOSAL FIELDS SHALL BE GRADED TO SHED RAINFALL AND DIVERT SURFACE w SUGGESTED: POLYETHYLENE EXTENSION RUNOFF AWAY FROM THE DISPOSAL FIELD. > APPROXIMATE TO GRADE WITH TAMPER RESISTANT N o FINISH GRADE ACCESS COVER DO NOT USE HEAVY EQUIPMENT WITHIN THE ABSORPTION AREA AFTER PIPING HAS n z BEEN INSTALLED. Z W THIS SYSTEM IS DESIGNED FOR WATER CONSERVING FIXTURES AND IS NOT DESIGNED SUGGESTED: INSTALL POLYLOK N a TO ACCOMODATE EXTREME WATER USE OR EXTREME ORGANIC LOADING DEVICES PL-122 EFFLUENT FILTER SUCH THAT IT IS READILY REMOVABLE w o 0p SUCH AS JACUZZI TYPE SPAS OR GARBAGE GRINDERS. THROUGH TANK ACC ESS COVER DISTRIBUTION Box z z 4" PVC SDR-35 w :, - ROOF, FOOTING, GARAGE, CELLAR AND SURFACE WATER DRAINAGE MUST BE INLET 4" PVC SDR-35 N EXCLUDED FROM THE WASTEWATER SYSTEM. MIN. SLOPE LIQUID LEVEL VOU 1/4" PER FOOT MIN. SLOPE INSTALLER ADVISED TO CONTACT DIG SAFELY NEW YORK PRIOR TO a10 2 1/8" PER FOOT BAFFLE CONSTRUCTION. : USE SPEED LEVELERS TO ASSURE - WATERTIGHT SLEEVE °mac ALL OUTLETS ARE AT EXACTLY AND SEAL (TYP.) THE SAME ELEVATION 4" PVC SDR-35 SOLID HEADER TO WASTEWATER SYSTEM MATERIAL SPECIFICATIONS o z x PERFORATED TRENCH PIPING, 1/8" O 1250 GAL PRECAST o n PER FOOT MIN SLOPE HOUSE SEWER CONCRETE SEPTIC TANK -' PIPING TO 8E 4" SDR-35 PVC. INSTALL WITH 1/4" PER FOOT MINIMUM SLOPE (4-BEDROOM DESIGN) 1000 GAL PRECAST MINIMUM 2X WIDTH EFFLUENT SEWER CONCRETE SEPTIC TANK MAXIMUM 4X WIDTH : • PIPING TO BE 4" SDR-35 PVC. INSTALL WITH 1/8" PER FOOT MINIMUM SLOPE (3-BEDROOM DESIGN) A a ABSORPTION TRENCH PERFORATED PIPE PIPING TO BE 4 PERFORATED PVC SEPTIC TANK NOTES WASHED STONE ALL UNITS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEW YORK STATE STONE IS TO BE 3/4" TO 1-1/2- WASHED STONE DEPARTMENT OF HEALTH AND SHALL BE OF PRECAST CONCRETE AS FILTER FABRIC MANUFACTURED BY UTOPIA ENTERPRISES OR EQUIVALENT. FILTER FABRIC TO BE TENCATE MIRAFt 140N OR EQUIVALENT 4 OZ/SY MINIMUM ALL STRUCTURES SHALL BE PLACED ON FIRM, COMPACT SAND OR GRAVEL BASE. BACKFILL MATERIAL WHERE EXISTING SOIL CONDITIONS ARE UNSUITABLE, CRUSHED STONE SHALL BE PLACED AS NECESSARY TO ACHIEVE A STABLE BASE. BACKFILL TO BE GRANULAR BACKFILL MATERIAL WITH NO PARTICLES GREATER THAN 3" TOPSOIL SEPTIC TANKS INSTALLED IN TRAFFIC AREAS SHALL BE OF EXTRA HEAVY CONSTRUCTION DESIGNED FOR H-20 WHEEL LOADING. PLACE 4" MINIMUM TOPSOIL OVER ENTIRE BACKFILL AREA. SEED, MULCH, AND ESTABLISH TURF ALL JOINTS MUST BE SEALED. SEPTIC TANK DETAIL NTS 4" MIN TOPSOIL OVER THE INDIVIDUAL LOT GRADING 4" MIN TOPSOIL OVER THE ENTIRE ABSORPTION FIELD; ENTIRE ABSORPTION FIELD; SEED SEED AND ESTABLISH TURF &ESTABLISH TURF SETTLEMENT ALLOW FOR �° GRANULAR BACKFILL FREE OF7 REDI M�NTJ FILTER 140N/OR EQUIVALENT STONES OVER 2" MINIMUM MIN. SEPTIC MIN. GARAGE FLOOR BASEMENT BOTTOM OF 12" MAX _ LOT NUMBER ELEVATION FLOOR TRENCH FILTER FABRic ELEVATION ELEVATION 6" MIN. M/RAFI 1 UAL 6-12" OR EQUAL 2' Ti?ENCH WIDTH 1 A 102 93 95 2- MIN. .Q1 SL_OPE Or' �If,70 �---- 18 102 93 95 2- IN. °� CpcP 0 04 DD12" MIN. 1C 10293 95 6" �CSO 4" PERFORATED PVC LATERAL,15PP 09 SLOPE 1/16" - 1/32- PER FT. END CAP 6" pDOo 0 ,0 — ��ppo 3/4" TO 1 1/2" 3/4- TO 1-1/2" WASHED WASHED CRUSHED STONE CRUSHED STONE ABSORPTION TRENCtj PROFILE NTS 2' 2' IN PAVED AREAS: SAW CUT PAVEMENT AND MAX. MAX. REPLACE WITH: GRADE AT UNPAVED AREAS, 12" NYSDOT ITEM 304.05 (ITEM-4) RESTORE TURF AFTER 2» NYSDOT ITEM 403.13 BINDER EXCAVATION ' h Y 1.5" NYSDOT ITEM 403.16 TOPCOAT z y zy � �r 1" IN GRASS AREAS; �c FINISHED GRADE FLUSH WITH PAVEMENT EXCAVATE TRENCH WIDTH //\//\//\�/j //\�//\�//\�//\//\/�\ p , TO PIPE WIDTH PLUS 2' MIN. \/•� /•� �\/\�\\��\��\� I \�/\� \��� TAX MAP # 308.7-1-48 12" NYSDOT `\ OF THIS ITEM 304.05 (ITEM-4) \ CURB BOX (EXTENSION TYPE ALTERATIONENGINEER ISSOA VIOLATIONCOF N S EDUCATIONPARW. OFESSIONAL MACHINE BACKFILL W/NATIVE MATERIAL 5 MIN. WITH ARCH PATTERN BASE AND 5 MIN. (4» MAX SIZE); STATIONARY ROD) COVER COMPACT IN 12" LIFTS CORPORATION STOP COPPER TUBING CURB STOP REVISED FOR SUBDIVISION MODIFICATION 10/15/18 TYPE K) 0 ISSUED FOR SUBDIVISION MODIFICATION 7/16/18 15` No. Revisions Date \� TYPE K COPPER SELECT GRANULAR MATERIAL (100% WATER WASTEWATER DETAILS PASSING 2') TO 18» ABOVE PIPE; PIPE TO BUILDING prepared for: HAND BACKFILL IN 6 LIFTS -- -- _ 6 D.I.P. WATER VELOPEMENT ------ --- TRA-TOM ®E - .:.mr. BEDDING 6" DEPTH; SAND, GRAVEL OR MAIN SOLID CONC. BLOCK OR C.I. " FOOT PIECE AS REQUIRED CRUSHED STONE (1 9/2 MAX) RICHMOND HILL DRIVE NOTE: ALL WATER PIPING & CONNECTIONS TO BE Town of Queensbury, Warren County, NY PIPE % ; ` IN ACCORDANCE WITH QUEENSBURY WATER DEPARTMENT STANDARDS Drawn: TRC Checked: GTH Scale: NOTED Date: 7/11/18 169 Haviland Road PIPE EXCAVATION (518) BACKFILL DETAIL WATER SERVICE PIPE CONNECTION DETAIL Queer 45 y, NY 12804 291261-01-56 Hutchins En If1@�Cltl 745-0307 Phone NTS NTS g g 518 745-0308 Fax