The Supervisor presented a statement for the months of June and July
of mgneys received. and disbursed during these months. The statements j
were read by the Clerk to the Board.
The board audited claims as follows: j
Amt. Amt.
No. Name of Claimant Nature of Claim Claimed Allowed
189 Dennis &- Co. , Inc. Clevenger'°s_Civil. Pract _
ice Aet.(M Bentley) 20000 20,0
190 Dennis & Co., Inc. 3- gate'Monthly rept,,forms
_. H.R. I. 5.21 5.21
ii 191 Niagara. Mohawk Power Street liting & signals 113*07 113.07 I
i } 1L92 G.F. Post Co. , .. Pub.Notices-Drainage 24.48 24.48
i 193 Mathryn E.-O'Brien Typing twn.bd.min.meetings 3.00 3.00
194 Carswell,. T &-T Co. Gasolene - PV Cemetery 9.46 9.46 {
M—,, Heag's Tire...Serviee 15 gaT.oil-$Q Cem. 4.80,, 4.80;
126 Franklin Scoville NJleage-PV g®metery 36.00 36.40
197 City G.F.Vater Fd« Water rent-Ridge Rd.W.D. 131.94 131.94
198 City G.Z .ldater Fid. Mater rent-WGFWD-95 __ - 482.30 482.30
199 City G.F'.1 a.ter Fd. Mater rent-23.N'GM 1555.8' 3-555.87
200 City G.F.Water F'd. Mater.-rent-93A-L.G.Rd.
XGFWD _ 331.06 331.06
2011 N.A.. Harvey, M.D. Queensbury Child. Health
_ Clinic _ 31.65 319-65
48.84 ;2:0 .84
.
On motion the meeting adjourned, s
a -L.�tlrW
_Town Clerk:.
i Special Meeting September 10, 1953
Present
H, Russell Harris Supervisor
th Bentley justice of the Peace
-Ren.ry l Sleight Justice of the Peace
06irti s-Lamps on Councilman
Absent: - s
- Raymond Walkup Councilman
Ernest-- L ►key, Superintendent of Highways, was also present.
The following bids were received and read:
Moynihan & Loughlin, Inc.
Sept. 10, 1953
Town Berard,.
Town of +Queensbury .
Glens Falls , N.Y.
r Re Storehouse
Re-Roof job
• Gentlemen:
We propose to furnish and install- new three (3) ply,, smooth
surface, built-up roof according to Johns-Manville-Roofing Specifi-
cations. _
This price is complete with new Johns-Manville insulating board
i- carat strip and Special Johns-Kanville Reinforced Composition base
flases h at parapet walls; new 26 gauge alvani$ed- Iron drip edging
at- rioiax of building,; and thel flashing of all obstacles projecting
aboie '"of level..
Above as outlined. fors the s= of Four-Hundred Sixty-one and
00/100 Doll.ars. ($461.00) . -
T6 remove old roof down to the roof boards acid the sum of
Seventy-Six and 00 '1:00 Dollars. ($76.00) .
r Very truly yours,
MONAHAN & LOUGHLIN,; INC.
°'1r'7'1e J,hr T'. 7rrrj -nn
(Signed) John K. Harrigan
United Roofing of Albany, Inc.
• ._ 425.Orange Street
Albany, New--York
Mr. Ray Walkup.
Tomm._of Oieensbury
Ridge Road
Queensbury, New-York
Location -' Glens Falls, New York
lie propose to furnish all Job - Ga.rgge .
material and labor for Owner• ,.. Town of Queensbury
the above dob as listed Architect
be1aw -]Date - September 8, 1953'We will remove the present roofing materials frox_they roof .sud.
premises. Over this area' we will apply a three' (3),', .y Is
surface asphalt built-up- roof with 26 gauge galva :sod metal
base- flashings extending the full height of the parapet and:_
a new 26 gauge galvanized iron coping. cover over. the present
concrete coping.
• At the eaves 'of the roof we will install a galvanized
metal gravel stop. .
Complete for the above said building in accordance with plans dated
architect as submitted to us
for the sum of FIB HUNDRED NINETY AND 00/100 ($590.00) Dollars.
If any changes. are_made .tm. said_drawing subsequent-to the afore-
said date, or if there is any departure in construction from said
drawings then all expense devolving upon us because of said changes
shall be paid to us in final settlement in addition to amount of pro-
posal named herein. Details must agree with the scale drawings on which
this proposal is based.
Terms: Net cash within 15 days from date of all invoices. :
Contracts extending more than one month will be baled at the
for partial payment. Partial payments will, be for r
end. of_each month p P Ym P
1
85% of our estimated value of material installed or delivered. Final !
« invoice will include the 15% reserve.
It is agreed that all.-surfaces we are to cover shall be cleaned
of all.rubbish, snow and ice.
'ate will not be liable for damages to the building or contents
caused by leaks.
All orders are accepted and contracts closed subject to delays
from causes beyond our control.
It is agreed that all essential facts are cover6d in this pro -
posal. and that no verbal agreements with our representatives shall be
recognized.
This proposal is good for 10 days. Its acceptance will.. copstitute
a contract subject to the approval of our. credit.departZent of Albany,
N.Y. Yours truly,
United Roofing of &lbany, Inc.
(signed) John J. Lyong
° - After discussion the following resolution was adopted* r
Osolut-ton Xn_ 7A_introduced, by Justice Sleight, seconded by Justice
Bentley.:
RESOLVED that the proposal for the repair of the storl'house
r roof mvAe ,by Moynihan & Loughlin, Inc. , be anal --
same s: hereby
accepted in accordance with the proposal given and recel.ved in the
amount of $461.070 and in the amount of $76.00 for remova of old roof
dove to roof rafters - a total of $537.00.
t; It is further resolved that the Supervisor be and' iFs hereby
authorized and directed to cause to be,_prepared: a contra0t'_ for said
wort_ and to execute the same« on behalf of the Torn.
i
1
1,017
Duly adopted by the following vote:
Ayes - Mr. Bentley, Mr. , Lampsen,r Mr. Sleight and Mr. Harris _
Noes -► none
The Board generally discussed the repair of roads.
Tba, pervisor presented his statement of moneys received and dis -
bursed for the month of August which was read to the Board by the
Clerk.
The board generally discussed sources of water for the water districts.
and Mr. Sleight suggested that the Board- contact John R. Mills in
Vermont In relation to establishment of the water .supply.
solution No. 79 introduced by Justice Sleight and seconded by
Justice Bentley.
RESOLVEJD that,nth* chairman of the water. �comittee contact John
R. Milks of¢I rs °Ve cnt, to make arrangements with the Town Board
to discuss the establishment of a water supply for the .water districts
in the Town.
Duly adopted by the following vote:.-.
Ayes. - :Mr Bentley, Mr. 'Lempson, Mr, Sleight and Mr. Harris
Noes ._.none
At ,' �po nt in the meeting Justice Bentley was excused.
John Van Dusan, Town. Surveyor, was present and discussed with the
Board drainage on and-.along Glenwood Ave.
R
On motion the fneeting adjourned.
t ,
1 ,
S ,ciaZ Meat Sept, 11 1953
r-c (TUl r > ; ., - Tom Clerk I 4
li. Russell Harris � ; -
_ pervis®x _ ..
ReAW81elghtley Justice of the Peace '
Raymond. Walkup Councilman '
is Lamps - inc 'man
Absernt -
Meredith Bentley Justice of the Peace
The board convened at 7:39 P.M. '
_ � p
In the Matter of the voting placea for Election istrict No.. 3, the
following resolution na.. 80 was introduced by Mr. Walkup and seconded
166 Justiee _ g„
r, M d
XESdt that Disttict No 3 -voting place at Pine View school
hottse''b*,.'c anged to V.W. Tricks garage on Miller Hill.
Duly ,adopted by the following voter
Ayes -► Mr. Walkup, Mr. Lampson, Mr. Sleight and Mr. *Harris
Noes ,,- none
Resolution No. 81 introduced by Councilman Lampson„ seconded by
Justice, Sleight
RESOLVED that the Tama. Board purchase four new metal election
booths .for_1 leation District No.. 5.
Duly adopted by the following vote: