2009-569 BY REVISION
C)7 NOTES:
1. Should the project become delayed for any reason, and
I the time between the beginning of the project and the date
stamped by the Engineer exceed one(1)year the plans
must be reviewed for NYS Code changes by a licensed
NYS Engineer or Architect prior to beginning construction.
2. All construction shall comply with the Residential Code of
New York State and the Energy Conservation Construction
ROOMM O Code of New York State.
ROOM
3. The contractor/owner shall comply with all laws,rules and
ordinances of any public authority bearing on the
(2)2x10
performance of the work.
HEADER 4. The contractor is solely responsible for all construction �--�
NEW SGD-FINAL LOCATION means, methods, t@ChnK]U@S, sequences and procedures
EXISTING DOOR TO ALONG WALL T.B.D. and for the hds,t e coordination Of all portions Of Work
BE REMOVED AND INFiLLED
5. The professional services of the Engineer do not extend to C)
or include the review or site observation of the contractor'sCQ
o
Owork or performance on this job. The Engineer is not u7
responsible and is to be held harmless by the ownerfrom "
eaTHRooM any claim or suit whatsoever, including all payments or
costs involved arising from or alleged to have arisen from � O
the contractors workto conform to design intent. v W
1 1 8*STEP UP I I KITCHEN 6. All measurements to be job/field verified and advise
BATHROOM g y p prior to proceeding ' i� c4
TO KITCHEN Engineer of an discrepancies anCl@S co
BEDROOM
7. Drawings not to be scaled from for field work purposes. i,- �-'
BATHROOM 8. All stairs'
A-3 i I rSEEAERNATES - a. Max rise 8 %" r, Z W
S SHEET A-2 b. Min run 9" F—�--i
c. Now 1 1/8"( >�
CLOSET EXISTING sxvLlGHr ( ` _ _ _ CL 9. All headers in bearing walls with openings 4-T or greater B
TO BE REMOVED M, 1 shall be supported on each side by a minimum of two(2) a
LIVING ROOM I 1 studs the size of the adjacent bearing wall.
- WiCATH. CEILIN _ A I 10. All bathroom and dryer vents shall vent directly to the ►►�-�- 04
GARAGE (319 I -- -- -- / exterior of the house. No vents shall vent into the soffits. a W
cu c�
CLOSET z j O
CHANGE TO 3/4-HR FR .. `/
DOOR W1I r, CA °
SELF CLOSER
l
WALL HEIGHT I
co
2)2x10
GW-1 HEADER ! DINING ROOM STAIRS CL General Design Criteria r
Aa r O 1 BASEMENT 1. Seismic designcategory
9o►Y—C
2 Concrete weathering probability—Severe
3. Design wind speed—90mph
STUDY 4. Design ground snow load—85 psf
(3)2x4 SOLID SUPPORT BEDROOM 5. Termite infestation—Slight to moderate
TO FOUNDA�I 3 3/4 x 14"MICROLLAM 6. Decay probability—Slightto moderate
L] ) 1
t7aIU BEAM CONNECT'�(" 3)2x4 SOLID SUPPORT 7. Exposure category
—t3
TO FOUNDATION 9 Soil 8. Wind-borne region—No
_ -I— CL I type—Sand(SW), well drained
i I General Design Loads
[I-2
1St Floor Load—40 psf live load plus dead load
Ground snow load—60-PSF
Roof 42.0-psf snow load—design per ASC E-7
E NOTICE Required Main Exit Notes
A�
KRAFT PAPER INSULATION MUST BE 1. The from door of the house is designated as the main house exit. c�
2 All egress doors shall be readily openable from the side from which egress U N
Pro osiad Floor Plan Changes
COVERED BY NON-COMBUSTIBLE BARRIER, { is to be made without the use of a key or special knowledge or effort.
Smoke and Carbon Monoxide Alarm Requirements Z
The re CO %.'
quired alarms shall receive their primary power from the building wiring. O .CoO
When such power is interrupted the smoke alarms shall receive power from a
N0T1battery.Wiring shall be permanent and without a disconnecting switch other than � y
CE those required for overcurrent protection. O CrJ
FOAM INSULATION MUST BE COVERED When more than one smoke alarm is required to be installed within an Individual O ��
dwelling unit the alarm devices shall be interconnected in such a manner that the
NOTE: BY A 15 MINUTE THERMAL BARN activation of one alarm will activate all the alarms. �L Co
THE ENTIRE ROOF DECKING AND SHINGLES
ARE TO BE REMOVED AND REPLACED WITH Smoke alarms shall be located in each bedroom,and outside the sleeping areas. O
}"PLY OR OSB AND 15#FELT 3-SEASON "M 6F% ENSBURY BUILDING DEPARTMENT
AND 20-yrASPHAL TOR FIBERGLASS SHINGLES ROOM Carbon monoxide alarms shall be located on each floor.
ICE/WATER SHIELD TO EXTEND '
Based on our limited examination,
�
24-in PAST INSIDE OF EXTERIOR WALL complimce with our=mts shag
ft beCOnstitled asindicating the h
plans and speoifioat m are In ful O
=01ance with the Building Codes of
New York S1ft NOTICE: O
Smoke detectors are required in bedrooms,
adjacent to bedrooms and on each floor
level including cellar or basement.
LWALL HEIGHT All smoke detectors&carbon monoxide
==Z7
BATHROOM 8y. detectors shall be Interconnnected with
I � battery backup and located on all levels. o �-
i Carbon monoxide detectors are required
outside sleeping areas and on all levels. °° 2,
8"STEP UP vo o=od d�v� o
TO KITCHEN KITCHEN �i 0-m o a�r o, o
BATHROOM V brn "°c 0.rk.. o
-- LIVING ROOM BEDROOM o v^o z� o c N E
W/CATH. CEILING BATHROOM .2-0
�i;o�+ o �'o o,>,
(8)ROOF RAFTERS TOWN OF '°�� ,� ° �o t`
CLOSET QUEENSBURY N;0 -y -N m o
cii._X ie..2 ?t., am
REMOVED&REPLACED EL BUILDING & C S DEPT. Z_Z3 O_ 0--o Mw
• AND RIDGE REPLACED ALONG
EX/STING(3) 13/4 x 16' SAME DISTANCE Reviewed By: a,,®,�$� I���j I M/CROLLAM RIDGE IS OK17- Date: �` �`' �r���i f J!'�r,. rpB�"'J,�
I r— iRIDGE � •. lo, 'YA,;er"STiNG , 'GARAGE
. s..-
�— CLOSET
EXISTING RIDGE
OK i T- I T �I T
WALL HEIGHT TOP PORTIONS OF THIS
II II z
ALL NEED TO BE
REPLACED J o
DINING ROOM i
STAIRS it S2
I TO c d v +lw�o
BASEMENT N u o a w a
O1 - i'41 C u'
I I I I I I (Do a, oSTUDY w u Y a Y
BEDROOM d1Atft-Ciofwoa o E:LL ►- LLC0awosC4- w
CL o aa+, u EzU_Rz
DAWN
gy
DATE
l I I November 16,2009
(4)ROOF RAFTERS PROJECT N0.
REMOVED&REPLACED
09-9104
ALL ROOF RAFTERS
EMOVED AND REPLACED Working
ra wI
IN THIS AREA V/�/V orAing D ngs SHEET NO.Existing Floor Plan&Fire Repair Areas r I
Floor Plans A-1
Scale: 114"= 1'-0"
BY REVISION
r
I
(4)2x4 SUPPORT (4)2x4 SUPPORT
SOLID TO—., SOLID TO--\
(4)2x4 SUPPORT
l
FOUNDATION FOUNDATION
SOLID T 80 STEP UP
FOUNDATION
TO KITCHEN KITCHEN 80 STEP UP TO KITCHEN KITCHEN
BATHROOM BATHROOM
8'STEP UP KITCHEN BATHROOM
TO KITCHEN
(4)13/4 x 18
(4) 1314 x 16' 6'-6BEAM " "
I
(2) 6,8. MICROLLAM BEAM MICROLLAM BEAM 20,-0" -� o
CONNECT"1" C CONNECT ^ �
SEE SHEET A-3 A 2 WALL BECOMES A CL SEE SHEET A-3 A WALL BECOMES A CL F�
c I HALF WALL
(3)2x4 SUPPORT A-2 WALL BECOMES A CL N1
HALF WALL
SOLID TO FOUNDATION I HALF WALL LOCATION OF SUPPORT LOCATION OF SUPPORT -9
FOR LR RIDGE B FOR LR RIDGE BEAM �D — O o
LOCATION OF SUPPORT
FOR LR RIDGE BEAM B C O
(3) 13/4 x 11 7/8" (3)2x4 SUPPORT B A (3) 13/4 x 18' U(3)Zx4 SUPPORT .� �
p C (3) i 3/4 x 117/8' )2x4 SUPPORT �2 A-2 MICROLLAM BEAM SOLID TO
" • BASEMENT FLOOR '�2 a-2 MICROLLAM BEAM BASEMENT FLOOR
D A 2 MICROLLAM314x11 BEAM ��(_IOLID TO CONNECT F CONNECT F a
CONNECT 'F BASEMENT FLOOR B SEE SHEET A-3
SEE SHEET A-3
SEE SHEET A-3 I
B x
D WALL TOTALLY
a-2 U
(2)1314 x 91/4' a-2 WALL TOTALLY A-2 SQ
�
MICROLLAM BEAM REMOVED ( REMOVED
CONNECT D L)
SEE SHEET OD I (4)2x4 SUPPORT DINING ROOM STAIRS (4)2x4 SUPPORT
DINING ROOM STAIRS
(4)2x4 SUPPORT SOLID T TO SOLID TO—
TO
SOLID T T TALLY DINING ROOM STAIRS FOUNDATION BASEMENT FOUNDATION BASEMENT C5 '
SOL .WALL O TO
FOUNDATION REMOVED BASEMENT is STUDY STUDY ►—� (u 0
STUDY M O
ao ° f
W a i
c
W
proposed Opening-Alternate 2 Pro osed Opening-Alternate 1
C)
Proposed O enln -Alfernate 3 164"KV BEAM a 18-rt K-W last K a(R BEAM 2"wn BEAM a nR BEAM
1d rtBah KiD 9EAM a tart K WLR BEAM .
EXIST,(3) 16'ML .Q
RIDGE C
2x10 RR OVER
LIVING ROOM 6"RIDGE BEAM
N C'�
PROPOSED(3) 13/4 x 16"ML SOLID BLOCKING TO tq �'^^
BEAM SEE ALT. 1 LR BEAM (3)13/4 x 16' 1--bi?
SIMPSON HSA50 O
SOLID BLOCKING BETWEEN MICROLLAM BEAM EQUAL HANGER
:3IDGE BEAM AND
�R BEAM (3) 13/4 x 16' SIMPSON HSA50 OR EQUAL HANGER
CO (0
2x6 MICROLLAM BEAM Q O
6
CO
3) 13/4 x 18'ML
KIT/DR BEAM O
SOLID BLOCKING TO E
SOLID BLOCKING LR BEAM
ETWEEN KIT/DR BEA L4) 13/4 x 16"MICROLLAN EXISTING 2x6 4
AND LR BEAM BEAM " O LR BEAM 16'MICROLLAM CEILING JOIST eC �..
Section A A coen Q CP itN.T.S.
`qu iO U 'may iI
= 8-in STE
KITCHEN&DINING Z {KITCHEN&DINING ROOM C)
ROOM FLOOR LEVEL
LIVING ROOM FLOOR LEVEL
FLOOR LEVEL
LIVING ROOM c
FLOOR LEVEL DOWN 8-in r204)
c
Section B-B �O�
KT.S +`o>,2 y�o� o
oocTo�+
d 0 L V O ,p++t C 6
t UNt+'N_ CP �.
OwNO64),m CN�OI pN
OOWN OCC NQ
++OCpOi�'0
o�u°;Ca v�iEcb ®c
EXIST.(3) 16-ML oycn c� ,Lo°
RIDGE j_4)u u.q cLt a O C
2x10RROVER z�z�a..o}y ..o Mw
LIVING ROOM 6'RIDGE BEAM ead�` "s w " y
r r�
3 1314 x 11-718' f___6R
SIMPSON HSA40 a ��'&.•` ;, °"d , `N
PROPOSED(3) 13/4 x 11-7/8'ML SOLID BLOCKING TO Ot e
BEAM SEE ALTS.2&3 LR BEAM MICROLLAM BEAM EQUAL HANGER <,� t
SOLID BLOCKING BETWEEN
IDGE BEAM AND (3)1314 x 11-7/8' SIMPSON HSA40
LR BEAM MICROLLAM BEAM OR EQUAL HANGER
w "` <<�
2x8 CJ %
��//
'd3) I V4 x �' 1�.4 o (i
2009
KlT1DR BEAM/8'ML C
SOLID BLOCKING TO l s �, >, +"� a o
SOLID BLOCKING BEAM EXISTING 2x6Vp
ETWEEN KIT/DR BEAM L2)13/4 x 9-114'MICROLLAMZo 3 a i e o
AND LR BEAM BEAM ��,O� o LR 8 91/4'MICROLLAM EAMn CEILING JOIST u U o a o
off K7S v rn_r+' - u0 0{'0
1� 6 0- UI L d+1 �Vi P �Vl
3)2x4POST = a-0�voi s 3 L L °> L
Ll nSOLID TO FOUNDATION 8-inSTE
KITCHEN&DINING 4 °v- 41 N 4-r 1A }
ROOM FLOOR LEVEL KITCHEN&DINING ROOM
LIVING ROOM FLOOR LEVEL s v- L L s° O w w O s a
FLOOR LEVEL i- o a a+� u F z c�+I z
DRAWN gy
DATE
LIVING ROOM November 16,2009
(:)Section D-D FLOOR LEVEL DOWN 8-In
PROJECT N0.
N.T.S.
09-9 1 04
SHEET NO.
Worki�foor
Drawings
Interior Changes A-2
Scale: 114"= 1 LO"
BY REVISION
BEAM CONNECTION DETAILS
MICROLLAM CONNECTION.,A N MICROLLAM CONNECTION.D N MICROLLAMi CONNECTION.G R
N BOX BEAM NEEDS
1/2"REGULAR REPAIR/REPLACEMENT EXISTING
2 ROWS 12d TYVEK THIS SIDE IN THIS AREA FOUNDATION
NAILS @ 12"oc 1/2"THRU BOLTS 1/2"THRU BOLTS GDW
3ni ROW REQ'D FOR
24"oc 12"oc
14", 16", 18"BEAMS N N N
MICROLLAM CONNECTION:B MICROLLAM CONNECTION: OOF TRUSSES 8"SONOTUBE TO (2)2x8 P.T. SUPPORT BEAM ON BOX
H E MICROLLAM CONNECTION: MIN.48"8FG BEAM /SlMPSON OR EQUAL
N� �`'� N HANGER
3 ROWS OF 12d �j
NAILS @ 121oc 1/2"THRU BOLTS 1/2"THRU BOLTS -,
12 oc 24"oc
1)LAYER 5/8'TYPE X GDW ^'
N� N�
E O co
A-3 �•
MICROLLAM CONNECTION:C MICROLLAM CONNECTION:F MICROLLAM CONNECTION:I �'� j O
N 04
3 ROWS OF 12d� Proposed Porch Foundation Plan co
��NAILS.@ 1216c 1/2"THRU BOLTS 1/2"THRU BOLTS
24"oc 12"oc
HOUSE SIDE l� Z U
FG/NSUL w W
OFFSET FROM
w
SIDE TO SIDE
/ GARAGE SIDE
�
(1 YERWIMP-
2x4 WOOD STUD
18 oc 2x10 RR- 16 oc
MATCH EXISTING SLOPE,ET AL 8 0
ROP-R-VENT ]F-04� U3 O
R-30 CATHEDRAL �3 CE/WATER SHIELD �� a
FG BATTS WITH �..�
V.B. WARM SIDE 00
f-2'-0 ACIA TO MATCH
HOUSE AS EXISTING w
4
0 3) 13/4 x 14"MICROLLAM
BEAM
Gara e/House Wall
W- -Garage/
N.T.S. NON-ALUMINUM FLASHING
r-PORCH DECKING T.B.D.
2x6 P.T.DJ-16"oc
} 21 2x8 P.T.BEAM
SIMPSON BC4 CAP OR EQUAL
2x6 P.T. LEDGER RADE [�
FASTEN TO FOUNDATION
W/7/16"LAGS @ 16-1noc �"
¢t8• W7 . T.4x4 POST AS REQUIRED
EXISTING HOUSE SIMPSON PB44 OR EQUAL POST BASE N
FOUNDATION_ 8-!n SONOTUBE .V
4 IN. 48-in BFG
MIN.3500-psi CONCRETE
0) O
IDGE VENT ALL RIDGES Section E O
1/2" CDX PLY OR OSB O N
C O
SHEATHING O J
15# FELT y �..
20 YR ASPHALT OR co
FIBERGLASS SHINGLES O
ICE/WATER SHIELD ROOF ,C
TO MIN. 24" INSIDE WALLS Q
R-30 FG INSULATION co
/ VAPOR BARRIER
TO WARM SIDE Window Schedule tl,
NEW RR TO MATCH ROP-R-VENT AS REQ'D O
EXISTING RR - 16"oc ID Mfgr. Size Type Tempered Low E Rough Open. Glass Vent Egr(
EXISTING CJ 16"oc
i'MGlass Req'd Req'd Clear Open.
- LUUUUUU 1 Andersen NLGD6068 Patio Door Yes Yes 6'-0" x 6'-8" 29.92 14.72 NA
RIP EDGE 2 or 3040-2 DH No Yes 6'-0" x 4'-0" 18.12 9.36 NA °
C L
1/2„ GO 1/2" GO w 2 -o Equal o��o 0 _l 0
EXISTING t/2 PLY OR OSB a °r_.__ °�
2x4-16"oc TYVEK OR ASCIA o _L a'L c U
EQUIVALENTUNIyo
VENTED SOFFIT OWO`o y o C-H 6°1
SIDING TO MATCH w
EXISTING Notes: g°�'E`a 'a NQ
OX BEAM EXISTING
*1 - Windows shown are Andersen 200 Series 2.o o o
*2 - Contractor to verify rough openings with manufacturer's
°��O��N '5"'"
� a am
specifications prior to framing rough openings �..z°�o o d 0w
REPLACE 2x6 PT SILL *3 - Should the contractor or client change the window manufacturer to one Z- N r7
A5 REQUIRED �30?33@OiPI9,�p
R-13 FG INSULATION other than that specified the specs shall be submitted to the engineer for review ��� rd
W/ VAPOR BARRIE �a> r�' I Aj -0A
TO WARM SIDE
prior to ordering the windows c +1
�� ,.��••=° "fiC®AB � a' '"�,
,_•",. Eft, ..,.
3/4 T&G PLY OR OS
G.
'v
A lbws r�n•:o .,,, " r 1
EXISTING FJ 16"0
_ L•.J A
i •• A
' XISTING FOUNDATION
R-19 FG INSULATION nr-
*Aq•'" 209
LIGHT VENT SCHEDULE J;;. „ , 4�$
IN THIS AREA ,y=,p o
Code (sfl Room Actual (so Code Egress Actual ' "` ` Ed w
: E
US uis'WWU
„a ; Area (so Glass Vent Window ID Glass Vent Egress so Window ID Egress so _ u °-0 °
E O ° d-0 a,V U d V
LivingRoom 319 25.52 12.76 1,2 48.04 24.08 NA NA (�q �'
d � = No, ux�cd�_c
tAJ- a)S 4te °>-- w a r
-P 4- 3 4J w++ w
ar Oddcvaca' x
_C4- LL.soa) Wa-CQ,
F O O-7041 U EZU4'Z
DRAWN gy
DATE
TYPICAL CONSTRUCTION
November 16,2009
N.T.S.
PROJECT NO.
09-9104
Workin Dra wins SHEET N0,
Details Founds ion
A-3
Scale: 1/4"= V-0"