Loading...
asbestos clearance letter P O.BOX 1024 Schenectady.NV 12301 _..4. 4SPECTRV1111 r (518)346-6374(Phone) Environmental associates, inc �^��' /I <818)348-4062(,pax) EXCEEDING OUR CLIENTS EXPECTATIONS or EXCELLENCE 4LCf lam. �� www4spechvm.com June 21, 2019 ,��N� � 2��� Visible Construction Corp (OWN OF OUELNSEURY 7 High Street, Suite 300 EUIL � r `�w Huntington,NY 11743 teiVO _ 0 RE: 682 Glen Street, Queensbury,NY-Asbestos Clearance Letter Spectrum Project Number: 19-402 FILE COPY Dear Mr. Holbrooke: Spectrum Environmental Associates, Inc. (Spectrum) is submitting this letter and attached documentation as confirmation that the referenced asbestos project is complete. On June 21, 2019, Mr. James Edge(AH#15-11979)performed a final visual inspection and collected final air samples in accordance with NYS ICR56 requirements for the removal(s) of the following materials by a licensed abatement contractor. • - 1800 SF of asbestos joint compound debris per the site specific variance 19-0692 New York State Department of Labor Industrial Code Rule 56-9.1(d)(1) requires a final visual inspection be performed by a New York State Certified Asbestos Project Monitor who is independent of the asbestos abatement contractor. In addition, if the location and quantity of asbestos containing materials being removed required final air clearance per ICR 56-9.2, these samples have been collected and analyzed as required under NYS DOH ELAP. Therefore, based on the final visual inspection(s)passing and the final air samples having met the New York State clearance criteria of less than 0.01 fibers per cubic centimeter, or the established background level(s), whichever is greater, the scheduled removal areas are considered clear and may be re-occupied. Spectrum will prepare a complete final report with all appropriate documentation for the client. If you have any questions concerning this letter, please contact our office at(518) 346-6374. Respectfully Submitted, Robert J DeRuyter VP of Operations Cc: file Attachments: Final Air Clearance Licensure and Certification Environmental Consulting&Management Services • Health&Safety Training • Laboratory Services . . . p o.a� �aa�r .. ::.:. ::. :-- : E vm fir.ii #t ar ..: . 4 e •.1, , vitr rtmenta►l Rssoclauti s,Inc. (918).4a- 00* 4X4Ltibniioer'Cii.iii BXFstrirr/[l.rS pI G icitts '.w iv4spiertntum.tom AIR SAMPLING CHAIN OF CUSTODY (REv 06-15-2017) PROJECT INFORMATION SAMPLE TYPE TYPE OF ANALYSIS TURNAROUND Project#: 19-402 Date Collected: 6-21.19 0 Phase lB(Background)A PCM-NIOSH 7400 A RUSH Job Site/Building: 682 Glen St.Queensbury,New York 0 Phase HA(Prep) 0 TEM-NIOSH 7402 0 12 Hour Room/Work Area: Building Interior O Phase IIB(Removal) 0 TEM-AHERA 0 24 Hour Rotameter#: " Calibration Date: 4-1-19 A Phase IIC(Clearance) 0 Other 0 48 Hour Collected By(Print): James Edge 0 Air Quality 0 Other SAMPLE IDENTIFICATION Lab ID Sample Pump Pump Pump Rate Rate Air Adjust No. No. No. Location On Off (LPM) (LPM) Time Volume L.O.D. Count Result Flmm NAE=Negative Air Exhaust hr.um hr:rnn On Off Min titers /IOQ F/cc 75; 72 Field Blank --- --- --- --- --- -- -- JUG --- . — j 3 --- --- --- --- --- --- --- I 76-77 73 Field Blank • - 7 7 74 IWA 1 0240 0440 1 0 1 0 ID IZOJ .002 . 6 $1 7614 75 IWA 2 0241 0441 10 10 'IOW Z i 5 7q0 76 IWA 3 0242 0442 10 10 ,003 10,i R1 77 IWA 4 0243 0443 10 10 1 V;21':1:3 75/7 78 IWA 5 0244 0444 10 10 l0 •0E4,6) w 79 OWA 1 0246 0416 10 10 y �d J 1, , ,p1„N _ . . . I ADDITIONAL INFO CHAIN OF CUSTODY ' i A F Report Results to: Relinquished: "Ayr �A06►i D, e:6-21-19 / Time: f Phone/Fax: Received: %� �'/�i%//, ;, e: L 7Time: Comments: Text me with results 518-929-2647 Sample Log-in: /Date: Time: . Sample Prep: Date: Time: Analyzed: Date: Time: QA/QC Review: Date: Time: NOTE:SwitirrtmESiv ranwz/a16esada2..s.Mr utilizes laboratories that meet the requirements set forth by AHERA 40 CFR 763.90(i)(2)(ii). Rotameters are calibrated against a Dry Cal DC-Lite Primary Flow Meter manufactured by BIOS International Corporation. Environmental Consulting&Management Services • Health&Safety Training • Laboratory Services c : a New York State—Department of Labor Division of Safety and Health License and Certificate Unit State Campus,Building 12 Albany,NY 12240 ASBESTOS HANDLING LICENSE Spectrum Environmental Associates, Inc. FILE NUMBER: 99-0129 LICENSE NUMBER: 29081 P.O. Box 1024 LICENSE CLASS: RESTRICTED DATE OF ISSUE: 02/27/2019 Schenectady, NY 12301 EXPIRATION DATE: 02/29/2020 Duly Authorized Representative—William L Massmann: This license has been issued in accordance with applicable provisions of Article 30 of the Labor Law of New York State and of the New York State Codes,Rules and Regulations(12 NYCRR Part 56). It is subject to suspension or revocation for a(1) serious violation of state,federal or local laws with regard to the conduct of an asbestos project,or(2)demonstrated lack of responsibility in the conduct of any job involving asbestos or asbestos material. This license is valid only for the contractor named above and this license or a photocopy must be prominently displayed at the asbestos project worksite. This license verifies that all persons employed by the licensee on an asbestos project in New York State have been issued an Asbestos Certificate,appropriate for the type of work they perform,by the New York State Department of Labor. Eileen M.Franko, Director SH 432(8/12) For the Commissioner of Labor a +. P.O.Box 1024 \ spEcrizol Schenectady,h'Y 12301 (518)346-6374(Phone) B" Environmental Gssociates, lnc. (518)346-4062(Pax) 7 'EXCEEDING ODE CLIENTS EXPECTNTIONS OF]EXCELLENCE' www.4spectrum.com State of New York— Department of Labor Asbestos Certification STATE Of NEW YORK-DEPARTMENT OF LABOR (' ASBESTOS CERTIFICATE l N. JAMES A EDGE CLASS(EXPIRES) C ATEC(09/19) D INSP(09/19) H PM (09/19) • cERTM 06-!S641 DMV1 1 10•ttis?6El MUST RE CARRIED ON ASBESTOS PROJECTS ZIUII! uiwunne IIIIIIIIIIll IIIIIulIllIllIll IF FOUND RETURN TO: — EYES BLU NYSDOL - L&C UNIT HAIR BRO ROOM 161A BUILDING 12 17. HGT 5' 10" STATE OFFICE CAMPUS ALBANY NY 12240 o State of New York— Department of Labor Codes Certification A Asbestos Handler B Restricted Handler- Allied Trades C Air Sampling Technician D Inspector E Management Planner F Operations and Maintenance G Supervisor H Project Monitor I Project Designer Environmental Consulting&Management Services Health&Safety Training • Laboratory Services