Loading...
ComCheck . e___e„ 3416 -.Jo i ? COMcheck Software Version 4.1.1.0 • rift Interior Lighting Compliance ' .3 n, 01 Project Information I' JUN 2 6 2Q1'" �.J Energy Code: 2015 IECC Project Title: Bldg. 1 Restroom Removal Renovation TOWN OF OUEENSBURY Project Type: Alteration cot.MUNITYDEVELOPME 1 Construction Site: Owner/Agent: Designer/Contractor: 289 Bay Road Joseph Caricari, P.E. Edward Ward, P.E. Queensbury, NY 12804 C.R. BArd Haanen Engineering,LLP 289 Bay Road 254 Bay Road Queensbury, NY 12804 Queensbury, NY 12804 (518)502-2272 (518)793-7444 Ext.20 Joseph.Caricari @crbard.com eward@hjhllc.com Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Open Offices&Conf.Rm.(Common Space Types:Office-Open Plan) 1015 0.98 995 1 Total Allowed Watts= 995 Proposed Interior Lighting Power A B C D E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Open Offices&Conf. Rm..(Common Space Types:Office-Open Plan 1015 sq.ft.) LED 1:LED Other Fixture Unit 36W: 1 24 34 816 Total Proposed Watts= 816 Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2015 IECC requirements in COMcheck Version 4.1.1.0 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. 1 E2...M9R40 -S: (,-)A Rie) E(. Name Title Signature Date FILE COPY i REVIEWED FOR ENERGY CODE COMPLIANCE Project Title: Bldg. 1 Restroom Removal Renovation Report date: 06/19/19 Data filename: P:\31\31004-Building 01 Manufacturing and Transition Area Page 1 of 5 Upgrade\Documents\Electrical\Lighting\Bldg 1 Restroom Removal-Renovation.cck I i Y COMcheck Software Version 4.1.1.0 \( 111 Inspection Checklist Energy Code: 2015 IECC lirrill Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID _ — --- --- C103.2 Plans, specifications, and/or Complies Requirement will be met. [PR4]1 calculations provide all information ❑Does Not with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 1 2 T Medium Impact(Tier 2) 3 Low Impact(Tier 3) —1 Project Title: Bldg. 1 Restroom Removal Renovation Report date: 06/19/19 Data filename: P:\31\31004-Building 01 Manufacturing and Transition Area Page 2 of 5 Upgrade\Documents\Electrical\Lighting\Bldg 1 Restroom Removal- Renovation.cck I Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.1 Lighting controls installed to uniformly Complies Requirement will be met. [EL15]' reduce the lighting load by at least DDoes Not 50%. ❑Not Observable ❑Not Applicable C405.2.1 Occupancy sensors installed in Complies Requirement will be met. [EL18]1 required spaces. Does Not ❑Not Observable ❑Not Applicable C405.2.1, Independent lighting controls installed Momplies Requirement will be met. C405.2.2. per approved lighting plans and all ❑Does Not 3 manual controls readily accessible and [EL23]2 visible to occupants. ❑Not Observable ❑Not Applicable C405.2.2 Automatic controls to shut off all Complies Requirement will be met. 1 building lighting installed in all ODoes Not [EL22]2 buildings. ❑Not Observable ONot Applicable C405.2.3 Daylight zones provided with ❑Complies Exception: Requirement does not apply. [EL16]2 individual controls that control the ❑Does Not lights independent of general area ot Observable lighting. Oislot Applicable C405.2.3, Primary sidelighted areas are DComplies Exception: Requirement does not apply. C405.2.3. equipped with required lighting ❑Does Not 1, controls. C405.2.3. ❑Not Observable 2 ZNot Applicable [EL20]1 C405.2.3, Enclosed spaces with daylight area ❑Complies Exception: Requirement does not apply. C405.2.3. under skylights and rooftop monitors ❑Does Not 1, are equipped with required lighting C405.2.3. controls. ['Not Observable 3 'Not Applicable [EL21]1 C405.2.4 Separate lighting control devices for ❑Complies Requirement will be met. [EL4]1 specific uses installed per approved ❑Does Not lighting plans. [Not Observable ,Eslot Applicable C405.2.4 Additional interior lighting power ❑Complies Requirement will be met. [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is nNot Observable automatically controlled and separated from general lighting. ONot Applicable C405.3 Exit signs do not exceed 5 watts per ,Complies Requirement will be met. [EL6]1 face. ❑Does Not :Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) r 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bldg. 1 Restroom Removal Renovation Report date: 06/19/19 Data filename: P:\31\31004-Building 01 Manufacturing and Transition Area Page 3 of 5 Upgrade\Documents\Electrical\Lighting\Bldg 1 Restroom Removal- Renovation.cck Section # Final Inspection Complies? Comments/Assumptions & Req.ID C303.3, Furnished O&M instructions for Complies Requirement will be met. C408.2.5. systems and equipment to the ❑Does Not 2 building owner or designated [FI17]3 representative. ❑Not Observable ❑Not Applicable C405.4.1 Interior installed lamp and fixture . .Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting plans,demonstrating proposed watts ❑Not Observable are less than or equal to allowed ❑Not Applicable watts. C408.2.5. Furnished as-built drawings for omplies Requirement will be met. 1 electric power systems within 90 days ❑Does Not [FI16]3 of system acceptance. DNot Observable ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies Requirement will be met. [FI33]1 ensure proper calibration, adjustment, ❑Does Not programming, and operation. NINot Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Bldg. 1 Restroom Removal Renovation Report date: 06/19/19 Data filename: P:\31\31004-Building 01 Manufacturing and Transition Area Page 4 of 5 Upgrade\Documents\Electrical\Lighting\Bldg 1 Restroom Removal-Renovation.cck ja ■ Project Title: Bldg. 1 Restroom Removal Renovation Report date: 06/19/19 Data filename: P:\31\31004-Building 01 Manufacturing and Transition Area Page 5 of 5 Upgrade\Documents\Electrical\Lighting\Bldg 1 Restroom Removal- Renovation.cck