Resolutions Town of QUEENSBURY
ZONING REFERAL FORM
I
I
SBL # . . . . . . . . . 123 . -1-21 Owner. . BRANSON, MARK
File # 1 . . . . . . Sub. 2-1998 Agent . . VAN DUSEN & STEVES
File # 2 . . . . . . Subdiv.
File # 3 . . . . . . P.U.D.
Applicant GEREAU, WILLIAM & LISA
Loc . CLENDON BROOK/TUTHILL
Application Type ZONE Lot Size 44 .50 acre Zone RR-5A
Project Desc ./Comments : 44 .50 ac . into 5 lots of 5 . 02/5 . 02/5, 13/5 . 01/27 .44
Class A subvision/APA
As per Sect : of the SUBDIV REG
SETBACKS EXISTING PROPOSED REQUIRED
Front Yard
Front (if corner)
Side Yard (1)
Side Yard (2)
Rear Yard
Rear Yard2
Width
Depth
MEETS DEPTH, WIDTH & SQ FOOTAGE REQUIREMENTS Y/N/U COMMENTS
PREEXISTING, NONCONFORMING LOT WITH PROPER SETBACKS
REQUIRED ROAD FRONTAGE ON PUBLIC ROAD
HAS REQUIRED OFF-STREET PARKING
PERMEABLE AREA IS ADEQUATE
BUILDING DOES NOT EXCEED MAX HEIGHT
REQUIRED SETBACKS FROM STREAM, LAKE A/0 TRAVEL COOR
BUFFER ZONES REQUIRED
IS LOT IN A FLOOD PLAIN ZONE?
Review Required by Zoning Board of Appeals :
Action File Number Res . Date WP File
Review Required by Planning Board:
Action File Number Res . Date WP File
SUBDIVISION Sub. 2-1998 06/18/1998 SUB2 . 98F
Reviewed by Staff :
Init Date Comments
MOTION TO APPROVE SUBDIVISION NO 2-1998 FINAL STAGE WILLIAM &
LISA GEREAU, Introduced by Robert Vollaro who moved for its
adoption, seconded by George Stark:
As per the written resolution, per the plan revised 6/15/98 and
received in the Planning Office 6/18/98 .
Whereas, the Town Planning Board is in receipt of Subdivision No.
2-1998 WILLIAM & LISA GEREAU, Final Stage for a five lot cluster
subdivision of 5 . 02 ac. , 5 . 02 ac . , 5 .13 ac . , 5 . 01 ac . , and 27 .44 ac
parcel ; and
Whereas, the above mentioned application, received 4/29/98 consists
of the following:
1 . Final Stage application
2 . Maps - S-1, D-1 dated 4/27/98
Whereas, the above file is supported with the following
documentation:
1 . 5/15/98 - Rist Frost comments
2 . 5/19/98 - Staff Notes
3 . 5/19/98 - Planning Bd. resolution
4 . 5/20/98 - Letter to M. Steves from L. Nowicki
5 . 5/27/98 - Rec'd revised Long EAF, maps Ss-1 revised 5/26/98,
D-1 revised 5/27/98
6 . 6/10/98 - Fax to C. Round from T. Nace in response to R/F
notes
7 . 6/10/98 - Rist Frost Comments
8 . 6/15/98 - Rist Frost Comments
Whereas, a public hearing was held on 5/19/98 and 6/18/98; and
Whereas, the Planning Board has determined that the proposal
complies with the subdivision requirements of the Code of the Town
of Queensbury (Zoning) ; and
Whereas, the Planning Board has considered the environmental
factors found in the Code of the Town of Queensbury (Zoning) ; and
Whereas, the requirements of the State Environmental Quality Review
Act have been considered; and
Therefore, Let It Be Resolved, as follows :
1 . The Town Planning Board, after considering the above, hereby
moves to Approve Subdivision No. 2-1998, Final Stage, WILLIAM
& LISA GEREAU.
2 . The applicant agrees to the conditions set forth in t1jis
resolution.
3 . The conditions shall be noted on the map.
4 . The issuance of permits is conditioned on compliance and
continued compliance with the Zoning Ordinance and subdivision
approval process .
5 . Engineering fees to be paid prior to a building permit being
issued.
6 . Recreation fees to be paid with submission of a building
permit application.
Duly adopted this 18th day of June, 1998, by the following vote:
AYES : Mr. Vollaro, Mr. Ringer, Mr. Paling, Mr. Stark,
Mrs . LaBombard, Mr. MacEwan
NOES : NONE
ABSENT: Mr. Brewer
(Additions to prepared resolution a summary, due to problems with
tape)
MOTION TO APPROVE SUBDIVISION NO 2-1998 PRELIMINARY STAGE FOR
WILLIAM & LISA GEREAU, Introduced by Robert Vollaro who moved for
its adoption, seconded by Catherine LaBombard:
As per the written resolution, per the plan revised 6/15/98 and
received in the Planning Office 6/18/98 .
Whereas, the Town Planning Board is in receipt of Subdivision No.
2-1998 WILLIAM & LISA GEREAU, Preliminary Stage for a five lot
cluster subdivision of 5 . 02 ac . , 5 . 02 ac . , 5 . 13 ac . , 5 .01 ac . and
27 .44 ac. parcel ; and
Whereas, the above mentioned application, received 4/29/98 consists
of the following:
1 . Preliminary Stage Application
2 . Maps - S-1, D-1 dated 4/27/98
Whereas, the above file is supported with the following
documentation:
1 . 5/15/98 - Rist Frost comments
2 . 5/19/98 - Staff Notes
3 . 5/19/98 - Planning Bd. resolution
4 . 5/20/98 - Letter to M. Steves from L. Nowicki
5 . 5/27/98 - Rec'd revised Long EAF, maps S-1 revised 5/26/98, D-
1 revised 5/27/98
6 . 6/10/98 - Fax to C. Round from T. Nace in response to R/F
notes
7 . 6/10/98 - Rist Frost comments
8 . 6/15/98 - Rist Frost comments
Whereas, a public hearing was held on 5/19/98 and 6/18/98 ; and
Whereas, the Planning Board has determined that the proposal
complies with the subdivision requirements of the Code of the Town
of Queensbury (Zoning) ; and
Whereas, the Planning Board has considered the environmental
factors found in the Code of the Town of Queensbury (Zoning) ; and
Whereas, the requirements of the State Environmental Quality Review
Act have been considered; and
Therefore, Let It Be Resolved, as follows :
1 . The Town Planning Board, after considering the above, hereby
moves to APPROVE Subdivision No. 2-1998, Preliminary Stage WILLIAM
& LISA GEREAU.
2 . The applicant agrees to the conditions set forth in this
resolution.
3 . The conditions shall be noted on the map.
4 . The issuance of permits is conditioned on compliance and
contined compliance with the Zoning Ordinance and subdivision
approval process .
5 . Engineering fees to be paid prior to a building permit being
issued.
6 . Recreation fees to be paid with submission of a building
permit application.
Duly adopted this 18th day of June 1998 by the following vote:
AYES : Mrs . LaBombard, Mr. Vollaro, Mr. Ringer, Mr. Paling,
Mr. Stark, Mr. MacEwan
NOES : NONE
ABSENT: Mr. Brewer
MOTION TO TABLE PRELIMINARY STAGE SUBDIVISION NO, 2-1998 WILLIAM
& LISA GEREAU, Introduced by Catherine LaBombard who moved for its
adoption, seconded by Robert Vollaro:
Number One, to revise the plan to five acres lots, to allow for
some kind of a buffering stipulation on those lots, to have it be
determined by the Zoning Administrator if a stormwater management
plan is needed, and what the future intent is going to be of those
30 acres that are left over, and compliance with the Rist-Frost
letter that is dated May 15, 1998, and to delineate all the other
land hooks or land parcels that are left over, and give us some
specifics on the lot clearing limits .
Duly adopted this 19th day of May, 1998, by the following vote:
AYES : Mr. Ringer, Mr. Paling, Mrs . LaBombard, Mr. Vollaro,
Mr. MacEwan
NOES : NONE
ABSENT: Mr. Brewer, Mr. Stark
**** 6/18/98