Loading...
ResCheck a ryi REScheck Software Version 4.6.4 u) cnmN Compliance Certificate o " o al o � � 3 = I" 70, N N Ul Project FoothillsBuilders Inc - m § CO o�ec es D IEJUN � No. m11] 0Energy Code: 2015 IECC VJLocation: Glens Falls, New York 2 20,19 a a. l Construction Type: Single-family _ N I"' n Project Type: New Construction rw` 0 n Conditioned Floor Area: 2,346 ft2 TOWN OF QUEENSBURY O Glazing Area 12% BUILDING&CODES f W Climate Zone: 6 (7635 HDD) t0 Permit Date: 0 1,4 Permit Number: . 0 N N Construction Site: Owner/Agent: Designer/Contractor: i'' t0 John Clendon Drive Daniel W. Ryan P.E. Lot#7 206 Glen Street Queensbury, NY 12804 Ste 30 Glens Falls, NY 12801 518-792-9264 ompliance: Passes using UA trade-off Compliance: 0.0%Better Than Code Maximum UA: 307 Your UA: 307 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Envelope Assemblies Gross Area Cavity Cont. Assembly or R-Value R-Value U-Factor UA Perimeter Ceiling 1: Raised or Energy Truss 1,072 49.0 0.0 0.020 21 Ceiling 2: Cathedral Ceiling 209 21.0 0.0 0.048 10 Wall 1: Wood Frame, 16" o.c. 1,287 21.0 0.0 0.057 62 Window 1: Vinyl/Fiberglass Frame:Double Pane with Low-E 113 0.290 33 Door 1: Solid 20 0.240 5 Door 2: Solid 18 0.140 3 Door 3: Glass 40 0.290 12 Wall 2: Wood Frame, 16" o.c. 1,262 21.0 0.0 0.057 64 Window 2:Vinyl/Fiberglass Frame:Double Pane with Low-E 142 0.290 41 Floor 1: All-Wood Joist/Truss:Over Outside Air 24 30.0 0.0 0.033 1 Floor 2: All-Wood Joist/Truss:Over Unconditioned Space 317 30.0 0.0 0.033 10 Basement Wall 1: Solid Concrete or Masonry 1,076 0.0 19.0 0.038 40 Wall height: 7.8' Depth below grade: 7.0' Insulation depth: 7.8' Window 3:Vinyl/Fiberglass Frame:Double Pane with Low-E 16 0.290 5 Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 1 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck t , Compli•nc• Statement: The proposed building design described here is consistent with the building plans, specifications, and other calc atio s submitted with the permit application.The proposed . ' .ing has been designed to meet the 2015 IECC re irements in RE ,chec Version 4.6.4 and to co • with the mandatory re. ' nts listed in the REScheck Inspection Checkli . "'me U • - •re — a - cam { 77 RO\z 1`e,;, to ,....... FESSIOP\-' Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 2 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck REScheck Software Version 4.6.4 4 i" Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions & Req.ID 103.1, Construction drawings and ❑Complies 103.2 documentation demonstrate ❑Does Not [PR1]1 energy code compliance for the kt building envelope.Thermal [Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR311 lighting and mechanical systems. ❑Not Observable - Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. 302.1, Heating and cooling equipment is Heating: Heating: ❑Complies 403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not [PR212 on loads calculated per ACCA Cooling: Cooling: Manual J or other methods ❑Not Observable Btu/hr Btu/hr approved by the code official. ❑Not Applicable Additional Comments/Assumptions: 1 !High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 3 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck Section Plans Verified Field Verified Foundation Inspection value Value Complies? Comments/Assumptions & Req.ID 402.1.1 Conditioned basement wall R- R- ❑Complies See the Envelope Assemblies (F04]1 insulation R-value. Where interior R_ R- ❑Does Not table for values. insulation is used,verification ❑Not Observable may need to occur during Insulation Inspection. Not ENot Applicable required in warm-humid locations in Climate Zone 3. 303.2 Conditioned basement wall ❑Complies [FO5]1 insulation installed per ElDoes Not manufacturer's instructions. ['Not Observable ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [F06]1 insulation depth of burial or ❑Does Not table for values. , distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed ❑Complies [F011]2 to protect exposed exterior ❑Does Not insulation and extends a ❑Not Observable minimum of 6 in. below grade. ONot Applicable 403.9 Snow-and ice-melting system ElComplies [F012]2 controls installed. ❑Does Not 4s ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) i 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 4 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck •Section Plans Verified Field Verified # Framing/ Rough-In Inspection Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Door U-factor. U- U- ElComplies See the Envelope Assemblies 402.3.4 EDoes Not table for values. [FR1]1 ENot Observable ENot Applicable 402.1.1, Glazing U-factor(area-weighted U- , U- ElComplies See the Envelope Assemblies 402.3.1, average). ❑Does Not table for values. 402.3.3, 402.3.6, ❑Not Observable 402.5 ENot Applicable [FR2]' 303.1.3 U-factors of fenestration products ElComplies [FR4]1 are determined in accordance ❑Does Not with the NFRC test procedure or taken from the default table. ['Not Observable ENot Applicable 402.4.1.1 Air barrier and thermal barrier ElComplies [FR23]1 installed per manufacturer's ❑Does Not instructions. [Not Observable ENot Applicable 402.4.3 Fenestration that is not site built ElComplies [FR20]1 is listed and labeled as meeting ❑Does Not AAMA/WDMA/CSA 101/1.5.2/A440 or has infiltration rates per NFRC [Not Observable 400 that do not exceed code ENot Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ElComplies [FR16]2 sealed at housing/interior finish ❑Does Not and labeled to indicate 52.0 cfm leakage at 75 Pa. ENot Observable ❑Nat Applicable 403.2.1 Supply and return ducts in attics ElComplies [FR12]1 insulated >= R-8 where duct is ❑Does Not >= 3 inches in diameter and >= ❑Not Observable R-6 where < 3 inches. Supply and return ducts in other portions of ENot Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.3.5 Building cavities are not used as ElComplies [FR15]3 ducts or plenums. ❑Does Not ❑Not Observable ENot Applicable 403.4 HVAC piping conveying fluids R- R- ElComplies [FR17]2 above 105 °F or chilled fluids ❑Does Not below 55 °F are insulated to >R- J ['Not Observable 3. ENot Applicable 403.4.1 Protection of insulation on HVAC ElComplies [FR24]i piping. ❑Does Not x [Not Observable ENot Applicable 403.5.3 Hot water pipes are insulated to R- R ❑Complies [FR18]2 >_R-3. ElDoes Not ENot Observable ❑Not Applicable 403.6 Automatic or gravity dampers are ❑Complies [FR19]2 installed on all outdoor air ❑Does Not intakes and exhausts. ❑Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 5 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck Additional Comments/Assumptions: ' 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1 Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 6 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck • Section Plans Verified Field Verified Insulation Inspection Value Value Complies? Comments/Assumptions & Req.ID 303.1 All installed insulation is labeled EComplies [IN13]2 or the installed R-values ❑Does Not provided. ENot Observable ENot Applicable 402.1.1, Floor insulation R-value. R- R- EComplies See the Envelope Assemblies 402.2.6 ❑ Wood ❑ Wood ❑Does Not table for values. [IN1]1 ❑ Steel ❑ Steel ENot Observable ENot Applicable 303.2, Floor insulation installed per EComplies 402.2.7 manufacturer's instructions and EDoes Not [IN2]1 in substantial contact with the underside of the subfloor, or floor ['Not Observable framing cavity insulation is in ENot Applicable contact with the top side of sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. 402.1.1, Wall insulation R-value. If this is a R- R- ❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass ❑Not Observable [IN3]1 exterior,the exterior insulation requirement applies(FR10). Steel ❑ Steel ENot Applicable 303.2 Wall insulation is installed per EComplies [IN4]1 manufacturer's instructions. ❑Does Not ENot Observable ❑Not Applicable Additional Comments/Assumptions: 1 i High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 7 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck Section Plans Verified Field Verified • Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 402.1.1, Ceiling insulation R-value. R- R- ['Complies See the Envelope Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel [Not Observable 402.2.6 [FI1]1 ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies 303.2 manufacturer's instructions. ❑Does Not [F121' Blown insulation marked every 300 ft2. ['Not Observable ❑Not Applicable 402.2.3 Vented attics with air permeable ElComplies [FI22]2 insulation include baffle adjacent ❑Does Not to soffit and eave vents that extends over insulation. ❑Not Observable ❑Not Applicable 402.2.4 Attic access hatch and door R- R- ❑Complies [F13]1 insulation ?R-value of the ❑Does Not adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ['Not Observable ❑Not Applicable 403.2.3 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies [F14]1 cfm/100 ft2 across the system or ft2 ft2 DDoes Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in ❑Not Observable tests, verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies [F127]1 determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g.across the system including the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g.across the entire system including the manufacturer's air handler enclosure. 403.3.2.1 Air handler leakage designated ❑Complies [F124]1 by manufacturer at<=2%of ❑Does Not design air flow. ['Not Observable ❑Not Applicable 403.1.1 Programmable thermostats ❑Complies [F19)2 installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to ❑Not Observable code specifications. [hot Applicable 403.1.2 Heat pump thermostat installed ❑Complies [FI10J2 on heat pumps. ❑Does Not ['Not Observable ENot Applicable 403.5.1 Circulating service hot water EComplies [FI11J2 systems have automatic or ❑Does Not accessible manual controls. [Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 8 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck • Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 403.6.1 All mechanical ventilation system ❑Complies (1125]2 fans not part of tested and listed ❑Does Not HVAC equipment meet efficacy and air flow limits. [Not Observable ❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies [F12612 through one-or two-pipe heating ❑Does Not systems have outdoor setback control to lower boiler water [Not Observable temperature based on outdoor ENot Applicable temperature. 403.5.1.1 Heated water circulation systems ❑Complies (1128]2 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply ❑Not Observable pipe. Gravity and thermos- ❑Not Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies [F12912 comply with IEEE 515.1 or UL ❑Does Not 515. Controls automatically adjust the energy input to the ['Not Observable heat tracing to maintain the ENot Applicable desired water temperature in the piping. 403.5.2 Water distribution systems that ❑Complies [F130]2 have recirculation pumps that ❑Does Not pump water from a heated water supply pipe back to the heated Not Observable water source through a cold ❑Not Applicable water supply pipe have a demand recirculation water system. Pumps have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to 104°F. • 403.5.4 Drain water heat recovery units ❑Complies [FI3112 tested in accordance with CSA ❑Does Not B55.1. Potable water-side pressure loss of drain water heat [Not Observable recovery units < 3 psi for ENot Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. _ 404.1 75%of lamps in permanent ❑Complies [F16]' fixtures or 75%of permanent ❑Does Not fixtures have high efficacy lamps. Does not apply to low-voltage ENot Observable lighting. ENot Applicable 404.1.1 Fuel gas lighting systems have ❑Complies [F123]3 no continuous pilot light. Oboes Not 4.3, ENot Observable ❑Not Applicable 11 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 9 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck Section Plans Verified Field Verified Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID 401.3 Compliance certificate posted. ❑Complies [F17]2 EDoes Not ['Not Observable ❑Not Applicable 303.3 Manufacturer manuals for ❑Complies [F11813 mechanical and water heating ❑Does Not systems have been provided. [Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Foothills Builders Inc Report date: 06/07/19 Data filename: C:\Users\DWR Desktop\Dropbox\DWRPE Engineering\Active Projects\1443 - DES - FHB Page 10 of10 Lot 7 John Clendon Dr\1443 ResCheck.rck A . i CI 20 I Efficie15ncyCG Energy Certificate Insulation Rating R-Value Above-Grade Wall 21.00 Below-Grade Wall 19.00 Floor 30.00 Ceiling / Roof 49.00 Ductwork (unconditioned spaces): Glass&Door Rating U-Factor SHGC Window 0.29 Door 0.29 Heating& Cooling Equipment Efficiency Heating System: Cooling System: Water Heater: Name: Date: Comments