Loading...
Signed Inspection Report (09-16-2019).pdfINSPECTION WORKSHEET (BINS-005922-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0625-2018 Case Module:Permit Inspection Date:Mon Sep 16, 2019 Inspection Status:Partial Pass Inspector:Mark Smith Inspection Type:Building Foundation Job Address:Parcel Number:154 CLEVERDALE RD Queensbury, NY 12804 227.17-2-30 Contact Type Company Name Name Engineer Environmental Design Partnership, LLC Applicant JEAN HOFFMAN Primary Owner Stonewood Development of Northeastern NY Inc Concrete Contractor R. C. Springer Concrete Contractor Stonewood Development of Northeastern NY Inc Granted Permission JEAN HOFFMAN Architect Tim McLaughlin Checklist Item Status Building Inspector Notes Failed 8/6/19 Footings Partial Approval - House and Garage Footings 8/14/19 foundation walls for main house approved NOTE: 8/27/19 inspection was for waterproofing/backfill/footing drains- observed no egress window @ foundation had been formed in. Leave area where window/egress will be free of backfill until egress cut in. Verified that egress window is required as door leading to exterior 9/16/19 poly under slab verified, footings for front porch approved Footings Passed 8/6/19 Footings Partial Approval Sep 16, 2019 Page (1) INSPECTION WORKSHEET (BINS-005922-2019) Checklist Item Status - House and Garage Footings 9/16/19 footings for front porch approved, 2rows of # 4 rebar horizontal continuous, vertical dowels to be wet set. Piers Failed Monolithic Slab Failed Reinforcement in Place Passed 8/6/19 Footings Partial Approval - House and Garage Footings Reinforcement in Place Passed 2 rows of # 4 rebar horizontal continuous one foot from top and bottom of wall Footing Dowels or Keyway in place Passed 8/6/19 Footings Partial Approval - House and Garage Footings # 4 rebar 48" on center one foot down from top of wall Foundation Dampproofing Failed Foundation Waterproofing Passed 8/27/19 Footing Drain Daylight or Sump Passed 8/27/19 Footing Drain Stone - 12 inch width Passed 8/27/19 Footing Drain stone - 6 mil poly Passed Fabric Sep 16, 2019 Page (2) INSPECTION WORKSHEET (BINS-005922-2019) Checklist Item Status Plumbing Under Slab Failed PVC / Cast / Copper Failed Foundation Insulation Interior / Exterior Passed Exterior 1/2" blue foam Rough Grade 6 inch drop within 10 ft.Failed Poly Under Slab Failed Sep 16, 2019 Page (3) Smith, Mark