signed inspection slipINSPECTION WORKSHEET (SEP-000612-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:SEP-0580-2018 Case Module:Permit
Inspection Date:Thu May 9, 2019 Inspection Status:Partial Pass
Inspector:John O'Brien Inspection Type:Septic
Job Address:Parcel Number:3 BAYBERRY CT
Queensbury, NY 12804
296.12-1-7
Contact Type Company Name Name
Contractor Rob Lanfear Excavating
Granted Permission Rob Lanfear Excavating
Primary Owner Turley, Leo
Engineer Rucinski-Hall Architecture
Applicant Rob Lanfear Excavating
Checklist Item Passed Comments
Building Inspector Notes NO 11/13/18 Septic System Partial Approval
Remaining Items:
- Stabilization of mound with vegetation (Lawn)
- Submit Engineer's Final Approval and as-built.
12/4/18 Septic System Partial Approval
- Received Ethan Hall's Final Approval Letter and As-Built
5/9/19 Septic System Partial Approval
Remaining Item:
- Stabilization of mound with vegetation (Lawn)
Type of Water: Municipal / Well Water YES Municipal
Absorbtion Fields: Total Length YES 270'
Length of Each Trench YES 6@45'
May 09, 2019 Page (1)
INSPECTION WORKSHEET (SEP-000612-2019)
Checklist Item Passed Comments
Depth of Trenches YES 18"
Size of Stone YES #2
Building to Tank YES -Existing sanitary from house to existing septic tank
- 4" sch40 pvc Existing Septic Tank to new Effluent Pump
Chamber.
Tank to Distribution Box YES - 2" pumpline to 4" pvc From Pump Tank to distribution box.
Distribution box to Field / Pit YES 4" pvc to 4" pvc perforated
Foundation to Tank YES Existing Septic Tank
Foundation to Absorption YES 60'+
Engineer Report and As-Built YES 11/13/18 Septic System Partial Approval
Remaining Items:
- Stabilization of mound with vegetation (Lawn)
- Submit Engineer's Final Approval and as-built.
12/4/18 Septic System Partial Approval
- Received Ethan Hall's Final Approval Letter and As-Built
Location of system on property YES Rear left side
May 09, 2019 Page (2)
INSPECTION WORKSHEET (SEP-000612-2019)
Checklist Item Passed Comments
System Use Status NO 11/13/18 Septic System Partial Approval
Remaining Items:
- Stabilization of mound with vegetation (Lawn)
- Submit Engineer's Final Approval and as-built.
12/4/18 Septic System Partial Approval
- Received Ethan Hall's Final Approval Letter and As-Built
Remaining Items:
- Stabilization of mound with vegetation (Lawn)
5/9/19 Septic System Partial Approval
Remaining Item:
- Stabilization of mound with vegetation (Lawn)
May 09, 2019 Page (3)
O'Brien, John (Inspector)