Loading...
4.01 4.1 SERVICES\\Barton & Loguidice – Traffic Signal at Bay and Quaker & Transfer From #64 – 10-7-19 RESOLUTION ENGAGING ENGINEERING SERVICES OF BARTON & LOGUIDICE, P.C., RELATED TO TRAFFIC SIGNAL DESIGN AT INTERSECTIONS OF BAY AND QUAKER ROADS AND GLENWOOD AVENUE AND QUAKER ROAD RESOLUTION NO.: __________________________________________________, 2019 INTRODUCED BY: __________________________________________________ SECONDED BY: ___________________________________________________ WHEREAS, by Resolution No.: 15,2017, the Queensbury Town Board authorized establishment of Traffic Signal Capital Project Fund #215 providing for the installation and upgrading of Town traffic signals in the Town of Queensbury, and WHEREAS, the Town Board wishes to engage the engineering services of Barton & Loguidice, P.C., (B&L) related to the design of traffic signals at the intersections of Bay and Quaker Roads and Glenwood Avenue and Quaker Road (Project) for an amount not to exceed $20,977 as delineated in a copy of B&L’s September 9, 2019 letter proposal presented at this meeting, and WHEREAS, the Town Board wishes to authorize such Project, with funding to be from Capital Reserve #64, and WHEREAS, in accordance with New York State General Municipal Law §6(c), the Town Board is authorized to withdraw and expend funds from Capital Reserve #64 subject to permissive referendum, 1 NOW, THEREFORE, BE IT RESOLVED, that the Queensbury Town Board hereby authorizes and directs engagement of Barton & Loguidice, P.C. for the provision of engineering services related to the design of traffic signals at the intersections of Bay and Quaker Roads and Glenwood Avenue and Quaker Road (Project) for an amount not to exceed $20,977 as delineated in a copy of B&L’s September 9, 2019 letter proposal presented at this meeting, to be paid from Capital Project Fund #215, and BE IT FURTHER, RESOLVED, that the Town Board hereby finds that the withdrawal and expenditure for such Project is an expenditure for a specific capital project and/or certain maintenance project for which the Capital Reserve Account #64 was established, and BE IT FURTHER, RESOLVED, that the Town Board hereby authorizes the Town Budget Officer to take all actions necessary to amend the Town Budget and effectuate the transfer from Reserve No.: 64 in the amount of $20,977 to Capital Construction Account No.: 215-3310-2899, and BE IT FURTHER, RESOLVED, that the Town Board further authorizes and directs the Town Supervisor to sign any needed Agreements and/or documentation and the Town Supervisor, Highway Superintendent and/or Town Budget Officer to take such other and further action necessary to effectuate all terms of this Resolution, and BE IT FURTHER, RESOLVED, that this Resolution is subject to a permissive referendum in accordance with the 2 provisions of Town Law Article 7 and the Town Board hereby authorizes and directs the Town Clerk to publish and post such notices and take such other actions as may be required by law. th Duly adopted this 7 day of October, 2019, by the following vote: AYES : NOES : ABSENT: 3 Barton September 9, 2019 Mr.John Strough Town Supervisor Town of Queensbury 742 Bay Road Queensbury, NY 12804 Re: Proposal for Engineering and Construction Phase Services Subj: Bay Road and Quaker Road Traffic Signal File: 703.3572 Dear Supervisor Strough: Barton & Loguidice (B&L) is pleased to offer you a Proposal for the Design of a traffic signal at the intersections of Bay Road/Quaker Road and Glenwood Avenue/Quaker Road. We look forward to continuing our work with you to improve the Quaker Road corridor. Attached to this letter is our proposed scope of services,technical assumptions,anticipated project schedule, and cost proposal to conduct the requested traffic signal design services. The scope of work outlines a project approach that corresponds to the included cost proposal. B&L proposes to complete the project on a time plus expense basis for a maximum fee of Twenty Thousand Nine Hundred Seventy Seven Dollars($20,977). Should you have any questions related to the enclosed materials, pleased contact me. Sincerely, BAR N & LOGUIDICE, D.P.C. Rob . Si zner, P.E. Vice President D1 R/ The experience to listen ,, The power to ,�-1_. F . .� .x . 5; o„u,,_-_.,, solve ® • Mr.John Strough Bay Rd./Quaker Rd. and Glenwood Ave./Quaker Rd.Traffic Signals September 9, 2019 Page2of5 7 Scope of Services B&L will provide the following scope of services to complete the traffic signal design at the intersections of Bay Road/Quaker Road and Glenwood Avenue/Quaker Road: 1. General and Administration a. Upon receipt of notice to proceed, B&L will attend an informational gathering/kick-off meeting with the Town to confirm the scope of work,schedule,and the existing issues with the traffic signals. 2. Data Collection a. B&L completed the necessary engineering data collection activities for the Bay Road/Quaker Road intersection through the Town's Signal Evaluation study in 2019. It is assumed no further effort under this phase is necessary at this intersection by B&L. b. Topographic survey and base mapping for the Glenwood Avenue/Quaker Road intersection will be completed by our proposed sub-consultant,Azimuth Surveying& Cartography. c. It is assumed that survey base mapping for the Bay Road/Quaker Road intersection will be provided by the Warren County DPW. Warren County is completing a federal aid project to replace the three culverts just north of the intersection and is currently in the process of completing ground survey that includes the signal project area. d. Research deeds and maps of record for the right-of-way boundary at the Glenwood Avenue/Quaker Road intersection in the Warren County Clerk's Office,Warren County DPW, and at the NYSDOT. e. Contact Dig Safe New York for design tickets and coordinate with town personnel for marking and/or utility record mapping. f. Perform topographic survey of the intersection site including 100 ft. along each intersection approach as measured from the center of the intersection. g. Set vertical and horizontal control on the Glenwood Avenue/Quaker Road site. h. Prepare existing conditions basemapping of the Glenwood Avenue/Quaker Road site. 3. Preliminary Design: a. The Draft submittal(assumed 75%stage) will include: i. Title Sheet ii. General Notes iii. Maintenance and Protection of Traffic iv. General Plans v. Preliminary Construction Cost Estimate b. The Draft plans will be submitted to the Town and Warren County DPW for review. c. B&L will meet with the Town (and representatives of Warren County,at the request of the Town)to review the Draft submittal, prior to developing the Final construction documents. Comments received will be incorporated,as appropriate, into the final design package. 4. Final Design: a. The Final submittal (100%o complete)will include: i. Title sheet • • Mr.John Strough Bay Rd./Quaker Rd. and Glenwood Ave./Quaker Rd.Traffic Signals September 9, 2019 Page 3 of 5 ii. General notes, index, legends, and abbreviations iii. Table of estimated quantities iv. Maintenance and Protection of Traffic plans and details v. General Plans including locations of signal poles, heads, pullboxes, conduits, detectors,controllers, and striping modifications(with and without pedestrian accommodations) vi. Miscellaneous Details and Tables including timing plan,table of operations, and wiring diagram vii. Contract bid documents viii. Final construction cost estimate 5. Bid and Award a. Addressing potential bidder questions b. Issuing addendum(s) c. Reviewing bids d. Providing award recommendation to the Town. 6. Construction a. Construction administration b. Submittal review/approval c. Periodic on-site observation d. Development of record plans. Technical Assumptions B&L has made the following technical assumptions associated with our fee proposal to complete the scope of services: 1. Assume one (1) kick-off meeting and site visit with the Town. 2. It is assumed that traffic data collection will not be required. 3. Two(2) plan submittals(draft and final)are included. 4. Design will be in English units on 11"x17" plans. 5. Proposed improvements can be completed within existing right-of-way. Right-of-way acquisition or easement maps are not included at this time. 6. Preliminary plans will be sent to utilities as needed for review of potential conflicts. The design of utility relocations is not included, however, location by survey and UFPO is included. 7. Design will be in compliance with the New York State Standard Sheets and Specifications, Manual on Uniform Traffic Control Devices(MUTCD),and the New York State Supplement to the MUTCD, unless otherwise indicated. S. Coordination with state/federal agencies or regulatory authority is not included. 9. Coordination with Warren County DPW is included for their review and concurrence with the draft and final plan submissions prior to construction. 10. It is assumed that environmental permitting is not required. 11. Bid documents will be provided in PDF format on Compact Discs. 12. It is assumed that the project will be bid as one (1)construction project that includes both signalized intersections. 4 Mr.John Strough Bay Rd./Quaker Rd.and Glenwood Ave./Quaker Rd.Traffic Signals •• , September 9, 2019 Page 4of5 ' 13. Assume bid documents will include one(1) base bid and no alternate bid items. 14. Assume one(1) addendum for one (1)2-week bidding period 15. Assume a total construction duration of four(4) months. Actual construction duration is anticipated to be one(1) month on site,although it is noted that currently there is a 12 to 14 week lead time for delivery of traffic signal poles. 16. Construction administration includes one (1) pre-construction meeting with the contractor, monitoring of the contractor's adherence to the schedule, submittal and material review/approval, one(1)contractors payment recommendation, and interpretation and clarification of design plans and specifications. 17. Construction observation includes periodic part-time observation of the quality of work and general conformance with the contract documents. 18. Record plans will be completed in PDF and hard copy format. Assume one(1)full size and one (1) half size set of record plans. 19. Dig Safe New York will be contacted to provide underground utility location markings. 20. Public Right-of-Way will be included in the base mapping. It is assumed that the Town will provide any available subdivision maps or site plans to locate the highway boundary at the four corners of the intersection. Property boundary survey is not included. 21. Digital copies of design can be provided in AutoCAD or Microstation format, if requested. 22. Utility inverts will be provided by utility owner record plans. 23. Assume B&L standard boiler plate contract documents will be utilized for the bid documents. 24. Assume the Town will place the advertisement for bids Anticipated Project Schedule Design Contract Authorization September 2019 Survey October 2019 Draft Submittal November 2019 Final Submittal December 2019 Bidding January 2020 Construction Start March 2020 Construction Complete June 2020 Fee Estimate by Phase and Billing Rate Schedule For the general scope of services,technical assumptions, and anticipated project schedule presented above, B&L proposes to complete the project on a time plus expense basis for a maximum fee of Twenty Thousand Nine Hundred Seventy Seven Dollars($20,977). An itemized effort hour estimate and billing rate schedule is included in support of the fee not-to-exceed, including estimated reimbursable expenses. 4, Barton&Loguldice,D.P.C. Bay Road and Quaker Road Traffic Signal Design Detailed Fee Estimate and Billing Rate Table 9-Sep-19 Phase 1 Phase 3 Phase 5 Phase 2 Phase 4 Phase 6 General& Preliminary Bidding and Total Hours Billing Rate Total Amount Administration Data Collection Design Final Design Award Construction . Vice President 1 1 2 $220 $439.80 Managing Engineer 2 1 8 6 1 12 30 $149 $4,455 Sr.Project Engineer 4 16 8 1 4 33 $123 $4,059 Engineer II 4 24 20 2 6 56 $90 $5,040 Principal Engineering Technician 2 4 2 8 $110 $878 Project Administrator 2 2 $82 . $164 Senior Group Technical Assistant 4 4 $63 $252 B&L Total Hours 5 9 50 39 8 24 135 $15,289 B&LTotal Fee $681 $1,001 $5,536 $4,334 $704 $3,034 $15,289 Azimuth Surveying $5,500 $5,500 Direct Non-Salary Cost $31 $31 $31 $31 $31 $31 $189 Total Project Cost $713 $6,532 $5,567 $4,366 $735 $3,065 $20,977 Page 5 of 5