engineer's letter RUCINSKI HALL ARCHITECTURE
Ronald Richard Rucinski `oq-
Ethan Peter Hall G`�g -�
134 Dix Avenue AS BUILT Q-��G
Glens Falls NY 12801 P
Voice 518 741 0268
Fax 518 741 0274
Email ephall@nycap.rr.com
Fuchs Residence- Wood Point Lane O L� C E O Lf 1 r'�
13 September 2019 SEP 1 ?0�g
John O'Brien — Town of Queensbury Building Department TOWN OF D F=-Clcgt1RY
742 Bay Road BUILDWG & CODES
Queensbury NY 12804
Re: Final Installation of New Sewage Disposal System
At the above referenced project location this office observed the partial installation of the new stone
and pipe gravity bed prior to backfill on 11 September 2019. The final as-built measurements on 13
September 2019 were taken following the installation of the new septic tank and it was field verified
that there were no wells within 200 feet of the system. All adjoining properties draw water from the
Lake. These installations are acceptable to this office. If there are any questions please contact
our office to discuss.
Regards 4946,42
Et an Peter Hall i "` r' °i. .`', r
Architect