Loading...
engineer's letter RUCINSKI HALL ARCHITECTURE Ronald Richard Rucinski `oq- Ethan Peter Hall G`�g -� 134 Dix Avenue AS BUILT Q-��G Glens Falls NY 12801 P Voice 518 741 0268 Fax 518 741 0274 Email ephall@nycap.rr.com Fuchs Residence- Wood Point Lane O L� C E O Lf 1 r'� 13 September 2019 SEP 1 ?0�g John O'Brien — Town of Queensbury Building Department TOWN OF D F=-Clcgt1RY 742 Bay Road BUILDWG & CODES Queensbury NY 12804 Re: Final Installation of New Sewage Disposal System At the above referenced project location this office observed the partial installation of the new stone and pipe gravity bed prior to backfill on 11 September 2019. The final as-built measurements on 13 September 2019 were taken following the installation of the new septic tank and it was field verified that there were no wells within 200 feet of the system. All adjoining properties draw water from the Lake. These installations are acceptable to this office. If there are any questions please contact our office to discuss. Regards 4946,42 Et an Peter Hall i "` r' °i. .`', r Architect 1