Loading...
mechanical testing report • I Mechanical Testing Inc. ac- Testing Services For Indoor Environments AABC Commissioning - Grou • CR Bard Building 1 Renovations FIRM: CUSTOMER: MTI-Mechanical Testing,Inc. Eckert Mechanical Service Corp PROJECT#: 4 Chelsea Place,Suite 102 19-433 Clifton Park NY 12065 My Till PROJECT ADDRESS: PHONE: 289 Bay Road (518)450-7292 78 Queensbury NY 12804 FAX: D _ DATE: (518)450-7295 2019-09-24 SEP 2 6 20192. CONTACT: Tom Madigan Sustainable Solutions for TOWN OF QUEENSBURY BUILDING&CODES Efficient Environments AL,14 WMEN TM O PAP B�'o� ,I! O . N . OWNED •��, 15.O' . CERTIFIED BY I NATOENAL C O NCILENT"Pm" irpt‘vI.1. � This is to certify that Mechanical Testing, Inc. has balanced the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements of the Associated Air Balance Council and the results of these tests are herein recorded. MTI Sustainable Solutions for Efficient Environments 4 Chelsea PI,Suite 102 Clifton Park,NY 12065 Phone:518-450-7292 Fax:518-450-1295 Design Review-Commissioning-Fire Life Safety-Test And Balance-ASHRAE 110-Drone Sales/Inspections Terms and Abbreviations In.-Inches In.w.g:Inches of Water Gauge ACH-Air Changes per Hour ISDFT-Insufficient Straight Duct for Traverse AHU-Air Handling Unit Kfactor-Correction factor to the free area AK-Free Area of Duct needed to calculate CFM. AVG-Average LAT-leaving Air Temperature BHP-Brake Horsepower LWT-Leaving Water Temperature BV-Ball Valve(Shut Off Valve) MAU-Make.Up Air Handling Unit CB-Circuit Breaker MAX-Maximum set point/flow CBV-Calibrated Balance Valve MIN-Minimum set point/flow CD-Ceiling Diffuser NI-Not Installed CFM-Cubic Feet per Minute NIS-Not in Scope CHWS-Chilled Water System 0/A-Outside Air CRAC-Computer Room Air Conditioner OBD-Opposed Blade Damper CS-Circuit Setter 0D-Outside Diameter Measurement of Sheave CUH-Cabinet Unit Heater. PH-Phase DAT-Discharge Air Temperature PSI-Pounds per Square Inch DD-Direct Drive(motor) RA-Return Air Des.-Design RAT-Return Air Temperature Disch.-Discharge RF-Return Fan ONE-Does Not Exist RHC-Reheat Coil DP-Discharge Pressure of Pump/Pressure Drop RPM-Revolutions per Minute EA-Exhaust Air RTU-Roof Top Unit EAV-Exhaust Air Valve SA-Supply Air EAT-Entering Air Temperature SAV-Supply Air Valve EF-Exhaust Fan SAT-Supply Air Temperature EG-Exhaust Grille S.F.-Service Factor ERU-Energy Recovery Unit SF-Supply Fan E.S.P.-External Static Pressure SP-Suction Pressure of Pump/Static Pressure EWT-Entering Water Temperature Sq.ft.-Square Feet FCU-Fan Coil Unit TAB-Test,Adjust and Balance FD-Fire Damper TDV-Triple Duty Valve FLA-Full Load Amperage TP-Thermally Protected Flow Coeff.—Correction Factor for Flow to VAV TSP-Total Static Pressure Flow Hood-Instrument that measures airflow. UH-Unit Heater FPM-Feet per Minute GPM-Gallons Per Minute V-Volts HEPA-High Efficiency Particulate Arrestance VAV-Variable Air Volume Box HP-Horsepower VD-Volume Damper HVAC-Heating Ventilation and Air Conditioning VFD-Variable Frequency Drive HWS-Hot Water System VVT-Variable Volume Terminal HX-Heat Exchanger WC-Water Column • Hz-Hertz Mechanical Testing Inc, = acg .11111/' C Testing Services For Indoor Environments commissionm AABC Group LOCATION: PROJECT NUMBER: CONTACT: CR Bard Building 1 Renovations 19-433 Tom Madigan 289 Bay Road Queensbury NY 12804 Table of Contents Instruments Used* 3 Instruments Used 3 Supply Outlet Sheet 4 Supply Outlet Summary.......................... ...... ............... 4. Return Inlet Sheet 5 Return Inlet Summary 5 Page 2 of 5 2019-09-24 Mechanical Testing Inc. - aC AABc g Testing Services For Indoor Environments CommissionimT1 ng Group— LOCATION: PROJECT NUMBER: CONTACT: CR Bard Building 1 Renovations 19-433 Tom Madigan 289 Bay Road Queensbury NY 12804 Instruments Used* Instruments Used AIR Manufacturer Evergreen Calibration Date. 8/19/19 Model No. S-PVF-1 Tech Name TM Serial No. 1500192 WATER Manufacturer Not Applicable Calibration Date Not Applicable Model No. Not Applicable Tech Name Not Applicable Serial No. Not Applicable IMAGES: Air r e:. ac- Calibrat1an Certificate amsase.wr,EVERGREEH7LlEpgrpy .custa, Haa�s.ca�Tiay k... Ned* $PVF.1 . a+o wo} 540Ia111mbw:1500102 NYryfidh �, Anal 15.Wn MRma: � r rraG..w.M LLO�MNeMea.L.e�.aLareaveatltparl�w� aatlpY�ayrrwgy 5nw suq.onurwrrx�.aal+vvmwm+eso.evm�m+trrv.xnowermur ssa.r.aum�va�l:vasnrrRaat�uewdmea�avrew yrybn?Way "'"'mrum"u2""***m c96S..(GUK awcL mrtsn.n? r wu.eot.aer.rw .m., aimes.% w.rnlWW' �wnlou r..., aw.anuesawnwamauam:e.r.rw s.rsnetrr, c -ao.nowwm.onsw,.ssowsu.ana ammo '^r .sw.arwsm..vmrwrwme.smv v0.10,srm rnnrr darn.ars.w.masap arruura:rv¢vnanm. rune asap ea=cummaTcn io •r rune raaa..armsrmnrtwure r.wevrt : aaM e si.weamuom.meuw emu. `. sn wIWTeHW.uw.:'rtR 6 N MM. ' r olgv hIDar fe Avg 2019 CypfieataNumber - Instruments Used Page 3 of 5 2019-09-24 Mechanical Testing Incl. = acg MTI N AABC E�5trng Services For Indoor Environments commissioning AABC croup— LOCATION: PROJECT NUMBER: CONTACT: CR Bard Building 1 Renovations 19-433 Tom Madigan 289 Bay Road Queensbuty NY 12804 Supply Outlet Sheet Supply Outlet Summary . SUPPLY OUTLET SUMMARY Name Room No. Type. Size AK Factor Design FPM Design CFM Reading 1 Reading 2 Final CFM %of Design SO-001 119 SA 24x24 1.000 70 70 76 76 76 109 - SO-002 119 SA 24x24 1.000 70 70 75 75 75 107 SO-003 119 SA 24x24 1.000 70 70 71 71 71 101 SO-004 119 SA 24x24 1.000 70 70 72 72 72 103 SO-005 130 SA 24x24 1.000 80 80 81 81 81 101 SO-006 130' SA, 24x24 3.000 80 80 80 80 - 80 100 SO-007 131 SA 24x24 1.000 70 70 69 70 70 100 Totals - - 510 ., 525 Supply Outlet Summary Page 4 of 5 2019-09-24 • • Mechanical Testinginc. = acg {, AABC TeSting 'Seri/ices For Indoor Environments Commissioning Group LOCATION: PROJECT NUMBER: CONTACT: CR Bard Building 1 Renovations • 19-433 Tom Madigan 289 Bay Road Queensbury NY 12804 • Return Inlet Sheet Return Inlet Summary RETURN INLET SUMMARY Name Room No. -Type Size AK Factor .Design FPM Design CFM Reading 1 Reading 2 Final CFM %of Design RI-001 119 RA 24x24 1.100 255 280 155 155 171 61 RI-002 130 RA 24x24 1.100 145 160 180 180 198 124 RI-003 131 RA 24x24 1.100 64 70 45 45 50 71 . Totals '- 510 - 419 NOTES: Return Inlet Summary RI-0011%of Design Damper is verified 100%open.Duct Is off existing system which serves inlets outside of the project scope. RI-0021%of Design No volume damper installed.Unable to reduce flow. RI-0031 Final CFM • Damper is verified 100%open. • Return Inlet Summary Page 5 of 5 2019-09-24