Test and Balance Reports
Project: West Mountain Ski Resort- Main Lodge Renovation
Address: Queensbury, New York 12804
Contractor: Adirondack P & M
Address: 10 Holden Ave. Queensbury, New York 12804
Certification:
The systems herein have been tested and balanced to
within tolerances specified in the plans and specifications or to
within the limitations of the equipment installed. All the Testing
and Balancing has been performed in accordance with The
Associated Air Balance Council and The National Environmental
Balancing Bureau. The results of those tests are recorded herein.
Date: 8/7/2019 By: EQ6���.
Jo n C. Merry
Testing and Balancing Agency: Date: 8/7/2019
Adirondack Air Balance Co.,Inc. Page: 1 of 6
Project# 3335
Project Name: West Mountain Ski Resort-Main Lodge Renovation Address: Queensbury,New York
AIR MOVING EQUIPMENT TEST SHEET
SYSTEM RTU-1 RTU-2
Equipment Location Roof Roof
Arca Served Various Serving
Equipment Manufacturer York York
Model Number ZE060H12B ZE060H12B
Serial Number N1N7384839 N1N7384838
Specified Actual Specified Actual
Total CFM -Fan 2000 NA 2000 NA
Total CFM-Outlet 2060 2090 2000 2021
RJA CFM NS Variable NS Variable
0/A CFM NS Variable NS Variable
Total Static Pressure(Total/Ext.) .6 ext. 1.29 Total .6 ext. 1.85 Total
Inlet Pressure NS 0.81 NS 1.11
Discharge Pressure NS 0.48 NS 0.74
Fan RPM 1088 NA 1088 NA
Specified Actual Specified Actual
Motor Manufacturer NS Baldor NS Baldor
Motor HP/BHP 1.5/1.13 1.5 1.5/1.13 1.5
Phase three three three three
Voltage 208 208 208 208
Amperage 4.3 3.4 4.3 3.5
Motor RPM NS 1725 NS 1725
Motor Service Factor NS 1.0 NS 1.0
Starter Heater Elements NS TP NS TP
Motor Sheave&No. Grooves VP44x7/8 50°/0 Closed VP44x7/8 80%Closed
Fan Sheave&No. Grooves AK59x1 AK59xl
Belts 1-AX36 1-AX36
Remarks:
Testingand Balancing Agency: Date: 8/7/2019
Adirondack Air Balance Co.,Inc. Page: 2 of 6
Project# 3335
Project Name: West Mountain Ski Resort-Main Lodge Renovation Address: Queensbury,New York
AIR MOVING EQUIPMENT TEST SHEET
SYSTEM MAU-1
Equipment Location Roof
Area Served Kitcken _
Equipment Manufacturer Greenheck
Model Number DG-112-H20
Serial Number 15624639
Specified Actual Specified Actual
Total CFM-Fan 5200 NA NA
Total CFM-Outlet 5250 _ 5365
R/A CFM _ 0% 0%
0/A CFM 100% 100%
Total Static Pressure(Total/Ext.) NS NS
Inlet Pressure NS 1.44
Discharge Pressure NS NA
Fan RPM NS 1185
Specified Actual Specified Actual
Motor Manufacturer NS Baldor
Motor HP/BHP NS 5.0
Phase three three
Voltage 208 208
Amperage 14.2 12.1,12.4,13.0
Motor RPM _ NS 1750
Motor Service Factor _ NS 1.15
Starter Heater Elements NS Adjustable
Motor Sheave&No. Grooves VP60x1 1/8 50%Closed
Fan Sheave&No. Grooves AK84x 1 _.
Belts 1-BX65
Remarks:
Testing and Balancing Agency: Date: 8/7/2019
Adirondack Air Balance Co.,Inc. Page: 3 of 6
Project# 3335
Project Name: West Mountain Ski Resort-Main Lodge Renovation Address: Queensbury,New York
EXHAUST FAN DATA SHEET
SYSTEM EF-1 EF-2
Equipment Location Roof Roof
Area Served Hood Hood
Equipment Manufacturer Greenheck Greenheck
Model Number CUBE-161-7-G CUBE-161-7-G
Serial Number 15624560 15624652
Specified Actual Specified Actual
Total CFM -Fan 2550 NA 2550 NA
Total CFM-Outlet 2550 2556 2550 2664
Total Static Pressure(Total/Ext.) .764 ext. NA .764 ext. NA
Inlet Pressure NS NA NS NA
Discharge Pressure NS 0.00 NS 0.00
Fan RPM NS 1158 NS 1158
Specified Actual Specified Actual
Motor Manufacturer NS Marathon NS Marathon
Motor HP/BHP 3/4 3/4 3/4 3/4
Phase three three three three
Voltage 208 208 208 208
Amperage 1.3 NA 1.3 NA
Motor RPM 1725 1725 1725 1725
Motor Service Factor NS 1.15 NS 1.15
Starter Heater Elements NS Breaker NS Breaker
Motor Sheave&No. Grooves VP34x5/8 90%Closed , VP34x5/8 90%Closed
Fan Sheave&No. Grooves AK44x3/4 AK44x3/4
Belts 1-AP20 1-AP20
Remarks:
Testing and Balancing Agency: Date: 8/7/2019
Adirondack Air Balance Co.,Inc. Page: 4 of 6
Project# 3335
Project Name: West Mountain Ski Resort-Main Lodge Renovation Address: Queensbury,New York
EXHAUST FAN DATA SHEET
SYSTEM EF-3
Equipment Location Roof
Area Served Pizza Hood
Equipment Manufacturer Greenheck
Model Number CUBE-121-3
Serial Number 15624560
_ Specified Actual Specified Actual
Total CFM- Fan 1400 NA
Total CFM-Outlet 1400 1285
Total Static Pressure(Total/Ext.) .764 ext. NA
Inlet Pressure NS NA
Discharge Pressure NS 0.00 _
Fan RPM 1414 1218
Specified Actual Specified Actual
Motor Manufacturer NS Marathon
Motor HP/BHP 1/3 1/3
Phase three three
Voltage 460 NA
Amperage 1.0 NA
Motor RPM 1725 1725
Motor Service Factor NS 1.15
Starter Heater Elements NS Breaker
Motor Sheave&No. Grooves VP34x5/8 90%Closed
Fan Sheave&No. Grooves AK44x3/4
Belts 1-AP20
Remarks:
' Testing and Balancing Agency: Date: 8/7/2019
Adirondack Air Balance Co..Inc. Page: 5 of 6
Project#: 3335
Project Name: West Mountain Ski Resort- Main Lodge Renovation Address: Queensbury, New York
AIR DISTRIBUTION TEST SHEET
Terminal Room Terminal Design Test-FPM or CFM Final
Number Number Type Size Factor FPM CFM Test I Test 2 Test 3 FPM CFM
RTU-1
1 41 CD-3 10"rd. 1.0 Hood 400 464 419 NR Hood 419
2 41 CD-3 10"rd. 1.0 Hood 400 447 405 NR Hood 405
3 42 CD-3 8"rd. 1.0 Hood 240 335 308* NR Hood 308*
4 41 CD-3 10"rd. 1.0 Hood 400 420 380 NR Hood 380
5 41 CD-3 10"rd. 1.0 Hood 400 405 365 NR Hood 365
6 Entry CD-2 8"rd. 1.0 Hood 120 137 123 NR Hood 123
7 Office CD-1 6"rd. 1.0 Hood 100 98 90 NR Hood 90
2060 *-left high 2090
RTU-2
1 31 CD-3 10"rd. 1.0 Hood 400 445 428 NR Hood 428
2 31 CD-3 10"rd. 1.0 Hood 400 429 399 NR Hood 399
3 Cashier CD-3 10"rd. 1.0 flood 150 137 149 NR Hood 149
4 31 CD-3 10"rd. 1.0 Hood 400 405 398 NR Hood 398
5 31 CD-3 10"rd. 1.0 Hood 400 415 412 NR Hood 412
6 Corridor CD-2 8"rd. 1.0 Hood 250 254 235 NR Hood 235
2000 2021
Testing and Balancing Agency: Date: 8/7/2019
Adirondack Air Balance Co..Inc. Page: 6 of 6
Project#: 3335
Project Name: West Mountain Ski Resort-Main Lodge Renovation Address: Queensbury, New York
AIR DISTRIBUTION TEST SHEET
Terminal Room Terminal Design Test-FPM or CFM Final
Number Number Type Size Factor FPM CFM Test I Test 2 Test 3 FPM CFM
MAU-1
1 Serving CD-5 14"rd. 1.0 Hood 750 415 NR NR Hood 415
2 Serving CD-5 14"rd. 1.0 Hood 750 - 650 NR NR Hood 650
3 Serving CD-5 14"rd. 1.0 Hood 750 800 NR NR Hood 800
4 Serving CD-5 14"rd. 1.0 Hood 750 850 NR NR Hood 850
5 Serving CD-5 14"rd. 1.0 Hood 750 900 NR NR Hood 900
6 Serving CD-5 14"rd. 1.0 Hood 750 750 NR NR Flood 750
7 Serving CD-5 14"rd. 1.0 Hood 750 1000 NR NR Hood 1000
5250 *-Balanced for total 5365
EF-I
Hood GT 96x 18 12 212 400 - 213 NR NR 213 2556
EF-2
Hood GT 96x18 12 222 400 213 NR NR 213 2664
EF-3
1 Hood OD 34x11 2.6 538 1400 485 NR NR 485 1261