Loading...
ComCheck 3 , Generated by COM check-Web Software Interior Lighting Compliance • Certificate ECEOVEr; Section 1: Project Information OCT 11 2nie Energy Code:2009 IECC Project Title:West Mtn. Kitchen Reno TOWN OF QUEENSBURY Project Type:Alteration BUILDING&COD ES Construction Site: Owner/Agent: Designer/Contractor: West Mountain Rd. West Mountain R.Kevin Lynn Queensbury,New York 12804 56 West Mountain Road 333 Glen Street,Suite 102 Queensbury,New York 12804 Glens Falls,New York 12801 518-209-7282 rklynn@rklynn.com Section 2: Interior Lighting and Power Calculation A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B x C) Kitchen(Dining:Cafeteria/Fast Food) 3172 1.4 4441 Total Allowed Watts= 4441 Section 3: Interior Lighting Fixture Schedule A BCD E Fixture ID:Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Kitchen(Dining:Cafeteria/Fast Food,3172 sq.ft.) LED-1:L1:8'LED Sealed Pendant:LED Other Fixture Unit 125W: 2 15 120 1800 LED-5:L5:4'LED Sealed Pendant:LED Other Fixture Unit 125W: 2 6 40 240 LED-2:L2:6"LED Cans:LED Panel 33W: 1 18 33 594 LED-3:L3:6"LED Pendant:LED Panel 60W: 1 15 33 495 LED-4:L4:Dec Heat Lamp:LED A Lamp 25W: 1 12 100 1200 Total Proposed Watts= 4329 Section 4: Requirements Checklist Lighting Wattage: ▪ 1. Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 4441 4329 Passes Controls, Switching,and Wiring: ci 2. Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. ▪ 3. Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. Project Title:West Mtn. Kitchen Reno Report date: 10/10/18 Data filename: Page 1 of 2 • 4. Independent controls for each space(switch/occupancy sensor). Exceptions: • Areas designated as security or emergency areas that must be continuously illuminated. • Lighting in stairways or corridors that are elements of the means of egress. • 5. Master switch at entry to hotel/motel guest room. 6. Individual dwelling units separately metered. D 7. Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. • 8. Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires,dual switching of alternate rows of luminaires,alternate luminaires,or alternate lamps,switching the middle lamp luminaires independently of other lamps,or switching each luminaire or each lamp. Exceptions: • Only one luminaire in space. • An occupant-sensing device controls the area. • The area is a corridor,storeroom,restroom,public lobby or sleeping unit. Areas that use less than 0.6 Watts/sq.ft. D 9. Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: • Sleeping units,patient care areas;and spaces where automatic shutoff would endanger safety or security. • 10.Photocell/astronomical time switch on exterior lights. Exceptions: Lighting intended for 24 hour use. • 11.Tandem wired one-lamp and three-lamp ballasted luminaires(No single-lamp ballasts). Exceptions: • Electronic high-frequency ballasts;Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement: The proposed lighting alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application.The proposed lighting alteration project has been designed to meet the 2009 IECC,Chapter 8,requirements in COMcheck-Web mply with th an tory requirements in the Requirements Checklist. to-to 2.4 Name-Title Signature Date Project Notes: Kitchen Alterations. Project Title:West Mtn. Kitchen Reno Report date: 10/10/18 Data filename: Page 2 of 2