Loading...
Mechanical Commissioning Requirements FRIEDMAN FISHER ASSOCIATES,P.C. CONSULTING ENGINEERS 10/16/19 Gary � �' (� dM McCoola Architect, PLLC 3 Broad Street, 3rd Floor Glens Falls, NY 12801 OCT 16 2019 TOWN OF QUEENSBURY RE: CWI, Mechanical Commissioning Requirements BUILDING&CODES Dear Mr. McCoola, This letter is regarding the mechanical commissioning requirements for the recently completed CWI renovation project. For this project existing roof top units were reused since they were capable of sufficiently heating and cooling the renovated space. The mechanical contractor for the project provided a balancing report for the existing RTU's and all air flows are within acceptable limits of what was designed on the construction drawings. The existing RTU's are functioning as expected and providing proper heating and cooling for the renovated space. The information submitted by the contractor fulfills our requirements for commissioning. Let us know if any additional information is required for this issue. Sincerely, Jeffrey Manor, P.E. 22 AVIATION ROAD • ALBANY, NY 12205 PHONE (518) 458-7040 • E-MAIL MAIL@FRIEDMANFISHER.COM