Loading...
building footings 7 days QCQAConcrete Field Observation Report LXXV DRILLING & TESTING SERVICES _Project: Stewarts-Queensbury,NY Report No.: C-081219 Client: Stewart's Shop Date: 811 212 01 9 Contractor: KM Masonry Job No.: 19-078 Concrete Supplier: Pallelte Mix No.: 40001 Weather: Sunny;Breezy Air Temp.:AM PM 84 General Placement Location: Building Perimeter Footings Sheet: 1 of 1 Time Test Data Air Unit Conc. Load Ticket Truck Cubic Water Start End Slump Content Weight Te.P No. No. No. Yards Added Batched Dischar a Dischar a Tested In. % Pcf F. Specimen Set.—Remarks 1 833802 4525 10 2:03 2:40 2:55 2:44 4.25 6.0 85 Set 1 6 Cylinders) 2 833803 4913 10 2:22 2:56 3:10 !� II 4 i I i Remarks: Cubic yards placed: 20 Rejected: TECHNICIAN: Tod Kobik COMPRESSIVE STRENGTH DATA Set Lab Cylinder Date Age Load Fracture Compressive No. No. Diameter Area Tested (days) lbs. Type Strength(psi) 1 5698 6.0 28.27 8/19/2019 7 100,640 5 3,560 5699 6.0 28.27 8/19/2019 7 104,160 5 3,680 5700 9/9/2019 28 5701 9/9/2019 28 5702 28/H 5703 28/H Specification Requirement at 28 days 4,000 Cylinder Size:6"x 12"unless otherwise noted Slump in accord with ASTM C-143 FRACTURE TYPE: Sampled in accord with ASTM C-172 Air in accord with ASTM C-231 1=Cone Both Ends Tested in accord with ASTM C-39 Unit Wt.in accord with ASTM C-138 2=Cone 1 End Tod Kobik Cast in accord with ASTM C-31 Temp in accord with ASTM C-1064 3=Columnar QCICA Laboratories Inc. 4=Diagonal Fracture Vice-President 5=Side Fracture 6=Side Fracture(2) 877 Route 4S-Schuylerville,NY 12871-Phone:(518)372-4067-Fax:(518)507-6113