Loading...
special inspections W14 re r AIL I A`O'W ASSOCIATES INC PY March 6, 2019 FILE CO- Mr.John O'Brien Code Enforcement Officer Town of Queensbury RE: 959 Route 9—SH Adirondack Urgent Care Dear John, Please see the list below for commissioning information as requested: HVAC—Appolo Heating—Ray Phillips—518-355-0433 Electrical/Lighting—Central NY Electrical—Jim Loiselle—518-348-1142 Please let me know if you need any other information regarding this permit application. Sincerely, Mario Tedesco -bt)ckd -zoR APPOLO H E A T I N Degrees Above The Rest, Awe(/9r6Sf June 26, 2019 Mario Tedesco AOW Associates 30 Essex St. Albany, NY 12206 RE: SH Adirondack Urgent Care, Queensbury,NY Dear Mario This is to Certify that the HVAC System Phase 1 equipment is fully operational and has been tested, Air balanced to the best it can be based on the job's phasing. We will complete a final air balance for the entire project(all 3 phases)when the project is a 100%complete. The job has been installed per the engineered plans,specifications and SMACNA standards. Appolo Mechanical will guarantee all work and will repair if found defective for 1 year per contract. Sincerely, Bert Cologgi Commercial Plumbing/HVAC Pipe Manager Appolo Heating, Inc. Plumbing&HVAC Contractors Robert Cologgi personally appeared before me, the undersigned notary public and provided satisfactory evidence of identification to be the person who signed this document in my presence and swore or affirmed to me that the contents of this document are truthful and accurate to the best of his/her knowledge and belief. (� Notary Public: l"-+ c/• Commission Expires: y/I5/a► is Robert Cologc is Ray Phillips: Plumbing/HVAC Pipe Manager Jennifer L Allen HVAC Manager 868 Burdeck St Notary Public, State of New York Schenectady, NY 12306 No. 01AL6279884 868 Burdeck St. 518-355-0433 Ext 231 Qualified In Albany County Schenectady, NY 12306 Commission Expires Li//,42/ 518-355-0433 Ext.247 $f • 1 .......s.tetts1"slAPPOLO mitHEATING Degrees Above The Rest, siAtC( I0f June 24, 2019 Mario Tedesco AOW Associates 30 Essex St. Albany,NY 12206 RE: SH Adirondack Urgent Care, Queensbury,NY Dear Mario, This is to Certify that the waste, Vent and domestic water pipe has been tested and installed per NYS Plumbing Code, and plans and specifications. Appolo Mechanical will guarantee all work and will repair if found defective for 1 year per contract. Since Ro ert F. Cologgi Commercial Plumbing/HVAC Pipe Manager 6010 Medical Gas Certified Appolo Heating, Inc. Commercial Dept. Robert F. Cologgi personally appeared before me,the undersigned notary public and provided satisfactory evidence of identification to be the person who signed this document in my presence and swore or affirmed to me that the contents of this document are truthful and accurate to the best of his/her knowledge and belief Notary Public: ),eft-4 Commission Expires: W /15 /al Jennifer L Allen Notary Public, State of New York No. 01AL6279884 Robert Cologgi: Qualified in Albany County Rav Phillips: Plumbing/HVAC Pipe Manager Commission Expires LI//5/oe/ HVAC Manager 868 Burdeck St 868 Burdeck St. Schenectady, NY 12306 Schenectady, NY 12306 518-355-0433 Ext 231 518-355-0433 Ext.247 .004"%ki APPOLO UH E A `fING Degrees Above The Rest, viva 1268/ June 24, 2019 Mario Tedesco AOW Associates 30 Essex St. Albany,NY 12206 RE: SH Adirondack Urgent Care, Queensbury,NY Dear Mario This is to Certify that the HVAC System,has been tested,Air balanced and installed per plans, specifications and, SMACNA standards. Appolo Mechanical will guarantee all work and will repair if found defective for 1 year per contract. Sincerely, Ray Phillips Commercial HVAC Manager Appolo Heating, Inc. Plumbing&HVAC Contractors Ray Phillips personally appeared before me,the undersigned notary public and provided satisfactory evidence of identification to be the person who signed this document in my presence and swore or affirmed to me that the contents of this document are truthful and accurate to the best of his/her knowledge and belief. Notary Public: ,4 • %it ..1" Commission Expires: "I /I5/91 Jennifer L Allen Notary Public, State of New York Robert Cologai: No. 01AL6279884 g Qualified in Albany County Ray Phillips: Plumbing/HVAC Pipe Manager Commission Expires ` i/15/,91 HVAC Manager 868 Burdeck St 868 Burdeck St. Schenectady, NY 12306 Schenectady, NY 12306 I 518-355-0433 Ext 231 518-355-0433 Ext.247 C,c—WAD—zo\°1 JIciki TR June 20, 2019 Reference: Saratoga Hospital Fire/Smoke Barriers Adirondack Urgent Care 959 US Rt9 Queensbury,NY Mr. Marshall, Based on my walkthrough/inspection of the above noted address; all newly created fire barriers in the above project has had the penetrations fire- stopped using Hilti UL assemblies to meet their required rating as deemed by the Life Safety drawings for this project as submitted to JGE. All Generic MEP,Conduit,cabling and HVAC penetrations were filled with FS One MAX or an equivalent manufacturer as needed to correctly maintain the rating of the fire barriers penetrated. Please note that this inspection was only of the interior of the rated rooms until access is given on the outside of the rooms for inspection. Inspector:Joshua A Glaski Owner of JGlaski Enterprises,INC,a privately owned full service passive fire Protection Company located in Upstate New York.We specialize in Healthcare regulatory compliance and have the expertise to maintain,service,inspect and install your passive fire protection systems including; Fire/Smoke dampers,Fire stopping,Fire doors and fire proofing needs.I started out in the fire stopping industry in 2002 slowly expanding and learning the vast world of Passive Fire Protection.Along this road I attended the business program at Sage College of Albany working towards my entrepreneurial goals,which was founded in 2008. Glossary of Firestop inspection under IFC standards: Annular Space-The opening around a penetrating item. F Rating-The time period that the through-penetration firestop system limits the spread of fire through the penetration when tested in accordance with ASTM E 814 or UL1479. s y Fireblocking-Building materials,or materials approved for use as fireblocking,installed to resist the free passage of flame to other areas of the building through concealed spaces. Fire-Resistant Joint System-An assemblage of specific materials or products that are designed,tested and fire-resistance rated in accordance with either ASTM E 1966 or UL 2079 to resist for a prescribed period of time the passage of fire through joints made in or between fire-resistance rated assemblies. Joint-The opening in or between adjacent assemblies that is created due to building tolerances,or is designed to allow independent movement of the building in any plane caused by thermal,seismic,wind or any other loading. L Rating-The air leakage rating of a through penetration firestop system or a fire-resistant joint system when tested in accordance with UL 1479 or UL 2079,respectively. Membrane Penetration-A breach in one side of a floor-ceiling,roof-ceiling or wall assembly to accommodate an item installed into or passing through the breach. Penetration Firestop-A through-penetration firestop or a membrane-penetration firestop. Perimeter Fire Barrier System-An assemblage of specific materials along the perimeter of a floor with an hourly fire endurance rating and a non-rated exterior curtain wall to ensure continuity of the separating function of the floor assembly.Tested in accordance with ASTM E2307. Splice-The result of a factory and/or field method of joining or connecting two or more lengths of a fire- resistant joint system into a continuous entity. Penetration Firestop-A through-penetration firestop or a membrane-penetration firestop. *Although ducts may be considered penetrations, the requirements for maintaining the fire rating of the assembly penetrated by ducts are beyond the scope of this document. T Rating-The time period that the penetration firestop system, including the penetrating item,limits the maximum temperature rise to 325°F(163°C)above its initial temperature through the penetration on the non-fire side when tested in accordance with ASTM E 814 or UL 1479. Through-Penetration Firestop System -An assemblage consisting of a fire-resistance-rated floor,floor- ceiling,or wall assembly,one or more penetrating items passing through the breaches in both sides of the assembly and the materials or devices,or both,installed to resist the spread of fire through the assembly for a prescribed period of time. DFT-Dry Film Thickness FIRE TEST STANDARDS The Test Standards relevant to Firestop Systems are: 1. ASTM E 814(ANSI/UL 1479)"Standard Test Method for Fire Tests of Through-Penetration Fire Stops" 2. ASTM E 1966(ANSI/UL 2079)"Standard Test Method for Fire-Resistive Joint Systems" 3. ASTM E 1399"Cyclic Movement and Measuring the Minimum and Maximum Joint Widths of Architectural Joint Systems" 4. ASTM E 2174"Standard Practice for On-Site Inspection of Installed Fire Stops" 5. ASTM E 2307"Standard Test Method for Determining the Fire Resistance of Perimeter Fire Barrier Systems using the Intermediate Scale,Multi-Story Test Apparatus" 6. ASTM E 2393"Standard Practice for On-Site Inspection of Installed Fire Resistive Joint System and Perimeter Fire Barriers" 7. ASTM E2750"Guide for Extension of Data from Penetration Firestop System Tests Conducted in Accordance with ASTM E814" 8. ASTM E 2837 "Standard Test Method for Determining the Fire Resistance of Continuity Head-of- Wall Joint Systems Installed Between Rated Wall Assemblies and Nonrated Horizontal Assemblies" 9. ASTM E3038 "Standard Practice for Assessing and Qualifying Candidates as Inspectors of Qualifications- Certifications/Training: NFPA Life Safety 101 Certified NFPA 80 trained/certified IFDIA certified Fire Inspector I training Hilti Certified 3m Certified STI Certified Rectorseal Certified *See attached certification listing Disclaimer:Limitations of Report This report is based on observations of the inspector on the day of the inspection,as well as any additional information furnished to the inspector at or before the time of the inspection.This report cannot account for conditions that were not reasonably observable upon inspection,or for pertinent information not made available to the inspector,or for changes in conditions subsequent to the inspection.Also,Please note all fire stop inspections were based on a VISUAL inspection only and destructive testing was not completed to ensure fire stop system.All Other types of penetrations were not assessed during JGE's walkthrough of the site as another firm was to be responsible.Head of wall/joints were only observed