Loading...
Manual J 4/ ._ i(a0-,„101Y /y/er 1--e)-.p( • Project SummaryJob: 061806 01JDate: Jun 06,2018 Entire House By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro`ect Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 JUK 2 2013 Phone:518-490-7500 Fax:518-490-7555 J Notes: Manual J Calculations fo 131 Rockwell Rd Queensbury, N .AlFicalculafagr�s��a� � pl�an T specification and 2015 IECC w/NY amendments. Subject to eh?ng ffIE�l i t e F VELO MEN Desi•n Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 °F Outside db 85 °F Inside db 70 °F Inside db 75 °F . Design TD 74 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 33868 Btuh Structure 15724 Btuh Ducts 4638 Btuh Ducts 1430 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 38506 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 15439 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 2254 Btuh Ducts 1181 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling Area(ft2) 2557 2557 Equipment latent load 3435 Btuh Volume(ff) 27613 27613 Air changes/hour 0.15 0.08 Equipment Total Load (Sen+Lat) 18873 Btuh Equiv.AVF(cfm) 91 70 Req.total capacity at 0.70 SHR 1.8 ton Heating Equipment Summary Cooling Equipment Summary Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref. n/a Coil n/a AHRI ref. n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating,output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. s.L� sigh cl,t„ 2018-Jun-07 12:37:50 �= "� -..P.•, .--,r--m.- Right-Suite@ Universal 2018 18.0.08 RSU23464 Page 1 ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Cale=MJ8 Front Door faces: E L Project Summary Job: 061806 1st Floor By: A Dole Riverside Energy Consulting Date: Jun 06,2018 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro-ect Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone: 518-490-7500 Fax:518-490-7555 Notes: Manual J Calculations for 131 Rockwell Rd Queensbury, NY.All calculations are based on plan specification and 2015 IECC w/NY amendments. Subject to change. Desi•n Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 °F Outside db 85 °F Inside db 70 °F Inside db 75 °F Design TD 74 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr/Ib Heating Summary Sensible Cooling Equipment Load Sizing Structure 27922 Btuh Structure 14249 Btuh Ducts 3387 Btuh Ducts 611 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 31308 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 infiltration Equipment sensible load 13374 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 1992 Btuh Ducts 1026 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ft2) 2086 2086 Equipment latent load 3017 Btuh Volume(113) 23845 23845 Air changes/hour 0.18 0.14 Equipment Total Load(Sen+Lat) 16392 Btuh Equiv.AVF (cfm) 72 56 Req.total capacity at 0.70 SHR 1.6 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 759 cfm Actual air flow 759 cfm Air flow factor 0.024 cfm/Btuh Air flow factor 0.051 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -Ff-wrighlb cr 2018-Jun-07 12:37:50 A z�> Right-Suite®U niversal 2018 18.0.08 RSU23464 Page 2 ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Calc=MJ8 Front Door faces: E 0- L Project Summary Job: 061806 Summary Date: Jun 06,2018 2nd Floor By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro'ect Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax: 518-490-7555 Notes: Manual J Calculations for 131 Rockwell Rd Queensbury, NY.All calculations are based on plan specification and 2015 IECC w/NY amendments. Subject to change. Desi•n Information Weather: Glens Falls AP, NY, US Winter Design Conditions Summer Design Conditions Outside db -4 °F Outside db 85 °F Inside db 70 °F Inside db 75 °F Design TD 74 °F Design TD 10 °F Daily range M Relative humidity 50 % Moisture difference 27 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 5946 Btuh Structure 2051 Btuh Ducts 1252 Btuh Ducts 871 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 7198 Btuh Use manufacturer's data n Rate/swing multiplier 0.90 Infiltration Equipment sensible load 2630 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 0 Structure 262 Btuh Ducts 155 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ft2) 471 471 Equipment latent load 417 Btuh Volume(ft') 3768 3768 Air changes/hour 0.30 0.23 Equipment Total Load(Sen+Lat) 3047 Btuh Equiv.AVF(cfm) 19 15 Req.total capacity at 0.70 SHR 0.3 ton Heating Equipment Summary Cooling Equipment Summary Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 116 cfm Actual air flow 116 cfm Air flow factor 0.016 cfm/Btuh Air flow factor 0.040 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. �dkar� t�i 2018-Jun-07 12:37:50 .? Q,�� Right-Suite®Universal 201818.0.08 RSU23464 Page 3 / ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Cale=MJ8 Front Door faces: E Load Short Form Job: 061806 Date: Jun 06,2018 fir'' ' _ , Entire House By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Project Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax:518-490-7555 Design Information Htg Clg Infiltration Outside db (°F) -4 85 Method Simplified Inside db(°F) 70 75 Construction quality Tight Design TD (°F) 74 10 Fireplaces 0 Daily range - M Inside humidity(%) 50 50 Moisture difference(gr/Ib) 52 27 HEATING EQUIPMENT COOLING EQUIPMENT Make n/a Make n/a Trade n/a Trade n/a Model n/a Cond n/a AHRI ref n/a Coil n/a AHRI ref n/a Efficiency n/a Efficiency n/a Heating input Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 0 cfm Actual air flow 0 cfm Air flow factor 0 cfm/Btuh Air flow factor 0 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat n/a Load sensible heat ratio 0 ROOM NAME Area Htg load Cig load Htg AVF CIg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) 1st Floor d 2086 31308 14860 759 759 2nd Floor d 471 7198 2922 116 116 Entire House d 2557 38506 17154 875 875 Other equip loads 0 0 Equip.@ 0.90 RSM 15439 Latent cooling 3435 TOTALS I 2557 I 38506 I 18873 I 875 I 875 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. an ' ''rig 111Cs F`t' 2018-Jun-0712:37:50 ate.. ---,, Right-Suite®U niversal 2018 18.0.08 RSU23464 Page 1 ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Calc=MJ8 Front Door faces: E 1r Load Short Form Job: 061806 • Date: Jun 06,2018 irir 1st Floor By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Project Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax: 518-490-7555 Design Information Htg Clg Infiltration Outside db(°F) -4 85 Method Simplified Inside db(°F) 70 75 Construction quality Tight Design TD (°F) 74 10 Fireplaces 0 Daily range - M Inside humidity(%) 50 50 Moisture difference(gr/lb) 52 27 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 759 cfm Actual air flow 759 cfm Air flow factor 0.024 cfm/Btuh Air flow factor 0.051 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.83 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Laundry 48 720 709 17 36 Bed 2 Bath 40 403 36 10 2 Bed 2 152 2577 883 62 45 Kitchen 317 3305 3122 80 159 Family 473 11176 5474 271 279 Dining 164 2020 1339 49 68 Master Bed 324 5697 1834 138 94 Master WIC 1 56 252 74 6 4 Master WIC 2 60 270 80 7 4 Foyer 187 1770 181 43 9 Hall/Mudroom 139 423 85 10 4 Master Bath - 126 2696 1043 65 53 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri h o 2018-Jun-07 12:37:50 ,.......,,----7.— Right-Suite®U niversal 2018 18.0.08 RSU23464 Paget ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Calc=MJ8 Front Door faces: E 1st Floor d 2086 31308 14860 759 759 Other equip loads 0 0 Equip. @ 0.90 RSM 13374 Latent cooling 3017 TOTALS I 2086 I 31308 I 16392 I 759 I 759 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrigh's F $ 2018-Jun-07 12:37:50 +v a•.,•_,.� Rig ht-Suite®Universal 2018 18.0.08 RSU23464 Page 3 ACCK ...a,NY\Rockwel1Rd_6.6.18\RockwellRd_6.6.2018.rup Cale=MJ8 Front Door faces: E Load Short Form • Job: 061806 Date: Jun 06,2018 ' 2nd Floor By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Project Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax: 518-490-7555 Design Information Htg • Clg Infiltration Outside db (°F) -4 85 Method Simplified Inside db(°F) 70 75 Construction quality Tight Design TD (°F) 74 10 Fireplaces 0 Daily range - M Inside humidity(%) 50 50 Moisture difference(gr/lb) 52 27 HEATING EQUIPMENT COOLING EQUIPMENT Make Make Trade Trade Model Cond AHRI ref Coil AHRI ref Efficiency 80 AFUE Efficiency 0 SEER Heating input 0 Btuh Sensible cooling 0 Btuh Heating output 0 Btuh Latent cooling 0 Btuh Temperature rise 0 °F Total cooling 0 Btuh Actual air flow 116 cfm Actual air flow 116 cfm Air flow factor 0.016 cfm/Btuh Air flow factor 0.040 cfm/Btuh Static pressure 0 in H2O Static pressure 0 in H2O Space thermostat Load sensible heat ratio 0.88 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bed 3 140 2467 1539 40 61 Bed 4 210 3783 1167 61 46 Bed 3/4 Bath 91 878 177 14 7 Bed 4 WIC 30 69 39 1 2 2nd Floor d 471 7198 2922 116 116 Other equip loads 0 0 Equip. @ 0.90 RSM 2630 Latent cooling 417 • TOTALS 1 471 I 7198 I 3047 I 116 I 116 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. I�I 2018-Jun-07 12:37:50 "+= 5� -,k Er.w��M Right-Suite®U niversal 2018 18.0.08 RSU23464 Page 4 ...a,NY\RockwellRd_6.6.181RockwellRd 6.6.2018.rup Calc=MJ8 Front Door faces: E 1 Building Analysis Job: 061806 Date: Jun 06,2018 401, Entire House By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro-act Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax:518-490-7555 Desi•n Conditions Location: Indoor: Heating Cooling Glens Falls AP, NY, US Indoor temperature (°F) 70 75 Elevation: 335 ft Design TD (°F) 74 10 Latitude: 43°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 51.7 26.5 Dry bulb(°F) -4 85 Infiltration: Daily range (°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Heatin. Component Btu h/ft2 Btuh %of load Walls 3.8 10033 26.1 acts Glazing 23.4 7951 20.6 V1Il Doors 10.3 216 0.6 po. Ceilings 1.9 3986 10.4 Infiltration Floors 2.1 4375 11.4 Infiltration 2.4 4638 12.0 Ducts Ilk 4638 12.0 PipinGazing , \ Roors Humidification 0 0 Ventilation 0 0 Cther Ceilings Adjustments 0 Total 38506 100.0 Coolin• Component Btuh/ft2 Btuh %of load Walls 0.4 928 5.4I Glazing 21.4 7265 42.3 lrtensi Gars Doors 1.4 29 0.2 , Ceilings 1.1 2392 13.9 A, Floors 0.3 595 3.5 Infiltration 0.3 765 4.5 !aloe Des Ducts 1430 8.3 C3aa • Ventilation 0 0 Internal gains 3750 21.9 Infiltration Blower 0 0 Floss Adjustments 0 C hE Celir Total 17154 100.0 Latent Cooling Load=3435 Btuh Overall U-value=0.052 Btuh/ft2-°F Data entries checked. ghtsoft' 2018-Jun-07 12:37:50 .,,,,. ,,,- :a.., Right-Suite®Universal 2018 18.0.08 RSU23464 Page 1 ...a,NY\RockwellRd_6.6.181RockwellRd_6.6.2018.rup Calc=MJ8 Front Door faces: E Building • CI' Analysis Job: 061806 Y Date: Jun 06,2018 1st Floor By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro-act Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax:518-490-7555 Desi• n Conditions Location: Indoor: Heating Cooling Glens Falls AP, NY, US Indoor temperature(°F) 70 75 Elevation: 335 ft Design TD(°F) 74 10 Latitude: 43°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 51.7 26.5 Dry bulb(°F) -4 85 Infiltration: Dailyrange(°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Heatin• Component Btuh/ft2 Btuh %of load Walls 3.8 7869 25.1 aids Glazing 23.3 6597 21.1 Will Doors 10.3 216 0.7 Ceilings 1.9 3086 9.9 Infiltration Floors 2.1 4375 14.0 Infiltration 2.4 5779 18.5 Ducts 3387 10.8 Piping 0 0 Gazing Floors Humidification 0 0 taller Ceilings Ventilation 0 0 Adjustments 0 Total 31308 100.0 Coolin• Component Btuh/ft2 Btuh %of load . Walls 0.4 728 4.9 W3iI Glazing 23.7 6690 45.0 Doors 1.4 29 0.2 Irtar CAns Ceilings 1.1 1852 12.5 Floors 0.3 595 4.0 Infiltration 0.3 605 4.1 Ducts 611 4.1 Gaa ' Dins Ventilation 0 0111 Irfiltraicn Internal gains 3750 25.2 Flom Blower 0 0 Adjustments 0 Celirx Total 14860 100.0 Cthsr Latent Cooling Load=3017 Btuh Overall U-value=0.052 Btuh/ft2-°F Data entries checked. 4 F6'1 Irit oft 2018-Jun-07 12:37:50 �•.+^_.-x--.a- __¢- Right-Suite®Universal 2018 18.0.08 RSU23464 Page 2 ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Cale=MJ8 Front Door faces: E Building Analysis - Job: 061806 Date: Jun 06,2018 ,t1 iir 2nd Floor By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro"ect Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax:518-490-7555 Desi•n Conditions Location: Indoor: Heating Cooling Glens Falls AP, NY, US Indoor temperature(°F) 70 75 Elevation: 335 ft Design TD (°F) 74 10 Latitude: 43°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 51.7 26.5 Dry bulb(°F) -4 85 Infiltration: Daily range (°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed(mph) 15.0 7.5 Fireplaces 0 Heatin• Component Btuh/ft2 Btuh %of load Walls 3.8 2165 30.1 Glazing 23.5 1355 18.8 Duds Doors 0 0 0 Will iii Ceilings 1.9 900 12.5 Floors 0 0 0 Infiltration 2.4 1527 21.2 Infiltration Ducts 1252 17.4 Piping 0 0 1111101* Humidification 0 0 Gazing Ceilings Ventilation 0 0 Adjustments 0 Total 7198 100.0 Coolin• Component Btuh/ft2 Btuh %of load Walls 0.4 200 6.9 III Glazing 20.0 1150 39.4 Doors 0 0 0 acts Ceilings 1.1 540 18.5 • Floors 0 0 0 Infiltration 0.3 160 5.5 aaa • Ducts 871 29.8 Ventilation 0 0 Internal gains 0 0 WilliF Infiltration Blower 0 0 Adjustments 0 Ceilings Total 2922 100.0 Latent Cooling Load=417 Btuh Overall U-value=0.055 Btuh/ft2-°F Data entries checked. 2018-Jun-07 12:37:50 Ar-rt9I!--,,,53 N Right-Suite®Universal 2018 18.0.08 RSU23464 Page 3 ...a,NY1RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Cale=MJ8 Front Door faces: E Component Constructions Job: 061806 Date: Jun 06,2018 Entire House By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro"ect Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax: 518-490-7555 Design Conditions Location: Indoor: Heating Cooling Glens Falls AP, NY, US Indoor temperature(°F) 70 75 Elevation: 335 ft Design TD(°F) 74 10 Latitude: 43°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 51.7 26.5 Dry bulb(°F) -4 85 Infiltration: Dailyrange(°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HIM Loss Clg HTM Gain ft' Btuh/ft°-°F 8°-°F/Btuh Btuh/fl° Btuh Btuh/if Btuh Walls 12E-5sw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2"gypsum n 687 0.052 24.0 3.82 2625 0.35 243 board int fnsh,r-5 ext bd ins,2"x6"wood frm,16"o.c.stud e 576 0.052 24.0 3.82 2201 0.35 204 s 592 0.052 24.0 3.82 2262 0.35 209 w 771 0.052 24.0 3.82 2945 0.35 272 all 2625 0.052 24.0 3.82 10033 0.35 928 Partitions (none) Windows U32 S32:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/4"gap, n 47 0.320 0 23.5 1098 7.03 328 1/8"thk;50% blinds 45°,medium;50% outdoor insect screen;6.67 ft e 109 0.320 0 23.5 2562 26.4 2874 head ht s 54 0.320 0 23.5 1267 13.6 731 w 125 0.320 0 23.5 2950 26.4 3309 all 335 0.320 0 23.5 7877 21.6 7242 Therma Low-E Divided Lite:1 glazing,clr glz,mtl no brk frm mat,1/8" e 5 0.190 0 14.0 74 4.16 22 thk;NFRC rated(SHGC=0.06);5 ft overhang(4 ft window ht,1 ft Sep.); 6.67 ft head ht Doors ThermaTru Basic:ThermaTru Basic e 21 0.140 7.0 10.3 216 1.39 29 Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 2086 0.026 38.0 1.91 3986 1.15 2392 gypsum board int fnsh Floors 19A-30bswp:Fir floor,frm fir,10"thkns,hrd wd fir fnsh,r-30 cav ins, 2086 0.034 30.0 2.10 4375 0.29 595 tight bsmt ovr - rriiglhttsa2 2018-Jun-0712:37:51 ,,,.,,r_.,. : , Right-Suite®Universal 2018 18.0.08 RSU23464 Page 1 ACM ...a,NY\Rockwel1Rd_6.6.18\Rockwel1Rd_6.6.2018.rup Cale=MJB Front Door faces: E , Component Constructions Job: 061806 Date: Jun 06,2018 2nd Floor By: A Dole _ Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro'ect Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax:518-490-7555 Design Conditions Location: Indoor: Heating Cooling Glens Falls AP, NY, US Indoor temperature(°F) 70 75 Elevation: 335 ft Design TD(°F) 74 10 Latitude: 43°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/Ib) 51.7 26.5 Dry bulb(°F) -4 85 Infiltration: Daily range(°F) - 22 ( M ) Method Simplified Wet bulb(°F) - 71 Construction quality Tight Wind speed (mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain . ft' Btuh/ft?°F ft'-°F/Btuh Btuh/ft' Btuh Btuh/ft' Btuh Walls 12E-5sw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2"gypsum e 195 0.052 24.0 3.82 746 0.35 69 board int fnsh,r-5 ext bd ins,2"x6"wood frm,16"o.c.stud s 171 0.052 24.0 3.82 654 0.35 61 w 200 0.052 24.0 3.82 764 0.35 71 all 566 0.052 24.0 3.82 2165 0.35 200 Partitions (none) Windows U32 S32:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/4"gap, e 29 0.320 0 23.5 677 26.4 760 1/8"thk;50% blinds 45°,medium;50% outdoor insect screen;6.67 ft s 29 0.320 0 23.5 677 13.6 391 head ht all 58 0.320 0 23.5 1355 20.0 1150 Doors (none) Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 471 0.026 38.0 1.91 900 1.15 540 gypsum board int fnsh Floors (none) ®-�g�f +PF��° 2018-Jun-07 12:37:51 a�nb°e,�,�>.,.r;.a,-« , Right-Suite®U niversal 2018 18.0.08 RSU23464 Page2 . " S ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Caic=MJ8 Front Door faces: E f iir.41 Component Constructions Job: 061806 .. .-- Date: Jun 06,2018 1st Floor By: A Dole Riverside Energy Consulting 1144 Main St,Brockton,MA 02301 Phone:508-400-4186 Fax:747-517-6129 Email:RiversideEnergyConsulting@gmail.com Pro-ect Information For: FW Webb Company 1 Mccrea Hill Rd, Ballston Spa, NY 12020 Phone:518-490-7500 Fax: 518-490-7555 Design Conditions Location: Indoor: Heating Cooling • Glens Falls AP, NY, US - Indoor temperature(°F) 70 • 75 Elevation: 335 ft Design TD (°F) 74 10 Latitude: 43°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 51.7 26.5 Dry bulb(°F) -4 85 Infiltration: Daily range (°F) - 22 (M ) Method Simplified Wet bulb(°F) - . 71 Construction quality Tight Wind speed(mph) 15.0 7.5 Fireplaces 0 Construction descriptions Or Area U-value Insul R Htg HTM Loss Gig HTM Gain ft° Btuh/ft'°F ft°-°F/Btuh Btuh/ft° Btuh Btuh/ft Btuh Walls 12E-5sw:Frm wall,vnl ext,3/8"wood shth,r-19 cav ins,1/2"gypsum n 687 0.052 24.0 3.82 2625 0.35 243 board int fnsh,r-5 ext bd ins,2"x6"wood frm,16"o.c.stud e 381 0.052 24.0 3.82 1455 0.35 135 s 421 0.052 24.0 3.82 1607 0.35 149 w 571 0.052 24.0 3.82 2181 0.35 202 all 2059 0.052 24.0 3.82 7869 0.35 728 Partitions (none) Windows U32 S32:2 glazing,clr low-e outr,air gas,vnl frm mat,clr innr,1/4"gap, n 47 0.320 0 23.5 1098 7.03 328 1/8"thk;50% blinds 45°,medium;50% outdoor insect screen;6.67 ft e 80 0.320 0 23.5 1885 26.4 2114 head ht s 25 0.320 0 23.5 590 13.6 340 w 125 0.320 0 23.5 2950 26.4 3309 all 277 0.320 0 23.5 6522 22.0 6092 Therma Low-E Divided Lite:1 glazing,clr glz,mtl no brk frm mat,1/8" e 5 0.190 0 14.0 74 4.16 22 thk;NFRC rated(SHGC=0.06);5 ft overhang(4 ft window ht,1 ft sep.); 6.67 ft head ht Doors ThermaTru Basic:ThermaTru Basic e 21 0.140 7.0 10.3 216 1.39 29 Ceilings 16B-38ad:Attic ceiling,asphalt shingles roof mat,r-38 cell ins,1/2" 1615 0.026 38.0 1.91 3086 1.15 1852 gypsum board int fnsh . Floors 19A-30bswp:Fir floor,frm flr,10"thkns,hrd wd flr fnsh,r-30 cav ins, 2086 0.034 30.0 2.10 4375 0.29 595 tight bsmt ovr 2018-Jun-07 12:37:51 AN s.a60,9,1.,,, d.,..-, Right-Suite®U niversal 2018 18.0.08 RSU23464 Page 3 lieffik ...a,NY\RockwellRd_6.6.18\RockwellRd_6.6.2018.rup Cale=MJ8 Front Door faces: E \ 11 ouJef-DO0 f LE l C 666eee -- BPI CERTIFIED BUILDING PERFORMANCE CO TRACTOR i APR UC ,1/4 , ii. d I P "SIN OF QUI::. ;,�' FERGUSON DRYWALL INNOVATIONS INC i.,___ - ' NITY DE' ' t°IFNT Myron R. Ferguson � � � � `��C 7394 Wileytown Rd, Middle Grove, NY 12850 CS 518.248-4147(c)/ myron@thatdrywallguy.com /Pr l vt a / House square footage 1127o 75 0 Vetriloo Or^tv&' House cubic footage 15465z 6'uPPnsjur7 r ii Blower Door Test Results: ACHSO measured results 2. 41 q Energy code required results ACH50 3.0 Pass'''---Fail CFM50 measured results 2.2 G 0 When calculated out to ACH50 (air exchanges per hour at negative 50)the number has to be 3 ACH50 or lower to meet the energy code.Your measured number translates to ./'1 ACHn (air exchanges per hour under natural conditions) The calculated BAS(building airflow standard)for your home is3g60 CFM50. BAS is the calculated minimum required airflow for a building and its occupants. Mechanical ventilation is required if the measured CFM50 is less than 70%of the BAS. 70%of3 q0 is 2 712.so mechanical ventilation is required. The cfm (cubic feet per minute) air exchange recommended for your house is.2 57.Your air exchange system should be set to exchange that amount of air. Signature of Testing Contractor ih iTur-t �'�-c-� rrr Myron R. Ferguson il =2--2c I As suspected your house is very tight. Tighter than required my the new energy code. As explained above you need to have a ventilation system.