LGPC applicationNEWYORK|Lake GeorgeSuae“SE Park Commission FILE COPY
BRUCE E.YOUNG DAVE WICK
Chairman Executive Director
Steven Seaboyer
PO Box 197
Cleverdale,NY 12820 UI
TOMLDING ‘&CODES
Permit#5234-65-18 Wharf Construction/Modification Parcel #227.13-2-36
Town of Queensbury
Dear Mr,Seaboyer:
Enclosed is your permit which was issued in accordance with the applicable provisions ofthe Park Commission's rules
and regulations (6 NYCRR 645 &646)and the Environmental Conservation Law.Please review the general and special
conditions included in the permit;these are intended to minimize any environmental disturbance associated with the
authorized activity.
Please note that itis the responsibilty of the permittee and the permittee's agent to comply with all permit conditions.
Further,the permit is valid only for the activity expressly authorized.Work beyond the scope of the permit shall be
considered as work without a permit.The notice enclosed with the permit must be displayed in a conspicuous place near
the project site during the entire petiod of construction and must be suitable protected from the elements.Any failure to
comply withthe terms ofthe permit may be treated as a violation ofthe Environmental Conservation Law.Questions
regarding this permit should be directed to the undersigned.
Should your plans change,you must contact this office to determine whether a modification to the permit is required
prior to initiating construction.Please note the expiration date of the permit.If further time is required to complete the
project,you must request renewal of the permit prior to this date.Your interest in maintaining the environmental quality
of Lake George is greatly appreciated by the Commission.
Sincerely,ateES,
Deputy Permit Administrator
cc:Town of Queensbury
Warren County Code Enforcement (boathouses only)
Frankie De Nardo
75 Fort George Road,P.O,Box 749,Lake George,NY 12845 |518.668.9347 Fax:518.668.5001 |www lgpe-state.ny.us info@lgpc.state.ny.us
LGPC Permit Number Effective Date
6234-5-18 DM 03/15/2018
_Stwyore Lake George Modification or Renewal Date
-ween:|Park Commission
cypelot enrat Expiration Date
New 03/15/2019
C1 Meritcaton REnMIy
al Under the Environmental Conservation LawVariance
Fx]Atcle 43,Title 1,GNYCRR 646-1.1 Article 18,Title 8,6NYCRR 608.5
Construction and Modification of Wharts
Article 43,Title 1,6NYCRR 646-1.1
Placement of Moorings
Article 43,Title 1,(NYCRR 646-1.4
Recreational Use -New
Article 43,Title 1,BNYCRR 646-1.4
Recreational Use -Seaplanes
Article 43,Title 1,Section 43-0117 Operation of ferries
Excavation and Placement of Fill in Navigable Waters
Article 43,Title 1,6NYCRR 646-1.2
Operation and Modification of Class A Marinas
Article 43,Title 1,6NYCRR 646-1.4
Recreational Use Parasail
Article 43,Title 1,6NYCRR 646-1.4
Recreational Use -Tour Boat
Article 43,Title 1,6NYCRR 646-4
and certain other boats,barges and vessels restricted.
SY CRT DarT a ‘Stormwater Management
Water Quality Certification
Permit Issued to Telephone Number
Steven Seaboyer 518-656-3047
Address of Permittee
P.O Box 197
Cleverdale,NY 12820
Contact Person (if not permittee)Telephone Number
Frankie De Nardo 361-3522
Facility Name Facility Address
Private Lakefront 83 Rockhurst Rd
County Warren Town Queensbury Parcel #227.13-2-36
AUTHORIZED ACTIVITY
Install railings,deck and staircase on existing roof of boathouse in accordance with plans attached as
‘Schedule A and made part of this permit.
By the acceptance of this permit,the permittee agrees that the permit is contingent upon strict compliance
with the Environmental Conservation Law,the Navigation Law,all applicable regulations,and the General
and Special Conditions included as part of this permit.
Deputy Permit Administrator:Molly Gallagher
Lake George Park Commission,PO Box 749,Lake George NY 12845,518-658-9347
Authorized Signature Date
;MMs a fis Page 1 of 5
GENERAL CONDITIONS
4.Allactiviies authorized by this permit must be in strict
conformance with the plans attached as Schedule A and
made part of this permit.Modifications to the project
require prior approval in writing from the Commission.
2.The permittee and any contractor,project engineer,or
other person responsible for the overall supervision of this
project shall read,understand and comply with this permit,
including all conditions to prevent environmental
degradation.
3,The Commission and/or the Department of
Environmental Conservation (the Department)may
conduct such on-site surveys,investigations,
‘examinations,and evaluations from time-to-time as it
‘deems necessary to ensure compliance with the terms
and conditions of this permit,and may conduct a final
inspection at any time after construction to determine
‘compliance with the permit.
4,Accopy of this permit must be available at all times at
the project site during performance of the authorized
activities.Failure to produce a copy of the permit upon
request by a Commission or a Department representative
is a violation of this permit.
5.The permittee is responsible for keeping the permit
‘active by submitting a renewal application,including any
forms,fees or supplemental information which may be
required by the Commission,no later than 30 days prior to
the expiration of this permit.
6.Any change or modification in any of the activities
authorized by this permit is subject to prior review and
approval by the Commission.Any modification of this
permit granted by the Commission must be in writing and
attached hereto.
7.The permittee is responsible for obtaining any other
permits,approvals,land easements,and rights-of-way
Which may be required for this activity.
8,Granting of this permit does not relieve the permittee
of the responsibilty of obtaining any other permission,
consent,permit,or approval from the US Army Corps of
Engineers,US Coast Guard,NYS Office of General
Services,NYS Department of Environmental
Conservation,NYS Department of Health,Adirondack
Park Agency,or local government which may be required.
9.This permit shall not be construed as conveying to the
permittee any right to trespass upon the lands or interfere
with the riparian rights of others in order to perform the
permitted work or as authorizing the impairment of any
rights,ttle or interest in real or personal property held or
vested in a person not a party to the permit.
40.The permittee has accepted expressly,by the
execution of the application,the full legal responsibilty of
all damages,direct or indirect,or whatever nature,and by
whomever suffered,arising out of the project described
herein and has agreed to indemnify and save harmless
the State from suits,actions,damages and costs of every
name and description resulting from the said project.
11.The State of New York shall in no case be liable for
any damage or injury to the structure or work herein
authorized which may be caused by or result from future
operations undertaken by the State for the conservation or
improvement of navigation,or for other purposes,and no
claim or right to compensation shall accrue from any such
damage.
12.Regulatory fees are due April 1 of each year for
docks,wharfs and moorings.
413.Wharfs and moorings authorized herein are for
residential use only and shall not be used for commercial,
association or marina purposes.
Environmental Protection
414,Disturbance to the bed and banks of Lake George
shall be kept to the minimum necessary to complete the
project.
16.Allnecessary precautions shall be taken to preclude
contamination of any wetland or waterway by suspended
solids,sediment,fuels,solvents,lubricants,epoxy
coatings,paint,concrete,leachate or any other
environmentally deleterious materials associated with the
project.
16.Heavy equipment,including bulldozers,backhoes,
payloaders,etc.,shall not be driven in the water.
17.Any material dredged in the prosecution of the work
herein permitted shall be removed evenly,without leaving
large refuse piles,ridges across the bed of a waterway or
floodplain or deep holes that may have a tendency to
‘cause damage to navigable channels or to the banks of a
waterway.
48.Any debris or excess materials from construction of
this project shall be immediately and completely removed
from the bed and banks of all water areas to an
appropriate upland area for disposal.
49.There shall be no unreasonable interference with
navigation by the work herein authorized.
20.Wood treated with Creosote,Pentachlorophenol or
CCA (Chromated Copper Arsenate)is prohibited for
in-water and above-water use.
LGPC Permit #:5234-5-18 Page 2 of 5
GENERAL CONDITIONS
21.if upon the expiration or revocation of this permit,the
project hereby authorized has not been completed,the
permittee shall,without expense to the State,and to such
extent and in such time and manner as the Commission
of the Department may require,remove all or any portion
of the uncompleted structure or fill and restore the site to
its former condition.No claim shall be made against the
State of New York on account of any such removal or
alteration.
22.If future operations by the State of New York require
‘an alteration in the position or the structure or work herein
authorized,or if,in the opinion of the Commission or the
Department,it shall cause unreasonable obstruction to
the free navigation of said waters or flood flows or
endanger the health,safety or welfare of the people of the
State,or cause loss or destruction of the natural
resources of the State,the owner may be ordered by the
Commission or the Department to remove or alter the
structural work,obstructions,or hazards caused thereby
without expense to the State.
Wharf Construction Specifications
The following conditions apply to all newly constructed
‘wharfs which have not received a variance from any of
these limits:
23.The location of the mean low water mark must be
field verified prior to construction.In no case shall any
part of the wharf extend further than 40'from the mean
low water mark.
24,The maximum surface area of any dock or wharf shall
be seven hundred square feet,including any walkway.
25,The maximum width of any pier shall be eight feet and
the minimum width of any pier shall be two feet.
26.The maximum width of any dock or wharf,including
all lateral projections,shall be forty feet.
27.No structure shall be constructed on a dock,wharf or
mooring which exceeds sixteen feet in height above the
mean high water mark and which is not in compliance
with local zoning.
28.Every dock or wharf constructed shall have a
minimum setback of twenty feet from the adjacent
property line extended into the lake on the same axis as
the property line runs onshore where it meets the lake,or
atarightangletothemeanhigh-water mark,whichever
results in the greater setback.
Crib Work
29,Stone used for filing shall be clean (not contain any
material than can pass through a No.8 sieve).The stone
shall not be less than six (6)inches in diameter.
30.No rocks for use in construction are to come from the
lake bed.
The following specifications apply to the construction or
replacement of rock-filled cribs.Existing cribs may be
repaired,
31.The size of any individual crib shall not exceed8feet
by 12 feet
32.Spacing between cribs shall not be less than 8 feet.A
minimum of6feetofopenwatershallbemaintained
between the shoreline and the first crib to allow for free
circulation of water.
33.Completed cribs shall be of the “open-sided"type
construction and provide for at least 40%unboarded
water contact area to the rock fill.
34,If granted under 6NYCRR Part 608,the Lake George
Park Commission hereby certifies that the subject project
will not contravene effluent limitations or other limitations.
of standards under Sections 301,302,303,306 and 307
of the Clean Water Act of 1977 (PL 9-217)provided that
all of the conditions listed herein are met.
Moorings
35.Moorings must mest the following minimum
specifications:the buoy shall be all white with a one inch
blue strip placed horizontally around the circumference
above the water line and a one inch strip of reflector tape
placed around the upper part of the buoy;at least one
cubic foot of buoy is to be above the waterline.
The following conditions apply to all new moorings which
have not received a variance from any of these limits:
36,Moorings shall be placed so that vessels moored to
them,at the full swing of their mooring or anchor line,will
be no closer than twenty feet to the projection of the
property lines extended into the lake along the axis of the
property lines as they intersect the lake,or a line extended
ata right angle to the mean high-water mark,whichever
results in the greater setback.
37.Moorings shall not be placed so that the full swing of
the vessel extends more than one hundred feet offshore
from the mean high-water mark.
Articulating Docks
38,Articulating docks must remain in the lowered position
at all times between May 15 and November 1.Boat lifts
and canopy frames shall be removed prior to lifting docks
into the winter position.
LGPC Permit #:5234-5-18 Page 3 of 5
3/1/2018 Site Inspection MG,JL
Parcel 227.13-2-36,Town of Queensbury
83 Rockhurst Rd
1"=20'Drawn by MG
Schedule A
Page 4 of 5
Permit #5234-5-18
“uononjsuod
Jo
poled
ay}
6uyinp
sjuauisje
ay}
wos
paj9a}04d
»p
adejd
snonojdsuo;
e
UJ
pa}sod
aq
Jsnw
eoKOU
SY)
6102
‘SL
Yue
:uoHeZUOUjNY
Jo
syeq
UOHeIIdxy
safoqees
UBAZJG
:dod}PHIUllod
BL-S-VETS
:CI
HWULed
LV€6-899-81S
‘GP8ZL
‘AN
2610985
aye
‘6yZ
XO
Od
32
UOISSIWIWOD
YJed
e6109¢5)
aye]
BY}
}9e}UOD
‘UOH}EWOJU!
JOYLINY
JO4
*9}S
SIY}
Je
UOIDNIYSUOD
JO
UOI}EOIPOW
‘aredoai
jueyM
JO}
ponssi
useq
sey
wuued
Wy
:3OILON
NOISSIININOD
MYVd
ADYOIAS
AVI
“ALINALOddO40
aLVIS
HOA
MAN
i
To the permittee:
Please sign,fold,tape shut and return upon completion of the project.
FOLD #2
Place
Steven Seaboyer Stamp
PO Box 197 Here
Cleverdale,NY 12820
Lake George Park Commission
PO Box 749
Lake George NY 12845
FOLD #1
Certification of Completion of Work Authorized By Permit #5234-5-18
issued on March 15,2018 Parcel #227.13-2-36,Town of Queensbury
Project:Install railings,deck and staircase on existing roof of boathouse in accordance
with plans attached as Schedule A and made part of this permit.
The project authorized by the above referenced permit was completed on__/_/_.
The dock was installed/constructed by
x
‘Owner's Signature Date
An inspection will be made once this form is received.The permit must be kept active during
construction.
NeWyORK|Lake George
_Grom.|Park Commission
75 Fort George Road,P..Box 749,Lake George,NY 12845 |516.668 5347 Fax:518.668.5001 |www gpc.state.ny.us info@lgpe state.ny.us
March 15,2018
NOTICE
Owner;Steven &Debby Seaboyer
Facility:Private Lakefront
Address:83 Rockhurst Rd
Parcel #:227.13-2-36,Town of Queensbury
Lakefront:90.00 Account#:897
The enclosed permit
7A2authories __new mooring(s),__new whar(s),_new boalPWC lt andor
-=3<2 dock modification,__mooring modification and
__supercedes Existing Whar or Mooring #
andior Permit #
Once the permitted project is complete your annual registration fee will be
For residential properties:
mooring(s)_0 x $50.
whari(s)_1 X $50.00
$0.00 New Account
$50.00 2 No Change
For Commercial or Association properties,fees may need fo be redetermined.