Loading...
blower doorBPI CERTIFIED BUILDING PERFORMANCE CONTRACTOR |aN |DONC AR FERGUSON DRYWALL INNOVATIONS INC.AINE DE =MENT Myron R.Ferguson ean7394WileytownRd,Middle Grove,NY 12850 |@0-25(2, 518,248-4147(c)/myron@thatdrywallguy.com ae lec LZ ne l House square footage_4270 7§_dverlok Drive House cubic footage4¥092 Queensbury WI Blower Door Test Results: ACHSO measured results_2.44 Energy code required results ACHSO 3.0 Passā€˜Fail__ CFMS50 measured results 22 60 When calculated out to ACHSO (air exchanges per hour at negative 50}the number has to be 3 ACHSO or lower to meet the energy code.Your measured number translates to_«/4_ACHn (air exchanges per hour under natural conditions) The calculated BAS (building airflow standard)for your hme is34GO_CFMSO.BAS is the calculated minimum required airflow for a building and its occupants.Mechanical ventilation is required if the measured CFMSO is less than 70%of the BAS.70%of 3460_is 2 772so mechanical ventilation is required. The cfm (cubic feet per minute)air exchange recommended for your house is 2 5 7.your air exchange system should be set to exchange that amount of air. Signature of Testing contactor NyseRFtegesoeesmynR.Ferguson 42-20/4 As suspected your house is very tight.Tighter than required my the new energy code.As explained above you need to have a ventilation system.