Loading...
final 04122019INSPECTION WORKSHEET (001936-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:RC-0160-2018Case Module:Permit Inspection Date:Fri Apr 12, 2019Inspection Status:Partial Pass Inspector:Charles DyerInspection Type:Residential Final Inspection Job Address:75 Overlook DRParcel Number: Queensbury, NY 12804 Contact TypeCompany NameName ApplicantLingel, Tyler ContractorT.P. Monahan, Inc. Primary OwnerLingel, Tyler Granted PermissionLingel, Tyler ArchitectRucinski-Hall Architecture Checklist ItemPassedComments General CommentsNO1. Return handrails into wall 2. Provide thermal barrier at exposed foam at utility area 3.provide final electric 4/12/19 for temp C/O conditions- 1. Complete deck rear of home 2. Provide final grade-6"-10' from foundation 3. Change out range hood to meet requirements of make up air. 4 inch Building Number Address visible from roadYES Chimney Height / B Vent / Direct Vent LocationNO Chimney Rain Cap InstalledNO Apr 12, 2019Page (1) INSPECTION WORKSHEET (001936-2019) Checklist ItemPassedComments Fresh Air IntakeYES Fresh air supply 3' from gradeYES 3" Plumbing Vent through roof minimum 18 inchYES Outside Spigots have Air GapYES Roof Complete / Exterior Finish CompleteYES Platform at all exterior doorsYES Handrail 4 or more risersYESReturn into wall Guards at stairs,decks,patios 30" + above gradeNO Guard at stairwell at 34" or moreYES Window guards req:<2' above floor/6' aboveYES grade - quick release installed Guard at deck, porches 36" or moreNOCondition for temp CO / deck to be constructed at later date Handrail Termination at Newell Post or WallYES Interior/Exterior Railings 34 to 38YES Wood deck: 2'+ from grade dia bracing required -NO H/C ramp compliant 4+ Deck Joist Ledger Connections-24" FromNO Ends Apr 12, 2019Page (2) INSPECTION WORKSHEET (001936-2019) Checklist ItemPassedComments Deck Ledger-Bolted per CodeNO Grade away from foundation: 6" down, 10' outNOWork in progress 6" clearance to sill plateYES Gas Shut-off Exposed & Regulator (18) AboveYES Grade HVAC Vent Terminal 10' from Lot Line &YES Openings Interior privacy/trim/doors/main entrance 36YES Bathroom / Kitchen WatertightYES Low flow toilet 1.3 gal/flushing cycle -YES showerhead/faucet Safety glazing: w/in 5' of tub/shower - stairwellYES win/adj to drs Smoke Detectors: Carbon MonoxideYES Smoke Detectors 3' from Kitchens & Baths R314YES Every level, Every bedroomYES Outside every bedroom areaYES Inter ConnectedYES Apr 12, 2019Page (3) INSPECTION WORKSHEET (001936-2019) Checklist ItemPassedComments Battery backup: _____YES Attic Access 22 x 30 minimumYES Attic Access Insulation = Attic R- ValueYES Attic Access GasketedYES Bathroom Fans, if no windowYES Plumbing fixturesYES Backflow Preventors where requiredYES Foundation insulation to floorYES Energy Sticker on Elec. Panel:R-Val. & HeatingYESProvide certification of insulation Sys All Hot Water Systems: R-3YES Duct work sealed properlyYES Intake OpeningsYES Range Hood 400+ cfm-Fresh Air REQUIREDYES Blower Door Test CertificationYES HRV or ERV Installed per Bedroom RequirementsYES Apr 12, 2019Page (4) INSPECTION WORKSHEET (001936-2019) Checklist ItemPassedComments Emergency egress below gradeYES Furnace shut-off w/in 30 ft. or w/in line of siteYES Propane Tank: Proper Setback from PropNO Line/Struct Furnace Hot Water Heater operatingYES Relief Valve ,Heat Trap/Water Temp 110 deg orYES less Encl. Stairs Sheetrock Underside minimum ½NO Gypsum 1/2" Gypsum or House Wall and GableYES 20 Minute Fire Door/Self-Closing HardwareYES Seals on Garage Doors, esp. WoodYES Basement stairs closed rise greater than 4 inchesYES Basement Egress: 5s.f. window w/sill or BilcoYES door Basement ceiling covered 2x8 fl joist or lessYES Jack posts in basement lagged at top and bottomYESProvide bracing at LVL's basement Verified 4/12/19 Garage Floor PitchedYES Apr 12, 2019Page (5) INSPECTION WORKSHEET (001936-2019) Checklist ItemPassedComments 1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl.YES Truss Gas Log In Sealed or Glass EnclosureYES Fin Elect; Energy Saving Light Bulbs 50 PercentYES CSST/other piping in conduit if buried,if requiredYES Final Survey Plot PlanYES Arc Fault Breaker Habitable SpacesYES Flex Gas Pipe BondingYES As Built Septic SystemYES Site Plan / Variance requiredNO Flood Plain Certification, if requiredNO Fuel Tanks above flood plain elevationNO Buried Fuel Tanks anchored in flood zoneNO Truss ID Signage Installed at Electrical MeterYES OK to Issue Temporary C/OYESSee conditions top of page 4/12/19 OK to Issue C/ONO Dyer, Charles (Inspector) Apr 12, 2019Page (6)