final 04092019INSPECTION WORKSHEET (001886-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:RC-0160-2018Case Module:Permit
Inspection Date:Tue Apr 9, 2019Inspection Status:Partial Pass
Inspector:Charles DyerInspection Type:Residential Final Inspection
Job Address:75 Overlook DRParcel Number:
Queensbury, NY 12804
Contact TypeCompany NameName
Primary OwnerLingel, Tyler
ContractorT.P. Monahan, Inc.
ArchitectRucinski-Hall Architecture
Granted PermissionLingel, Tyler
ApplicantLingel, Tyler
Checklist ItemPassedComments
General CommentsNO1. Return handrails into wall
2. Provide thermal barrier at exposed foam at utility area
3.provide final electric
4 inch Building Number Address visible from roadYES
Chimney Height / B Vent / Direct Vent LocationNO
Chimney Rain Cap InstalledNO
Fresh Air IntakeYES
Fresh air supply 3' from gradeYES
Apr 09, 2019Page (1)
INSPECTION WORKSHEET (001886-2019)
Checklist ItemPassedComments
3" Plumbing Vent through roof minimum 18 inchYES
Outside Spigots have Air GapNO
Roof Complete / Exterior Finish CompleteYES
Platform at all exterior doorsNO
Handrail 4 or more risersNOReturn into wall
Guards at stairs,decks,patios 30" + above gradeNO
Guard at stairwell at 34" or moreYES
Window guards req:<2' above floor/6' aboveYES
grade - quick release installed
Guard at deck, porches 36" or moreNOCondition for temp CO / deck to be constructed at later date
Handrail Termination at Newell Post or WallNO
Interior/Exterior Railings 34 to 38YES
Wood deck: 2'+ from grade dia bracing required -NO
H/C ramp compliant
4+ Deck Joist Ledger Connections-24" FromNO
Ends
Deck Ledger-Bolted per CodeNO
Grade away from foundation: 6" down, 10' outNOWork in progress
Apr 09, 2019Page (2)
INSPECTION WORKSHEET (001886-2019)
Checklist ItemPassedComments
6" clearance to sill plateYES
Gas Shut-off Exposed & Regulator (18) AboveNO
Grade
HVAC Vent Terminal 10' from Lot Line &YES
Openings
Dryer Duct Max Length 35', Labeled Over 35'NO
Interior privacy/trim/doors/main entrance 36YES
Bathroom / Kitchen WatertightYES
Low flow toilet 1.3 gal/flushing cycle -YES
showerhead/faucet
Safety glazing: w/in 5' of tub/shower - stairwellYES
win/adj to drs
Smoke Detectors: Carbon MonoxideYES
Smoke Detectors 3' from Kitchens & Baths R314YES
Every level, Every bedroomNO
Outside every bedroom areaYES
Inter ConnectedYES
Battery backup: _____YES
Apr 09, 2019Page (3)
INSPECTION WORKSHEET (001886-2019)
Checklist ItemPassedComments
Attic Access 22 x 30 minimumYES
Attic Access Insulation = Attic R- ValueYES
Attic Access GasketedYES
Bathroom Fans, if no windowYES
Plumbing fixturesYES
Backflow Preventors where requiredYES
Foundation insulation to floorYES
Energy Sticker on Elec. Panel:R-Val. & HeatingNO
Sys
All Hot Water Systems: R-3YES
Duct work sealed properlyYES
Intake OpeningsYES
Range Hood 400+ cfm-Fresh Air REQUIREDYES
Blower Door Test CertificationYES
HRV or ERV Installed per Bedroom RequirementsYES
Emergency egress below gradeYES
Apr 09, 2019Page (4)
INSPECTION WORKSHEET (001886-2019)
Checklist ItemPassedComments
Furnace shut-off w/in 30 ft. or w/in line of siteYES
Propane Tank: Proper Setback from PropNO
Line/Struct
Furnace Hot Water Heater operatingYES
Relief Valve ,Heat Trap/Water Temp 110 deg orYES
less
Encl. Stairs Sheetrock Underside minimum ½NO
Gypsum
1/2" Gypsum or House Wall and GableNO
20 Minute Fire Door/Self-Closing HardwareYES
Seals on Garage Doors, esp. WoodYES
Basement stairs closed rise greater than 4 inchesYES
Basement Egress: 5s.f. window w/sill or BilcoYES
door
Basement ceiling covered 2x8 fl joist or lessYES
Jack posts in basement lagged at top and bottomNOProvide bracing at LVL's basement
Garage Floor PitchedYES
1/2" Gypsum-Bsmt Ceiling<2x10 Frame/TJI/Fl.YES
Truss
Apr 09, 2019Page (5)
INSPECTION WORKSHEET (001886-2019)
Checklist ItemPassedComments
Gas Log In Sealed or Glass EnclosureNO
Fin Elect; Energy Saving Light Bulbs 50 PercentNO
CSST/other piping in conduit if buried,if requiredYES
Final Survey Plot PlanYES
Arc Fault Breaker Habitable SpacesYES
Flex Gas Pipe BondingYES
As Built Septic SystemYES
Site Plan / Variance requiredNO
Flood Plain Certification, if requiredNO
Fuel Tanks above flood plain elevationNO
Buried Fuel Tanks anchored in flood zoneNO
Truss ID Signage Installed at Electrical MeterNO
OK to Issue Temporary C/ONO
OK to Issue C/ONO
Dyer, Charles (Inspector)
Apr 09, 2019Page (6)