ResCheck GComplianceenerated by REScheck-Web Software
0
Certificate
Project 0 Ridge road
Energy Code: 2015 IECC
Location: Warren County, New York
Construction Type: Single-family 297.6-1-29 RC-0489-2019
Project Type: New Construction Beshara Enterprises LLC
Conditioned Floor Area: 2,600 ft2 733 Ridge Rd
Glazing Area 6 SFD 1301 s.f., Garage 391 s.f.
Climate Zone: 6 (8499 HDD) g
Permit Date:
Permit Number:
Construction Site: Owner/Agent: Designer/Contractor:
0 Ridge road Beshara Enterprises LLC
queenbury, ny 12804 4 Jon Kay Rd.
Fort Edward, NY 12828
michaelbeshara2@yahoo.com
Compliance: Passes using UA trade-off
Compliance: 2.7%Better Than Code Maximum UA: 221 Your UA: 215
The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home.
Envelope Assemblies
Gross Area Cavity Cont.
Assembly or U-Factor UA
R-Value R-Value
Perimeter
Ceiling: Raised or Energy Truss 1,300 38.0 0.0 0.025 33
Main Floor Walls: Wood Frame, 16" o.c. 1,404 21.0 0.0 0.057 68
Front Door: Solid Door(under 50%glazing) 20 0.200 4
Fire Door: Solid Door(under 50%glazing) 18 0.200 4
Sliding Door: Glass Door(over 50%glazing) if it >- 40 0.280 11
Main Floor Windows: Vinyl Frame L=! - Ct U) 129 0.280 36
Ix]Li.]
Basement: Solid Concrete or Masonry g (4O 981 0.0 19.0 0.041 39
Wall height: 8.0' N W U
Depth below grade: 6.0' c Lu
Insulation depth: 8.0' n n o N D
Basement Windows: Vinyl Frame pub LLB? 32 0.280 9
LJ Basement: Solid Concrete or Masonry 0G 107 0.0 19.0 0.043 5
Wall height: 4.0' e�n�np
Depth below grade: 3.5' L`"� •d
Insulation depth: 4.0' I—
Basement(back wall-wood portion): Wood Frame 107 21.0 0.0 0.060 6
Wall height: 4.0'
Depth below grade: 0.0'
Insulation depth: 4.0'
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 1 of10
Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other
calculations submitted with the permit application.The proposed building has been designed to meet the 2015 IECC requirements in
REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
/� d�le( . 60sti�,rg -Z e�n6g✓J *rrate J1 Lr 020i1,, i9
Name-Title ignature Date
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 2 of10
REScheck Software VersionChecklist: REScheck-Web
0
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section Plans Verified Field Verified
# Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions
& Req.ID
103.1, Construction drawings and EComplies
103.2 documentation demonstrate ❑Does Not
[PR1]1 energy code compliance for the
0 building envelope.Thermal ['Not Observable
envelope represented on ❑Not Applicable
construction documents.
103.1, Construction drawings and ❑Complies
103.2, documentation demonstrate ❑Does Not
403.7 energy code compliance for
[PR3]1 lighting and mechanical systems. ❑Not Observable
** Systems serving multiple ❑Not Applicable
dwelling units must demonstrate
compliance with the IECC
Commercial Provisions.
302.1, Heating and cooling equipment is Heating: Heating: ❑Complies
403.7 sized per ACCA Manual S based Btu/hr Btu/hr ❑Does Not
[PR2]z on loads calculated per ACCA Cooling: Cooling:
Manual J or other methods ['Not Observable
u Btu/hr Btu/hr ❑Not Applicable
approved by the code official. PP
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 3 of10
Section Plans Verified Field Verified
Foundation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1 Conditioned basement wall R- R- ElComplies See the Envelope Assemblies
[FO4]1 insulation R-value. Where interior R_ R- ❑Does Not table for values.
insulation is used, verification
may need to occur during ['Not Observable
Insulation Inspection. Not ❑Not Applicable
required in warm-humid locations
in Climate Zone 3.
303.2 Conditioned basement wall ❑Complies
[FO5]1 insulation installed per ❑Does Not
manufacturer's instructions.
❑Not Observable
❑Not Applicable
402.2.9 Conditioned basement wall ft ft Complies See the Envelope Assemblies
[FO6]1 insulation depth of burial or ❑Does Not table for values.
distance from top of wall.
❑Not Observable
❑Not Applicable
303.2.1 A protective covering is installed ❑Complies
[FO11]2 to protect exposed exterior ❑Does Not
insulation and extends a
minimum of 6 in. below grade. ❑Not Observable
❑Not Applicable
403.9 Snow-and ice-melting system Complies
[FO12]2 controls installed. ❑Does Not
:Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 4 of10
Section Plans Verified Field Verified
# Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions
& Req.ID
402.1.1, Door U-factor. U- U- ❑Complies See the Envelope Assemblies
402.3.4 ❑Does Not table for values.
[FR1]1 ['Not Observable
❑Not Applicable
402.1.1, Glazing U-factor(area-weighted U- U- ❑Complies See the Envelope Assemblies
402.3.1, average). ❑Does Not table for values.
402.3.3,
402.5 ❑Not Observable
[FR2P ❑Not Applicable
303.1.3 U-factors of fenestration products ❑Complies
[FR4]1 are determined in accordance ❑Does Not
with the NFRC test procedure or
taken from the default table. ['Not Observable
❑Not Applicable
402.4.1.1 Air barrier and thermal barrier ❑Complies
[FR23]1 installed per manufacturer's ❑Does Not
instructions.
['Not Observable
❑Not Applicable
402.4.3 Fenestration that is not site built ❑Complies
[FR20]1 is listed and labeled as meeting ElDoes Not
AAMA/WDMA/CSA 101/I.S.2/A440 ['Not Observable
or has infiltration rates per NFRC
400 that do not exceed code ❑Not Applicable
limits.
402.4.5 IC-rated recessed lighting fixtures ❑Complies
[FR16]z sealed at housing/interior finish ❑Does Not
and labeled to indicate s2.0 cfm
leakage at 75 Pa. ❑Not Observable
❑Not Applicable
403.3.1 Supply and return ducts in attics ❑Complies
[FR12]1 insulated >= R-8 where duct is ❑Does Not
>= 3 inches in diameter and >=
R-6 where < 3 inches. Supply and ❑Not Observable
return ducts in other portions of ❑Not Applicable
the building insulated >= R-6 for
diameter>= 3 inches and R-4.2
for< 3 inches in diameter.
403.3.5 Building cavities are not used as ElComplies
[FR15]3 ducts or plenums. ❑Does Not
:Not Observable
❑Not Applicable
403.4 HVAC piping conveying fluids R- R- ❑Complies
[FR17]z above 105°F or chilled fluids ❑Does Not
below 55 °F are insulated to >R-
ep
3 ❑Not Observable
❑Not Applicable
403.4.1 Protection of insulation on HVAC ❑Complies
[FR24]1 piping. ❑Does Not
['Not Observable
❑Not Applicable
403.5.3 Hot water pipes are insulated to R- R- ❑Complies
[FR18]2 >_R-3. ❑Does Not
❑Not Observable
❑Not Applicable
403.6 Automatic or gravity dampers are ❑Complies
[FR19]z installed on all outdoor air ❑Does Not
intakes and exhausts.
❑Not Observable
ENot Applicable
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 5 of10
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 6 of10
Section Plans Verified Field Verified
# Insulation Inspection Value Value Complies? Comments/Assumptions
& Req.ID
303.1 All installed insulation is labeled ❑Complies
[IN13]2 or the installed R-values ❑Does Not
provided.
['Not Observable
❑Not Applicable
402.1.1, Wall insulation R-value. If this is a R- R ❑Complies See the Envelope Assemblies
402.2.5, mass wall with at least 1/2 of the El Wood ❑ Wood ❑Does Not table for values.
402.2.6 wall insulation on the wall ❑ Mass El Mass ❑Not Observable
[IN3]1 exterior,the exterior insulation
requirement applies (FR10). ❑ Steel ❑ Steel ❑Not Applicable
303.2 Wall insulation is installed per ❑Complies
[IN4]1 manufacturer's instructions. ❑Does Not
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 7 of10
Section
# Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions
& Req.ID Value Value
402.1.1, Ceiling insulation R-value. R- R- ❑Complies See the Envelope Assemblies
402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values.
402.2.2, ❑ Steel ❑ Steel [Not Observable
402.2.6
[F11]1 ❑Not Applicable
303.1.1.1, Ceiling insulation installed per ❑Complies
303.2 manufacturer's instructions. EDoes Not
[F12]1 Blown insulation marked every
300 ft2. ❑Not Observable
❑Not Applicable
402.2.3 Vented attics with air permeable ❑Complies
[F122]2 insulation include baffle adjacent ElDoes Not
to soffit and eave vents that
extends over insulation. ['Not Observable
❑Not Applicable
402.2.4 Attic access hatch and door R- R- ❑Complies
[FI3]1 insulation >_R-value of the ElDoes Not
adjacent assembly.
❑Not Observable
❑Not Applicable
402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50 = ❑Complies
[F117]1 ach in Climate Zones 1-2, and EDoes Not
<=3 ach in Climate Zones 3-8.
❑Not Observable
❑Not Applicable
403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies
[FI4]1 cfm/100 ft2 across the system or ft2 ft2 ElDoes Not
<=3 cfm/100 ft2 without air
handler @ 25 Pa. For rough-in [Not Observable
tests, verification may need to ❑Not Applicable
occur during Framing Inspection.
403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies
[F127]1 determine air leakage with ft2 ft2 ❑Does Not
either: Rough-in test: Total
leakage measured with a ❑Not Observable
pressure differential of 0.1 inch ❑Not Applicable
w.g. across the system including
the manufacturer's air handler
enclosure if installed at time of
test. Postconstruction test:Total
leakage measured with a
pressure differential of 0.1 inch
w.g. across the entire system
including the manufacturer's air
handler enclosure.
403.3.2.1 Air handler leakage designated EComplies
[F124]1 by manufacturer at <=2%of EDoes Not
design air flow.
['Not Observable
❑Not Applicable
403.1.1 Programmable thermostats ❑Complies
[FI9]2 installed for control of primary ElDoes Not
heating and cooling systems and
initially set by manufacturer to ❑Not Observable
code specifications. ❑Not Applicable
403.1.2 Heat pump thermostat installed ❑Complies
[FI10]2 on heat pumps. EDoes Not
['Not Observable
❑Not Applicable
403.5.1 Circulating service hot water ❑Complies
[FI11]2 systems have automatic or ElDoes Not
accessible manual controls.
[Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 8 of10
Section
# Final Inspection Provisions Plans Verified Field Verified Complies? Comments/Assumptions
& Req.ID Value Value
403.6.1 All mechanical ventilation system ❑Complies
[FI25]2 fans not part of tested and listed ❑Does Not
HVAC equipment meet efficacy
and air flow limits. ['Not Observable
❑Not Applicable
403.2 Hot water boilers supplying heat ❑Complies
[FI26]2 through one-or two-pipe heating ❑Does Not
systems have outdoor setback
control to lower boiler water ['Not Observable
temperature based on outdoor ❑Not Applicable
temperature.
403.5.1.1 Heated water circulation systems ❑Complies
[F128]2 have a circulation pump.The ❑Does Not
system return pipe is a dedicated
return pipe or a cold water supply ❑Not Observable
pipe. Gravity and thermos- ❑Not Applicable
syphon circulation systems are
not present. Controls for
circulating hot water system
pumps start the pump with signal
for hot water demand within the
occupancy. Controls
automatically turn off the pump
when water is in circulation loop
is at set-point temperature and
no demand for hot water exists.
403.5.1.2 Electric heat trace systems ❑Complies
[FI29]2 comply with IEEE 515.1 or UL ❑Does Not
515. Controls automatically
adjust the energy input to the ❑Not Observable
heat tracing to maintain the ❑Not Applicable
desired water temperature in the
piping.
403.5.2 Water distribution systems that ❑Complies
[F130]2 have recirculation pumps that ❑Does Not
pump water from a heated water
supply pipe back to the heated ['Not Observable
water source through a cold ❑Not Applicable
water supply pipe have a
demand recirculation water
system. Pumps have controls
that manage operation of the
pump and limit the temperature
of the water entering the cold
water piping to 1044F.
403.5.4 Drain water heat recovery units EComplies
[FI31]2 tested in accordance with CSA ❑Does Not
B55.1. Potable water-side
pressure loss of drain water heat ['Not Observable
recovery units < 3 psi for ❑Not Applicable
individual units connected to one
or two showers. Potable water-
side pressure loss of drain water
heat recovery units < 2 psi for
individual units connected to
three or more showers.
404.1 75%of lamps in permanent ❑Complies
[F16]1 fixtures or 75%of permanent ❑Does Not
fixtures have high efficacy lamps.
Does not apply to low-voltage ['Not Observable
lighting. ❑Not Applicable
404.1.1 Fuel gas lighting systems have ❑Complies
[FI23]3 no continuous pilot light. ❑Does Not
❑Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 9 of10
Section Plans Verified Field Verified
# Final Inspection Provisions Value Value Complies? Comments/Assumptions
& Req.ID
401.3 Compliance certificate posted. ❑Complies
[FI7]2 ❑Does Not
[Not Observable
❑Not Applicable
303.3 Manufacturer manuals for ❑Complies
[FI18]3 mechanical and water heating ❑Does Not
systems have been provided.
[Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 0 Ridge road Report date: 10/04/18
Data filename: Page 10 of10
c2015 IECC Energy
..(1 Efficiency Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 19.00
Floor 0.00
Ceiling / Roof 38.00
Ductwork (unconditioned spaces):
Glass & Door Rating U-Factor SHGC
Window 0.28
Door 0.28
Heating & Cooling Equipment Efficiency
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments