Loading...
CC-0044-2019TOWN OF QUEENSBURY a y 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 Community Development - Building & Codes (518) 761-8256 CERTIFICATE OF OCCUPANCY Permit Number: CC-0044-2019 Date Issued: Monday, June 24, 2019 This is to certify that work requested to be done as shown by Permit Number CC-0044-2019 has been completed. Tax Map Number: 309.7-1-55 Location: 28 WESTERN AVE SOUTH Owner: Hudson Headwater Health Network- Applicant: BBL Construction Services This structure may be occupied as a: New Commercial Building 5700 s.f. Tenant: HHHN By Order of Town Board TOWN OF QUEENSBURY Issuance of this Certificate of Occupancy DOES NOT relieve thepropertyownerowneroftheresponsibilityforcompliancewithSitePlan, Variance, or other issues and conditions as a result of approvals by the Director of Building&Code Enforcement Planning Board or Zoning Board of Appeals. TOWN OF QUEENSBURY 742 Bay Road,Queensbury,NY 12804-5904 (518)761-8201 f-=s Community Development- Building& Codes (518) 761-8256 BUILDING PERMIT Permit Number: CC-0044-2019 Tax Map No: 309.7-1-55 Permission is hereby granted to: Hudson Headwater Health Network For property located at:28 WESTERN AVE SOUTH In the Town of Queensbury,to construct or place at the above location in accordance with application together with plot plans and other information hereto filed and approved and in compliance with the NYS Uniform Building Codes and the Queensbury Zoning Ordinance Type of Construction Owner Name: Hudson Headwater Health Network Business Office-Alteration 656,367.00 Owner Address: 9 Carey RD Total Value 656,367.00 Queensbury,NY 12804 Contractor or Builder's Name/Address Electrical Inspection Agency BBL Construction Services 302 Washington AVE,Extension Albany,NY 12203 Plans&Specifications New Commercial Building 5700 s.f. Tenant: HHHN 1,710.00 PERMIT FEE PAID -THIS PERMIT EXPIRES: Thursday,February 20,2020 If a longer period is required,an application for an extension must be made to the code Enforcement Officer of the Town of Queensbury before the expiration date.) Dated at the Town of Queensbury; Wednesday,February 20,2019 SIGNED BY: T d/ J for the Town of Queensbury. Director of Building&Code Enforcement r r O `, e Jse Only ADDITION/AL ' iA`T ONPER1VIIT--' it#• l 4^. .. APPLIC I NJAN 2 8 2019 , f) . i it Fee: $ 7J Ti»r'n oIQuccnsbutv 742 Bay Road,Queensbury,NY 12804 TOWN OF QUEENSBUIbice#: i 2-0 C P:518-761-8256 www.aueensburv.net BUILDING&CODES Project Location: 28 S.Western Ave Tax Map ID #: 30q .) --1 - sf 5 6 -)16L 63 Subdivision Name: CONTACT INFORMATION: Applicant: Name(s): BBL Construction Services, LLC (Mike Rank) Mailing Address, C/S/Z: 302 Washington Avenue Extension,Albany, NY 12203 Cell Phone: ( 518 ) 265-3053 Land Line: ( 518 ) 452-8200 x4293 Email: mrank@bblinc.com Primary Owner(s): Name(s): Hudson Headwaters Health Network(Dal Valentini) Mailing Address, C/S/Z: 9 Carey Road, Queensbury, NY 12804 Cell Phone: ( 518 ) 857-3408 Land Line: ( 518 ) 761-0300 x31624 Email: dvalentini@hhhn.org Contractor(s): Business Name: BBL Construction Services, LLC Contact Name(s): Mike Rank Mailing Address, C/S/Z: 302 Washington Avenue Extension,Albany, NY 12203 Cell Phone: ( 518 ) 265-3053 Land Line: ( 518 ) 452-8200 x4293 Email: mrank@bblinc.com Architect(s)/Engineer(s): Business Name: HCP Architect's, LLP Contact Name(s): Ben Nassivera Mailing Address, C/S/Z: 302 Washington Avenue Extension,Albany, NY 12203 Cell Phone: ( 518 ) 265-7625 Land Line: ( 518 )218-0614 Email: bnassivera@hcpdesign.com Contact Person for Building & Code Compliance: Ben Nassivera (Architect) Cell Phone: ( 518 ) 265-7625 Land Line: ( 518 ) 218-0614 Email: bnassivera@hcpdesign.com Mike Rank(Construction Project Manager) Cell: 518-265-3053 Email: mrank@bblinc.com Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised March 2018 PROJECT INFORMATION: TYPE: X Commercial Residential WORK CLASS: Single-Family Two-Family Multi-Family(#of units Townhouse Business Office Retail Industrial/Warehouse Garage (#of cars X Other (describe Medical Office-Fit-Up ) ADDITION SQUARE FOOTAGE: ALTERATION SQUARE FOOTAGE: 1st floor: 1st floor: -5,63- C oe 2nd floor: 2nd floor: N/A 3rd floor: 3rd floor: N/A Basement (habitable space): Basement (habitable space): N/A Total square feet: N/A Total square feet: -;f0T s )CO Please note: This project consists of interior fit-up only, with minor modifications to the existing entry in order to accommodate a new vestibule area. The fencing for the existing dumpster enclosure will also be replaced with new wood fencing. There will be no modifications to the existing site. ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 656,367.00 2. If Commercial project, what is the proposed use: Medical Services-Primary Care 3. Source of Heat (circle one): 1420 Oil Propane Solar Other Fireplaces need a separate Fuel Burning Appliances&Chimney Application Existing shed at NW corner of parking lot,which is to remain 4. Are there any structures not shown on the plot plan? ®NO Explain: as is. 5. Are there any easements on the property? YES 6. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? 1.31 Acres b. Is this a corner lot? YES NO c. Will the grade be changed as a result of the construction? YES NO d. What is the water source? (PUBLIC PRIVATE WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? Sewer Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised March 2018 DECLARATION: 1. I acknowledge that no construction shall be commenced prior to issuance of a valid permit and will be completed within a 12 month period. 2. If the work is not completed by the 1 year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I also understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities prior to issuance of a certificate of occupancy. I have read and agree to the above: PRINT NAME: Michael. Rank SIGNATURE: DATE: 1 I2e—(l, Town of Queensbury Building&Code Enforcement Addition/Alteration Application Revised March 2018 COMcheck Software Version 4.1.1.0 NI/lic Mechanical Compliance Certificate Project Information A Energy Code: 2015 IECC Project Title:Hudson Headwaters JAN 2 8 2019 J Location: Glens Falls, New York Climate Zone: 6a TOWN OF QUEENSBURY Project Type: Alteration BUILDING&CODES Construction Site: OwnerlApent Designer/Contractor: 28 Southwestern Ave McD Metals Queensbury, NY REVIEWED FOR 20 Corporate Albany, NY 12203e ENERGY CODE COMPLIANC, Mechanical Systems List Quantity System Type&Description I FILE COPY 1 HVAC System 1 (Multiple-Zone): Heating:1 each-Hydronic or Steam Coil,Hot Water,Capacity=185 ki3tufn No minimum efficiency requirement applies Cooling:1 each-Single Package DX Unit,Capacity=185 kBtulh.Air-Cooled Condenser,Air Economizer Proposed Efficiency=11.00 EER,Required Efficiency: 10.80 EER +12.2 IEER Fan System: FAN SYSTEM 1 I All—Compliance(Brake HP method):Passes Fans: FAN 1 Supply,Multi-Zone VAV,5120 CFM,5.0 motor nameplate hp,3.2 design brake hp(3.2 max.BHP),0.0 fan efficiency grade 1 Plant 1: Heating:Hot Water Boiler,Capacity 185 kBtulh,Gas No minimum efficiency requirement applies 1 Water Heater 1: Electric Storage Water Heater,Capacity:40 gallons w/Circulation Pump Proposed Efficiency:1.00 SL,%/h(if>12 kW),Required Efficiency:0.98 SL,%/h(if>12 kW) Mechanical Compliance Statement Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.T proposed mechanical systems have been designed to meet the 2015 IECC requirements in COM ion 4.1. 0 an o co ply with any applicable mandatory requirements listed in the Inspection Checklist. t Me]rJ>Q N 1 r I Z'3riavrIcavas(1 j l ( `Name-Title ( • Signature—. Date TiLEulc co Slc t A Sso Gil-f'C X7-C. OFNSE 309.7-1-55 CC-0044-2019 P\ LI HHHN r— tii..al 28 Western Ave S 1`at _. z New Commercial Bldg 5700 s.f. t10FEssio, Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD2003SBS\Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 1 of 11 COMcheck Software Version 4.1.1.0 Inspection Checklist Energy Code: 2015 IECC Requirements: 92.0% were addressed directly in the COMcheck software Text in the"Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance is itemized in a separate table. a reference to that table is provided. Section j Plan Review Complies?Comments/Assumptions R C103.2 Plans,specifications,and/or Complies Requirement will be met. PR2]1 calculations provide all information Does Not with which compliance can be determined for the mechanical Not Observable systems and equipment and Not Applicable document where exceptions to the standard are claimed.Load calculations per acceptable engineering standards and handbooks. C103.2 Plans,specifications,and/or Requirement will be met. PR3]1 calculations provide all information. -maces Not with which compliance can be Not Observabledeterminedfortheservicewater heating systems and equipment and got Applicable document where exceptions to the standard are claimed.Hot water system sized per manufacturer's sizing guide. C406 Plans,specif:catcrs, and/or Complies PR9]1 calculations provide all information Does Not with which compliance can be determined for the additional energy Not Observable efficiency package options. Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 12 1-Medium Impact(Tier 2) 13 (Low Impact(Tier 3) Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD2003SBS1Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 2 of 11 Footing/Foundation Inspection Complies?Comments/Assumptions Req.ID; C403.2.4. Snow/ice melting system sensors for OComplies Exception:Requirement does not apply. 5. future connection to controls.Freeze ElDoes Not C403.2.4. protection systems have automatic rt 6 controls installed. Not Observable FO973 DNot Applicable Additional Comments/Assumptions: t'.1 jHigh Impact(Tier 1) T 2 1Medium Impact(Tier 2) 1-37-Low Impact(Tier 3) Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD20035B5\Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 3 of 11 Seecction — 1 Plumbing Rough-In Inspection ! Complies?Comments/Assumptions R ..IDS C404.5. Heated water supply piping conforms OComplies Requirement will be met. C404.5.1. to pipe length and volume Does Not C404.5.2 requirements.Refer to section details. : Not ObservablePL6]3 Not Applicableti C404.5, Heated water supply piping conforms OComplies Requirement will be met. C404.5.1, to pipe length and volume Does Not C404.5.2 requirements.Refer to section details. PL6]3 Not Observable Not Applicable C404.5, Heated water supply piping conformsDComplies Requirement will be met. C404.5.1, 'to pipe length and volume ODoes Not C404.5.2 requirements.Refer to section details. PL613 Not Observable Not Applicable C404.6.1. Automatic time switches installed to Complies Exception: Requirement does not apply. C404.6.2 automatically switch off the Does Not PL3]1 recirculating hot-water system or heat trace. Not Observable Not Applicable C404.6.3 Pumps that circulate water between a Complies Exception: Requirement does not apply. PL713 heater and storage tank have controls Does Not that limit operation from startup to 5 minutes after end of heating [Not Observable cycle. Not Applicable C404.6.3 Pumps that circulate water between a OComplies Requirement will be met. PL713 heater and storage tank have controls Does Not that limit operation from startup to 5 minutes after end of heating Not Observable cycle. Not Applicable C404.6.3 Pumps that circulate water between a OComplies Exception: Requirement does not apply. PL713 heater and storage tank have controls Does Not that limit operation from startup to 5 minutes after end of heating Not Observable cycle. Not Applicable C404.7 Water distribution system that pumps OComplies Exception: Requirement does not apply. KS]3 water from a heated-water supply `Does Not pipe back to the heated-water source through a cold-water supply pipe is a Not Observable demand recirculation water system. Not Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. C404.7 Water distribution system that pumps OComplies Exception: Requirement does not apply. PL813 water from a heated-water supply :DDoes Not 4 pipe back to the heated-water source through a cold-water supply pipe is a ONot Observable demand recirculation water system. Not Applicable Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. 1 High Impact(Tier 1) 1 2 !Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD2003SBS\Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 4 of 11 Section Plumbing Rough-In Inspection Complies?Comments/Assumptions Req.ID,. _ J404.7 Water distribution system that pumps OComplies Exception: Requirement does not apply.PL1313 water from a heated-water supply Does Not pipe back to the heated-water source through a cold-water supply pipe is a DNot Observable demand recirculation water system. Not Applicable Pumps within this system have controls that start the pump upon y i receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F, Additional Comments/Assumptions: 1 High Impact(Tier 1) f 2 Medium Impact(Tier 2) j 3 (Low Impact(Tier 3) Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD20035B5\Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 5 of 11 Section r i Mechanical Rough-In Inspection Complies?Comments/Assumptions Req.ID j C402.2.6 Thermally ineffective panel surfaces of DComplies Exception:Requirement does not apply.ME4113 sensible heating panels have Does Not insulation>=R-3.5. Not Observable Not Applicable C403.2.13 Unenclosed spaces that are heated Complies Exception:Requirement does not apply.ME7112 use only radiant heat. Does Not M Not Observable Not Applicable C403.2.3 'HVAC equipment efficiency verified. _ ['Complies See the Mechanical Systems list for values. ME5512 : Does Not Not Observable Not Applicable C403.2.4. Zone isolation devices and controls Complies Requirement will be met. 4 installed where applicable. Does Not ME112J3 Not Observable Not Applicable C403.2.4. Fault detection and diagnostics Complies Exception:Requirement does not apply. 7 installed with air-cooled unitary DX Does Not ME3:1312 units having economizers.Not Observable Not Applicable C403.2.5. Hot water boilers supplying heat via Complies Exception: Requirement does not apply. 1 one-or two-pipe systems include Does Not ME11412 outdoor setback control. Not Observable I Not Applicable C403.2.6 Demand control ventilation provided Complies Exception: Requirement does not apply. 1 for spaces>500 ft2 and>25 Does Not ME5911 people/1000 ft2 occupant density and served by systems with air side Not Observable economizer, auto modulating outside Not Applicable air damper control,or design airflow 3,000 cfm. C403.2.6. Enclosed parking garage ventilation Complies Exception:Requirement does not apply. 2 has automatic contaminant detection Does Not ME115]3 and capacity to stage or modulate fans to 50%or less of design capacity. ONot Observable Not Applicable C403.2.7 Exhaust air energy recovery on Complies Exception: Requirement does not apply. ME57J1 systems meeting Table C403.2.7(1) Does Not and C403.2.7(2). Not Observable Not Applicable C403.2.8 Kitchen exhaust systems comply with Complies Exception: Requirement does not apply. ME11613 replacement air and conditioned Does Not supply air limitations,and satisfy hood rating requirements and maximum Not Observable exhaust rate criteria. Not Applicable C403.2.9 HVAC ducts and plenums insulated. Complies Requirement will be met. ME60]Z :Where ducts or plenums are installed Does Not in or under a slab,verification may need to occur during Foundation Not Observable Inspection. Not Applicable C403.2.9 Ducts and plenums sealed based on Complies Requirement will be met. ME10]2 static pressure and location. ODoes Not Not Observable i Not Applicable High Impact(Tier 1) ` j 2 (Medium Impact(Tier 2) 3!Low Impact(Tier 3) j1 Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: 11MCD2003SBStUsers\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 6 of 11 Section { Mechanical Rough-In Inspection ' Complies?Comments/Assumptions ReglDI C403.3 Air economizers provided where Complies Requirement will be met. ME62)1 required,meet the requirements for Does Not design capacity,control signal, ventilation controls,high-limit shut-off. :Not Observable integrated economizer control,and Not Applicable provide a means to relieve excess outside air during operation. C403.4.1. Hydronic and multizone HVAC system Complies Exception:Requirement does not apply. 1 controls areVAV fans driven by Goes Not ME7512 mechanical or electrical variable speed drive per Table C403.4.1.1. Not Observable Not Applicable C403.4.1. VAV fans have static pressure sensors Complies Exception:Requirement does not apply. 2 located so controller setpoint<=1.2 Does Not ME6712 .w.c.. Not Observable Not Applicable C403.4.1. Reset static pressure setpoint for DDC Complies _ Requirement will be met. 3 controlled VAV boxes reporting to Does Not ME24]2 central controller based on the zones requiring the most pressure. Ivct Observable Not App;:cable C403.4.2. 'Three-pipe hydronic systems using a Complies Requirement will be met. 1 common return for hot and chilled Does Not ME5012 water are not used. Not Observable Not Applicable C403.4.2. Two-pipe hydronic systems using a Complies Requirement will be met. 2 common distribution system have Does Not ME6412 controls to allow a deadband>=15 F. Not Observableallowoperationinonemodeforat least 4 hrs before changeover,and Not Applicable have rest controls to limit heating and I cooling supply temperature to<=30 QF. J C403.4.2. Chilled water plants with multiple Complies Requirement will be met. 6 chillers have capability to reduce flow Does Not ME2613 automatically through the chiller plant when a chiller is shut down.Boiler Not Observable plants with multiple boilers have the Not Applicable capability to reduce flow automatically through the boiler plant when a boiler is shut down. C403.4.4. Multiple zone VAV systems with DDC Complies Requirement will be met. 6 of individual zone boxes have static Does Not ME110]3 pressure setpoint reset controls. Not Observable See the Mechanical Systems list for values. Not Applicable C403.4.5 Condenser heat recovery system that Complies Exception:Design SWH load=1 MMBtu/h. ME31]3 can heat water to 85 QF or provide Does Not 60%of peak heat rejection is installed for preheating of service hot water. [Not Observable Not Applicable C408.2.2. Air outlets and zone terminal devices Complies Requirement will be met. x 1 have means for air balancing. ODoes Not ME5333 DJNot Observable ONot Applicable C408.2.2. HVAC hydronic heating and cooling Complies Requirement will be met. 2 coils have means to balance and have Does Not ME5413 pressure test connections. Not Observable Not Applicable 1 1High Impact(Tier 1) 12 1Medium Impact(Tier 2) I 3 'Low Impact(Tier 3) j Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD2003SBS1Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 7 of 11 Section i # Mechanical Rough-In Inspection i Complies?Comments/Assumptions Req-ID; C403.5, Refrigerated display cases,walk-in Complies Exception:Requirement does not apply. C403.5.1, coolers or walk-in freezers served by Does Not C403.5.2 remote compressors and remote ME12313 condensers not located in a Jot Observable condensing unit, have fan-powered ENot Applicable condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Additional Comments/Assumptions: I 1 IHigh Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1 Project-title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD20035BS\Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 8 of 11 r, Section 1 i I Final Inspection Complies?Comments/Assumptions Re..IDi C303.3, Furnished O&M manuals for HVAC Complies Requirement will be met. C408.2.5. systems within 90 days of system Oboes Not 3 acceptance. FI813 Not Observable Not Applicable C403.2.2 HVAC systems and equipment Complies Requirement will be met. F127]3 capacity does not exceed calculated ODoes Not loads. Not Observable Not Applicable C403.2.4. Heating and cooling to each zone is Complies Requirement will be met. 1 controlled by a thermostat control. ODoes Not FI47]3 Minimum one humidity control device per installed Not Observable humidification/dehumidification Not Applicable system. C403.2.4. Thermostatic controls have a 5 °F Complies Requirement will be met. 1.2 deadband. ODoes Not F138]3 Not Observable Not Applicable C403.2.4. Temperature controls have setpoint Complies Requirement will be met. 1.3 overlap restrictions. ODoes Not F120]3 Not Observable DNot Applicable C403.2.4. Each zone equipped with setback Complies Requirement will be met. 2 controls using automatic time clock or !_',-Does Not FI39J3 programmable control system. Not Observable Not Applicable C403.2.4. Automatic Controls:Setback to 55°F Complies Requirement will be met. 2.1,heat)and 85°F(cool); 7-day clock,2- ODoes Not C403.2.4. hour occupant override,10-hour 2.2 backup Not Observable F14013 Not Applicable C403.2.4. Systems include optimum start Complies Requirement will be met. 2.3 centres. ODoes Not j[FI41]' Not Observable L„_ ONot ApplicableC404.3 Heat traps installed on supply and Complies -Exception:Requirement does not apply. FI21]3 discharge piping of non-circulating ODoes Not systems. Not Observable Not Applicable C404.4 All piping insulated in accordance with Complies Requirement will be met. I( F12511 section details and Table C403.2.10. ODoes Not Not Observable Not Applicable C404.6.1 Controls are installed that limit the Complies Exception:Requirement does not apply. FI12]3 operation of a recirculation pump ODoes Not installed to maintain temperature of a storage tank.System return pipe is a Not Observable dedicated return pipe or a cold water Not Applicable supply pipe. C408.2.1 Commissioning plan developed by 'Complies 1t Goos Cta FI28]1 registered design professional or ODoes Not approved agency. Not Observable I21Not Applicable 1 High Impact(Tier 1) j 2 1Medium Impact(Tier 2) 1 3 jLow Impact(Tier 3) Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD2003SBS\Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 9 of 11 Section I S I Final Inspection I Complies?Comments/Assumptions Req.ID l C408.2.3. HVAC equipment has been tested to Complies Requirement will be met. 1 ensure proper operation.Does Not Ft31]1 ONot Observable ONot Applicable C408.2.3. •HVAC control systems have been DComplies Requirement will be met. 2 tested to ensure proper operation. Does Not • F110]1 calibration and adjustment of controls. ONot Observable Not Applicable , C408.2.3. .Economizers have been tested to Complies Requirement will be met. W f f 3 ensure proper operation. Does Not FI32J1 ONot Observable' ONot Applicable C408.2.4 Preliminary commissioning report Complies F12911 completed and certified by registered Does Not design professional or approved agency. ONot Observable Not Applicable C408.2.5. :Furnished HVAC as-built drawings Complies Requirement will be met. 1 submitted within 90 days of system Does Not • F1713 acceptance. Not Observable ONot Applicable C408.2.5. An air and/or hydronic system DComplies Requirement will be met. 3 balancing report is provided for HVAC Does Not FI43]1 systems. Not Observable ONot Applicable C408.2.5. Final commissioning report due to Complies — y 4 building owner within 90 days of Does Not F130]1 receipt of certificate of occupancy. ONot Observable Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 {Medium Impact(Tier 2)- 3 {Low Impact(Tier 3) Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD20035B51Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 10 of 11 I • Project Title: Hudson Headwaters Report date: 01/23/19 Data filename: \\MCD2003SB5\Users\Brian\My Documents\COMcheck\Hudson Headwaters.cck Page 11 of 11 HVAC SYSTEMS TESTING: Air Balance Report for Hudson Headwaters Health Network Michael J. Lucarelli June 8, 2019 PO Box 719 Glens Falls, New York 12801 20 Corporate Circle Albany, New York 12203 Location: MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 Date: Prepared by: Engineer: Contractor: Queenbury, New York Strenkowski Associates, P.C. McD Metals, LLC 28 Southwestern Ave. Project: Project: Address: DATE: PROJECT # : MJL ADTEK Enterprises, LLC.TESTING AND BALANCING FIRM: BALANCED BY: SIGNATURE: June 8, 2019 Michael J. Lucarelli Michael J. Lucarelli THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES. ANY VARIANCES FROM DESIGNED QUANTITIES WHICH EXCEEDS NEBB TOLERANCES ARE NOTED THROUGHOUT THIS REPORT. THE AIR DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING AND BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS. THE WATER DISTRIBUTION SYSTEMS HAVE BEEN TESTED & BALANCED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH NEBB "PROCEDURAL STANDARDS FOR TESTING AND BALANCING OF ENVIRONMENTAL SYSTEMS" AND THE PROJECT SPECIFICATIONS. CERTIFICATION 28 Southwestern Ave. Queenbury, New York Hudson Headwaters Health Network M7041 CD - Ceiling Diffuser CS - Circuit Setter DD - Direct Drive ER - Exhaust Register LD - Linear Diffuser NA - Not Accessible ND - No Volume Damper NG - No Gauges NI - Not Installed NR - Not Required NS - Not Specified OBD - Opposed Blade Damper OD - Open Duct RG - Return Grille SR - Supply Register SD - Supply Diffuser TP- Thermally Protected EP-Electronically Protected WMS - Wire Mesh Screen NN - Diffuser, Register or Grille Noisy: All available adjustments made to correct condition. Additonal Dampers, sound lining or duct change required to correct condition. MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 Following are code definitions as used in a balancing report: PROJECT NAME: ADDRESS: ACTUAL 5116 4983 4108 1008* 2.62 2.02 0.6 943 CENTURY 5.0 3 211/212/211 13.0/12.6/12.6 1755 1.0 VFD 60 HZ Remarks: * Min. O.A. damper position set at 30%. MOTOR SHEAVE & NO. GROOVES FAN SHEAVE & NO. GROOVES BELTS 1VP50 x 1-1/8" ( 50% CL) BK80 x 1-3/16" BX60 9.2 NS NS AMPERAGE MOTOR RPM MOTOR SERVICE FACTOR STARTER HEATER ELEMENTS NS MOTOR MANUFACTURER MOTOR HP/BHP PHASE VOLTAGE FAN RPM NS NS 3 208 INLET PRESSURE DISCHARGE PRESSURE TOTAL STATIC PRESSURE 1.0 NS NS SPECIFIED 5120 5100 4095 1025 NS SERIAL NUMBER TOTAL CFM-FAN TOTAL CFM-OUTLET R/A CFM O/A CFM 0819P13292 SPECIFIED ACTUAL AIR MOVING EQUIPMENT TEST SHEET SYSTEM EQUIPMENT LOCATON AREA SERVICED EQUIPMENT MANUFACTURER MODEL RTU-1 OUTSIDE PAD 1ST FLOOR CARRIER 50TC-D16A2A5A2W1J0 TOTAL PAGES:7 MJL ADTEK Enterprises, LLC Phone: (518)218-0497 P.O. Box 16144, Albany, NY 12212 PAGE NUMBER:1 Hudson Headwaters Health Network 28 Southwestern Ave. Queenbury, New York PROJECT NUMBER:M7041 6/8/2019DATE: PROJECT NAME: ADDRESS: Zone/Branch Building Floor & Column Duct Size Effect Area Velocity FPM CFM Velocity FPM CFM Velocity FPM CFM RTU-1 SUPPLY 1 123 36" x 16"4.0 1280 5120 1279 5116 1279 5116 RETURN 1 123 36" x 16"4.0 1024 4095 1027 4108 1027 4108 Remarks: DATE: PROJECT NUMBER:M7041 MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 6/8/2019 Hudson Headwaters Health Network 2 TOTAL PAGES:7 DUCT TRAVERSE TEST FORM CONDITIONSLOCATON REQUIRED FIRST TEST FINAL TEST PAGE NUMBER:28 Southwestern Ave. Queenbury, New York TYPE SIZE Ak FPM CFM TEST 1 TEST 2 TEST 3 FPM CFM RTU-1 SUPPLY RH-6 1 114 SD 8"RD 1.0 HOOD 135 126 126 NR HOOD 126 2 112 SD 8"RD 1.0 HOOD 135 128 128 NR HOOD 128 3 108 SD 8"RD 1.0 HOOD 135 133 133 NR HOOD 133 4 107 SD 8"RD 1.0 HOOD 135 127 127 NR HOOD 127 5 103 SD 6"RD 1.0 HOOD 50 47 47 NR HOOD 47 6 TOTAL 590 TOTAL 561 VAV-4 1 135 SD 6"RD 1.0 HOOD 95 94 94 NR HOOD 94 2 136 SD 10"RD 1.0 HOOD 262 263 263 NR HOOD 263 3 136 SD 10"RD 1.0 HOOD 263 267 267 NR HOOD 267 4 137 SD 6"RD 1.0 HOOD 90 90 90 NR HOOD 90 TOTAL 710 TOTAL 714 VAV-3 1 146 SD 6"RD 1.0 HOOD 75 71 71 NR HOOD 71 2 105 SD 8"RD 1.0 HOOD 175 173 173 NR HOOD 173 3 105 SD 8"RD 1.0 HOOD 175 174 174 NR HOOD 174 4 106 SD 6"RD 1.0 HOOD 75 75 75 NR HOOD 75 TOTAL 500 TOTAL 493 RH-2 1 139 SD 8"RD 1.0 HOOD 135 125 125 NR HOOD 125 2 140 SD 8"RD 1.0 HOOD 135 131 131 NR HOOD 131 3 141 SD 6"RD 1.0 HOOD 75 75 75 NR HOOD 75 4 142 SD 8"RD 1.0 HOOD 135 123 123 NR HOOD 123 5 143 SD 8"RD 1.0 HOOD 135 124 124 NR HOOD 124 TOTAL 615 TOTAL 578 Remarks: Queenbury, New York 28 Southwestern Ave. PROJECT NUMBER:M7041 6/8/2019DATE: MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 PROJECT NAME: Hudson Headwaters Health Network PAGE NUMBER: TOTAL PAGES: 3 7 FINAL AIR DISTRIBUTION TEST SHEET TERMINAL NUMBER ROOM NUMBER TERMINAL DESIGN TEST-FPM or CFM ADDRESS: TYPE SIZE Ak FPM CFM TEST 1 TEST 2 TEST 3 FPM CFM RTU-1 SUPPLY continued RH-5 1 124 SD 8"RD 1.0 HOOD 135 136 136 NR HOOD 136 2 125 SD 6"RD 1.0 HOOD 100 102 102 NR HOOD 102 3 126 SD 6"RD 1.0 HOOD 100 106 106 NR HOOD 106 4 130 SD 6"RD 1.0 HOOD 100 93 93 NR HOOD 93 5 132 SD 10"RD 1.0 HOOD 300 297 297 NR HOOD 297 TOTAL 735 TOTAL 734 RH-8 1 122 SD 8"RD 1.0 HOOD 135 139 139 NR HOOD 139 2 117 SD 8"RD 1.0 HOOD 135 134 134 NR HOOD 134 3 116 SD 8"RD 1.0 HOOD 115 116 116 NR HOOD 116 4 115 SD 8"RD 1.0 HOOD 135 128 128 NR HOOD 128 TOTAL 520 TOTAL 517 RH-7 1 113 SD 6"RD 1.0 HOOD 100 103 103 NR HOOD 103 2 118 SD 8"RD 1.0 HOOD 135 132 132 NR HOOD 132 3 119 SD 8"RD 1.0 HOOD 135 136 136 NR HOOD 136 4 120 SD 8"RD 1.0 HOOD 135 138 138 NR HOOD 138 5 121 SD 6"RD 1.0 HOOD 100 95 95 NR HOOD 95 TOTAL 605 TOTAL 604 Remarks: MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 PROJECT NAME: Hudson Headwaters Health Network PROJECT NUMBER:M7041 DATE:6/8/2019 ADDRESS: 28 Southwestern Ave.PAGE NUMBER:4 FINAL Queenbury, New York TOTAL PAGES:7 AIR DISTRIBUTION TEST SHEET TERMINAL NUMBER ROOM NUMBER TERMINAL DESIGN TEST-FPM or CFM TYPE SIZE Ak FPM CFM TEST 1 TEST 2 TEST 3 FPM CFM RTU-1 SUPPLY continued VAV-1 1 102 SD 8"RD 1.0 HOOD 225 217 217 NR HOOD 217 2 101 SD 8"RD 1.0 HOOD 200 193 193 NR HOOD 193 3 102 SD 8"RD 1.0 HOOD 225 211 211 NR HOOD 211 4 102 SD 8"RD 1.0 HOOD 175 161 161 NR HOOD 161 TOTAL 825 TOTAL 782 UNIT TOTAL 5100 UNIT TOTAL 4983 Remarks: MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 PROJECT NAME: Hudson Headwaters Health Network PROJECT NUMBER:M7041 DATE:6/8/2019 ADDRESS: 28 Southwestern Ave.PAGE NUMBER:5 FINAL Queenbury, New York TOTAL PAGES:7 AIR DISTRIBUTION TEST SHEET TERMINAL NUMBER ROOM NUMBER TERMINAL DESIGN TEST-FPM or CFM PROJECT NAME: ADDRESS: ACTUAL NA 670 0.43 0.35 0.08 NA* BROAD OCEAN 1/4 1 120 1.8 300-1750 1.0 EP Remarks: PROJECT NUMBER:M7041 6/8/2019DATE: Queenbury, New York Hudson Headwaters Health Network 28 Southwestern Ave.PAGE NUMBER: TOTAL PAGES:7 6 PHASE 1 DISCHARGE PRESSURE NS FAN RPM NS MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 BELTS MOTOR SERVICE FACTOR NS STARTER HEATER ELEMENTS NS DIRECTDRIVEMOTORSHEAVE & NO. GROOVES FAN SHEAVE & NO. GROOVES VOLTAGE 115 AMPERAGE 2.55 MOTOR RPM NS MOTOR MANUFACTURER NS MOTOR HP/BHP 1/4 GREENHECK MODEL SQ-99-VG-4-X NS TOTAL CFM-FAN 675 TOTAL CFM-OUTLET 665 INLET PRESSURE TOTAL STATIC PRESSURE 0.75 SYSTEM EF-1 Speed Pod set at 7.0 EXHAUST FAN DATA SHEET EQUIPMENT LOCATON CEILING AREA SERVICED BATHROOMS DIRECT DRIVE DIRECT DRIVE SERIAL NUMBER 15776074 SPECIFIED SPECIFIED ACTUAL EQUIPMENT MANUFACTURER TYPE SIZE Ak FPM CFM TEST 1 TEST 2 TEST 3 FPM CFM EF-1 1 127 EG 8"RD 1.0 HOOD 120 82 123 123 HOOD 123 2 126 EG 8"RD 1.0 HOOD 120 97 131 126 HOOD 126 3 129 EG 6"RD 1.0 HOOD 85 81 115 89 HOOD 89 4 131 EG 6"RD 1.0 HOOD 85 76 121 84 HOOD 84 5 145 EG 6"RD 1.0 HOOD 85 66 110 83 HOOD 83 6 110 EG 6"RD 1.0 HOOD 85 56 87 84 HOOD 84 7 103 EG 6"RD 1.0 HOOD 85 44 66 81 HOOD 81 TOTAL 665 TOTAL 670 Remarks: MJL ADTEK Enterprises, LLC P.O. Box 16144, Albany, NY 12212 Phone: (518)218-0497 PROJECT NAME: Hudson Headwaters Health Network PROJECT NUMBER:M7041 DATE:6/8/2019 ADDRESS: 28 Southwestern Ave.PAGE NUMBER:7 FINAL Queenbury, New York TOTAL PAGES:7 AIR DISTRIBUTION TEST SHEET TERMINAL NUMBER ROOM NUMBER TERMINAL DESIGN TEST-FPM or CFM RX Date/Time 0611212019 11:41 15182731202 P.008 Jun. 12. 201911_19A MDIA No, 9164 P. 818 MIDDLE DEPARTMENT INSPECTION AGENCY, INC. that the electrical wiring to the electrical equipment listed below has been examined and is approved as being in accord with the National Electrical Code, applicable governmental, utility and Agency rules in effect on the date noted below and is issued subject to the following conditions. Owner: HHHN Pediatric Center Date: 05/29/2019 Occupant: Locatio Comm. 58 South Western Ave OccupancyNon-Residential Queensbury, Warren Co. NY Applicant F � Comalli Group Inc. 7 Westview Rd :.. Pittsfield, MA 01201 Joseph A.Holmes No. • •141222109840EL' r _ Equipment: -....... 1 -125 Amp Transfer Switch; 1 -225-Amp Panel;'31•='Switches; 148-Receptscles;'82 Fixtures; 1 -30 Amp Water Heater;2-1000 KW Electric Heaters. •'�•.;-•`'-•.... ... -.r .. .... ... 17,^roc 9 W JUN' 1.2 2019 TOWN OF OUEENSBURY BUILDING&OODES This certificate applies to the electrical wiring to the electrical equipment listed Immediately null and void- This certificate applies only to the use,occupancy aril above and the installation inspected as of the above noted date based on a visual ownership as indicated herein, Upon a change in the use,occupancy or ownership Inspection. No warranty is expressed or implied as to the mechanical safety,of i- of the property indicated above,this certificate shall be immediately null and void. ciency or fitness of the equipment for any particular purpose. This certificate shall In u%event that this certificate becomes invalid based upon the above conditions, be valid for a period of one year from the above noted date. Should the electrical this certificate may be revalidated upon rainspection by Middle Department system to which this certificate applies be altered in any way,Including but not limit- Inspection Agency.Inc. An application tot inspection must be submitted to Middle ed to.the introduction of additional electrical equipment and/or the replacement Of Department Inspection Agency, Inc. to initiate the inspection and revalidatlon any of the components installed as of the above noted date,this certificate shall be process. A fee will be charged for this service. INSPECTION WORKSHEET (BINS-003079-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0044-2019 Case Module:Permit Inspection Date:Fri May 31, 2019 Inspection Status:Passed Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:28 WESTERN AVE SOUTH Queensbury, NY 12804 309.7-1-55 Contact Type Company Name Name Granted Permission Hudson Headwater Health Network Applicant BBL Construction Services Contractor BBL Construction Services Primary Owner Hudson Headwater Health Network Engineer HCP Architects, LLP Checklist Item Passed Comments Building Inspector Notes YES 4/2/19 Framing Partial Approval Interior non-bearing metal partitions approved 4/23/19 Framing Partial Approval Vestibule exterior and interior framing approved. 5/31/19 Framing Approved - Above ceiling inspection for ceiling lights bracing and sheetrock plenum intact. Framing YES 4/2/19 Framing Partial Approval Interior non-bearing metal partitions approved 4/23/19 Framing Partial Approval Vestibule exterior and interior framing approved. 5/31/19 Framing Approved - Above ceiling inspection for ceiling lights bracing and sheetrock plenum intact. Bracing Bridging YES 4/2/19 Framing Partial Approval Interior non-bearing metal partitions approved May 31, 2019 Page (1) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-003639-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0044-2019 Case Module:Permit Inspection Date:Mon Jun 17, 2019 Inspection Status:Failed Inspector:John O'Brien Inspection Type:Commercial Final Inspection Job Address:Parcel Number:28 WESTERN AVE SOUTH Queensbury, NY 12804 309.7-1-55 Contact Type Company Name Name Primary Owner Hudson Headwater Health Network Engineer HCP Architects, LLP Applicant BBL Construction Services Granted Permission Hudson Headwater Health Network Contractor BBL Construction Services Checklist Item Passed Comments Ext Finish /Grade Complete/6 in 10ft or Equivalent YES - Fill in around main entrance foundation Attic Access 30 x 20 x 30 (h)YES - Label ceiling grid for location of attic access Handicapped Bath/Parking Lot Signage YES - Completed handicapped parking signage and striping as discussed. Universal Symbol of Access displayed - on all H/C signs YES - Completed handicapped parking signage and striping as discussed. Jun 17, 2019 Page (1) INSPECTION WORKSHEET (BINS-003639-2019) Checklist Item Passed Comments Site Plan Variance required NO - Site Inspection by Bruce Frank (TOQ Code Compliance Officer) Decision on Handicapped Parking Requirements based on future parking. Existing parking meets the requirements. Expansion of parking lot would require additional handicapped parking space. Engineer or Architect Approval YES - Provide Final Approval Letter from Architect stating the building has been completed in accordance with the approved plans and COMcheck for HVAC and Electrical. Special Inspections YES HVAC Air Balancing Report Approved OK to Issue C/O NO 6/13/19 Final Inspection Not Approved Fill in around main entrance foundation Label ceiling grid for location of attic access Completed handicapped parking signage and striping as discussed. Site Inspection by Bruce Frank (TOQ Code Compliance Officer) Provide Final Approval Letter from Architect stating the building has been completed in accordance with the approved plans and COMcheck for HVAC and Electrical. Complete all site items as per Bruce Frank. 6/17/19 Final Inspection Not Approved Remaining Items: Site Inspection by Bruce Frank (TOQ Code Compliance Officer) Decision on Handicapped Parking Requirements based on future parking. Existing parking meets the requirements. Expansion of parking lot would require additional handicapped parking space. Jun 17, 2019 Page (2) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-003823-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-0044-2019 Case Module:Permit Inspection Date:Mon Jun 24, 2019 Inspection Status:Passed Inspector:John O'Brien Inspection Type:Commercial Final Inspection Job Address:Parcel Number:28 WESTERN AVE SOUTH Queensbury, NY 12804 309.7-1-55 Contact Type Company Name Name Granted Permission Hudson Headwater Health Network Engineer HCP Architects, LLP Primary Owner Hudson Headwater Health Network Contractor BBL Construction Services Applicant BBL Construction Services Checklist Item Status Ext Finish /Grade Complete/6 in 10ft or Equivalent Passed Fill in around main entrance foundation Attic Access 30 x 20 x 30 (h)Passed Label ceiling grid for location of attic access Handicapped Bath/Parking Lot Signage Passed Completed handicapped parking signage and striping as discussed. Universal Symbol of Access displayed - on all H/C signs Passed Completed handicapped parking signage and striping as discussed. Site Plan Variance required Passed Site Inspection by Bruce Frank (TOQ Code Compliance Officer) Jun 24, 2019 Page (1) INSPECTION WORKSHEET (BINS-003823-2019) Checklist Item Status Decision on Handicapped Parking Requirements based on future parking. Existing parking meets the requirements. Expansion of parking lot would require additional handicapped parking space. Engineer or Architect Approval Passed Provide Final Approval Letter from Architect stating the building has been completed in accordance with the approved plans and COMcheck for HVAC and Electrical. Special Inspections Passed HVAC Air Balancing Report Approved OK to Issue C/O Passed 6/13/19 Final Inspection Not Approved Fill in around main entrance foundation Label ceiling grid for location of attic access Completed handicapped parking signage and striping as discussed. Site Inspection by Bruce Frank (TOQ Code Compliance Officer) Provide Final Approval Letter from Architect stating the building has been completed in accordance with the approved plans and COMcheck for HVAC and Electrical. Complete all site items as per Bruce Frank. 6/17/19 Final Inspection Not Approved Remaining Items: Site Inspection by Bruce Frank (TOQ Code Compliance Officer) Decision on Handicapped Parking Requirements based on future parking. Existing parking meets the requirements. Expansion of parking lot would require additional handicapped parking space. 6/24/19 Final Inspection Approved - Ok to Issue CO! Jun 24, 2019 Page (2) O'Brien, John Site Data Worksheet REQUIRED PROPOSED NOTES: Lot Size =20,044SQFT. 57,463 SF. 100% Poo A>Am 1. CONSTRUCTION IS TO PROCEED IN ACCORDANCE .WITH. THE: Site Statistics:CONSTRUCTION PHASING SCHEDULE SUPPLIED BY THE CONTRACTOR OR SHOWN ON THE PLANS. ALL ELEMENTS OF EASEMENTS AND RIGHT-OF-Greens oce 3a% rr r T WAY PROCUREMENT ARE TO BE COMPLETED PRIOR TO BEGINNING p 20,908 SF. 36.6X L, BEG N G THEAsphalt14,418.4 SF. 25.3% la ;y I T .A t!1 1 Zr NEXT CONSTRUCTION PHASE. THESE ELEMENTS INCLUDE ALL UTILITYBuilding/Sidewalk I '_' 'r r 1 11V;SURrD THE DISTN'01E INSTALLATION, THE BASE COURSE OF ASPHALT PAVING.p V NG, ANDWoods374.85 SF. 12. 2% GAS MAIN FRv"; " +E RO ; RTY' LINES TO THE TEESTABLISHING GRASSES ON ALL OTHER R.O.W. AREAS AND ANY OTHER14,374.85 SF. 25.2aG SCTURE(S) OR 'IGN ) AREAS DISTURBED BY CONSTRUCTION. FOR TIME FRAMESBuildingHeight40' MAX 30' 1 q OUTSIDE THE GROWING SEASON, OTHER METHODS OF SOIL WParkingSpaces2$ spaces (on site) si ,u DAi STABILIZATION (SUCH AS THE USE OF JUTE MESH AND EXCELSIOR3Handicapspaces (on sited MATTING) WILL BE USED UNTIL SUCH TIME AS GRASS CAN BETotalspaces31 G , ESTABLISHED: U W Setbacks .(Building): fSS C<J IFrontwt51.70• 2. IMMEDIATELY FOLLOWING THE COMPLETION OF CONSTRUCTION Z ACTIVITIES IN ANY PORTION OF THE SITE, PERMANENT VEGETATION v asSide (L} 20' 9.3' W'--- w fir Side (R) 20' 30.4' 0' 9S W V SHALL BE ESTABLISHED ON ALL EXPOSED SOILS.rzLO W 12» WA AV,,,, eRear2098.3 0L, TER MAIN 3. IN SOME INSTANCES ESTABLISHING VEGETATION ON R.O.W. AREASIPF W GAS PIPING WILL BE NECESSARILY DELAYED WHILE CONSTRUCTION IS IN CzT W W DETAIL 1 /C-7 PROGRESS. DURING THESE TIMES SEDIMENT CONTROL MEASURES WILL C Y c ZWATERTAPPINGVALVEBEEMPLOYEDTOPREVENTSEDIMENTFROMLEAVINGTHESITE.U nrs W VEGETATION IS TO BE ESTABLISHED IN THESE AREAS AS SOON AS 1T a `'t>DETAIL 4 C-7PARKINGCALCULATIONSFALLSJOFw----_ 1' WIDE PAINTED STOP BAR & SIGN IS PRACTICAL. C) 4 - SOU £ SB 4Y c w --J.,BUILDING SQUARE FOOTAGE = 5600.0SM, = 18.66 WCqS 304 W---- W Q 4. THE SEDIMENT CONTROL MEASURES DETAILED ON SHEET C-3 SHALL14EMPLOYEES = 7 1 BE IN PLACE PRIOR TO CONSTRUCTION START-UP FOR EACH2 tonctRF W CONSTRUCTION PHASE. THESE MEASURES CONSIST OF HAY BALE DIKES, SILT FENCES, DRAINAGE DITCH SEDIMENT FILTERS, STORM o I25.66 GATE VA YE ---- of GLENS DRAIN INLET FILTERS, AND STABILIZED CONSTRUCTION ENTRANCES.0 ItsSIGNTnrVNQEgUEENBURYONCECONSTRUCTED, ALL MEASURES SHALL BE PROPERLY MAINTAINED 00 ADD 20X = 1.20 x 2 .4 DETAIL 16/C-631SPACESY AND/OR REPLACED AS NECESSARY, AND THEN REMOVED FROM THE SITE LO N 3 3 2 PRESSURE SEWER DETAIL ONCE VEGETATION AND PAVEMENT ARE IN PLACE. U DETAIL 15 j C-6 U NIX)WATER & SEWER DEMAND C. SANITARY GRINDER PUMP 5. DAMAGE TO SURFACE WATERS RESULTING FROM EROSION AND t m LoAowWDETAIL5jC-7 SEDIMENTATION SHALL BE MINIMIZED BY STABILIZING DISTURBED w -75.7 Z v FLOW :PER. EMPLOEE 10.2 GPD x 14 EMPLOYEES = 142.8 GPD AREAS AND. BY REMO VING SEDIMENT FROM CONSTRUCTION SITEFIREHYDRANT5600SOFTx1/10 GAL/SOFT = 560 GPD j DETAIL i 2/C-6 DISCHARGES.702.8 GPD V( 1' J z otWvW U S GRADE CLEAN OUT 1 D4 J BA DETAIL 13 jC-6 s. INSOFAR AS PRACTICABLE, EXISTING VEGETATION SHALL BE OPLIMITSOFCLEARING 7g PRESERVED. SITE PREPARATION ACTIVITIES SHALL BE PLANNED TO 01MINIMIZETHEAREAANDDURATIONOFSOILDISRUPTION. ALL m13PROPSED4PAINTEDCENTERLINE a HEALTHY TREES OF DESIRABLE SPECIES ARE TO BE PROTECTED FROM WOODS FRENCH BUILDING DRdt N NDS OF DAMAGE. ALL UNNECESSARY REMOVAL OF HEALTHY TREES SHALL BE c Qin L ETAIL 3/C-3 SWEET AVOIDED.D C' HANDICAP DETAIL 1/C-6 a80,x70• t8' 7, PERMANENT TRAFFIC CORRIDORS SHALL BE ESTABLISHED AND "ROUTES a 1 MEDICAL PROPOSED 5 WIDE OF CONVENIENCE SHALL BE AVOIDED_ CONSTRUCTION TRAFFIC 5800 S ARTS' BPI LDfNG CONCRETE WALK 8/C-6 SHALL NOT CROSS STREAMS OR DITCHES EXCEPT AT SUITABLEcRFFF•_ 9973 PROPOSED ASPHALT t CROSSING FACILITIES, AND SHALL NOT OPERATE UNNECESSARIL(30.4 CIRf' SURFACE 6 6 f WITHIN WATERWAYS OR DRAINAGE DITCHES. r g. TOPSOIL AND FILL THAT IS TO REMAIN STOCKPILE ON-SITE FOR 1 j ! PERIODS GREATER THAN 14 DAYS SHALL BE STABILIZED BY SEEDING.PROPOSED BERM CURB E.y PRIOR TO THE SEEDING OPERATION, THE STOCKPILED MATERIALytt 1 9/C-6 SHALL BE GRADED AS NEEDED AND FEASIBLE TO PERMIT THE USE OFNCHIM#RK PROPOSED CURB CONVENTIONAL EQUIPMENT FOR SEEDBED PREPARATION, SEEDING, ms'1 W MULCH APPLICATION, AND MULCH ANCHORING. IN NO CASE SHALL oE99.35, ERODIBLE MATERIALS BE STOCKPILED WITHIN 25 FT OF ANY DITCH co STREAM, OR OTHER SURFACE WATER. Cq wPROPSEDWD. LATiCE 9. EMBED HAY BALES 4 INCHES. STAKE ALL BALES TO RESI:' J' SipEyyA FENCE do GATE 5/C 6 HAY BALES SHOO T WATER FORCES. Q f LK LS EXTEND FAR ENOUGH UP SLOPE TO ?REVENT WATER i l L -FROM FLOWING AROUND ENDS AND CAUSING WASHOUT. HAY BALES COLLECTPROPSEDLIMITSOFCLEARINGOILUNDERLOWFLOWCONDITIONS. HAY BALES SHOULD BE USED INLlltSLAWSN/F of 1 t1 R?0. DRAINAGE CHANNELS FROM MAINTENANCE AREA.1i`RI ER i W Z Li 10. HAY BALE BERMS SHALL BE CONSTRUCTED AROUND ALL STr,Ct;PILES OF WOODSFILL, TOPSOIL AND EXCAVATED OVERBURDEN THAT ARE TO REMAIN WEXPOSEDFORPERIODSLESSTHAN14AYL 1Q `' --- 31 PARKING DAYS. HAY BALL BERMS SHALLSPACESIBEANCHOREDANDMAINTAINEDINGOODCONDITIONUN'`IL SUCH TIME 5p AS SAID STOCKPILES ARE REMOVED AND STOCKPILING AREAS ARE WSMACXBROUGHTTOFINALGRADEANDPERMANENTLYSTABILIZED. Ck? GENERAL SITE NOTES: r I. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL OBSERVE EXISTING 4. CONDITIONS; VERIFYING GRADES AND FIELD MEASUREMENTS AND NOTIFYTHEENGINEERORLANDSCAPEARCHITECTOFANYDISCREPANCIES. j SL 7 . O F c; ADJUSTMENTS MUST BE APPROVED BY THE ENGINEER OR LANDSCAPEARCHITECTPRIORTOINSTALLATION INV=94. 2. THE UTILITIES SHOWN HAVE BEEN PLOTTED FROM AVAILABLE NAPPING, fl , r THEY ARE NOT CERTIFIED AS TO THE ACCURACY OF THEIR LOCATION, 13 R ofTHEIRCOMPLETENESS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO D w VERIFY THE LOCATI[ri AND EXTENT OF ALL STRUCTURES ANT) UTILITIES. m AIX 1ASW ofINY=94, 0 w« cow oR CONOWoN o -Me"3. CONTRACTORS SHALL OBTAIN ALL REQUIRED APPROVALS, PEPMITS, vw 2y 0m INSPECTIONS APPROVALS, ETC. FOR WORK PERFORMED FROM AG' ANuWEtrC ir"r C =4•r ftVKAN- .t NORTH A1 1 All per 1 HAVING JURISDICTION THEREOF. NCIES N Nfi 4. C13NTRACTUR SHALL PROVIDE PROPER SIGNS, BARRICADES AND/17RFDiETTOO INJURY.T WORK, PROPERTY, EQUIPMENT AND PERS IS f?QM OF THE Comm DNOlt 6w= sNouLu F 5. DAILY TRAFFIC IN THE VICINITY OF THE SITE' SHALL NOT BE-IMPEDER of N0M' _AMEREAWITHOUTPRIERAPPROVAL13FGOVERNINGHIGHWAYPERSONNEL. SPEED XTA. I t f2D,HOLDENAND TRAFFIC CONTROL SICIIS ARE TO LONF`(M WITH LOCAL, COUNTY,AND/OR STATE SPECIFICATIONS. N6. CONTRACTOR IS RESPONSIBLE TO REPAIR AND REPLACE ALL ITEMS Wv ITDISTUFDAMAGED tN2BED ON THIDE13F E PROPERTY E WHICH CONSTRUCTIONNOTPARTLIMI t#' TF, OR ANY E,THIS PROJECT / CONTRACT. D4 7. PRIOR TO PROJECT CLOSE-OUT, CONTRACTOR SHALL REMOVE (MD SITE PLANLEGALLYDISPOSEOF) ALL DEBRIS AND EXCESS MATERIAL FROM THE SITE.a CONTRACTOR SHALL TAKE EVERY PRECAUTION TO AVOID DAMAGE TO NTSANYVEGETATIONTOREMAIN,APPROVED UNDER AUTHORITY OF A RESOLUTION ADOPTED s. ALL Exlsnl STRUCTURES TA26ALLENANDUTILITIESINCLUDINGBUTNOTLIMITEDTO; SEWERS, CATCH BASINS, INLETS, MANHOLES, WATER SERVICE, PUBLIC 5%ZQ O5ANDPRIVATEUTILITIES, POLES TO REMAIN SHALL BE LOCATED' AND51TE 'L AEI ry_ BY THE PLANNING PROTECTED. IF SUCH STRUCTURES AND/ORUTILITIES CONTRACTOR SHALL REPAIR OR PAY IRARE DAMAGED, THEC-2 FOR THE REPAIR OF THE SAME TO ABOARDOFTHETOWNOFQUEENSBURYscAl . 1`=20 MINI" PRE CONTRACT/PROJECT CONDITION 1 TAD 7/12/o 3(} 60 gp 10. IF IN THE COURSE [#' CONSTRUCTION A CONDITION EXISTS WHICH MLWAIXDISAGREESWITHWHATISINDICATEDO+1 THESE PLANS, THE CONTRACTOR 2 TAT} 7/2: SHALL STOP WORK AND NOTIFY THE ENGINEER IBR LANDSCAPE ARCHITECT.SHOULD HE/SHE FAIL TO FOLLOW THIS PROCEDURE AND CONTINUE WORK,3CHAIRPERSONHE/SHE SHALL ASSUME ALL RESPONSIBILITY AND LIABILITY ARISINGTHEREFROM. 11. THE CONTRACTOR SHALL NOTIFY CALL BEFatE YOU DIG 1-800--922-4455 FOR SWAP: tle¢ ,T tto.VERIFICATION OF THE LOCATION 1 UMDERGRD ID UTILITIES AT LEASTDATESIGNED------.._.. ...... 72 HOURS PRIOR TO THE START OF EXCAVATION. HMNA05- 12. CONTRACTOR SHALL COMPLY WITH CO+tSTRUCTION INSPECTIONREQUIREMENTSANDPHASEWORKACCORDINGLY. 11 IT IS T HE CONTRACTORS RESPONSIBILITY TO MAINTAIN EXISTINGUTILITYSERVICESENCOUNTEREDANDRESTOREANYSERVICESDAMAGEDORINTERRUPTEDBYNEWWOW. ER NEST J. GAILOR, P.E. MAP REFERENCE 0 i'i i iMAPOFASURVEYMADEFORyPGRWESTERNREALTY. LLG 600,r BY* VAN DUSEN SIEVES Owl ZDATAMAY3. 2003 LAST REVISED+ MAY 31 20(?5 O Q U W ClIIiTJIC AS PZR YAP JtCPZA M Q 0 EST.ERIVAVEjVjjE S07°14` aw 1 NOTICE a W r R A,FT 3 ULATI ON 0 1-:9ED BY 1 s y u 0 a LANDS F OF 56.925.00 sq.ft.W MIJLDER 1.31 acres NOTICE dFOAMINSULATIONMUSTBE t° COVERED BY A 15 MINUTE THERMAL BARRIER GO y CO aui LANDS N/Fof REVIEWED FORSWEET ENERGY CODE COMPLIANCE T' ° 1 STORY V WOOD FRAMED i OFFICE w 45.00 74 32 PARKING 0 NOTICE y h LEVER HANDLES REQUIRED ON ALL PASSAGE DOORS 1;0 9 WHETHER IN z EXTERIOR DOORS a l l 1 a 07 1 A 0 COTE c0 SIDEWALK E..i i O LU LANDS N/F OF 0 RINGER V ASPHALT a) PARKING Q v O c crt-re r FILE COPY MM = N Z V! 1 0 z 0 TOWN OF QUEENSBURY BUILDING DEPARTMENT Z Based on our limited examination,compliance with our comments shall not be construed as indicating the plans and specifications are in I full compliance with the Building Codes of I HEREBY GERTIFY 7MT TINS MAP WAS PREPARED NO 74 New York State. C z FRCM AN AGTUAL FIELD SURVEY. TENS GERTrIGATON ShALL RUM ONLY TO THE PERSONS j Or FOR WMOM THE SrLIKVEY WAS PREPARED AND ON THER Q) BEMALF TO THE TITLE COMPANY. GOVERNMENTAL ACAMY i U AND LENDING NSTRUnON LISTED WREON. T' G0t71 TATI1ONS ARE NOT TRANSFERAKE TO ADDITIOMAL T^ NSTITLRIONS OR SUBSCO ENT OWNERS. GERTEED TOsPGR WESMTM REALTY. LLG HOLDGLNSFALLSNATIONAL5AW TRUST COMPANY. EN ITS SUCCESSORS AND/OR AS AVEN UE M O>° GIM CAGO TITLE b 10 Gll!RTM aY r x w TTHEw G. S LL LEGEND m aDATEDeARCH10. 200f r F ,- 4 LAMP F05T v FAZE HYDRANT Ddw hARpi 3M 2M A N['t 8C7r! T-2I+r TOWN OF QU BUILDING & O ' T. S- 1ReviewedBy:- Date: f- I CO 1/1 - SHEEr I OF I PGR WESTERN D%q DWG_ NO. OSOG5AB