Loading...
application PRINCIPLE STRUCTURE Office Use Only PERMIT APPLICATI ON �-� —�jl1 `— ' c, Permit#: . Town ofQucensbury Permit Fee: $ !p 50° 01) 742 Bay Road, Queensbury, NY 12804 *Rec. Fee: $ P: 518-761-8256 www.queensbury.net Invoice#: ) 397 Project Location: 1172 State Route 9 Tax Map #: 288.20-1-20 Subdivision Name: E IEC n in E TOWN BD.RESOLUTION 86-2013:$850 recreation fee for new dwelling units si I �j - i y, multiple family, apartments,condominiums, t)wnhouses,and/or manufactured adularr h� m o es, dj,{1ot ilE homes. This is in addition to thepermit fee(s). by CONTACT INFORMATION: • TOWN OF QUEENSBURY BUILDING&CODES • Applicant: Name(s): The Great Escape Theme Park,LLC (Eric Gilbert) Mailing Address, C/S/Z: PO Box 511,Lake George,NY 12845 Cell Phone: ( ) Land Line: ( 518 ) 792-3500 _ Email: • Primary Owner(s): Name(s): Same as Above Mailing Address, C/S/Z: Cell Phone: ( ) Land Line: ( Email: ❑ Check if all work will be performed by homeowner only • Contractor(s): Workers' Comp documentation must be submitted with this application Contractor Name(s): Dean Hyatt Contractor Trade: Work to be completed by Great Escape Theme Park Mailing Address, C/S/Z: PO box 511,Lake George,NY 12845 Cell Phone: ( 518 ) 812-9345 Land Line: ( 518 ) 792-3500 Email: all yatt@sftp.com **List all additional contractors on the back of this form • Architect(s)/Enqineer(s): Business Name: JARRETT Engineers,PLLC Contact Name(s): Robert U.Holmes II,P.E. Mailing Address, C/S/Z: 12 East Washington St.,Glens Falls,NY 12801 Cell Phone: ( 518 ) 796-7381 Land Line: ( 518 ) 792-2907 Email: bholmes@jarrettengineers.com Contact Person for Building & Code Compliance: Dean Hyatt Cell Phone: ( 518 ) 955-0865 Land Line: ( 518 ) 792-3500 Email: dhyatt@sftp.com Principle Structure Packet Revised February 2019 PROJECT INFORMATION: TYPE: X Commercial Residential WORK CLASS: Single-Family Two-Family _Multi-Family(#of units ) Townhouse Business Office Retail Hotel/Motel _Industrial/Warehouse Garage(#ofcars ) X Other(describe Amusement Park ) STRUCTURE SQUARE FOOTAGE: GARAGE SQUARE FOOTAGE: la trY: Shipwreck Cove: 2600+sq.ft. 1ST floor: Rieft: Bucket Blaster: 830 sq. ft. 2nd floor: XIIRcat: Pump House: 256 sq. ft. Total square feet: Basement(habitable space): Total square feet: 3686 sq.ft. ADDITIONAL PROJECT INFORMATION: 1. Estimated Cost of Construction: $ 300,000.00 2. Proposed use of the building: Water attraction _ 3. If Commercial or Industrial, indicate the name of the business: The Great Escape Theme Park,LLC 4. Source of Heat: Gas Oil Propane Solar Other: N/A (Fireplaces need a separate Fuel Burning Appliances& Chimney Application, one per appliance) 5. Are there any structures not shown on the plot plan? NO Explain: Located in the Great Escape Theme Park. 6. Are there any easements on the property? YES NO 7. SITE INFORMATION: a. What is the dimensions or acreage of the parcel? 237.6 acres b. Is this a corner lot? YES (01 c. Will the grade be changed as a result of the construction? YES NO d. What is the water source? JUBLIC PRIVATE WELL e. Is the parcel on SEWER or a PRIVATE SEPTIC system? Sewer Principle Structure Packet Revised February 2019 , DECLARATION : I. lacknowledge that no construction shall commence priorto issuance of a valid building permit and work will be completed within a 12 month period. 2. If the work is not completed by the 1year expiration date the permit may be renewed, subject to fees and department approval. 3. I certify that the application, plans and supporting materials are a true and complete statement and/or description of the work proposed, that all work will be performed in accordance with the NYS Building Codes, local building laws and ordinances, and in conformance with local zoning regulations. 4. I acknowledge that prior to occupying the facilities proposed I, or my agents, will obtain a certificate of occupancy. 5. I understand that I/we are required to provide an as-built survey by a licensed land surveyor of all newly constructed facilities priorto issuance ofa certificate of occupancy. I have read and agree to the above: PRINT NAME: 6: c a /b9 A— SIGNATURE: DATE: 3/z ( // I • Principle Structure Packet Revised February 2019