Loading...
Inspection 01312019INSPECTION WORKSHEET (SEP-000620-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:SEP-0011-2019 Case Module:Permit Inspection Date:Thu Jan 31, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Septic Job Address:Parcel Number:30 BEACON HOLLOW WAY Queensbury, NY 12804 297.13-1-44 Contact Type Company Name Name Contractor IBS Septic Primary Owner Hochsprung, Peter Granted Permission Hochsprung, Peter Applicant IBS Septic Checklist Item Passed Comments Building Inspector Notes NO 1/18/19 Septic Inspection Partial Approval- Field Only! 1/31/19 Septic System Partial Approval Remaining Items: - Complete Alarm and Pump wiring. - Final Electrical Inspection - Verify Pump and Alarm operation. - Design Professional needs to verify operations of pump and alarm system. Type of Water: Municipal / Well Water YES Municipal Absorbtion Fields: Total Length YES 100' of 3" perforated pressure laterals. Septic tanks & pump station anchored in flood zone YES Not required as per letter from Ethan Hall. Jan 31, 2019 Page (1) INSPECTION WORKSHEET (SEP-000620-2019) Checklist Item Passed Comments Length of Each Trench YES 4@25' Depth of Trenches YES 12" Size of Stone YES #2 Building to Tank YES 4" sch40 pvc Septic Tank to Pumpstation 4" sch40 pvc Tank to Distribution Box YES Pumpstation to manifold Distribution box to Field / Pit YES 3" sch40 pvc manifold to 3" sch40 pvc laterals Opening Sealed:NO InletOutlet Pipes & Baffles YES Effluent Filter installed on outlet of septic tank. Foundation to Tank YES 12'-6" Foundation to Absorption YES House bump out to nearest edge of field is 20' Conforms as per Plot Plan YES Partial field only! Location of system on property YES Partial Field Only! Middle Rear Jan 31, 2019 Page (2) INSPECTION WORKSHEET (SEP-000620-2019) Checklist Item Passed Comments System Use Status NO 1/18/19 Septic Inspection Partial Approval- Field Only! OK TO BACKFILL MAIN PORTION OF LEACH BED ONLY! 1/31/19 Septic System Partial Approval Remaining Items: - Complete Alarm and Pump wiring. - Final Electrical Inspection - Verify Pump and Alarm operation. - Design Professional needs to verify operations of pump and alarm system. Jan 31, 2019 Page (3) O'Brien, John (Inspector)