Inspection 01312019INSPECTION WORKSHEET (SEP-000620-2019)
Town of Queensbury - Building and Codes - Fire Marshal
742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal
Case Number:SEP-0011-2019 Case Module:Permit
Inspection Date:Thu Jan 31, 2019 Inspection Status:Partial Pass
Inspector:John O'Brien Inspection Type:Septic
Job Address:Parcel Number:30 BEACON HOLLOW WAY
Queensbury, NY 12804
297.13-1-44
Contact Type Company Name Name
Contractor IBS Septic
Primary Owner Hochsprung, Peter
Granted Permission Hochsprung, Peter
Applicant IBS Septic
Checklist Item Passed Comments
Building Inspector Notes NO 1/18/19 Septic Inspection Partial Approval- Field Only!
1/31/19 Septic System Partial Approval
Remaining Items:
- Complete Alarm and Pump wiring.
- Final Electrical Inspection
- Verify Pump and Alarm operation.
- Design Professional needs to verify operations of pump and
alarm system.
Type of Water: Municipal / Well Water YES Municipal
Absorbtion Fields: Total Length YES 100' of 3" perforated pressure laterals.
Septic tanks & pump station anchored in flood
zone
YES Not required as per letter from Ethan Hall.
Jan 31, 2019 Page (1)
INSPECTION WORKSHEET (SEP-000620-2019)
Checklist Item Passed Comments
Length of Each Trench YES 4@25'
Depth of Trenches YES 12"
Size of Stone YES #2
Building to Tank YES 4" sch40 pvc
Septic Tank to Pumpstation
4" sch40 pvc
Tank to Distribution Box YES Pumpstation to manifold
Distribution box to Field / Pit YES 3" sch40 pvc manifold to 3" sch40 pvc laterals
Opening Sealed:NO
InletOutlet Pipes & Baffles YES Effluent Filter installed on outlet of septic tank.
Foundation to Tank YES 12'-6"
Foundation to Absorption YES House bump out to nearest edge of field is 20'
Conforms as per Plot Plan YES Partial field only!
Location of system on property YES Partial Field Only! Middle Rear
Jan 31, 2019 Page (2)
INSPECTION WORKSHEET (SEP-000620-2019)
Checklist Item Passed Comments
System Use Status NO 1/18/19 Septic Inspection Partial Approval- Field Only!
OK TO BACKFILL MAIN PORTION OF LEACH BED ONLY!
1/31/19 Septic System Partial Approval
Remaining Items:
- Complete Alarm and Pump wiring.
- Final Electrical Inspection
- Verify Pump and Alarm operation.
- Design Professional needs to verify operations of pump and
alarm system.
Jan 31, 2019 Page (3)
O'Brien, John (Inspector)