Loading...
inspectionFoundation Inspection Report Office No,(518)761-8256 Date Inspection request received: Queensbury Building &Code Enforcement Arrive amp Depary742BayRd.,Queensbury,NY 12804 Inspector's Initials:ie = NAME: LOCATION: Monolithic Siab Reinforcement in Place 2 —p | ‘The contractor is responsible for HZ providing protection from freezing for 48 hours following the placement |of the concrete, |___Materials for this purpose on site. |Foundation /Walipour Reinforcement in Place Foundation Dampproofing Foundation /Waterproofing ‘Type of Dampproofing /Waterproofing|Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 inches above footing | 6 mil poly for wet areas under slab _|Backfill Approval Plumbing Under Stab PVC/Cast /Copper | Foundation Insulation Interior /Exterior Re ‘Rough Grade 6 inch drop within 10 ft.| | L)Suetfemingway Building Codes Inspection.FORMS\Foundation Inspection Report.doc January 28,2003 Queensbury Building &Code Enforcement -Residential Final Inspection Office No.(518)761-8256 Arrive:am/pm LB wx *s Initials:Ae"Date Inspection request received:ae Inspector'sTnitial NAME:Serwogs PERMIT #:Qe a 8 LOCATION:MALEpbs OF DATE:see TYPE OF STRUCTUI |‘Chimney Ht./"B”Vent/Direct Vent Location Fresh Air Intake : 3 inch Plumb Vent through roof minimum 6”|Frebus RSF —Oo IK Roof Complete /Exterior Finish Complete | Guard 30 in.ot more @ stairs,decks,patios ‘Guard at stairwell at 34 in.or more Guard at deck,porches 36 in.or more Exterior Finish Complete TInterior/Exterior Railings 34 in,t0 38 in, Platform at all exterior doors | Tnterior Handrails stairs 2 or more risers Enclosed Stairs Sheetrock Underside minimum 14"| Gypsum { Grade away from foundation 6 in.with 10 f.i Handrail Termination at Newell Post or Wall re 6 inch clearance to sill plate ‘Gas Valve shut-off exposed /regulator 18”above grade ‘Gas Furnace shut-off within 30 for within line of site Oil Furnace shut-off at entrance to furnace area Furnace/Hot Water Heater operating Attic Grecosuee — Low water shut-off boiler Relief Valve(s)installed /Heat Trap/Water Temp 110 aInteriorprivacy/trim/doors /main entrance 36 inBathroom//Kitchen watertight Safety glazing /Window in stairwells safety glazing Tnterior Smoke Detectors: Everylevel:1 Every Bedroom: Outside every bedroom area: Inter Connected:1 Battery backup: Carbon Monoxide Detector Bathroom Fans,if no window Plumbing fixtures 1 Foundation insulation Floor truss,draft stopping finished basement 1,000 sf Emergency egress below grade Basement stairs closed rise >4 inches Garage Floor Pitched Garage fireproofing /%hour fire door /door closer Duct work Sealed properly x a)(Gas Logs in Sealed or Glass ‘Atg-4ccess 30 in.x 22 in. x 30 in.(nt)In accessible area | ‘Crawl Spaces 18”x 247accegs,1 sq.f.-150 sq.fi.vents | Juilding No./Addresd visibje fromrroag Final Electrical [()/JO]J)(17)Vv Site Plan /Variance feuirdd Final Survey Plot Plan ‘As Built Septic System /Sewer Dept.Inspection Sticker Flood Plain Certification,if required ‘Okay to issue C/C or C/O [Temporary/Permanent]|V | LAPamW \Building &Codes\Inspection Forms\Res.Final Insp.form 2.docLast printed 2/12/04 Framing /Firestopping Inspection Report Office No.(518)761-8256 Date Inspection request received: Queensbury Building &Code Enforcement Arrive:am|GRIM|742 Bay Road,Queensbury,NY 12804 Inspector’s Initials: PERMIT #:@ 5 aeNAME: LOCATION:)INSPECT ON:7S‘TYPE OF STRUCTURE: |y¥TN [Naas COMMENTS Altic Access 22”x 30”minimum Jack Studs /Headers al Se Bracing /Bridging 7 oO Joist hangers Jack Posts /Main Beams Exterior sheeting nailed properly 12"0.c. Headroom 6 ft.8 in. Stairwells 36 in.or more Headroom 6 fi.8 in. Notches /Holes /Bearing Walls Metal Strapping for Notches Top Plate 1 Ys (w)16 gauge (8)16D nails each side Draft stopping 1,000 sq.ft.floor trusses ‘Anchor Bolts 6 fi.or less on center Iceind water shield 24 inches from wall Vv Fire separation 1,2,3 hour Fire wall 2,3,4 hour Firestopping Penetration sealed 16 inch insulation in cavity min. Garage Fire Separation House side ¥inch or 5/8 inch Type X Garage side 5/8 inch ‘Type X Ceiling/wall Windows Habitable Space /Bedrooms 24 in.(H) 20 in.(W) 5.7 sf above /below grade 5.0 sf grade Foundation Inspection Report Office No.(518)761-8256 Date Inspection request received: Queensbury Building &Code Enforcement Arrive:am/pm Depart 742 Bay R.,Queensbury,NY 12804 Inspector's Initials:(1)Mm ) NAME:RMR SKbiicoe PERMIT #:“418 LOCATION:z Es ‘TYPE OF STRUCTURE: Comments ee Ly TN Twa Footings || Piers ae Monolithic Slab ~ Reinforcement in Place The contractor is responsible for providing protection from freezing for 48 hours following the placement of the concrete. Materials for this purpose on site, Foundation /Wallpour ‘Reinforcement in Place Foundation Dampproofing Foundation /Waterproofing Type of Dampproofing /Waterproofing “Footing Drain Daylight or Sump Footing Drain Stone: 12 inch width 6 jaches above footing ‘mil poly for wet areas under slab A\hackiilll Approval Vv Plumbing eas Slab ee | T L|Foundation Insulation Interior /Exterior | [ete |__| |\Rough Grade 6 inch drop within 10 ft.| LASvetiemingwvay’Building Codes Inspection.FORMS Foundation Inspection Report.doc January 28,2003, (COMMONWEALTH ELECTRICAL INSPECTION SERVICE,INC.()Main Office 176 Doe Run Road -Manheim,PA 17545 SsMUNICIPALCERTIFICATE-ELECTRICAL APPROVAL cet.N2 89959 catincard no... insted By 204 Seand..06 AST ‘The conditions following governed the issuance ofthis certicae,and any cenificate previously issued is cancelled: This certificate only covers the electrical equipment and installation conditions as of date.Upon the introduction of additional equipment or alterations,application shall be promptly madeforinspection Inspectors of this Company shall have the privilege of makingejnspections at any time,and if its rules are violated,the Company shall have the Os fe Date LOL OS NSPECTOR