Loading...
inspection 08262019INSPECTION WORKSHEET (FMGAS-005374-2019) RC-0170-2019Permit Management Case Number:Case Module: 08/26/2019Partial Pass Inspection Date:Inspection Status: Mike PalmerGas Fireplace/Stove Inspector:Inspection Type: 289.16-1-10 Job Address:Parcel Number: 57 Grand View Dr Queensbury, NY 12804 Contact TypeCompany NameName ApplicantHilltop Construction ContractorHilltop Construction Granted PermissionMarc Garvey Primary OwnerMarc Garvey Checklist ItemPassedComments Fire Marshal NotesTrueHeatilator Model A36 w / factory built vertical chimney system Floor ProtectionTrueZero clearance CO DetectionFalseReturn to verify Vent Chimney TerminationFalse Can't see chimney clearances after firebox opening Return for termination and raincap CSST BondingTrue ICC Trac pipe used for possible gas log set See page 34 for log set instructions Gas Shut-off ValveFalseVerify Mantel-height above fp openingFalseSee page 32 for directions - return to verify Hearth Extension (if any)FalseSee page 28 for directions return to verify Combustion AirTrue Vent Clearance to CombustiblesTrue Clearances to Combustibles (all sides)True3/4 side and rear ok Firestop(s) - Vertical ChaseTrue December 11, 2019Page 1 of 1