Loading...
inspectionsINSPECTION WORKSHEET (BINS-001808-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Wed Apr 3, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Agent White, Richard Engineer Hutchins Engineering Granted Permission Bette & Cring, LLC Architect Silvestri Architects, PC Primary Owner Exit 18 Development LLC Contractor Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Applicant Bette & Cring, LLC Checklist Item Passed Comments Apr 03, 2019 Page (1) INSPECTION WORKSHEET (BINS-001808-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor return Ductwork at south end corridor. 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. 4/2/19 Insulation Partial Approval - 2nd Floor - Balance of sound vinyl between rooms approved 4/3/19 Insulation Partial Approval - 2nd Floor Only! - Bathroom sound batt Insulation approved except for 2 bathrooms below 3rd floor tub trap leak. Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Apr 03, 2019 Page (2) INSPECTION WORKSHEET (BINS-001808-2019) Checklist Item Passed Comments Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. 4/2/19 Insulation Partial Approval - 2nd Floor - Balance of sound vinyl between rooms approved 4/3/19 Insulation Partial Approval - 2nd Floor Only! - Bathroom sound batt Insulation approved except for 2 bathrooms below 3rd floor tub trap leak. Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO 3/22/19 Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. Apr 03, 2019 Page (3) INSPECTION WORKSHEET (BINS-001808-2019) Checklist Item Passed Comments Tub Shower R-20 with Vapor Barrier NO Air Barrier behind Knee Walls NO All Ductwork Sealed Return and Supply NO 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor except return ductwork at south end corridor. Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Apr 03, 2019 Page (4) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001735-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Tue Apr 2, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Contractor Bette & Cring, LLC Engineer Hutchins Engineering Architect Silvestri Architects, PC Applicant Bette & Cring, LLC Granted Permission Bette & Cring, LLC Agent White, Richard Primary Owner Exit 18 Development LLC Primary Owner Ed & Ed T Enterprises, LLC Checklist Item Passed Comments Apr 02, 2019 Page (1) INSPECTION WORKSHEET (BINS-001735-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor return Ductwork at south end corridor. 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. 4/2/19 Insulation Partial Approval - 2nd Floor - Balance of sound vinyl between rooms approved Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Apr 02, 2019 Page (2) INSPECTION WORKSHEET (BINS-001735-2019) Checklist Item Passed Comments Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. 4/2/19 Insulation Partial Approval - 2nd Floor - Balance of sound vinyl between rooms approved Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO 3/22/19 Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. Air Barrier behind Knee Walls NO Apr 02, 2019 Page (3) INSPECTION WORKSHEET (BINS-001735-2019) Checklist Item Passed Comments Tub Shower R-20 with Vapor Barrier NO All Ductwork Sealed Return and Supply NO 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor except return ductwork at south end corridor. Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Apr 02, 2019 Page (4) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001734-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Tue Apr 2, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Granted Permission Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Architect Silvestri Architects, PC Primary Owner Exit 18 Development LLC Contractor Bette & Cring, LLC Engineer Hutchins Engineering Agent White, Richard Applicant Bette & Cring, LLC Checklist Item Passed Comments Apr 02, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001734-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases 3/22/19 Plumbing Partial Approval - 2nd Floor Only! - Nail Plates Approved 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. 4/2/19 Plumbing Partial Approval - 9 Plumbing Vent Stacks Approved (Head Test) - Roof Drains & Overflows Approved (Head Test) - 3rd Floor Tub Traps Approved ( Tubs filled w/ water for flow test) Plumbing Under Slab YES 11/2/18. Underslab for north half of building Apr 02, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001734-2019) Checklist Item Passed Comments Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. 3/22/19 Plumbing Partial Approval - 2nd Floor Only! - Nail Plates Approved 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. 4/2/19 Plumbing Partial Approval - 9 Plumbing Vent Stacks Approved (Head Test) - Roof Drains & Overflows Approved (Head Test) - 3rd Floor Tub Traps Approved ( Tubs filled w/ water for flow test) Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Apr 02, 2019 Page (3) INSPECTION WORKSHEET (RPLUM-001734-2019) Checklist Item Passed Comments Washing Machine Trap: 18"-24" discharge NO Cleanout every 100 feet change of direction NO Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Drain Vent YES 11/2/18 north half of building water head test ok Apr 02, 2019 Page (4) INSPECTION WORKSHEET (RPLUM-001734-2019) Checklist Item Passed Comments Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Apr 02, 2019 Page (5) INSPECTION WORKSHEET (RPLUM-001734-2019) Checklist Item Passed Comments 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Pressure Test NO Water Supply Piping NO 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. Air Head NO 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Apr 02, 2019 Page (6) INSPECTION WORKSHEET (RPLUM-001734-2019) Checklist Item Passed Comments Duct Insulation - if required in unheated spaces NO Duct Testing Outside Conditioned Space NO Duct work sealed properly NO 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. Apr 02, 2019 Page (7) O'Brien, John (Inspector) INSPECTION WORKSHEET (FIST-001733-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Mon Apr 1, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Firestopping Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Architect Silvestri Architects, PC Applicant Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Primary Owner Exit 18 Development LLC Agent White, Richard Contractor Bette & Cring, LLC Engineer Hutchins Engineering Granted Permission Bette & Cring, LLC Checklist Item Passed Comments Apr 01, 2019 Page (1) INSPECTION WORKSHEET (FIST-001733-2019) Checklist Item Passed Comments Building Inspector Notes NO 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. 3/27/19 Firestopping Partial Approval - 2nd Floor Bathrooms - Plumbing chases firestopping approved 2nd Floor Bathrooms except for rooms 201, 203, & 207. 3/29/19 Firestopping Partial Approval- 2nd Floor only! -Plumbing chases at 201, 203 and 207 approved -Partial approval of dead space shaft at south side of main canopy. Firestop between 2nd& 3rd floor approved. Top of Shaft at Roof needs to be firestopped will recheck on Monday. 4/1/19 Firestopping & Draftstopping Partial Approval - 3rd floor only! - Draftstops between rooms & bathrooms - Firestopping at exterior walls, bathroom walls. room walls, tub traps and corridor walls. - Completed Firestopping the lid of the dead space shaft at the south side of the front canopy. Remaining Items: - Floor and Ceiling Firestops for HVAC rated shafts. - Draftstops In floor above plumbing chases at room divider walls. Fire separation 1, 2, 3 hour NO Fire wall 2, 3, 4 hour NO Fireproofing NO Apr 01, 2019 Page (2) INSPECTION WORKSHEET (FIST-001733-2019) Checklist Item Passed Comments Firestopping NO 3/12/19 Complete sealing all penetrations between rooms in draft stops on all floors 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. 3/27/19 Firestopping Partial Approval - 2nd Floor Bathrooms - Plumbing chases firestopping approved 2nd Floor Bathrooms except for rooms 201, 203, & 207. 3/29/19 Firestopping Partial Approval- 2nd Floor only! -Plumbing chases at 201, 203 and 207 and chase behind elevator approved. -Partial approval of dead space shaft at south side of main canopy. Firestop between 2nd& 3rd floor approved. Top of Shaft at Roof needs to be firestopped will recheck on Monday. 4/1/19 Firestopping & Draftstopping Partial Approval - 3rd floor only! - Draftstops between rooms & bathrooms - Firestopping at exterior walls, bathroom walls. room walls, tub traps and corridor walls. - Completed Firestopping the lid of the dead space shaft at the south side of the front canopy. Remaining Items: - Floor and Ceiling Firestops for HVAC rated shafts. - Draftstops In floor above plumbing chases at room divider walls. Draft stopping 1,000 sq. ft. floor trusses NO 4/1/19 Firestopping & Draftstopping Partial Approval - 3rd floor only! - Draftstops between rooms & bathrooms - Firestopping at exterior walls, bathroom walls. room walls, tub traps and corridor walls. - Completed Firestopping the lid of the dead space shaft at the south side of the front canopy. Remaining Items: - Floor and Ceiling Firestops for HVAC rated shafts. - Draftstops In floor above plumbing chases at room divider walls. Penetration sealed NO Apr 01, 2019 Page (3) INSPECTION WORKSHEET (FIST-001733-2019) Checklist Item Passed Comments 16 inch insulation in cavity min.NO Garage Fire Separation NO House side ½ inch or 58 inch Type X NO Garage side 5/8 inch Type X NO Ceilingwall NO Apr 01, 2019 Page (4) O'Brien, John (Inspector) INSPECTION WORKSHEET (FIST-001669-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 29, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Firestopping Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Primary Owner Ed & Ed T Enterprises, LLC Primary Owner Exit 18 Development LLC Architect Silvestri Architects, PC Applicant Bette & Cring, LLC Engineer Hutchins Engineering Contractor Bette & Cring, LLC Granted Permission Bette & Cring, LLC Agent White, Richard Checklist Item Passed Comments Building Inspector Notes NO 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. 3/27/19 Firestopping Partial Approval - 2nd Floor Bathrooms - Plumbing chases firestopping approved 2nd Floor Bathrooms except for rooms 201, 203, & 207. 3/29/19 Firestopping Partial Approval- 2nd Floor only! -Plumbing chases at 201, 203 and 207 approved -Partial approval of dead space shaft at south side of main canopy. Firestop between 2nd& 3rd floor approved. Top of Shaft at Roof needs to be firestopped will recheck on Monday. Mar 29, 2019 Page (1) INSPECTION WORKSHEET (FIST-001669-2019) Checklist Item Passed Comments Fire separation 1, 2, 3 hour NO Fire wall 2, 3, 4 hour NO Fireproofing NO Firestopping NO 3/12/19 Complete sealing all penetrations between rooms in draft stops on all floors 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. 3/27/19 Firestopping Partial Approval - 2nd Floor Bathrooms - Plumbing chases firestopping approved 2nd Floor Bathrooms except for rooms 201, 203, & 207. 3/29/19 Firestopping Partial Approval- 2nd Floor only! -Plumbing chases at 201, 203 and 207 and chase behind elevator approved. -Partial approval of dead space shaft at south side of main canopy. Firestop between 2nd& 3rd floor approved. Top of Shaft at Roof needs to be firestopped will recheck on Monday. Penetration sealed NO 16 inch insulation in cavity min.NO Garage Fire Separation NO House side ½ inch or 58 inch Type X NO Garage side 5/8 inch Type X NO Ceilingwall NO Mar 29, 2019 Page (2) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001670-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 29, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Primary Owner Exit 18 Development LLC Applicant Bette & Cring, LLC Architect Silvestri Architects, PC Primary Owner Ed & Ed T Enterprises, LLC Granted Permission Bette & Cring, LLC Contractor Bette & Cring, LLC Agent White, Richard Engineer Hutchins Engineering Checklist Item Passed Comments Mar 29, 2019 Page (1) INSPECTION WORKSHEET (BINS-001670-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor return Ductwork at south end corridor. 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Mar 29, 2019 Page (2) INSPECTION WORKSHEET (BINS-001670-2019) Checklist Item Passed Comments Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO 3/22/19 Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. 3/29/19 Insulation Partial Approval - 2nd Floor window sealing with sprayfoam approved. - Sound vinyl between rooms approved south wing 2nd floor. Tub Shower R-20 with Vapor Barrier NO Air Barrier behind Knee Walls NO Mar 29, 2019 Page (3) INSPECTION WORKSHEET (BINS-001670-2019) Checklist Item Passed Comments All Ductwork Sealed Return and Supply NO 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor except return ductwork at south end corridor. Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Mar 29, 2019 Page (4) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001531-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 22, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Primary Owner Exit 18 Development LLC Architect Silvestri Architects, PC Agent White, Richard Engineer Hutchins Engineering Applicant Bette & Cring, LLC Granted Permission Bette & Cring, LLC Contractor Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Checklist Item Passed Comments Mar 22, 2019 Page (1) INSPECTION WORKSHEET (BINS-001531-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor return Ductwork at south end corridor. 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Mar 22, 2019 Page (2) INSPECTION WORKSHEET (BINS-001531-2019) Checklist Item Passed Comments Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/22/19 Insulation Partial Approval-2nd Floor South Wing - 3 1/2" Sound batts in ceilings of rooms except bathrooms. - R19 fiberglass insulation and poly vapor barrier exterior walls. Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO 3/22/19 Note: Remove fiberglass insulation at perimeter of windows and install window and door spray foam. Tub Shower R-20 with Vapor Barrier NO Air Barrier behind Knee Walls NO All Ductwork Sealed Return and Supply NO 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor except return ductwork at south end corridor. Mar 22, 2019 Page (3) INSPECTION WORKSHEET (BINS-001531-2019) Checklist Item Passed Comments Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Mar 22, 2019 Page (4) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001565-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 22, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Contractor Bette & Cring, LLC Granted Permission Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Engineer Hutchins Engineering Primary Owner Exit 18 Development LLC Agent White, Richard Applicant Bette & Cring, LLC Architect Silvestri Architects, PC Checklist Item Passed Comments Mar 22, 2019 Page (1) INSPECTION WORKSHEET (BINS-001565-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. 2/15/19 Framing for first and second floor main hall ceiling approved. Third floor main hall ceiling not approved, it is still missing joist hangers.sound proofing insulation must be verified before sheet rock is installed. 3/22/19 Framing Partial Approval - 2nd Floor Only! Note: Received Dan Ryan's Structural Inspection Report for floors 1,2 & 3 (Special Inspection). I will perform my final framing inspections on the 1st & 3rd floor next week. Framing NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. 2/15/19 first and second floor main hall ceiling only approved. Third floor is missing joist hangers. Sound proofing insulation must be verified before Sheetrock is installed. 3/22/19 Framing Partial Approval - 2nd Floor Only! Note: Received Dan Ryan's Structural Inspection Report for floors 1,2 & 3 (Special Inspection). I will perform my final framing inspections on the 1st & 3rd floor next week. Bracing Bridging NO Hurricane Clips/Uplift Screws/Nail Holes Filled NO Joist hangers NO Mar 22, 2019 Page (2) INSPECTION WORKSHEET (BINS-001565-2019) Checklist Item Passed Comments Jack Posts Main Beams NO Headroom 6 ft. 8 in.NO Notches Holes Bearing Walls NO Metal Strapping for Notches Top Plate NO Draft stopping 1,000 sq. ft. floor trusses NO 2nd floor only completed. Anchor Bolts 6 ft. or less on center NO Design Professional Sign-off, if required YES 3/22/19 Note: Received Dan Ryan's Structural Inspection Report for floors 1,2 & 3 (Special Inspection). I will perform my final framing inspections on the 1st & 3rd floor next week. Mar 22, 2019 Page (3) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001567-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 22, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Contractor Bette & Cring, LLC Granted Permission Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Engineer Hutchins Engineering Primary Owner Exit 18 Development LLC Agent White, Richard Applicant Bette & Cring, LLC Architect Silvestri Architects, PC Checklist Item Passed Comments Mar 22, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001567-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases 3/22/19 Plumbing Partial Approval - 2nd Floor Only! - Nail Plates Approved Plumbing Under Slab YES 11/2/18. Underslab for north half of building Mar 22, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001567-2019) Checklist Item Passed Comments Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. 3/22/19 Plumbing Partial Approval - 2nd Floor Only! - Nail Plates Approved Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Washing Machine Trap: 18"-24" discharge NO Cleanout every 100 feet change of direction NO Mar 22, 2019 Page (3) INSPECTION WORKSHEET (RPLUM-001567-2019) Checklist Item Passed Comments Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Drain Vent YES 11/2/18 north half of building water head test ok Mar 22, 2019 Page (4) INSPECTION WORKSHEET (RPLUM-001567-2019) Checklist Item Passed Comments Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Mar 22, 2019 Page (5) INSPECTION WORKSHEET (RPLUM-001567-2019) Checklist Item Passed Comments 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Pressure Test NO Water Supply Piping NO Air Head NO 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Duct Insulation - if required in unheated spaces NO Mar 22, 2019 Page (6) INSPECTION WORKSHEET (RPLUM-001567-2019) Checklist Item Passed Comments Duct Testing Outside Conditioned Space NO Duct work sealed properly NO 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases Mar 22, 2019 Page (7) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001582-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Mon Mar 25, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Contractor Bette & Cring, LLC Granted Permission Bette & Cring, LLC Agent White, Richard Applicant Bette & Cring, LLC Primary Owner Exit 18 Development LLC Engineer Hutchins Engineering Primary Owner Ed & Ed T Enterprises, LLC Architect Silvestri Architects, PC Checklist Item Passed Comments Mar 25, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001582-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases 3/22/19 Plumbing Partial Approval - 2nd Floor Only! - Nail Plates Approved 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. Plumbing Under Slab YES 11/2/18. Underslab for north half of building Mar 25, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001582-2019) Checklist Item Passed Comments Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. 3/22/19 Plumbing Partial Approval - 2nd Floor Only! - Nail Plates Approved 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Washing Machine Trap: 18"-24" discharge NO Mar 25, 2019 Page (3) INSPECTION WORKSHEET (RPLUM-001582-2019) Checklist Item Passed Comments Cleanout every 100 feet change of direction NO Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Drain Vent YES 11/2/18 north half of building water head test ok Mar 25, 2019 Page (4) INSPECTION WORKSHEET (RPLUM-001582-2019) Checklist Item Passed Comments Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Mar 25, 2019 Page (5) INSPECTION WORKSHEET (RPLUM-001582-2019) Checklist Item Passed Comments 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Pressure Test NO Water Supply Piping NO 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. Air Head NO 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Mar 25, 2019 Page (6) INSPECTION WORKSHEET (RPLUM-001582-2019) Checklist Item Passed Comments Duct Insulation - if required in unheated spaces NO Duct Testing Outside Conditioned Space NO Duct work sealed properly NO 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases 3/25/19 Plumbing Partial Approval - Pressure Test Approved waterlines in rooms for 1st, 2nd, and 3rd Floor. 80 PSI ! - Seal Ductwork Partial Approval north and south wings of 1st floor. Mar 25, 2019 Page (7) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001611-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Mon Mar 25, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Contractor Bette & Cring, LLC Granted Permission Bette & Cring, LLC Agent White, Richard Applicant Bette & Cring, LLC Primary Owner Exit 18 Development LLC Engineer Hutchins Engineering Primary Owner Ed & Ed T Enterprises, LLC Architect Silvestri Architects, PC Checklist Item Passed Comments Mar 25, 2019 Page (1) INSPECTION WORKSHEET (BINS-001611-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. 2/15/19 Framing for first and second floor main hall ceiling approved. Third floor main hall ceiling not approved, it is still missing joist hangers.sound proofing insulation must be verified before sheet rock is installed. 3/15/19 Draftstopping Partial Approval-2nd Floor Rooms only! -Draftstopping in rooms of 2nd floor Approved except for bathrooms. 3/25/19 Framing Inspection Partial Approval - Framing Approved for 1st and 3rd floor rooms and corridors Framing NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. 2/15/19 first and second floor main hall ceiling only approved. Third floor is missing joist hangers. Sound proofing insulation must be verified before Sheetrock is installed. Air Seal all Plates and Sills NO Air Seal All Registers at Floor NO Air Sealing all Joints Before Insulation NO Mar 25, 2019 Page (2) INSPECTION WORKSHEET (BINS-001611-2019) Checklist Item Passed Comments Notches Holes Bearing Walls NO Metal Strapping for Notches Top Plate NO Draft stopping 1,000 sq. ft. floor trusses NO 3/15/19 Draftstopping Partial Approval-2nd Floor Rooms only! -Draftstopping in rooms of 2nd floor Approved except for bathrooms. Design Professional Sign-off, if required NO Mar 25, 2019 Page (3) O'Brien, John (Inspector) INSPECTION WORKSHEET (FIST-001566-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Wed Mar 27, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Firestopping Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Engineer Hutchins Engineering Contractor Bette & Cring, LLC Applicant Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Granted Permission Bette & Cring, LLC Architect Silvestri Architects, PC Agent White, Richard Primary Owner Exit 18 Development LLC Checklist Item Passed Comments Building Inspector Notes NO 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. 3/27/19 Firestopping Partial Approval - 2nd Floor Bathrooms - Plumbing chases firestopping approved 2nd Floor Bathrooms except for rooms 201, 203, & 207. Fire separation 1, 2, 3 hour NO Mar 27, 2019 Page (1) INSPECTION WORKSHEET (FIST-001566-2019) Checklist Item Passed Comments Fire wall 2, 3, 4 hour NO Fireproofing NO Firestopping NO 3/12/19 Complete sealing all penetrations between rooms in draft stops on all floors 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. 3/27/19 Firestopping Partial Approval - 2nd Floor Bathrooms - Plumbing chases firestopping approved 2nd Floor Bathrooms except for rooms 201, 203, & 207. Penetration sealed NO 16 inch insulation in cavity min.NO Garage Fire Separation NO House side ½ inch or 58 inch Type X NO Garage side 5/8 inch Type X NO Ceilingwall NO Mar 27, 2019 Page (2) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001475-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 15, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Contractor Bette & Cring, LLC Architect Silvestri Architects, PC Primary Owner Exit 18 Development LLC Agent White, Richard Granted Permission Bette & Cring, LLC Engineer Hutchins Engineering Primary Owner Ed & Ed T Enterprises, LLC Applicant Bette & Cring, LLC Checklist Item Passed Comments Mar 15, 2019 Page (1) INSPECTION WORKSHEET (BINS-001475-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. 2/15/19 Framing for first and second floor main hall ceiling approved. Third floor main hall ceiling not approved, it is still missing joist hangers.sound proofing insulation must be verified before sheet rock is installed. 3/15/19 Draftstopping Partial Approval-2nd Floor Rooms only! -Draftstopping in rooms of 2nd floor Approved except for bathrooms. Framing NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. 2/15/19 first and second floor main hall ceiling only approved. Third floor is missing joist hangers. Sound proofing insulation must be verified before Sheetrock is installed. Truss Specification Provided NO Bracing Bridging NO Hurricane Clips/Uplift Screws/Nail Holes Filled NO Air Seal all Plates and Sills NO Mar 15, 2019 Page (2) INSPECTION WORKSHEET (BINS-001475-2019) Checklist Item Passed Comments Air Seal All Registers at Floor NO Air Sealing all Joints Before Insulation NO Joist hangers NO Jack Posts Main Beams NO Exterior sheeting nailed properly NO 12 O.C.NO Headroom 6 ft. 8 in.NO Notches Holes Bearing Walls NO Metal Strapping for Notches Top Plate NO Draft stopping 1,000 sq. ft. floor trusses NO 3/15/19 Draftstopping Partial Approval-2nd Floor Rooms only! -Draftstopping in rooms of 2nd floor Approved except for bathrooms. Anchor Bolts 6 ft. or less on center NO Ice and water shield 24 inches from wall NO Soffits-Insulation Baffel NO Windows Habitable Space Bedrooms NO 24 in. (H)NO Mar 15, 2019 Page (3) INSPECTION WORKSHEET (BINS-001475-2019) Checklist Item Passed Comments 20 in. (W)NO 5.7 sf above below grade NO 5.0 sf grade NO Design Professional Sign-off, if required NO Mar 15, 2019 Page (4) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001448-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 15, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Agent White, Richard Primary Owner Exit 18 Development LLC Primary Owner Ed & Ed T Enterprises, LLC Contractor Bette & Cring, LLC Architect Silvestri Architects, PC Engineer Hutchins Engineering Granted Permission Bette & Cring, LLC Applicant Bette & Cring, LLC Checklist Item Passed Comments Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval Mar 15, 2019 Page (1) INSPECTION WORKSHEET (BINS-001448-2019) Checklist Item Passed Comments - 3rd Floor Corridor return Ductwork at south end corridor. Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO Air Barrier behind Knee Walls NO Tub Shower R-20 with Vapor Barrier NO Mar 15, 2019 Page (2) INSPECTION WORKSHEET (BINS-001448-2019) Checklist Item Passed Comments All Ductwork Sealed Return and Supply NO 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! 3/15/19 Ductwork Sealing Partial Approval - 3rd Floor Corridor except return ductwork at south end corridor. Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Mar 15, 2019 Page (3) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001500-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Wed Mar 20, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Agent White, Richard Engineer Hutchins Engineering Architect Silvestri Architects, PC Contractor Bette & Cring, LLC Applicant Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Primary Owner Exit 18 Development LLC Granted Permission Bette & Cring, LLC Checklist Item Passed Comments Mar 20, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001500-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases Plumbing Under Slab YES 11/2/18. Underslab for north half of building Mar 20, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001500-2019) Checklist Item Passed Comments Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Washing Machine Trap: 18"-24" discharge NO Cleanout every 100 feet change of direction NO Mar 20, 2019 Page (3) INSPECTION WORKSHEET (RPLUM-001500-2019) Checklist Item Passed Comments Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Drain Vent YES 11/2/18 north half of building water head test ok Mar 20, 2019 Page (4) INSPECTION WORKSHEET (RPLUM-001500-2019) Checklist Item Passed Comments Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Mar 20, 2019 Page (5) INSPECTION WORKSHEET (RPLUM-001500-2019) Checklist Item Passed Comments 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Pressure Test NO Water Supply Piping NO Air Head NO 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Duct Insulation - if required in unheated spaces NO Mar 20, 2019 Page (6) INSPECTION WORKSHEET (RPLUM-001500-2019) Checklist Item Passed Comments Duct Testing Outside Conditioned Space NO Duct work sealed properly NO 3/19/19 Sealed Ductwork Partial Approval - 2nd Floor Mechanical Chases Mar 20, 2019 Page (7) O'Brien, John (Inspector) INSPECTION WORKSHEET (FIST-001519-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Wed Mar 20, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Firestopping Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-86.11 Contact Type Company Name Name Agent White, Richard Engineer Hutchins Engineering Architect Silvestri Architects, PC Contractor Bette & Cring, LLC Applicant Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Primary Owner Exit 18 Development LLC Granted Permission Bette & Cring, LLC Checklist Item Passed Comments Building Inspector Notes NO 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. Fire separation 1, 2, 3 hour NO Fire wall 2, 3, 4 hour NO Fireproofing NO Mar 20, 2019 Page (1) INSPECTION WORKSHEET (FIST-001519-2019) Checklist Item Passed Comments Firestopping NO 3/12/19 Complete sealing all penetrations between rooms in draft stops on all floors 3/19/19 Firestopping Partial Approval - 2nd Floor Walls Approved except plumbing chases common with corridor walls & gaps at top plates of double walls at bathrooms and mechanical rooms. Penetration sealed NO 16 inch insulation in cavity min.NO Garage Fire Separation NO House side ½ inch or 58 inch Type X NO Garage side 5/8 inch Type X NO Ceilingwall NO Mar 20, 2019 Page (2) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001320-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Wed Mar 6, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-89.1 Contact Type Company Name Name Granted Permission Bette & Cring, LLC Engineer Hutchins Engineering Primary Owner Ed & Ed T Enterprises, LLC Primary Owner Exit 18 Development LLC Architect Silvestri Architects, PC Contractor Bette & Cring, LLC Agent White, Richard Applicant Bette & Cring, LLC Checklist Item Passed Comments Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation Window Sealing NO Mar 06, 2019 Page (1) INSPECTION WORKSHEET (BINS-001320-2019) Checklist Item Passed Comments U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO Air Barrier behind Knee Walls NO Tub Shower R-20 with Vapor Barrier NO All Ductwork Sealed Return and Supply NO Duct Blaster Test for duct work, R-8 NO Mar 06, 2019 Page (2) INSPECTION WORKSHEET (BINS-001320-2019) Checklist Item Passed Comments All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Mar 06, 2019 Page (3) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-001360-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 8, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Building Insulation Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-89.1 Contact Type Company Name Name Agent White, Richard Granted Permission Bette & Cring, LLC Primary Owner Exit 18 Development LLC Contractor Bette & Cring, LLC Engineer Hutchins Engineering Architect Silvestri Architects, PC Primary Owner Ed & Ed T Enterprises, LLC Applicant Bette & Cring, LLC Checklist Item Passed Comments Building Inspector Notes NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! Mar 08, 2019 Page (1) INSPECTION WORKSHEET (BINS-001360-2019) Checklist Item Passed Comments Window Sealing NO U Factors = .3 cfm for windows, .5 cfm for doors NO Tyvek or Similar Exterior Sealant NO Proper Vent, Attic Vent NO Insulation Residential Check Commercial Check NO 2/19/19 Insulation Partial Approval- 3 1/2" Sound batts in corridor floors. - 1st Floor Corridor Ceiling North Wing only where 3 1/2" Sound Insulation is Installed before elevator. - 2nd Floor Corridor Ceiling at North & South Wings only where 3 1/2" Sound Insulation is installed. 3/6/19 Insulation Partial Approval - R38 fiberglass insulation 2nd floor overhangs. - 1st floor elevator foyer ceiling 3 1/2" fiberglass sound batt insulation Blower Door Test NO Combustion Air Supply for Furnace NO Fresh air supply 3' from grade NO Duct Insulation - if required in unheated spaces NO Door / Window Sealed (No Insulation)NO Tub Shower R-20 with Vapor Barrier NO Air Barrier behind Knee Walls NO Mar 08, 2019 Page (2) INSPECTION WORKSHEET (BINS-001360-2019) Checklist Item Passed Comments All Ductwork Sealed Return and Supply NO 3/8/19 Ductwork Sealing Partial Approval - 2nd Floor Corridor Only! Duct Blaster Test for duct work, R-8 NO All Return Air Hard Duct Work NO House Wrap Taped at all Seams NO Mar 08, 2019 Page (3) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001177-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Wed Feb 27, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-89.1 Contact Type Company Name Name Engineer Hutchins Engineering Primary Owner Ed & Ed T Enterprises, LLC Agent White, Richard Contractor Bette & Cring, LLC Architect Silvestri Architects, PC Primary Owner Exit 18 Development LLC Applicant Bette & Cring, LLC Granted Permission Bette & Cring, LLC Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved Plumbing Under Slab YES 11/2/18. Underslab for north half of building Feb 27, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001177-2019) Checklist Item Passed Comments Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Washing Machine Trap: 18"-24" discharge NO Cleanout every 100 feet change of direction NO Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved Drain Vent YES 11/2/18 north half of building water head test ok Feb 27, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001177-2019) Checklist Item Passed Comments Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved Pressure Test NO Water Supply Piping NO Air Head NO 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Duct Insulation - if required in unheated spaces NO Duct Testing Outside Conditioned Space NO Duct work sealed properly NO Feb 27, 2019 Page (3) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001202-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Thu Feb 28, 2019 Inspection Status:Passed Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-89.1 Contact Type Company Name Name Engineer Hutchins Engineering Contractor Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Granted Permission Bette & Cring, LLC Agent White, Richard Applicant Bette & Cring, LLC Primary Owner Exit 18 Development LLC Architect Silvestri Architects, PC Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. Feb 28, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001202-2019) Checklist Item Passed Comments Plumbing Under Slab YES 11/2/18. Underslab for north half of building Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Washing Machine Trap: 18"-24" discharge NO Cleanout every 100 feet change of direction NO Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. Feb 28, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001202-2019) Checklist Item Passed Comments Drain Vent YES 11/2/18 north half of building water head test ok Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. Pressure Test NO Water Supply Piping NO Air Head NO 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Feb 28, 2019 Page (3) INSPECTION WORKSHEET (RPLUM-001202-2019) Checklist Item Passed Comments Duct Insulation - if required in unheated spaces NO Duct Testing Outside Conditioned Space NO Duct work sealed properly NO Feb 28, 2019 Page (4) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001223-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Fri Mar 1, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-89.1 Contact Type Company Name Name Contractor Bette & Cring, LLC Agent White, Richard Architect Silvestri Architects, PC Granted Permission Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Primary Owner Exit 18 Development LLC Engineer Hutchins Engineering Applicant Bette & Cring, LLC Checklist Item Passed Comments Mar 01, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001223-2019) Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Plumbing Under Slab YES 11/2/18. Underslab for north half of building Mar 01, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001223-2019) Checklist Item Passed Comments Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Washing Machine Trap: 18"-24" discharge NO Cleanout every 100 feet change of direction NO Mar 01, 2019 Page (3) INSPECTION WORKSHEET (RPLUM-001223-2019) Checklist Item Passed Comments Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Drain Vent YES 11/2/18 north half of building water head test ok Mar 01, 2019 Page (4) INSPECTION WORKSHEET (RPLUM-001223-2019) Checklist Item Passed Comments Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Mar 01, 2019 Page (5) INSPECTION WORKSHEET (RPLUM-001223-2019) Checklist Item Passed Comments 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 2/27/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 218-230, 232 & 318-330, 332 Approved 2/28/19 Plumbing Partial Approval - Sanitary Pressure Test for Rooms 210-217 & 310-317 Approved. 3/1/19 Plumbing Partial Approval Sanitary Pressure Tests for Rooms 101-109, 201-209, & 301-309 Remaining Items: -Vent stacks thru roof will need pressure tests. -Bathtubs will need a water flow test -Pressure Test for domestic water supplies. -Pressure Test Storm & Overflow Drains -Pressure Test Gas Lines -Recheck all plumbing for stud guards, pipe hangers and correct pitch of pipe. -Inspect pipe insulation. Pressure Test NO Water Supply Piping NO Air Head NO 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Duct Insulation - if required in unheated spaces NO Mar 01, 2019 Page (6) INSPECTION WORKSHEET (RPLUM-001223-2019) Checklist Item Passed Comments Duct Testing Outside Conditioned Space NO Duct work sealed properly NO Mar 01, 2019 Page (7) O'Brien, John (Inspector) INSPECTION WORKSHEET (RPLUM-001158-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Tue Feb 26, 2019 Inspection Status:Partial Pass Inspector:John O'Brien Inspection Type:Rough Plumbing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-89.1 Contact Type Company Name Name Primary Owner Exit 18 Development LLC Architect Silvestri Architects, PC Applicant Bette & Cring, LLC Contractor Bette & Cring, LLC Engineer Hutchins Engineering Granted Permission Bette & Cring, LLC Agent White, Richard Primary Owner Ed & Ed T Enterprises, LLC Checklist Item Passed Comments Building Inspector Notes NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved Plumbing Under Slab YES 11/2/18. Underslab for north half of building Rough Plumbing / Nail Plates NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved Feb 26, 2019 Page (1) INSPECTION WORKSHEET (RPLUM-001158-2019) Checklist Item Passed Comments Plumbing Vent Vents in Place NO 3" Vent Through Roof NO 1 ½ inch minimum Drain Size NO Washing Machine Drain 2 inch minimum NO Washing Machine Trap: 18"-24" discharge NO Cleanout every 100 feet change of direction NO Pressure Test NO 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved Drain Vent YES 11/2/18 north half of building water head test ok Air Head NO Air Test 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved 5 psi or 10 ft. above highest conn. for 15 minutes NO 5 PSI 2/26/19 Plumbing Partial Approval-Pressure Test Only! - Sanitary pressure test for rooms 112-115, 228-232, & 328-332 Approved Pressure Test NO Water Supply Piping NO Air Head NO Feb 26, 2019 Page (2) INSPECTION WORKSHEET (RPLUM-001158-2019) Checklist Item Passed Comments 50 P.S.I for 15 minutes NO Air Test Gas Piping 10 psi for 10 Minutes NO All Return Air Hard Duct Work NO Duct Insulation - if required in unheated spaces NO Duct Testing Outside Conditioned Space NO Duct work sealed properly NO Feb 26, 2019 Page (3) O'Brien, John (Inspector) INSPECTION WORKSHEET (BINS-000859-2019) Town of Queensbury - Building and Codes - Fire Marshal 742 Bay Road - (518) 761-8256 Building (518) 761-8206 Fire Marshal Case Number:CC-000181-2017 Case Module:Permit Inspection Date:Mon Feb 11, 2019 Inspection Status:Failed Inspector:John O'Brien Inspection Type:Building Framing Job Address:Parcel Number:21 Big Boom RD Queensbury, NY 12804 309.14-1-89.1 Contact Type Company Name Name Primary Owner Exit 18 Development LLC Architect Silvestri Architects, PC Engineer Hutchins Engineering Applicant Bette & Cring, LLC Agent White, Richard Granted Permission Bette & Cring, LLC Primary Owner Ed & Ed T Enterprises, LLC Contractor Bette & Cring, LLC Checklist Item Passed Comments Building Inspector Notes NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. Feb 11, 2019 Page (1) INSPECTION WORKSHEET (BINS-000859-2019) Checklist Item Passed Comments Framing NO 2/11/19 Framing Not Approved - Preliminary Framing - Provide Dan Ryan's Inspection Report for the first floor framing inspection for walls and ceiling. - Provide floor and roof truss diagrams for framing inspections. - Engineer's approval on fastening of interior walls, corridor walls, and shear walls. Framer has used power actuated nails at all locations which is different from the approved plans. I spoke with Dan Ryan the engineer today while on site performing my inspection. Truss Specification Provided NO Bracing Bridging NO Hurricane Clips/Uplift Screws/Nail Holes Filled NO Air Seal all Plates and Sills NO Air Seal All Registers at Floor NO Air Sealing all Joints Before Insulation NO Joist hangers NO Jack Posts Main Beams NO Exterior sheeting nailed properly NO 12 O.C.NO Headroom 6 ft. 8 in.NO Notches Holes Bearing Walls NO Feb 11, 2019 Page (2) INSPECTION WORKSHEET (BINS-000859-2019) Checklist Item Passed Comments Metal Strapping for Notches Top Plate NO Draft stopping 1,000 sq. ft. floor trusses NO Anchor Bolts 6 ft. or less on center NO Ice and water shield 24 inches from wall NO Soffits-Insulation Baffel NO Windows Habitable Space Bedrooms NO 24 in. (H)NO 20 in. (W)NO 5.7 sf above below grade NO 5.0 sf grade NO Design Professional Sign-off, if required NO Feb 11, 2019 Page (3) O'Brien, John (Inspector)